SlideShare a Scribd company logo
1 of 5
Download to read offline
ABB
1
Mohamed Ahmed Zeyada
1-A Syndicates Buildings, End of Moustafa El-Nahhas St., Nasr City, Cairo, Egypt.
(+2)0109159409, m.zeyada@yahoo.com
Education:
B.Sc. Electrical Engineering (Power & M/Cs. Dept.), Ain Shams University, July-2003.
Graduation Project: Power System Planning for a Newly Developed Area.
General Grade: Good. Graduation Project Grade: Excellent.
Experiences:
ABB Power Systems & Automation Technologies, S.A.E.
(May 2005 - Present)
Field Of Experience:
Lead Electrical Engineer, had been worked in the following jobs:
Job Title: Project Manager
Main Accountabilities and Duties:
· Plan and schedule project timelines using MS project.
· Ensure that all project activities are developed and executed in accordance with
company procedures, contract specifications / technical requirements, quality
standards, OHS requirements, cost/profitability targets, scheduling targets and
code of conduct.
· Cooperate with supply management in supplier selection and monitoring ongoing
performance.
· Ensure that all functions (engineering/construction/commissioning/supply chain)
assign the appropriate resources and competencies for the specific discipline.
:Main Reference Projects
· Upgrade of refrigerators feeding line for Alexandria container &
Cargo Handling Co. - Alex. Terminal (282 KUSD): Turnkey project,
scope of supply includes complete electrification package for no.2 shelters
of type power module enclosure with size (8X3X3.5) mt., each includes 2
MVA dry type distribution transformer, 3200 Amp low voltage switchboard,
interconnecting cupper bus duct in addition to no. 18 of “400 Amp low
voltage distribution panel boards”.
· Supply and install fire alarm system for ABB Low Voltage Factory
(182 KUSD): Turnkey project, scope of work includes design, supply,
installation and commissioning for a complete intelligent addressable fire
alarm system (Brand : Notifier) including fire alarm control panel complete
with all accessories, manual and automatic detectors and complete fire
alarm network including raceways, accessories and fire alarm cables.
Both projects had been developed and executed successfully according to
contractual specifications, cost effectively, with customer satisfaction and
committed to OHS policy.
ABB
2
Job Title: Project Engineering Leader
Main Accountabilities and Duties:
· Ensure that the engineering activities are efficiently and cost-effectively executed
in accordance with contract specifications, quality standards, and safety
requirements.
· Technically support the sales team during the tender phase, defining scope of
work and other relevant details related to E&I construction package engineering.
· Technically evaluate proposals received from external vendors.
· Develop materials technical specifications, scope of work, cable schedules,
layout drawings for cable routing and detailed bill of materials related to E&I
installation works.
· Supervise the grant of engineering subcontracts related to E&I installation works
(technical specification, technical evaluation, etc.), manages the engineering
subcontractor jointly with other involved disciplines and define engineering
deliverables’ schedule & quality.
· Support the construction team/subcontractor during erection activities, clarifying
or providing solutions to repair engineering errors and supports (if required) the
commissioning & startup team.
· Solve problems that appear during engineering development, support the project
manager in issuing claims (new scope of work, cost impact, time impact, etc.).
· Serves as the point of contact for the customer in terms of the engineering of E&I
construction package.
:Main Reference Projects
· AZFC Unit#6 upgrade project – sulfuric plant (11.750 MEGP): Turnkey
project including design, supply, installation and commissioning works for
a complete DCS control system, E&I package.
· AZFC 3rd
concentration line project – phosphoric plant (2.000 MEGP):
Turnkey project including design, supply, installation and commissioning
works for a complete DCS control system, E&I package.
· Control system upgrade for power house pumps 1 & 2 - Petrobel
Belayem, Fieran Plant: Design, supply, installation and commissioning
works for a complete package of instrumentation and DCS control system.
· Alamain shipping & booster pumps upgrade project, El-Hamra Plant,
KPC: Design, installation and commissioning works for a complete E&I
package.
· Meliha wells telemetry system at Western Desert, Agieba Petroleum
Co.: Implement a monitoring and automation service to Meliha well heads
including design, supply, installation and commissioning works for a
complete SCADA, telecom network and instrumentation package.
ABB
3
· Engineering Services for XCCP Plant at Arab Potash Company (APC)
Ltd. - (Jordan): A complete engineering works of instrumentation & DCS
including complete documentation package for instruments bulk materials.
· Long Term Solution Project - WEPCO (Abu Qir Plant - Alexandria): A
complete engineering works of instrumentation & DCS including complete
documentation package for instruments bulk materials.
Job Title: Site Construction Leader
Main Accountabilities and Duties:
· Supervise site construction planning and efficient execution by coordinating work
activities among multiple parties.
· Ensure that the site construction activities are efficiently and cost-effectively
executed in accordance with contract specifications, quality standards, and safety
requirements.
· Proactively promote OHS considerations to project partners throughout the
project.
· Coordinate schedules so that resources and materials are available to promote
efficient construction, identifies problem areas and determine corrective actions in
