CAREER OBJECTIVE
• Seeking a position to utilize my skills and abilities in the Industry which
offers Professional growth while being resourceful, innovative and flexible.
SUMMARY
• Strong in planning, coordinating and problem solving abilities.
• Good Communication and Interpersonal skills.
• Ability to work under pressure in fast-paced, time-sensitive environments
CURRENT EMPLOYMENT DETAILS
• NISSI Engineering Solutions Pvt Ltd.
SOFTWARE SKILLS
Operating Systems : Windows, Unix, Linux.
Software Knowledge : DS Agile, Pacis, PLC.
ACADEMIC PROFILE
COURSE YEAR Of PASSING INSTITUTION/PERCENTAGE
B.E 2013 Chettinad College of Engineering and
[Electrical and Electronics Technology
Engineering] [ 68.25% ]
HSC 2009 Tamil Nadu State Board
[Computer Science] [ 82.33% ]
Matriculation 2007 Tamil Nadu Matriculation Board
[ 85.64% ]
PROJECT DETAILS
ENVIRONMENT:
MAT LAB.
Languages:
C
ROLES:
Development and Technical
Support
DURATION:
June 2012 to April 2013
TEAM SIZE:
4
PROJECT DETAILS
SITE:
PGCIL, BASSI 400/220KV S/S,
JAIPUR.
SCADA:
DS AGILE(ALSTOM)
ROLES:
ADAPTATION OF CMR AND RELAY
BASED ON SITE SCHEME.
DURATION:
Feb 2014 to September 2014
TEAM SIZE:
A SINGLE-PHASE BIDIRECTIONAL PWM CONVERTER FOR MICRO-GRID
SYSTEM
PROJECT DESCRIPTION
Our project is a simple implementation of both converter and inverter being
operated by a single device. The complete design procedure is given under
different modes of operation for the single-phase energy systems application.
This design procedure can be used for other single-phase application.
RESPONSIBILITIES:
• Developing, modifying and reviewing jobs responsible to process
the feed from interface system.
• Report generation as per requests from the project guide on the
basis of the data fetched from the device.
• Monitoring various implementation processes in device and
resolving high priority issues.
• Functionality Enhancements on the basis of the device Testing.
• Problem Management-Handling escalations and providing regular
updates to the guide during critical/major issues.
ACHIEVEMENTS:
• Participated in various symposiums.
• Attended a workshop on PLC conducted by chettinad college of
engineering and technology.
• We won the hand ball zonal level match under Anna university
during the year 2013.
NATIONAL TRANSMISSION ASSET MANAGEMENT CENTER (NTAMC).
PROJECT DESCRIPTION
The main aim of NTAMC is to monitor and control all power grid under
one roof. The scope my work is to hard wire all relay and CMR to
obtain the status and also to control them from remote end. The
relays had been adapted based on old scheme but without disturbing
old functionality new relay are adapted to control operation by remote
end. After completion of hard wiring soft signal are given out from Bay
Control Unit(BCU) which is transmitted and received from remote end
through fiber optic communication. Each and every signals are tested
and commissioned.
PROJECT DETAILS
SITE:
GETCO, MOHAR 220/66/11.5KV
S/S, ANANDH.
SCADA:
DS AGILE(ALSTOM)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS AND SCADA.
DURATION:
Sep 2014 to May 2015
TEAM SIZE:
7
PROJECT DETAILS
SITE:
BCPL, DIBURGARH, ASSAM.
SCADA:
PACIS(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS AND SCADA.
DURATION:
June 2015 to July 2015
TEAM SIZE:
1
PROJECT DETAILS
SITE:
PGCIL, NAGAPATTINAM,
TAMILNADU.
SCADA:
PACIS(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
GUJARAT ELECTRICITY TRANSMISSION CO-OPERATION.
PROJECT DESCRIPTION
It is 220/66/11.5 KV S/S commissioning project
RESPONSIBILITIES:
• Testing of line protection relay and transform protection relay
signal in SCADA.
• Report generation for site daily, weekly, monthly.
• Relay signals has to be taken and displayed in SCADA and these
signal has to be reporting to remote end SLDC through
communication link.
• Commission of AUX-BCU for controlling ACDB,DCDB and PLCC-BCU
