1. Chandru D
E-MAIL
chandru.d1908@gmail.com
Mobile
+91 9629310684
+966560936397
PERSONAL DETAILS
Father Name:
Dhanasekaran k
DOB: 19th
august 1989
Nationality: Indian.
Languages Known:
Tamil & English
Marital Status: Single
Permanent Address:
71, Thiruvalluvar Nagar ,
L.N.S (P.O),
Karur-639002
CAREER OBJECTIVE
• Seeking a position to utilize my skills and abilities in the Industry which
offers Professional growth while being resourceful, innovative and flexible.
SUMMARY
• Strong in planning, coordinating and problem solving abilities.
• Good Communication and Interpersonal skills.
• Ability to work under pressure in fast-paced, time-sensitive environments
CURRENT EMPLOYMENT DETAILS
• NISSI Engineering Solutions Pvt Ltd.
SOFTWARE SKILLS
Operating Systems : Windows, Unix, Linux.
Software Knowledge : DS Agile, Pacis, PLC.
ACADEMIC PROFILE
COURSE YEAR Of PASSING INSTITUTION/PERCENTAGE
B.E 2013 Chettinad College of Engineering and
[Electrical and Electronics Technology
Engineering] [ 68.25% ]
HSC 2009 Tamil Nadu State Board
[Computer Science] [ 82.33% ]
Matriculation 2007 Tamil Nadu Matriculation Board
[ 85.64% ]
2. PROJECT DETAILS
ENVIRONMENT:
MAT LAB.
Languages:
C
ROLES:
Development and Technical
Support
DURATION:
June 2012 to April 2013
TEAM SIZE:
4
PROJECT DETAILS
SITE:
PGCIL, BASSI 400/220KV S/S,
JAIPUR.
SCADA:
DS AGILE(ALSTOM)
ROLES:
ADAPTATION OF CMR AND RELAY
BASED ON SITE SCHEME.
DURATION:
Feb 2014 to September 2014
TEAM SIZE:
A SINGLE-PHASE BIDIRECTIONAL PWM CONVERTER FOR MICRO-GRID
SYSTEM
PROJECT DESCRIPTION
Our project is a simple implementation of both converter and inverter being
operated by a single device. The complete design procedure is given under
different modes of operation for the single-phase energy systems application.
This design procedure can be used for other single-phase application.
RESPONSIBILITIES:
• Developing, modifying and reviewing jobs responsible to process
the feed from interface system.
• Report generation as per requests from the project guide on the
basis of the data fetched from the device.
• Monitoring various implementation processes in device and
resolving high priority issues.
• Functionality Enhancements on the basis of the device Testing.
• Problem Management-Handling escalations and providing regular
updates to the guide during critical/major issues.
ACHIEVEMENTS:
• Participated in various symposiums.
• Attended a workshop on PLC conducted by chettinad college of
engineering and technology.
• We won the hand ball zonal level match under Anna university
during the year 2013.
NATIONAL TRANSMISSION ASSET MANAGEMENT CENTER (NTAMC).
PROJECT DESCRIPTION
The main aim of NTAMC is to monitor and control all power grid under
one roof. The scope my work is to hard wire all relay and CMR to
obtain the status and also to control them from remote end. The
relays had been adapted based on old scheme but without disturbing
old functionality new relay are adapted to control operation by remote
end. After completion of hard wiring soft signal are given out from Bay
Control Unit(BCU) which is transmitted and received from remote end
through fiber optic communication. Each and every signals are tested
and commissioned.
3. PROJECT DETAILS
SITE:
GETCO, MOHAR 220/66/11.5KV
S/S, ANANDH.
SCADA:
DS AGILE(ALSTOM)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS AND SCADA.
DURATION:
Sep 2014 to May 2015
TEAM SIZE:
7
PROJECT DETAILS
SITE:
BCPL, DIBURGARH, ASSAM.
SCADA:
PACIS(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS AND SCADA.
DURATION:
June 2015 to July 2015
TEAM SIZE:
1
PROJECT DETAILS
SITE:
PGCIL, NAGAPATTINAM,
TAMILNADU.
SCADA:
PACIS(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
GUJARAT ELECTRICITY TRANSMISSION CO-OPERATION.
PROJECT DESCRIPTION
It is 220/66/11.5 KV S/S commissioning project
RESPONSIBILITIES:
• Testing of line protection relay and transform protection relay
signal in SCADA.
• Report generation for site daily, weekly, monthly.
• Relay signals has to be taken and displayed in SCADA and these
signal has to be reporting to remote end SLDC through
communication link.