order to optimize the project performance.
· Coordinate and provide guidance, support and assistance to the internal and
external resources to ensure appropriate commitment to contract, project plan
and OHS guidelines.
· Coordinate construction efforts with project manager, procurement manager, and
OHS safety manager as well as customer representatives.
Main Reference Projects:
· AZFC Unit#6 upgrade project – sulfuric plant (11.750 MEGP): Turnkey
project including design, supply, installation and commissioning works for
a complete DCS control system, E&I package.
· AZFC 3rd
concentration line project – phosphoric plant (2.000 MEGP):
Turnkey project including design, supply, installation and commissioning
works for a complete DCS control system, E&I package.
· Control system upgrade for power house pumps 1 & 2 - Petrobel
Belayem, Fieran Plant: Design, supply, installation and commissioning
works for a complete package of instrumentation and DCS control system.
· Alamain shipping & booster pumps upgrade project, El-Hamra Plant,
KPC: Design, installation and commissioning works for a complete E&I
package.
· Meliha wells telemetry system at Western Desert, Agieba Petroleum
Co.: Implement a monitoring and automation service to Meliha well heads
including design, supply, installation and commissioning works for a
complete SCADA, telecom network and instrumentation package.
ABB
4
· Supply and install MCC-1 & 2 for the “Egyptian Co. for Refrigeration
by Natural Gas (Gas Cool)” Cooling Substation in ECHEM
administration building, 5th Settlement, New Cairo: Supply, installation
and commissioning works including MCCs, cables and cable trays.
· Supply and install MCC-4, 5 & 6 for the Egyptian Co. for Refrigeration
by Natural Gas (Gas Cool) Cooling Substation Smart Village, Cairo-
Alexandria road: Supply, installation and commissioning works including
MCCs, cables and cable trays.
· TAURT LNG Train1 Supply at Port Said District – GUPCO/BP -
Consultant (Enppi): Supply, installation and commissioning works for a
complete package of instrumentation & DCS Erection Works.
· Helwan Ammonia/Urea Fertilizing Project at Helwan - Helwan
Fertilizer Co. – Design & Build Contractor (Uhde): Installation and
commissioning works for a complete E&I package including cable trays &
ladders, cable laying & connections, lighting system, earthing & lightning
systems, low voltage & medium voltage switchgears.
· Revamping of Main Substation, T.V. Building - Radio & T.V. Union,
Cairo: Electrical installation works including LV switchgears, cable trays &
ladders, cable laying & connections and bus ducts.
ElMottaheda For Contracting & Technology Co.
(April 2004 - April 2005)
Field Of Experience: Technical Office Engineer, in the following projects:
I- Air mall (Sharm ElSheikh Airport):
Owner: Egyptian Airport Co. Consultant: Shaker Consultancy Group.
II- New Terminal Building in Sharm ElSheikh Airport:
Owner: Egyptian Airport Co. Consultant: Dar ElHandasa.
III- CINNABON Restaurants in (Mohandeseen, City Stars, Carrefour ”Alex.”):
Owner: ElMottaheda for Foods & Beverage. Consultant: Shaker Consultancy.
IV- Neema Heights Village (Hotel & Time Share Units):
Owner: Arab Real estates Co. Consultant: Mahmoud ElMoshneb Office.
V- Esplanada Mall (Hurghada) "Final Works":
Owner: Arab Real estates Co. Consultant: Mahmoud ElMoshneb Office.
Responsibilities:
· Tenders studying (prepare technical & financial offers).
· Prepare all procurements tasks.
· Prepare shop drawings using AutoCAD.
· Prepare and design single line diagrams for LV Distribution Panel Boards.
ABB
5
Training:
o Successfully completed all topics of ABB project management certification
program including (Project planning, analysis and control), (Project leadership,
management and communication), (Project management applications) and the
certification process is in progress (2012 – 2014)
o Successfully completed (problem solving and decision making - Oct. 2013).
o Successfully completed ABB Safety Training Courses (Ergonomics, Defensive
driving, Electrical safety, Project safety management).
o Successfully completed ABB Project Risk Management Program (Sep. 2010).
o Successfully completed report writing workshop by American Chamber (Dec.
2009).
o Successfully completed ABB Leadership Challenge Program (July 2009).
o Successfully completed ABB Information security Course (January 2009).
o Successfully completed 1st
Aid Program, (By Egyptian Red Crescent Authority)
o Successfully completed the requirements of ISO 9001:2008 Internal Auditing
Course, delivered by BSI Business Solutions Ltd.
o Successfully completed Occupational Safety & Health Administration (OSHA)
Training Course (Dec. 2007)
o New & Renewable Energy Authority, Cairo(July 2002):-
Successfully completed summer training in renewable energy field.
o Egyptian Electrical Cables Co.(July 2000 & July 2001):-
Successfully completed summer training in motors maintenance dept. (A.C. Motors,
D.C. Motors & M.V. Cables Factory).
Personal Abilities & Skills:
Þ Communication skills with others, ability of collective work with team to do the
best.
Þ Active team member advising and supporting all colleagues.
Þ Adherence with work ethics (veracity, honesty, cooperation, charity…).
Þ Personal leadership and result oriented.
Þ Functional sense, self restricting for internal problems & applying practical
solutions.
Þ Computer skills includes Microsoft Windows, Office, AutoCAD 2D, MS project.
Þ English language: very good spoken & written, Arabic is the mother tongue.
Personal Data:
§ Date of Birth: 22nd Sep. 1980.
§ Nationality: Egyptian.
§ Social Status: Married and have 2 sons.
§ Military Service: Exempted.
§ Passport: Valid.
§ Driving license: Available.