to send signal to trip other end of line.
BHRAMAPUTRA CRACKERS AND POLIMERS LTD(BCPL)
PROJECT DESCRIPTION
It is Waste water treatment Plant LT panel Data concentrator project.
RESPONSIBILITIES:
• Testing of P127 relay signal in SCADA through Modbus
communication.
• Sending AI and DI signal for Load shedding through Modbus
communication from Pacis Gateway.
• Commission of MAIN BCU and STANDBY BCU for receiving Data
from Relay and send Data to Remote end.
POWERGRID CORPARATION OF INDIA(PGCIL)
PROJECT DESCRIPTION
It is 765/400 KV S/S commissioning project
RESPONSIBILITIES:
• Testing of line protection relay and transform protection relay
signal in SCADA.
• Report generation for site daily, weekly, monthly for both DI and
AI values.
• Relay signals has to be taken and displayed in SCADA and these
signal has to report to remote end SLDC through communication
DURATION:
JULY 2012 to AUG 2013
TEAM SIZE:
2
PROJECT DETAIL
SITE:
APTRANSCO, RAJAYAMUNDRY,
ANDRA PRADESH.
SCADA:
PACIS(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS AND SCADA.
DURATION:
AUG 2015 to SEP 2015
TEAM SIZE:
2
PROJECT DETAIL
SITE:
HSIIDC, BAWAL, HARYANA.
SCADA:
PACIS(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS AND SCADA.
DURATION:
OCT 2015 to JAN 2016
TEAM SIZE:
1
• Commission of AUX-BCU LT panel Automation and Fire Fighting
Automation.
• Commission of Gateway for T104 protocol for NTAMC project.
ANDRA PRADESH TRANSMISSION CORPORATION LTD(APTRANSCO)
PROJECT DESCRIPTION
It is 220KV S/S commissioning project
RESPONSIBILITIES:
• Formation of Dual Ring Fiber Optic Network.
• Testing of line protection relay Micom, ABB relay signal in SCADA.
• Commission of BCU DO control for Circuit Breaker, Isolator etc.
and DI signal from field.
• Report generation for site daily, weekly, monthly.
• Relay signals and BCU Signals has to be taken and displayed in
SCADA and these signal has to report to remote end SLDC through
communication link Via Gateway.
• Commission of Main and Stanby Servers.
• Time Synchronisation of IEDs present in the Network through
Masibus time server.
HARYANA STATE INDUSTRIAL AND INFRASTRUCTURE DEVELOPMENT
CORPORATION(HSIIDC)
PROJECT DESCRIPTION
It is 220/132/33KV S/S commissioning project
RESPONSIBILITIES:
• Formation of Dual Ring Fiber Optic Network.
• Testing of line protection relay Micom, ABB relay signal in SCADA.
• Commission of BCU DO control for Circuit Breaker, Isolator etc.
and DI signal from field.
• Relay signals and BCU Signals has to be taken and displayed in
SCADA and these signal has to report to remote end SLDC through
communication link Via Gateway(T104).
• Commission of Main and Stanby Servers.
• Time Synchronisation of IEDs present in the Network through
Masibus time server.
• New ECO-SUI SCADA has been implemented at this site.
PROJECT DETAIL
SITE:
OPTCL, JALDA, ODHISA.
SCADA:
VIJEO CTECT(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS SIGNALS IN SCADA.
DURATION:
FEB 2016 to MAR 2016
TEAM SIZE:
1
PROJECT DETAIL
SITE:
PATNA,BIHAR.
SCADA:
PACIS OI(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS SIGNALS IN SCADA.
DURATION:
APR 2016 to JULY 2016
TEAM SIZE:
1
PROJECT DETAIL
SITE:
Vijayawada,Andra Pradesh.
SCADA:
PACIS OI(SCHNEIDER)
ROLES:
OPC gateway commissioning.
DURATION:
JULY 2016 to AUG 2016
TEAM SIZE:
ODHISA POWER TRANSMISSION CORPORATION LIMITED(OPTCL)
PROJECT DESCRIPTION
It is 220/132/33KV S/S ODSSP commissioning project
RESPONSIBILITIES:
• Formation of LAN Network.
• Testing of SIEMENS relay signals in SCADA.
• Commission of RTU and DO control for Circuit Breaker, Isolator
etc. and DI signal from field via SIEMENS relays.
• All SIEMENS relay has to be integrated to RTU via IEC-61850.
• Relay signals has to be taken and displayed in VIJEO CTECT
SCADA Via RTU T104 protocol.
• Commission of Main and Stanby RTU.