• Commission of AUX-BCU for controlling ACDB,DCDB and PLCC-BCU
to send signal to trip other end of line.
BHRAMAPUTRA CRACKERS AND POLIMERS LTD(BCPL)
PROJECT DESCRIPTION
It is Waste water treatment Plant LT panel Data concentrator project.
RESPONSIBILITIES:
• Testing of P127 relay signal in SCADA through Modbus
communication.
• Sending AI and DI signal for Load shedding through Modbus
communication from Pacis Gateway.
• Commission of MAIN BCU and STANDBY BCU for receiving Data
from Relay and send Data to Remote end.
POWERGRID CORPARATION OF INDIA(PGCIL)
PROJECT DESCRIPTION
It is 765/400 KV S/S commissioning project
RESPONSIBILITIES:
• Testing of line protection relay and transform protection relay
signal in SCADA.
• Report generation for site daily, weekly, monthly for both DI and
AI values.
• Relay signals has to be taken and displayed in SCADA and these
signal has to report to remote end SLDC through communication
4. DURATION:
JULY 2012 to AUG 2013
TEAM SIZE:
2
PROJECT DETAIL
SITE:
APTRANSCO, RAJAYAMUNDRY,
ANDRA PRADESH.
SCADA:
PACIS(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS AND SCADA.
DURATION:
AUG 2015 to SEP 2015
TEAM SIZE:
2
PROJECT DETAIL
SITE:
HSIIDC, BAWAL, HARYANA.
SCADA:
PACIS(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS AND SCADA.
DURATION:
OCT 2015 to JAN 2016
TEAM SIZE:
1
• Commission of AUX-BCU LT panel Automation and Fire Fighting
Automation.
• Commission of Gateway for T104 protocol for NTAMC project.
ANDRA PRADESH TRANSMISSION CORPORATION LTD(APTRANSCO)
PROJECT DESCRIPTION
It is 220KV S/S commissioning project
RESPONSIBILITIES:
• Formation of Dual Ring Fiber Optic Network.
• Testing of line protection relay Micom, ABB relay signal in SCADA.
• Commission of BCU DO control for Circuit Breaker, Isolator etc.
and DI signal from field.
• Report generation for site daily, weekly, monthly.
• Relay signals and BCU Signals has to be taken and displayed in
SCADA and these signal has to report to remote end SLDC through
communication link Via Gateway.
• Commission of Main and Stanby Servers.
• Time Synchronisation of IEDs present in the Network through
Masibus time server.
HARYANA STATE INDUSTRIAL AND INFRASTRUCTURE DEVELOPMENT
CORPORATION(HSIIDC)
PROJECT DESCRIPTION
It is 220/132/33KV S/S commissioning project
RESPONSIBILITIES:
• Formation of Dual Ring Fiber Optic Network.
• Testing of line protection relay Micom, ABB relay signal in SCADA.
• Commission of BCU DO control for Circuit Breaker, Isolator etc.
and DI signal from field.
• Relay signals and BCU Signals has to be taken and displayed in
SCADA and these signal has to report to remote end SLDC through
communication link Via Gateway(T104).
• Commission of Main and Stanby Servers.
• Time Synchronisation of IEDs present in the Network through
Masibus time server.
• New ECO-SUI SCADA has been implemented at this site.
5. PROJECT DETAIL
SITE:
OPTCL, JALDA, ODHISA.
SCADA:
VIJEO CTECT(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS SIGNALS IN SCADA.
DURATION:
FEB 2016 to MAR 2016
TEAM SIZE:
1
PROJECT DETAIL
SITE:
PATNA,BIHAR.
SCADA:
PACIS OI(SCHNEIDER)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS SIGNALS IN SCADA.
DURATION:
APR 2016 to JULY 2016
TEAM SIZE:
1
PROJECT DETAIL
SITE:
Vijayawada,Andra Pradesh.
SCADA:
PACIS OI(SCHNEIDER)
ROLES:
OPC gateway commissioning.
DURATION:
JULY 2016 to AUG 2016
TEAM SIZE:
ODHISA POWER TRANSMISSION CORPORATION LIMITED(OPTCL)
PROJECT DESCRIPTION
It is 220/132/33KV S/S ODSSP commissioning project
RESPONSIBILITIES:
• Formation of LAN Network.
• Testing of SIEMENS relay signals in SCADA.
• Commission of RTU and DO control for Circuit Breaker, Isolator
etc. and DI signal from field via SIEMENS relays.
• All SIEMENS relay has to be integrated to RTU via IEC-61850.
• Relay signals has to be taken and displayed in VIJEO CTECT
SCADA Via RTU T104 protocol.
• Commission of Main and Stanby RTU.
