A qualified Electrical and Instrument Supervisor with the objective of gaining new experience and explore deeper
technical knowledge within the ever-challenging oil and gas industry. Has previously spent a solid 15 years within
new oil and gas facilities development projects for a list of multinational clients that include PETRONAS Carigali,
PETRONAS Gas, TOTAL OIL, MAERSK OIL QATAR and OPTIMAL. Experiences also include almost 3 years of working
abroad within difficult and challenging environments in Nigeria and Turkmenistan. Has proven ability with particular
expertise in fabrication, installation, hook up, pre-commissioning and commissioning of major electrical systems that
include gas turbine and diesel generators, HV and LV switchgears and transformers, motors, solar panel and all
other electrical related systems. Well verse in clients and international codes and standards within electrical
discipline. Additional knowledge and skills on contractor management related activities that include progress
reporting, quality assurance and control monitoring, punch-list management, documentations and project handover
to end-user.
Education
Background
1999 – 2000 Miza Electrical Centre, Setiu, Terengganu
Electrical Certificate (MLVK)
Sijil Kemahiran Malaysia (SKM Level 1)
Sijil Kemahiran Malaysia – Intermediate (SKM Level 2)
Wireman (PW 1)
Chargeman (A0)
1992 – 1994 Sekolah Menengah Kg. To’ Uban, Pasir Mas, Kelantan
Penilaian Menengah Rendah (PMR)
Work
Experience
PETRONAS Carigali Sdn. Bhd. (PCSB), Kuala Lumpur, Malaysia (July 2015 – present)
Samarang Redevelopment Project
Electrical and Instrument (E&I) Supervisor – Onshore Fabrication Yard and Offshore Labuan
Job Description;
• Responsible in managing all contractor’s E&I related activities at site and ensuring E&I activities are complying
to project drawings and specifications and PETRONAS Technical Standard (PTS)
• Involved in installation of a new Gas Turbine Generator (GTG) and Low Voltage (LV) Switchgear
• Tasks include monitoring of construction, modification, installation, pre-commissioning and commissioning
activities for both GTG and LV switchgear and existing GTG control system upgrade
• Work scopes include modification of LV switchgear and breaker switches, monitoring of calibration of
transmitters and instrument valves, cold and hot (three point) loop checks and troubleshooting
• Responsible in preparing daily progress report and quality control documents for KL project office
Dowell Schlumberger (SLB), Kuala Lumpur, Malaysia (Dec 2011 – June 2015)
Samarang Redevelopment Project
Electrical and Instrument (E&I) Supervisor – KL Office, Onshore Fabrication Yard and Offshore Labuan
Job Description;
• Responsible in managing all consultant and contractor’s E&I related activities and ensuring E&I activities are
complying to project drawings and specifications and PETRONAS Technical Standard (PTS)
• Involved in installation of Metering system, new Lifeboat, Produced Water Treatment (PWT) system as well as
Living Quarters (LQ) Upgrade, Infill Drilling and Integrated Operation (IO)
• Tasks include E&I documents and drawings review during engineering phase, monitoring of fabrication scope
at fabrication yard, and offshore construction, installation, pre-commissioning and commissioning activities
• Work scopes include Solar Panel, Lifeboat, MCC for HVAC, DC Generator and LV Switchgear
• Responsible in preparing daily progress report and quality control documents for KL project office
KARIM KAMARUDIN
Contact: +6019 9000 459 / +6019 9000 431 Email: karimzarim79@gmail.com
DOB: February 17th
, 1979 (36 years old) karimzarim79@yahoo.com
IC: 790217-11-5191 (Malaysian)
Muslim, Male, Married
Permanent Address: B330 Seraya Apartment, Jalan Sek 3/1A, Taman Kajang Utama, 43000
Kajang, Selangor
2. Technip Geoproduction (M) Sdn. Bhd., Kuala Lumpur, Malaysia (June 2010 – Oct 2011)
MCR-A and MDP-A Turkmenistan Block 1 Gas Development Project
Client – PETRONAS Carigali (Turkmenistan) Sdn. Bhd. (PCTSB)
Electrical Supervisor – Onshore Fabrication Yard, Onshore Terminal and Offshore Turkmenistan
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for electrical
systems within the new offshore drilling platform and onshore receiving terminal
• Tasks include equipment functional test, MV and LV switching, equipment solo and test run
• Work scopes include power generation system, 230V and 110V UPS system, MV and LV switchgear, MCC,
6.6kV transformer, diesel centrifuge system, LV and HV motors and navigational lighting system
Sime Darby Engineering Sdn. Bhd. (SDE), Pasir Gudang, Malaysia (May 2009 – May 2010)
Kumang Cluster Development Project
Client – PETRONAS Carigali Sdn. Bhd.