• New VIJEO CTECT SCADA has been implemented at this site.
RAPTPR(Bihar)
PROJECT DESCRIPTION
It is 33KV S/S PATNA commissioning project
RESPONSIBILITIES:
• Formation of WAN Network all over Patna.
• Testing of protection relay signals in SCADA.
• Commission of RTU and DO control for Circuit Breaker, Isolator
etc. and DI signal from field via SIEMENS relays.
• All relay has to report to RTU via IEC-61850.
• Relay signals has to be taken and displayed in Pacis OI SCADA Via
IEC61850 protocol.
• Commission of Main and Stanby RTU.
LANCO(Vijayawada)
PROJECT DESCRIPTION
It is 400KV Gas Power plant commissioning project
RESPONSIBILITIES:
• Installing OPC gateway and testing of the same.
• Commission of Main and Stanby OPC gatewa
PROJECT DETAIL
SITE:
9053 Riyadh Metro, KSA.
SCADA:
DS AGILE OI(Alstom)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS SIGNALS IN SCADA.
DURATION:
05/AUG/2016 to 09/AUG/2016
TEAM SIZE:
5
PROJECT DETAIL
SITE:
132/33/13.8KV Al Jowa S/S, KSA.
SCADA:
DS AGILE OI(Alstom)
ROLES:
Site Survey and Boot Installation.
DURATION:
11/AUG/2016 to 18/AUG/2016
TEAM SIZE:
1
PROJECT DETAIL
SITE:
132/33/13.8KV Al Jowa S/S, KSA.
SCADA:
DS AGILE OI(Alstom)
ROLES:
Testing and Commissioning of
SCADA.
DURATION:
18/AUG/2016 to 13/Oct/2016
380/132/33/13.8KV 9053 Riyadh Metro S/S
PROJECT DESCRIPTION
It is 380/132/33/13.8KV 9053 Riyadh Metro S/S commissioning project
RESPONSIBILITIES:
• Formation of Fiber Optic Ring network and communicating various
IP series ring to one PC through router to access all IEDs
connected to different rings and also to configure all EFS switch
ports to monitor link states dynamically in SCADA HMI.
• Testing of protection relay signals in SCADA.
• Commission of various schemes like ABTS, ACCS and testing their
operations at site.
• Various types of IEDs to be integrated to SCADA via IEC-61850.
• End to End testing of Sub Station signals for field to remote end as
per approved IO lists.
132/33/13.8KV Al Jowa S/S
PROJECT DESCRIPTION
It is 132/33/13.8KV Al Jowa S/S commissioning project
RESPONSIBILITIES:
• Boot installation of C264 and SCADA materials checking.
• Have done site survey regarding site status and readiness to start
SAS work.
132/33/13.8KV Sharurah PP1 and PP2 S/S
PROJECT DESCRIPTION
It is 132/33/13.8KV Sharurah PP1 and PP2 S/S commissioning
project
RESPONSIBILITIES:
• Formation of Fiber Optic Ring network and communicating various
IP series ring to one PC through router to access all IEDs
connected to different rings and also to configure all EFS switch
ports to monitor link states dynamically in SCADA HMI.
• Testing of protection relay signals in SCADA.
• Commission of various schemes like ABTS, ACCS and testing their
operations at site.
• Various types of IEDs to be integrated to SCADA via IEC-61850.
• Closed Loop testing of Sub Station signals for field to remote end
PROJECT DETAIL
SITE:
132/33/13.8KV Al Jowa S/S, KSA.
SCADA:
DS AGILE OI(Alstom)
ROLES:
Testing and Commissioning of
SCADA.
DURATION:
18/AUG/2016 to 13/Oct/2016
TEAM SIZE:
3
380/132/33/13.8KV 9052 Riyadh Metro S/S
PROJECT DESCRIPTION
It is 380/132/33/13.8KV 9052 Riyadh Metro S/S commissioning
project
RESPONSIBILITIES:
• Formation of Fiber Optic Ring network and communicating various
IP series ring to one PC through router to access all IEDs
connected to different rings and also to configure all EFS switch
ports to monitor link states dynamically in SCADA HMI.
• Testing of protection relay signals in SCADA.
• Commission of various schemes like ABTS, ACCS and testing their
operations at site.
• Various types of IEDs to be integrated to SCADA via IEC-61850.
• Local and Remote operation checking from SCADA upto field.
Breaker, Disconnector, Earthswitch to be controlled by SCADA
along with their appropriate introlock give as per approved
introlock scheme.
Place: Name:
Chandru.D