• New VIJEO CTECT SCADA has been implemented at this site.
RAPTPR(Bihar)
PROJECT DESCRIPTION
It is 33KV S/S PATNA commissioning project
RESPONSIBILITIES:
• Formation of WAN Network all over Patna.
• Testing of protection relay signals in SCADA.
• Commission of RTU and DO control for Circuit Breaker, Isolator
etc. and DI signal from field via SIEMENS relays.
• All relay has to report to RTU via IEC-61850.
• Relay signals has to be taken and displayed in Pacis OI SCADA Via
IEC61850 protocol.
• Commission of Main and Stanby RTU.
LANCO(Vijayawada)
PROJECT DESCRIPTION
It is 400KV Gas Power plant commissioning project
RESPONSIBILITIES:
• Installing OPC gateway and testing of the same.
• Commission of Main and Stanby OPC gatewa
6. PROJECT DETAIL
SITE:
9053 Riyadh Metro, KSA.
SCADA:
DS AGILE OI(Alstom)
ROLES:
TESTING AND COMMISIONIING
OF RELAYS SIGNALS IN SCADA.
DURATION:
05/AUG/2016 to 09/AUG/2016
TEAM SIZE:
5
PROJECT DETAIL
SITE:
132/33/13.8KV Al Jowa S/S, KSA.
SCADA:
DS AGILE OI(Alstom)
ROLES:
Site Survey and Boot Installation.
DURATION:
11/AUG/2016 to 18/AUG/2016
TEAM SIZE:
1
PROJECT DETAIL
SITE:
132/33/13.8KV Al Jowa S/S, KSA.
SCADA:
DS AGILE OI(Alstom)
ROLES:
Testing and Commissioning of
SCADA.
DURATION:
18/AUG/2016 to 13/Oct/2016
380/132/33/13.8KV 9053 Riyadh Metro S/S
PROJECT DESCRIPTION
It is 380/132/33/13.8KV 9053 Riyadh Metro S/S commissioning project
RESPONSIBILITIES:
• Formation of Fiber Optic Ring network and communicating various
IP series ring to one PC through router to access all IEDs
connected to different rings and also to configure all EFS switch
ports to monitor link states dynamically in SCADA HMI.
• Testing of protection relay signals in SCADA.
• Commission of various schemes like ABTS, ACCS and testing their
operations at site.
• Various types of IEDs to be integrated to SCADA via IEC-61850.
• End to End testing of Sub Station signals for field to remote end as
per approved IO lists.
132/33/13.8KV Al Jowa S/S
PROJECT DESCRIPTION
It is 132/33/13.8KV Al Jowa S/S commissioning project
RESPONSIBILITIES:
• Boot installation of C264 and SCADA materials checking.
• Have done site survey regarding site status and readiness to start
SAS work.
132/33/13.8KV Sharurah PP1 and PP2 S/S
PROJECT DESCRIPTION
It is 132/33/13.8KV Sharurah PP1 and PP2 S/S commissioning
project
RESPONSIBILITIES:
• Formation of Fiber Optic Ring network and communicating various
IP series ring to one PC through router to access all IEDs
connected to different rings and also to configure all EFS switch
ports to monitor link states dynamically in SCADA HMI.
• Testing of protection relay signals in SCADA.
• Commission of various schemes like ABTS, ACCS and testing their
operations at site.
• Various types of IEDs to be integrated to SCADA via IEC-61850.
• Closed Loop testing of Sub Station signals for field to remote end
7. PROJECT DETAIL
SITE:
132/33/13.8KV Al Jowa S/S, KSA.
SCADA:
DS AGILE OI(Alstom)
ROLES:
Testing and Commissioning of
SCADA.
DURATION:
18/AUG/2016 to 13/Oct/2016
TEAM SIZE:
3
380/132/33/13.8KV 9052 Riyadh Metro S/S
PROJECT DESCRIPTION
It is 380/132/33/13.8KV 9052 Riyadh Metro S/S commissioning
project
RESPONSIBILITIES:
• Formation of Fiber Optic Ring network and communicating various
IP series ring to one PC through router to access all IEDs
connected to different rings and also to configure all EFS switch
ports to monitor link states dynamically in SCADA HMI.
• Testing of protection relay signals in SCADA.
• Commission of various schemes like ABTS, ACCS and testing their
operations at site.
• Various types of IEDs to be integrated to SCADA via IEC-61850.
• Local and Remote operation checking from SCADA upto field.
Breaker, Disconnector, Earthswitch to be controlled by SCADA
along with their appropriate introlock give as per approved
introlock scheme.
Place: Name:
Chandru.D