More Related Content

What's hot (20)

khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 
Ashraf Suleiman.
Ashraf Suleiman.Ashraf Suleiman.
Ashraf Suleiman.
 
shahid#2
shahid#2shahid#2
shahid#2
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
AHMAD MOHAMAD HAMZEH-CV-2015 (2)
AHMAD MOHAMAD HAMZEH-CV-2015 (2)AHMAD MOHAMAD HAMZEH-CV-2015 (2)
AHMAD MOHAMAD HAMZEH-CV-2015 (2)
 
Saw Qualification1
Saw Qualification1Saw Qualification1
Saw Qualification1
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
C&c construction group
C&c construction groupC&c construction group
C&c construction group
 
Irfan-Mohammad
Irfan-MohammadIrfan-Mohammad
Irfan-Mohammad
 
C&c construction group social media
C&c construction group social mediaC&c construction group social media
C&c construction group social media
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_New
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 

Viewers also liked

Filosofia - helenistica
Filosofia - helenistica Filosofia - helenistica
Filosofia - helenistica Samuel Araújo
 
Estatuto criança adolescente_comentado
Estatuto criança adolescente_comentadoEstatuto criança adolescente_comentado
Estatuto criança adolescente_comentadoAgassis Rodrigues
 
Sit 4 vol 2 o império de alexandre e a fusão cultural
Sit 4 vol 2 o império de alexandre e  a fusão culturalSit 4 vol 2 o império de alexandre e  a fusão cultural
Sit 4 vol 2 o império de alexandre e a fusão culturalAprendendoHistoriacomNemeis
 
02 marrou, henri-irénée. história da educação na antiguidade-. segunda part...
02   marrou, henri-irénée. história da educação na antiguidade-. segunda part...02   marrou, henri-irénée. história da educação na antiguidade-. segunda part...
02 marrou, henri-irénée. história da educação na antiguidade-. segunda part...omaratom
 
Escolas Helenísticas
Escolas HelenísticasEscolas Helenísticas
Escolas Helenísticasfiloscar
 
O Modelo Romano_Educação
O Modelo Romano_EducaçãoO Modelo Romano_Educação
O Modelo Romano_EducaçãoPedro Carvalho
 
Período helenístico
Período helenísticoPeríodo helenístico
Período helenísticoCariinna
 