More Related Content

What's hot

Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning EngineerKumaresanT7
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkJoshua Clark
 
Update_CV_2015_Jerry_Lusdoc
Update_CV_2015_Jerry_LusdocUpdate_CV_2015_Jerry_Lusdoc
Update_CV_2015_Jerry_LusdocJerry Lusdoc
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning EngineerMathivanan K
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated ResumeAnkit Agarwal
 

What's hot (19)

Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Dcsr.profile 2016
Dcsr.profile 2016Dcsr.profile 2016
Dcsr.profile 2016
 
DCSR ENERGY
DCSR ENERGYDCSR ENERGY
DCSR ENERGY
 
Resume_Chandan
Resume_ChandanResume_Chandan
Resume_Chandan
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
CompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua ClarkCompEx Electrician - CV - Joshua Clark
CompEx Electrician - CV - Joshua Clark
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Update_CV_2015_Jerry_Lusdoc
Update_CV_2015_Jerry_LusdocUpdate_CV_2015_Jerry_Lusdoc
Update_CV_2015_Jerry_Lusdoc
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
resume N
resume Nresume N
resume N
 
UPDATE CV 2016
UPDATE  CV 2016UPDATE  CV 2016
UPDATE CV 2016
 
Resume_Antony new
Resume_Antony newResume_Antony new
Resume_Antony new
 

Viewers also liked

Viewers also liked (19)

Hierarchy diagram
Hierarchy diagramHierarchy diagram
Hierarchy diagram
 
E learning
E learningE learning
E learning
 
P13 portfolio
P13 portfolioP13 portfolio
P13 portfolio
 
Desechos
DesechosDesechos
Desechos
 
Peru
PeruPeru
Peru
 
Manotecnologia
ManotecnologiaManotecnologia
Manotecnologia
 
P15 portfolio
P15 portfolioP15 portfolio
P15 portfolio
 
Fotosplantilla9 e
Fotosplantilla9 eFotosplantilla9 e
Fotosplantilla9 e
 
Archivo vacio 3
Archivo vacio 3Archivo vacio 3
Archivo vacio 3
 
Festival fi de curs 2009 2010
Festival fi de curs 2009 2010Festival fi de curs 2009 2010
Festival fi de curs 2009 2010
 
Conectivismo
ConectivismoConectivismo
Conectivismo
 
Certificates scan
Certificates scanCertificates scan
Certificates scan
 
JEAT exam certificate Paivi Ellonenpdf
JEAT exam certificate Paivi EllonenpdfJEAT exam certificate Paivi Ellonenpdf
JEAT exam certificate Paivi Ellonenpdf
 
