Mohamed Ahmed Zeyada has over 15 years of experience in project management and engineering roles at ABB Power Systems & Automation Technologies. He has successfully led numerous electrical and instrumentation projects in Egypt for industries such as oil and gas, mining, and utilities. His roles have included project manager, project engineering leader, and site construction leader. He has extensive experience developing project plans, schedules, specifications, and managing project execution according to safety, quality and budget targets. He holds a B.Sc. in Electrical Engineering and has received training in project management, leadership, safety and other relevant areas from ABB and other organizations.
1. ABB
1
Mohamed Ahmed Zeyada
1-A Syndicates Buildings, End of Moustafa El-Nahhas St., Nasr City, Cairo, Egypt.
(+2)0109159409, m.zeyada@yahoo.com
Education:
B.Sc. Electrical Engineering (Power & M/Cs. Dept.), Ain Shams University, July-2003.
Graduation Project: Power System Planning for a Newly Developed Area.
General Grade: Good. Graduation Project Grade: Excellent.
Experiences:
ABB Power Systems & Automation Technologies, S.A.E.
(May 2005 - Present)
Field Of Experience:
Lead Electrical Engineer, had been worked in the following jobs:
Job Title: Project Manager
Main Accountabilities and Duties:
· Plan and schedule project timelines using MS project.
· Ensure that all project activities are developed and executed in accordance with
company procedures, contract specifications / technical requirements, quality
standards, OHS requirements, cost/profitability targets, scheduling targets and
code of conduct.
· Cooperate with supply management in supplier selection and monitoring ongoing
performance.
· Ensure that all functions (engineering/construction/commissioning/supply chain)
assign the appropriate resources and competencies for the specific discipline.
:Main Reference Projects
· Upgrade of refrigerators feeding line for Alexandria container &
Cargo Handling Co. - Alex. Terminal (282 KUSD): Turnkey project,
scope of supply includes complete electrification package for no.2 shelters
of type power module enclosure with size (8X3X3.5) mt., each includes 2
MVA dry type distribution transformer, 3200 Amp low voltage switchboard,
interconnecting cupper bus duct in addition to no. 18 of “400 Amp low
voltage distribution panel boards”.
· Supply and install fire alarm system for ABB Low Voltage Factory
(182 KUSD): Turnkey project, scope of work includes design, supply,
installation and commissioning for a complete intelligent addressable fire
alarm system (Brand : Notifier) including fire alarm control panel complete
with all accessories, manual and automatic detectors and complete fire
alarm network including raceways, accessories and fire alarm cables.
Both projects had been developed and executed successfully according to
contractual specifications, cost effectively, with customer satisfaction and
committed to OHS policy.
2. ABB
2
Job Title: Project Engineering Leader
Main Accountabilities and Duties:
· Ensure that the engineering activities are efficiently and cost-effectively executed
in accordance with contract specifications, quality standards, and safety
requirements.
· Technically support the sales team during the tender phase, defining scope of
work and other relevant details related to E&I construction package engineering.
· Technically evaluate proposals received from external vendors.
· Develop materials technical specifications, scope of work, cable schedules,
layout drawings for cable routing and detailed bill of materials related to E&I
installation works.
· Supervise the grant of engineering subcontracts related to E&I installation works
(technical specification, technical evaluation, etc.), manages the engineering
subcontractor jointly with other involved disciplines and define engineering
deliverables’ schedule & quality.
· Support the construction team/subcontractor during erection activities, clarifying
or providing solutions to repair engineering errors and supports (if required) the
commissioning & startup team.
· Solve problems that appear during engineering development, support the project
manager in issuing claims (new scope of work, cost impact, time impact, etc.).
· Serves as the point of contact for the customer in terms of the engineering of E&I
construction package.
:Main Reference Projects
· AZFC Unit#6 upgrade project – sulfuric plant (11.750 MEGP): Turnkey
project including design, supply, installation and commissioning works for
a complete DCS control system, E&I package.
· AZFC 3rd
concentration line project – phosphoric plant (2.000 MEGP):
Turnkey project including design, supply, installation and commissioning
works for a complete DCS control system, E&I package.
· Control system upgrade for power house pumps 1 & 2 - Petrobel
Belayem, Fieran Plant: Design, supply, installation and commissioning
works for a complete package of instrumentation and DCS control system.
· Alamain shipping & booster pumps upgrade project, El-Hamra Plant,
KPC: Design, installation and commissioning works for a complete E&I
package.
· Meliha wells telemetry system at Western Desert, Agieba Petroleum
Co.: Implement a monitoring and automation service to Meliha well heads
including design, supply, installation and commissioning works for a
complete SCADA, telecom network and instrumentation package.
3. ABB
3
· Engineering Services for XCCP Plant at Arab Potash Company (APC)
Ltd. - (Jordan): A complete engineering works of instrumentation & DCS
including complete documentation package for instruments bulk materials.
· Long Term Solution Project - WEPCO (Abu Qir Plant - Alexandria): A
complete engineering works of instrumentation & DCS including complete
documentation package for instruments bulk materials.
Job Title: Site Construction Leader
Main Accountabilities and Duties:
· Supervise site construction planning and efficient execution by coordinating work
activities among multiple parties.
· Ensure that the site construction activities are efficiently and cost-effectively
executed in accordance with contract specifications, quality standards, and safety
requirements.
· Proactively promote OHS considerations to project partners throughout the
project.
· Coordinate schedules so that resources and materials are available to promote
efficient construction, identifies problem areas and determine corrective actions in
order to optimize the project performance.