Os fundamentos da filosofia gilberto cotrin
Os fundamentos da filosofia   gilberto cotrinOs fundamentos da filosofia   gilberto cotrin
Os fundamentos da filosofia gilberto cotrinandre barbosa
 
Helenismo
HelenismoHelenismo
Helenismo--- ---
 

Viewers also liked (14)

Filosofia - helenistica
Filosofia - helenistica Filosofia - helenistica
Filosofia - helenistica
 
Cap 4 - Filosofia Helenística
Cap 4 - Filosofia HelenísticaCap 4 - Filosofia Helenística
Cap 4 - Filosofia Helenística
 
Estatuto criança adolescente_comentado
Estatuto criança adolescente_comentadoEstatuto criança adolescente_comentado
Estatuto criança adolescente_comentado
 
Sit 4 vol 2 o império de alexandre e a fusão cultural
Sit 4 vol 2 o império de alexandre e  a fusão culturalSit 4 vol 2 o império de alexandre e  a fusão cultural
Sit 4 vol 2 o império de alexandre e a fusão cultural
 
02 marrou, henri-irénée. história da educação na antiguidade-. segunda part...
02   marrou, henri-irénée. história da educação na antiguidade-. segunda part...02   marrou, henri-irénée. história da educação na antiguidade-. segunda part...
02 marrou, henri-irénée. história da educação na antiguidade-. segunda part...
 
Cultura clássica
Cultura clássicaCultura clássica
Cultura clássica
 
Escolas Helenísticas
Escolas HelenísticasEscolas Helenísticas
Escolas Helenísticas
 
Cultura CláSica
Cultura CláSicaCultura CláSica
Cultura CláSica
 
O Modelo Romano_Educação
O Modelo Romano_EducaçãoO Modelo Romano_Educação
O Modelo Romano_Educação
 
Período helenístico
Período helenísticoPeríodo helenístico
Período helenístico
 
Helenismo
HelenismoHelenismo
Helenismo
 
Período helenístico
Período helenísticoPeríodo helenístico
Período helenístico
 
Os fundamentos da filosofia gilberto cotrin
Os fundamentos da filosofia   gilberto cotrinOs fundamentos da filosofia   gilberto cotrin
Os fundamentos da filosofia gilberto cotrin
 
Helenismo
HelenismoHelenismo
Helenismo
 

Similar to ABB Project Manager's Resume

Similar to ABB Project Manager's Resume (20)

ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
CV - Ammar Syed
CV - Ammar SyedCV - Ammar Syed
CV - Ammar Syed
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level Assignment
 
Alaa Mohamed CV
Alaa Mohamed CVAlaa Mohamed CV
Alaa Mohamed CV
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
MAraziR-1 (1)
MAraziR-1 (1)MAraziR-1 (1)
MAraziR-1 (1)
 
amr cv
amr cvamr cv
amr cv
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
Engr. sayed assawy
Engr. sayed assawyEngr. sayed assawy
Engr. sayed assawy
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
 