Coupon
CouponCoupon
Coupon
 
Gopinoylogo
GopinoylogoGopinoylogo
Gopinoylogo
 
Inspectall Initial
Inspectall InitialInspectall Initial
Inspectall Initial
 
Videoconferencia
VideoconferenciaVideoconferencia
Videoconferencia
 
Campeonato gaúcho 2014 segunda divisão
Campeonato gaúcho 2014   segunda divisãoCampeonato gaúcho 2014   segunda divisão
Campeonato gaúcho 2014 segunda divisão
 
Odet Pictures LinkedIn
Odet Pictures LinkedInOdet Pictures LinkedIn
Odet Pictures LinkedIn
 

Similar to Chandru D's Resume Summary

Similar to Chandru D's Resume Summary (20)

SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR  COMMISSIONING ENGINEERSETHUMADHAVAN SENIOR  COMMISSIONING ENGINEER
SETHUMADHAVAN SENIOR COMMISSIONING ENGINEER
 
Gokul resume
Gokul resumeGokul resume
Gokul resume
 
CV
CVCV
CV
 
kumaresan_SAS Engg
kumaresan_SAS Enggkumaresan_SAS Engg
kumaresan_SAS Engg
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
Resume
ResumeResume
Resume
 
sivachandran resume
sivachandran resumesivachandran resume
sivachandran resume
 
Balaji Resume
Balaji ResumeBalaji Resume
Balaji Resume
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Ahmed Elsayed Salem CV
Ahmed Elsayed Salem CVAhmed Elsayed Salem CV
Ahmed Elsayed Salem CV
 
14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv14.09.06 - Enayat updated cv
14.09.06 - Enayat updated cv
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
CV
CVCV
CV
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
Resume_Gopala
Resume_GopalaResume_Gopala
Resume_Gopala
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Soumyajit_Sarkar
Soumyajit_SarkarSoumyajit_Sarkar
Soumyajit_Sarkar
 