· Coordinate and provide guidance, support and assistance to the internal and
external resources to ensure appropriate commitment to contract, project plan
and OHS guidelines.
· Coordinate construction efforts with project manager, procurement manager, and
OHS safety manager as well as customer representatives.
Main Reference Projects:
· AZFC Unit#6 upgrade project – sulfuric plant (11.750 MEGP): Turnkey
project including design, supply, installation and commissioning works for
a complete DCS control system, E&I package.
· AZFC 3rd
concentration line project – phosphoric plant (2.000 MEGP):
Turnkey project including design, supply, installation and commissioning
works for a complete DCS control system, E&I package.
· Control system upgrade for power house pumps 1 & 2 - Petrobel
Belayem, Fieran Plant: Design, supply, installation and commissioning
works for a complete package of instrumentation and DCS control system.
· Alamain shipping & booster pumps upgrade project, El-Hamra Plant,
KPC: Design, installation and commissioning works for a complete E&I
package.
· Meliha wells telemetry system at Western Desert, Agieba Petroleum
Co.: Implement a monitoring and automation service to Meliha well heads
including design, supply, installation and commissioning works for a
complete SCADA, telecom network and instrumentation package.
4. ABB
4
· Supply and install MCC-1 & 2 for the “Egyptian Co. for Refrigeration
by Natural Gas (Gas Cool)” Cooling Substation in ECHEM
administration building, 5th Settlement, New Cairo: Supply, installation
and commissioning works including MCCs, cables and cable trays.
· Supply and install MCC-4, 5 & 6 for the Egyptian Co. for Refrigeration
by Natural Gas (Gas Cool) Cooling Substation Smart Village, Cairo-
Alexandria road: Supply, installation and commissioning works including
MCCs, cables and cable trays.
· TAURT LNG Train1 Supply at Port Said District – GUPCO/BP -
Consultant (Enppi): Supply, installation and commissioning works for a
complete package of instrumentation & DCS Erection Works.
· Helwan Ammonia/Urea Fertilizing Project at Helwan - Helwan
Fertilizer Co. – Design & Build Contractor (Uhde): Installation and
commissioning works for a complete E&I package including cable trays &
ladders, cable laying & connections, lighting system, earthing & lightning
systems, low voltage & medium voltage switchgears.
· Revamping of Main Substation, T.V. Building - Radio & T.V. Union,
Cairo: Electrical installation works including LV switchgears, cable trays &
ladders, cable laying & connections and bus ducts.
ElMottaheda For Contracting & Technology Co.
(April 2004 - April 2005)
Field Of Experience: Technical Office Engineer, in the following projects:
I- Air mall (Sharm ElSheikh Airport):
Owner: Egyptian Airport Co. Consultant: Shaker Consultancy Group.
II- New Terminal Building in Sharm ElSheikh Airport:
Owner: Egyptian Airport Co. Consultant: Dar ElHandasa.
III- CINNABON Restaurants in (Mohandeseen, City Stars, Carrefour ”Alex.”):
Owner: ElMottaheda for Foods & Beverage. Consultant: Shaker Consultancy.
IV- Neema Heights Village (Hotel & Time Share Units):
Owner: Arab Real estates Co. Consultant: Mahmoud ElMoshneb Office.
V- Esplanada Mall (Hurghada) "Final Works":
Owner: Arab Real estates Co. Consultant: Mahmoud ElMoshneb Office.
Responsibilities:
· Tenders studying (prepare technical & financial offers).
· Prepare all procurements tasks.
· Prepare shop drawings using AutoCAD.
· Prepare and design single line diagrams for LV Distribution Panel Boards.
5. ABB
5
Training:
o Successfully completed all topics of ABB project management certification
program including (Project planning, analysis and control), (Project leadership,
management and communication), (Project management applications) and the
certification process is in progress (2012 – 2014)
o Successfully completed (problem solving and decision making - Oct. 2013).
o Successfully completed ABB Safety Training Courses (Ergonomics, Defensive
driving, Electrical safety, Project safety management).
o Successfully completed ABB Project Risk Management Program (Sep. 2010).
o Successfully completed report writing workshop by American Chamber (Dec.
2009).
o Successfully completed ABB Leadership Challenge Program (July 2009).
o Successfully completed ABB Information security Course (January 2009).
o Successfully completed 1st
Aid Program, (By Egyptian Red Crescent Authority)
o Successfully completed the requirements of ISO 9001:2008 Internal Auditing
Course, delivered by BSI Business Solutions Ltd.
o Successfully completed Occupational Safety & Health Administration (OSHA)
Training Course (Dec. 2007)
o New & Renewable Energy Authority, Cairo(July 2002):-
Successfully completed summer training in renewable energy field.
o Egyptian Electrical Cables Co.(July 2000 & July 2001):-
Successfully completed summer training in motors maintenance dept. (A.C. Motors,
D.C. Motors & M.V. Cables Factory).
Personal Abilities & Skills:
Þ Communication skills with others, ability of collective work with team to do the
best.
Þ Active team member advising and supporting all colleagues.
Þ Adherence with work ethics (veracity, honesty, cooperation, charity…).
Þ Personal leadership and result oriented.
Þ Functional sense, self restricting for internal problems & applying practical
solutions.
Þ Computer skills includes Microsoft Windows, Office, AutoCAD 2D, MS project.
Þ English language: very good spoken & written, Arabic is the mother tongue.
Personal Data:
§ Date of Birth: 22nd Sep. 1980.
§ Nationality: Egyptian.
§ Social Status: Married and have 2 sons.
§ Military Service: Exempted.
§ Passport: Valid.
§ Driving license: Available.