Brentcliffe - Victoria Park Construction Liaison Committee Meeting

3,632 views

Published on

The construction liaison committee meeting of Brentcliffe - Victoria Park for May 3, 2018. You can see the presentation here:

Published in: Government & Nonprofit
  • Be the first to comment

  • Be the first to like this

Brentcliffe - Victoria Park Construction Liaison Committee Meeting

  1. 1. CROSSTOWN LRT Construction Liaison Committee Brentcliffe – Victoria Park May 3, 2018
  2. 2. What Are We Building • 15 underground stations and 10 surface stops – 9 km below ground and 10 km above ground • A maintenance and storage facility • A 19-kilometre route separated from regular traffic • Transit communications system • Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station
  3. 3. How We’re Building: Surface Stops • Sequential road widening will be implemented to allow traffic flow to be maintained during construction. • The track where the trains will run is at the same level of the roadway on concrete pad foundations, approximately 100 meters long. • Example of a Cross Section (Pharmacy Stop) • U-turns are permitted at intersections due to unavailability of mid-block left turns
  4. 4. Unique Design Concepts: Surface Stops •Clean, rectilinear form. Intuitive and easy to use •Transparent, to ensure clear sightlines to the street and to maximize the sense of the security to the passenger •Provides protection from rain/snow and splash from the street Shelter Design
  5. 5. At-Grade Artist Renderings Green Track Medians Renderings are an illustrative example and subject to change
  6. 6. At-Grade Artist Renderings Sunnybrook Stop Aerial Sunnybrook Stop Platform Renderings are an illustrative example and subject to change
  7. 7. At-Grade Artist Renderings Aga Khan (Ferrand) Stop Aerial Aga Khan (Ferrand) Stop Platform Renderings are an illustrative example and subject to change
  8. 8. At-Grade Artist Renderings Wynford Stop Aerial Wynford Stop Platform Renderings are an illustrative example and subject to change
  9. 9. At-Grade Artist Renderings Sloane Stop Aerial Sloane Stop Platform Renderings are an illustrative example and subject to change
  10. 10. At-Grade Artist Renderings O’Connor Stop Aerial O’Connor Stop Platform Renderings are an illustrative example and subject to change
  11. 11. West At-Grade (Brentcliffe Portal to O’Connor Stop) – Activities Completed and Upcoming Completed to Date  Median Removals mid-block between Pharmacy Avenue and the DVP Ongoing  Installation of Temporary Traffic Signals along Eglinton Avenue East  Street furniture removals between Brentcliffe Road and Ionview Road  Subsurface Utility Engineering  Geotechnical Investigations  Median Removals within the intersections along Eglinton Avenue East  Resumption of Tree Protection and Removals between Don Avon and Victoria Park Avenue Upcoming  Utility Relocations between Brentcliffe Road and Birchmount Road, where not currently underway
  12. 12. West At-Grade (Brentcliffe Portal to Victoria Park Stop) – Activities Brentcliffe Portal • Preparatory works continue where necessary – Geotechnical Investigations – Subsurface Utility Investigations – Tree Protection and Removals • Support of Excavation ongoing West At-Grade • Preparatory works continue where necessary – Geotechnical Investigations – Subsurface Utility Investigations – Tree Protection and Removals • Median Removal works almost complete; intersections underway. • Utility relocations between Sloane and Victoria Park underway • Hydro relocations between Brentcliffe and Victoria Park scheduled to begin within the next couple of weeks.
  13. 13. Construction Progress Pictures: Brentcliffe Portal East Portal: waterproofing East Portal: Backfilling on top of roof
  14. 14. How we’re building Science Centre Station Cut and Cover Methodology at Science Centre Station
  15. 15. Science Centre Aerial View (90%) Main Entrance Bus Terminal and Secondary Entrance Renderings are an illustrative example and subject to change
  16. 16. Science Centre West Portal (90%) Located west of Don Mills Road and Eglinton Avenue East intersection Rendering is an illustrative example and subject to change
  17. 17. Science Centre Station East Portal (90%) Located east of Don Mills Road and Eglinton Avenue East intersection Rendering is an illustrative example and subject to change
  18. 18. Science Centre Main Entrance Plaza (90%) Rendering is an illustrative example and subject to change
  19. 19. Science Centre Main Entrance Dusk (90%) Rendering is an illustrative example and subject to change
  20. 20. Science Centre Bus Terminal (90%) Rendering is an illustrative example and subject to change
  21. 21. Science Centre Secondary Entrance/Bus Terminal (90%) Rendering is an illustrative example and subject to change
  22. 22. Science Centre Bus Terminal Interior (90%) Rendering is an illustrative example and subject to change
  23. 23. Science Centre Station– Activities Completed and Upcoming Completed to Date  Piling (part of support of excavation) installation complete for current traffic stage  First tower crane installed within work zone on west side of Don Mills Ongoing  Work on the East/West Transmission Main (watermain) continues. City of Toronto work to facilitate connection to existing infrastructure underway. • Excavation of the Main Station Box underway and piling on the western side of the intersection is complete allowing for traffic decking to start. • Once decking is in place, traffic can be flipped to the next stage, allowing piling to begin on the east side of the intersection. Upcoming  Excavation for main station box in the center of Eglinton Avenue East  Traffic Reconfiguration to Stage 7 to support of excavation work on the east side of the Don Mills and Eglinton Ave East intersection expected to occur mid-late May.
  24. 24. Current Traffic Staging at Don Mills & Eglinton Traffic flip took place late-October and is expected to continue to be in place until approximately mid-May 2018
  25. 25. Upcoming Traffic Configuration at Science Centre Station Next stage expected to be implemented mid-late May 2018
  26. 26. Construction Progress Pictures: Science Centre Station Science Centre: Arrival and installation of first Tower Crane Science Centre: Main entrance invert pour
  27. 27. Stay up to date
  28. 28. 416-782-8118 or 416-482-7411 24 hours/7days a week www.thecrosstown.ca crosstown@metrolinx.com facebook.com/thecrosstown twitter.com/crosstownTO instagram.com/eglinton_crosstown Crosstown West Office 1848 Eglinton Ave W (at Dufferin) Crosstown East Office 660 Eglinton Ave E (at Bayview) Stay in Touch

×