Chandru D's Resume Summary

  • 1. Chandru D E-MAIL chandru.d1908@gmail.com Mobile +91 9629310684 +966560936397 PERSONAL DETAILS Father Name: Dhanasekaran k DOB: 19th august 1989 Nationality: Indian. Languages Known: Tamil & English Marital Status: Single Permanent Address: 71, Thiruvalluvar Nagar , L.N.S (P.O), Karur-639002 CAREER OBJECTIVE • Seeking a position to utilize my skills and abilities in the Industry which offers Professional growth while being resourceful, innovative and flexible. SUMMARY • Strong in planning, coordinating and problem solving abilities. • Good Communication and Interpersonal skills. • Ability to work under pressure in fast-paced, time-sensitive environments CURRENT EMPLOYMENT DETAILS • NISSI Engineering Solutions Pvt Ltd. SOFTWARE SKILLS Operating Systems : Windows, Unix, Linux. Software Knowledge : DS Agile, Pacis, PLC. ACADEMIC PROFILE COURSE YEAR Of PASSING INSTITUTION/PERCENTAGE B.E 2013 Chettinad College of Engineering and [Electrical and Electronics Technology Engineering] [ 68.25% ] HSC 2009 Tamil Nadu State Board [Computer Science] [ 82.33% ] Matriculation 2007 Tamil Nadu Matriculation Board [ 85.64% ]
  • 2. PROJECT DETAILS ENVIRONMENT: MAT LAB. Languages: C ROLES: Development and Technical Support DURATION: June 2012 to April 2013 TEAM SIZE: 4 PROJECT DETAILS SITE: PGCIL, BASSI 400/220KV S/S, JAIPUR. SCADA: DS AGILE(ALSTOM) ROLES: ADAPTATION OF CMR AND RELAY BASED ON SITE SCHEME. DURATION: Feb 2014 to September 2014 TEAM SIZE: A SINGLE-PHASE BIDIRECTIONAL PWM CONVERTER FOR MICRO-GRID SYSTEM PROJECT DESCRIPTION Our project is a simple implementation of both converter and inverter being operated by a single device. The complete design procedure is given under different modes of operation for the single-phase energy systems application. This design procedure can be used for other single-phase application. RESPONSIBILITIES: • Developing, modifying and reviewing jobs responsible to process the feed from interface system. • Report generation as per requests from the project guide on the basis of the data fetched from the device. • Monitoring various implementation processes in device and resolving high priority issues. • Functionality Enhancements on the basis of the device Testing. • Problem Management-Handling escalations and providing regular updates to the guide during critical/major issues. ACHIEVEMENTS: • Participated in various symposiums. • Attended a workshop on PLC conducted by chettinad college of engineering and technology. • We won the hand ball zonal level match under Anna university during the year 2013. NATIONAL TRANSMISSION ASSET MANAGEMENT CENTER (NTAMC). PROJECT DESCRIPTION The main aim of NTAMC is to monitor and control all power grid under one roof. The scope my work is to hard wire all relay and CMR to obtain the status and also to control them from remote end. The relays had been adapted based on old scheme but without disturbing old functionality new relay are adapted to control operation by remote end. After completion of hard wiring soft signal are given out from Bay Control Unit(BCU) which is transmitted and received from remote end through fiber optic communication. Each and every signals are tested and commissioned.
  • 3. PROJECT DETAILS SITE: GETCO, MOHAR 220/66/11.5KV S/S, ANANDH. SCADA: DS AGILE(ALSTOM) ROLES: TESTING AND COMMISIONIING OF RELAYS AND SCADA. DURATION: Sep 2014 to May 2015 TEAM SIZE: 7 PROJECT DETAILS SITE: BCPL, DIBURGARH, ASSAM. SCADA: PACIS(SCHNEIDER) ROLES: TESTING AND COMMISIONIING OF RELAYS AND SCADA. DURATION: June 2015 to July 2015 TEAM SIZE: 1 PROJECT DETAILS SITE: PGCIL, NAGAPATTINAM, TAMILNADU. SCADA: PACIS(SCHNEIDER) ROLES: TESTING AND COMMISIONIING GUJARAT ELECTRICITY TRANSMISSION CO-OPERATION. PROJECT DESCRIPTION It is 220/66/11.5 KV S/S commissioning project RESPONSIBILITIES: • Testing of line protection relay and transform protection relay signal in SCADA. • Report generation