Electrical Technician – Onshore Fabrication Yard
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for electrical
systems within the new offshore central processing platform (CPP) and drilling platform facilities
• Task includes electrical equipment functional test prior to pre-commissioning activity
• Scopes include power generation, UPS, water maker, fire water, diesel centrifuge and water injection systems
Sime Darby Engineering Sdn. Bhd. (SDE), Pasir Gudang, Malaysia (Mar 2009 – Apr 2009)
ASBGA and ASBEA Development Project
Client – Maersk Oil Qatar
Electrical Technician – Onshore Fabrication Yard
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for new offshore
processing platforms
• Tasks include equipment functional test, continuity check and pre-inspection before start-up
• Work scopes include power generation system (gas turbine generator), LV switch box and MCC
• Also involve in providing temporary power supply for instrument cabinet and settings of management relays
JC Marine Engineering Pte. Ltd., Batu Pahat, Malaysia (Mar 2009 – Mar 2009)
Client – Singapore Star Shipping Pte. Ltd.
Electrical Supervisor – Onshore Fabrication Yard
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for a new barge
• Tasks include equipment installation, functional test, continuity check and pre-inspection before start-up
• Work scopes include emergency generator, switch box, lighting, fans and blowers
Sime Darby Engineering Sdn. Bhd. (SDE), Pasir Gudang, Malaysia (Aug 2008 – Dec 2008)
Sumandak Phase 2 Development Project
Client – PETRONAS Carigali Sdn. Bhd.
Electrical Technician – Onshore Fabrication Yard
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for electrical
systems within the new offshore central processing platform (CPP) facility
• Task includes electrical equipment functional test prior to pre-commissioning activity
• Scopes include power generation, UPS, water maker, fire water, diesel centrifuge and water injection systems
Sime Engineers Consortium Sdn. Bhd. (SEC), Kuantan, Malaysia (Apr 2008 – Aug 2008)
EPCC - Kuantan Compressor Station Expansion Project
Client – PETRONAS Gas Bhd. (PGB)
Electrical Supervisor – Onshore Project Site
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for electrical
systems within the upgrading of onshore gas compression station
• Task includes electrical equipment functional test prior to pre-commissioning activity
• Scopes include gas compression motor, MCC, UPS, battery charger and lighting systems
3. Tanjung Offshore Sdn. Bhd., Pasir Gudang, Malaysia (Dec 2007 – Mar 2008)
Sumandak Phase 2 Development Project – Water Injection Treatment Module
Client – PETRONAS Carigali Sdn. Bhd. (PCSB)
Electrical Supervisor – Onshore Fabrication Yard
Job Description;
• Responsible as electrician in execution of hook up and pre-commissioning activities for water treatment
module within the new offshore central processing platform (CPP) facility
• Tasks include electrical equipment functional test prior to pre-commissioning activity and monthly inspection
• Work scopes include compressor and spare motors, water injection lab and lighting systems
Sime Darby Engineering Sdn. Bhd. (SDE), Pasir Gudang, Malaysia (Aug 2007 – Dec 2007)
Sumandak Phase 2 Development Project
Client – PETRONAS Carigali Sdn. Bhd.
Electrical Technician – Onshore Fabrication Yard
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for new offshore
central processing platform (CPP) and drilling platform
• Task includes electrical equipment functional test prior to pre-commissioning and commissioning activities
• Work scopes include power generation, temporary 24VDC, 110VDC and 230VAC UPS, gas compression and
other electrical related systems
SAIBOS AKOGEP SNC (SAIPEM), Nigeria (Sep 2006 – Apr 2007)
Amenam Kpono Oil and Gas Phase 2 Development Project
Client – ELF Petroleum Nigeria Limited (EPNL), TOTAL
Electrical Technician – Offshore Nigeria
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for electrical
systems within the new offshore central processing platform (CPP) facility
• Tasks include electrical equipment functional test prior to pre-commissioning activity, monthly inspection,
commissioning and troubleshooting
• Work scopes include power generation, transformer, temporary generator, temporary 24VDC and 230VAC
UPS, LV and HV motors
Sime Darby Engineering (SDE) Sdn. Bhd., Pasir Gudang, Malaysia (Dec 2005 – Aug 2006)
Amenam Kpono Oil and Gas Phase 2 Development Project
Client – ELF Petroleum Nigeria Limited (EPNL), TOTAL
Electrical Technician – Onshore Fabrication Yard
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for electrical
systems within the new offshore central processing platform (CPP) facility
• Tasks include electrical equipment functional test prior to pre-commissioning activity, monthly inspection,
commissioning and troubleshooting
• Work scopes include power generation, transformer, temporary generator, temporary 24VDC and 230VAC
UPS, LV and HV motors
Technip Engineering (M) Sdn. Bhd., Kerteh, Malaysia (Feb 2000 – Sep 2003)
Client – OPTIMAL (M) Sdn. Bhd.
Electrical Technician – Onshore Project Site
Job Description;
• Responsible as electrician in execution of pre-commissioning and commissioning activities for new onshore
chemical processing plant
• Tasks include electrical equipment functional test prior to pre-commissioning and commissioning activities
• Work scopes include temporary 24VDC and 230VAC power generation, UPS, electrical motors, navigational
aid, lighting and power socket circuitry, heater and HVAC systems
Referees
1 Mr. Yopy Sosiawan Amrizal PETRONAS Carigali Sdn. Bhd. (PCSB)
Contact details available upon request.2 Mr. Eliff Maznur Mazlan PETRONAS Carigali Sdn. Bhd. (PCSB)
3 Mr. Firman Sajat PETRONAS Carigali Sdn. Bhd. (PCSB)