ABB Project Manager's Resume

  • 1. ABB 1 Mohamed Ahmed Zeyada 1-A Syndicates Buildings, End of Moustafa El-Nahhas St., Nasr City, Cairo, Egypt. (+2)0109159409, m.zeyada@yahoo.com Education: B.Sc. Electrical Engineering (Power & M/Cs. Dept.), Ain Shams University, July-2003. Graduation Project: Power System Planning for a Newly Developed Area. General Grade: Good. Graduation Project Grade: Excellent. Experiences: ABB Power Systems & Automation Technologies, S.A.E. (May 2005 - Present) Field Of Experience: Lead Electrical Engineer, had been worked in the following jobs: Job Title: Project Manager Main Accountabilities and Duties: · Plan and schedule project timelines using MS project. · Ensure that all project activities are developed and executed in accordance with company procedures, contract specifications / technical requirements, quality standards, OHS requirements, cost/profitability targets, scheduling targets and code of conduct. · Cooperate with supply management in supplier selection and monitoring ongoing performance. · Ensure that all functions (engineering/construction/commissioning/supply chain) assign the appropriate resources and competencies for the specific discipline. :Main Reference Projects · Upgrade of refrigerators feeding line for Alexandria container & Cargo Handling Co. - Alex. Terminal (282 KUSD): Turnkey project, scope of supply includes complete electrification package for no.2 shelters of type power module enclosure with size (8X3X3.5) mt., each includes 2 MVA dry type distribution transformer, 3200 Amp low voltage switchboard, interconnecting cupper bus duct in addition to no. 18 of “400 Amp low voltage distribution panel boards”. · Supply and install fire alarm system for ABB Low Voltage Factory (182 KUSD): Turnkey project, scope of work includes design, supply, installation and commissioning for a complete intelligent addressable fire alarm system (Brand : Notifier) including fire alarm control panel complete with all accessories, manual and automatic detectors and complete fire alarm network including raceways, accessories and fire alarm cables. Both projects had been developed and executed successfully according to contractual specifications, cost effectively, with customer satisfaction and committed to OHS policy.
  • 2. ABB 2 Job Title: Project Engineering Leader Main Accountabilities and Duties: · Ensure that the engineering activities are efficiently and cost-effectively executed in accordance with contract specifications, quality standards, and safety requirements. · Technically support the sales team during the tender phase, defining scope of work and other relevant details related to E&I construction package engineering. · Technically evaluate proposals received from external vendors. · Develop materials technical specifications, scope of work, cable schedules, layout drawings for cable routing and detailed bill of materials related to E&I installation works. · Supervise the grant of engineering subcontracts related to E&I installation works (technical specification, technical evaluation, etc.), manages the engineering subcontractor jointly with other involved disciplines and define engineering deliverables’ schedule & quality. · Support the construction team/subcontractor during erection activities, clarifying or providing solutions to repair engineering errors and supports (if required) the commissioning & startup team. · Solve problems that appear during engineering development, support the project manager in issuing claims (new scope of work, cost impact, time impact, etc.). · Serves as the point of contact for the customer in terms of the engineering of E&I construction package. :Main Reference Projects · AZFC Unit#6 upgrade project – sulfuric plant (11.750 MEGP): Turnkey project including design, supply, installation and commissioning works for a complete DCS control system, E&I package. · AZFC 3rd concentration line project – phosphoric plant (2.000 MEGP): Turnkey project including design, supply, installation and commissioning works for a complete DCS control system, E&I package. · Control system upgrade for power house pumps 1 & 2 - Petrobel Belayem, Fieran Plant: Design, supply, installation and commissioning works for a complete package of instrumentation and DCS control system. · Alamain shipping & booster pumps upgrade project, El-Hamra Plant, KPC: Design, installation and commissioning works for a complete E&I package. · Meliha wells telemetry system at Western Desert, Agieba Petroleum Co.: Implement a monitoring and automation service to Meliha well heads including design, supply, installation and commissioning works for a complete SCADA, telecom network and instrumentation package.
  • 3. ABB 3 · Engineering Services for XCCP Plant at Arab Potash Company (APC) Ltd. - (Jordan): A complete engineering works of instrumentation & DCS including complete documentation package for instruments bulk materials. · Long Term Solution Project - WEPCO (Abu Qir Plant - Alexandria): A complete engineering works of instrumentation & DCS including complete documentation package for instruments bulk materials. Job Title: Site Construction Leader Main Accountabilities and Duties: · Supervise site construction planning and efficient execution by coordinating work activities among multiple parties. · Ensure that the site construction activities are efficiently and cost-effectively executed in accordance with contract specifications, quality standards, and safety requirements. · Proactively promote OHS considerations to project partners throughout the project. · Coordinate schedules so that resources and materials are available to promote efficient construction, identifies problem areas and determine corrective