for site daily, weekly, monthly. • Relay signals has to be taken and displayed in SCADA and these signal has to be reporting to remote end SLDC through communication link. • Commission of AUX-BCU for controlling ACDB,DCDB and PLCC-BCU to send signal to trip other end of line. BHRAMAPUTRA CRACKERS AND POLIMERS LTD(BCPL) PROJECT DESCRIPTION It is Waste water treatment Plant LT panel Data concentrator project. RESPONSIBILITIES: • Testing of P127 relay signal in SCADA through Modbus communication. • Sending AI and DI signal for Load shedding through Modbus communication from Pacis Gateway. • Commission of MAIN BCU and STANDBY BCU for receiving Data from Relay and send Data to Remote end. POWERGRID CORPARATION OF INDIA(PGCIL) PROJECT DESCRIPTION It is 765/400 KV S/S commissioning project RESPONSIBILITIES: • Testing of line protection relay and transform protection relay signal in SCADA. • Report generation for site daily, weekly, monthly for both DI and AI values. • Relay signals has to be taken and displayed in SCADA and these signal has to report to remote end SLDC through communication
  • 4. DURATION: JULY 2012 to AUG 2013 TEAM SIZE: 2 PROJECT DETAIL SITE: APTRANSCO, RAJAYAMUNDRY, ANDRA PRADESH. SCADA: PACIS(SCHNEIDER) ROLES: TESTING AND COMMISIONIING OF RELAYS AND SCADA. DURATION: AUG 2015 to SEP 2015 TEAM SIZE: 2 PROJECT DETAIL SITE: HSIIDC, BAWAL, HARYANA. SCADA: PACIS(SCHNEIDER) ROLES: TESTING AND COMMISIONIING OF RELAYS AND SCADA. DURATION: OCT 2015 to JAN 2016 TEAM SIZE: 1 • Commission of AUX-BCU LT panel Automation and Fire Fighting Automation. • Commission of Gateway for T104 protocol for NTAMC project. ANDRA PRADESH TRANSMISSION CORPORATION LTD(APTRANSCO) PROJECT DESCRIPTION It is 220KV S/S commissioning project RESPONSIBILITIES: • Formation of Dual Ring Fiber Optic Network. • Testing of line protection relay Micom, ABB relay signal in SCADA. • Commission of BCU DO control for Circuit Breaker, Isolator etc. and DI signal from field. • Report generation for site daily, weekly, monthly. • Relay signals and BCU Signals has to be taken and displayed in SCADA and these signal has to report to remote end SLDC through communication link Via Gateway. • Commission of Main and Stanby Servers. • Time Synchronisation of IEDs present in the Network through Masibus time server. HARYANA STATE INDUSTRIAL AND INFRASTRUCTURE DEVELOPMENT CORPORATION(HSIIDC) PROJECT DESCRIPTION It is 220/132/33KV S/S commissioning project RESPONSIBILITIES: • Formation of Dual Ring Fiber Optic Network. • Testing of line protection relay Micom, ABB relay signal in SCADA. • Commission of BCU DO control for Circuit Breaker, Isolator etc. and DI signal from field. • Relay signals and BCU Signals has to be taken and displayed in SCADA and these signal has to report to remote end SLDC through communication link Via Gateway(T104). • Commission of Main and Stanby Servers. • Time Synchronisation of IEDs present in the Network through Masibus time server. • New ECO-SUI SCADA has been implemented at this site.
  • 5. PROJECT DETAIL SITE: OPTCL, JALDA, ODHISA. SCADA: VIJEO CTECT(SCHNEIDER) ROLES: TESTING AND COMMISIONIING OF RELAYS SIGNALS IN SCADA. DURATION: FEB 2016 to MAR 2016 TEAM SIZE: 1 PROJECT DETAIL SITE: PATNA,BIHAR. SCADA: PACIS OI(SCHNEIDER) ROLES: TESTING AND COMMISIONIING OF RELAYS SIGNALS IN SCADA. DURATION: APR 2016 to JULY 2016 TEAM SIZE: 1 PROJECT DETAIL SITE: Vijayawada,Andra Pradesh. SCADA: PACIS OI(SCHNEIDER) ROLES: OPC gateway commissioning. DURATION: JULY 2016 to AUG 2016 TEAM SIZE: ODHISA POWER TRANSMISSION CORPORATION LIMITED(OPTCL) PROJECT DESCRIPTION It is 220/132/33KV S/S ODSSP commissioning project RESPONSIBILITIES: • Formation of LAN Network. • Testing of SIEMENS relay signals in SCADA. • Commission of RTU and DO control for Circuit Breaker, Isolator etc. and DI signal from field via SIEMENS relays. • All SIEMENS relay has to be integrated to RTU via IEC-61850. • Relay signals has to be