actions in order to optimize the project performance. · Coordinate and provide guidance, support and assistance to the internal and external resources to ensure appropriate commitment to contract, project plan and OHS guidelines. · Coordinate construction efforts with project manager, procurement manager, and OHS safety manager as well as customer representatives. Main Reference Projects: · AZFC Unit#6 upgrade project – sulfuric plant (11.750 MEGP): Turnkey project including design, supply, installation and commissioning works for a complete DCS control system, E&I package. · AZFC 3rd concentration line project – phosphoric plant (2.000 MEGP): Turnkey project including design, supply, installation and commissioning works for a complete DCS control system, E&I package. · Control system upgrade for power house pumps 1 & 2 - Petrobel Belayem, Fieran Plant: Design, supply, installation and commissioning works for a complete package of instrumentation and DCS control system. · Alamain shipping & booster pumps upgrade project, El-Hamra Plant, KPC: Design, installation and commissioning works for a complete E&I package. · Meliha wells telemetry system at Western Desert, Agieba Petroleum Co.: Implement a monitoring and automation service to Meliha well heads including design, supply, installation and commissioning works for a complete SCADA, telecom network and instrumentation package.
  • 4. ABB 4 · Supply and install MCC-1 & 2 for the “Egyptian Co. for Refrigeration by Natural Gas (Gas Cool)” Cooling Substation in ECHEM administration building, 5th Settlement, New Cairo: Supply, installation and commissioning works including MCCs, cables and cable trays. · Supply and install MCC-4, 5 & 6 for the Egyptian Co. for Refrigeration by Natural Gas (Gas Cool) Cooling Substation Smart Village, Cairo- Alexandria road: Supply, installation and commissioning works including MCCs, cables and cable trays. · TAURT LNG Train1 Supply at Port Said District – GUPCO/BP - Consultant (Enppi): Supply, installation and commissioning works for a complete package of instrumentation & DCS Erection Works. · Helwan Ammonia/Urea Fertilizing Project at Helwan - Helwan Fertilizer Co. – Design & Build Contractor (Uhde): Installation and commissioning works for a complete E&I package including cable trays & ladders, cable laying & connections, lighting system, earthing & lightning systems, low voltage & medium voltage switchgears. · Revamping of Main Substation, T.V. Building - Radio & T.V. Union, Cairo: Electrical installation works including LV switchgears, cable trays & ladders, cable laying & connections and bus ducts. ElMottaheda For Contracting & Technology Co. (April 2004 - April 2005) Field Of Experience: Technical Office Engineer, in the following projects: I- Air mall (Sharm ElSheikh Airport): Owner: Egyptian Airport Co. Consultant: Shaker Consultancy Group. II- New Terminal Building in Sharm ElSheikh Airport: Owner: Egyptian Airport Co. Consultant: Dar ElHandasa. III- CINNABON Restaurants in (Mohandeseen, City Stars, Carrefour ”Alex.”): Owner: ElMottaheda for Foods & Beverage. Consultant: Shaker Consultancy. IV- Neema Heights Village (Hotel & Time Share Units): Owner: Arab Real estates Co. Consultant: Mahmoud ElMoshneb Office. V- Esplanada Mall (Hurghada) "Final Works": Owner: Arab Real estates Co. Consultant: Mahmoud ElMoshneb Office. Responsibilities: · Tenders studying (prepare technical & financial offers). · Prepare all procurements tasks. · Prepare shop drawings using AutoCAD. · Prepare and design single line diagrams for LV Distribution Panel Boards.
  • 5. ABB 5 Training: o Successfully completed all topics of ABB project management certification program including (Project planning, analysis and control), (Project leadership, management and communication), (Project management applications) and the certification process is in progress (2012 – 2014) o Successfully completed (problem solving and decision making - Oct. 2013). o Successfully completed ABB Safety Training Courses (Ergonomics, Defensive driving, Electrical safety, Project safety management). o Successfully completed ABB Project Risk Management Program (Sep. 2010). o Successfully completed report writing workshop by American Chamber (Dec. 2009). o Successfully completed ABB Leadership Challenge Program (July 2009). o Successfully completed ABB Information security Course (January 2009). o Successfully completed 1st Aid Program, (By Egyptian Red Crescent Authority) o Successfully completed the requirements of ISO 9001:2008 Internal Auditing Course, delivered by BSI Business Solutions Ltd. o Successfully completed Occupational Safety & Health Administration (OSHA) Training Course (Dec. 2007) o New & Renewable Energy Authority, Cairo(July 2002):- Successfully completed summer training in renewable energy field. o Egyptian Electrical Cables Co.(July 2000 & July 2001):- Successfully completed summer training in motors maintenance dept. (A.C. Motors, D.C. Motors & M.V. Cables Factory). Personal Abilities & Skills: Þ Communication skills with others, ability of collective work with team to do the best. Þ Active team member advising and supporting all colleagues. Þ Adherence with work ethics (veracity, honesty, cooperation, charity…). Þ Personal leadership and result oriented. Þ Functional sense, self restricting for internal problems & applying practical solutions. Þ Computer skills includes Microsoft Windows, Office, AutoCAD 2D, MS project. Þ English language: very good spoken & written, Arabic is the mother tongue. Personal Data: § Date of Birth: 22nd Sep. 1980. § Nationality: Egyptian. § Social Status: Married and have 2 sons. § Military Service: Exempted. § Passport: Valid. § Driving license: Available.