taken and displayed in VIJEO CTECT SCADA Via RTU T104 protocol. • Commission of Main and Stanby RTU. • New VIJEO CTECT SCADA has been implemented at this site. RAPTPR(Bihar) PROJECT DESCRIPTION It is 33KV S/S PATNA commissioning project RESPONSIBILITIES: • Formation of WAN Network all over Patna. • Testing of protection relay signals in SCADA. • Commission of RTU and DO control for Circuit Breaker, Isolator etc. and DI signal from field via SIEMENS relays. • All relay has to report to RTU via IEC-61850. • Relay signals has to be taken and displayed in Pacis OI SCADA Via IEC61850 protocol. • Commission of Main and Stanby RTU. LANCO(Vijayawada) PROJECT DESCRIPTION It is 400KV Gas Power plant commissioning project RESPONSIBILITIES: • Installing OPC gateway and testing of the same. • Commission of Main and Stanby OPC gatewa
  • 6. PROJECT DETAIL SITE: 9053 Riyadh Metro, KSA. SCADA: DS AGILE OI(Alstom) ROLES: TESTING AND COMMISIONIING OF RELAYS SIGNALS IN SCADA. DURATION: 05/AUG/2016 to 09/AUG/2016 TEAM SIZE: 5 PROJECT DETAIL SITE: 132/33/13.8KV Al Jowa S/S, KSA. SCADA: DS AGILE OI(Alstom) ROLES: Site Survey and Boot Installation. DURATION: 11/AUG/2016 to 18/AUG/2016 TEAM SIZE: 1 PROJECT DETAIL SITE: 132/33/13.8KV Al Jowa S/S, KSA. SCADA: DS AGILE OI(Alstom) ROLES: Testing and Commissioning of SCADA. DURATION: 18/AUG/2016 to 13/Oct/2016 380/132/33/13.8KV 9053 Riyadh Metro S/S PROJECT DESCRIPTION It is 380/132/33/13.8KV 9053 Riyadh Metro S/S commissioning project RESPONSIBILITIES: • Formation of Fiber Optic Ring network and communicating various IP series ring to one PC through router to access all IEDs connected to different rings and also to configure all EFS switch ports to monitor link states dynamically in SCADA HMI. • Testing of protection relay signals in SCADA. • Commission of various schemes like ABTS, ACCS and testing their operations at site. • Various types of IEDs to be integrated to SCADA via IEC-61850. • End to End testing of Sub Station signals for field to remote end as per approved IO lists. 132/33/13.8KV Al Jowa S/S PROJECT DESCRIPTION It is 132/33/13.8KV Al Jowa S/S commissioning project RESPONSIBILITIES: • Boot installation of C264 and SCADA materials checking. • Have done site survey regarding site status and readiness to start SAS work. 132/33/13.8KV Sharurah PP1 and PP2 S/S PROJECT DESCRIPTION It is 132/33/13.8KV Sharurah PP1 and PP2 S/S commissioning project RESPONSIBILITIES: • Formation of Fiber Optic Ring network and communicating various IP series ring to one PC through router to access all IEDs connected to different rings and also to configure all EFS switch ports to monitor link states dynamically in SCADA HMI. • Testing of protection relay signals in SCADA. • Commission of various schemes like ABTS, ACCS and testing their operations at site. • Various types of IEDs to be integrated to SCADA via IEC-61850. • Closed Loop testing of Sub Station signals for field to remote end
  • 7. PROJECT DETAIL SITE: 132/33/13.8KV Al Jowa S/S, KSA. SCADA: DS AGILE OI(Alstom) ROLES: Testing and Commissioning of SCADA. DURATION: 18/AUG/2016 to 13/Oct/2016 TEAM SIZE: 3 380/132/33/13.8KV 9052 Riyadh Metro S/S PROJECT DESCRIPTION It is 380/132/33/13.8KV 9052 Riyadh Metro S/S commissioning project RESPONSIBILITIES: • Formation of Fiber Optic Ring network and communicating various IP series ring to one PC through router to access all IEDs connected to different rings and also to configure all EFS switch ports to monitor link states dynamically in SCADA HMI. • Testing of protection relay signals in SCADA. • Commission of various schemes like ABTS, ACCS and testing their operations at site. • Various types of IEDs to be integrated to SCADA via IEC-61850. • Local and Remote operation checking from SCADA upto field. Breaker, Disconnector, Earthswitch to be controlled by SCADA along with their appropriate introlock give as per approved introlock scheme. Place: Name: Chandru.D