Eglinton & Mount Pleasant CLC - 14July2021 Slide 1 Eglinton & Mount Pleasant CLC - 14July2021 Slide 2 Eglinton & Mount Pleasant CLC - 14July2021 Slide 3 Eglinton & Mount Pleasant CLC - 14July2021 Slide 4 Eglinton & Mount Pleasant CLC - 14July2021 Slide 5 Eglinton & Mount Pleasant CLC - 14July2021 Slide 6 Eglinton & Mount Pleasant CLC - 14July2021 Slide 7 Eglinton & Mount Pleasant CLC - 14July2021 Slide 8 Eglinton & Mount Pleasant CLC - 14July2021 Slide 9 Eglinton & Mount Pleasant CLC - 14July2021 Slide 10 Eglinton & Mount Pleasant CLC - 14July2021 Slide 11 Eglinton & Mount Pleasant CLC - 14July2021 Slide 12 Eglinton & Mount Pleasant CLC - 14July2021 Slide 13 Eglinton & Mount Pleasant CLC - 14July2021 Slide 14 Eglinton & Mount Pleasant CLC - 14July2021 Slide 15
Upcoming SlideShare
What to Upload to SlideShare
Next
Download to read offline and view in fullscreen.

0 Likes

Share

Download to read offline

Eglinton & Mount Pleasant CLC - 14July2021

Download to read offline

Eglinton & Mount Pleasant CLC - 14July2021

  • Be the first to like this

Eglinton & Mount Pleasant CLC - 14July2021

  1. 1. July 14, 2021 Eglinton Crosstown LRT Eglinton – Mt Pleasant CLC
  2. 2. ACCESSIBILITY HIGHLIGHTS 2 EGLINTON STATION: • The Main Station Entrance will be barrier-free, including elevators connecting passengers to the street level and to the platform levels. • Transfer elevators will provide access between the TTC Line 1 and ECLRT Line 5. • Six points of access are provided to the station from street level. MOUNT PLEASANT: • The Main Station Entrance will be barrier-free, including elevators connecting passenger to the street level and to the platform level. • At street level, the Main Entrance connects with the TTC bus routes on Mount Pleasant Road, Northbound and Southbound. INSERT FOOTER
  3. 3. ACCESSIBILITY HIGHLIGHTS 3 For all ECLRT Stations: • A barrier-free route with elevators from the Main Station Entrance through to the platforms. • The paving design for all station entrances includes wayfinding strategies such as an “urban carpet” that provides visual contrasting paving materials to guide passengers towards the Main Station Entrance. Tactile guidance paths that colour contrast with the surrounding floor surface, commencing inside the main Station Entrance doors, leading to the platform level via the elevator. • Enhanced Passenger Assistant Intercoms will be provided at the station entrance lobbies, accommodating verbal and non- verbal communication, and provide a hearing induction loop to assist people who use hearing aids. • A Paratransit stop will be located within proximity and within sight lines to each station’s Main Entrance. • Station entrances will provide hands free automatic sliding doors, providing an accessible clear width when open. • Directory signs for elevators will be provided in braille and print. • Tactile walking attention indicators will be provided at the top of all stairs and along all platform edges. • Stair’s nosing will provide a high level of colour contrast with the treads. • The Designated Waiting Areas on the platforms will be identified with a colour contrasted textured flooring surface.
  4. 4. Eglinton Station
  5. 5. EGLINTON STATION UPDATE 5 CENTRAL WEST WORKS MONTHLY MEETING Activity Location Approx. Date & Duration Extended Hours for Station Box Construction • Rebar, conduit, formwork, and steel installations Beneath Eglinton Avenue and Eglinton TTC Station Underway through 2021 Monday – Friday; 24-hours Berwick Portal Construction • Architectural & mechanical electrical works Berwick Avenue and Eglinton TTC Station Through 2021 • Periodic closures of Berwick Ave; subject to TTC approval TTC Eglinton Station Works • Platform extension works, cable installations, and elevator construction Eglinton TTC Station Elevator construction ongoing at 2200 Yonge St – former Smoke’s Poutinerie Periodically through 2021 Next TTC Line 1 closure scheduled for: July 17 – July 18, 2021 North Tunnel Ventilation Shaft Construction Center of Yonge St between Eglinton Ave and Roehampton Ave Underway until late Summer 2021 East Tunnel Ventilation Shaft Construction Salvation Army Site Through 2021 Concrete Works Throughout all station areas Through 2021 Traffic Configuration Change • To faciliate construction of the southeast entrance Yonge Street north and south of Eglinton Avenue Stage 1: As early as August 1, 2021 for approximately fifteen (15) days Stage 2: As early as August 15, 2021 for approximately five (5) months
  6. 6. UPCOMING TRAFFIC CONFIGURATION 6 CENTRAL WEST WORKS MONTHLY MEETING Expected to remain in place until August 1, 2021
  7. 7. UPCOMING TRAFFIC CONFIGURATION – STAGE 1 7 CENTRAL WEST WORKS MONTHLY MEETING As early as August 1, 2021 for approximately fifteen (15) days Draft map; graphic is subject to change.
  8. 8. UPCOMING TRAFFIC CONFIGURATION – STAGE 2 8 CENTRAL WEST WORKS MONTHLY MEETING As early as August 15, 2021 for approximately five (5) months Draft map; graphic is subject to change.
  9. 9. CONSTRUCTION PROGRESS PHOTOS 9 STATION BOX – ROOF SLAB POUR STATION BOX – WALL POUR
  10. 10. Mount Pleasant Station
  11. 11. MOUNT PLEASANT STATION UPDATE 11 Activity Location Approx. Date & Duration Station Box Construction • Rebar installations, formwork, concrete pours, masonry works, track and overhead catenary system installations Beneath Eglinton Avenue East • Currently working at the concourse and platform levels Underway into Fall 2021 Main Entrance Construction • Waterproofing, rebar and steel installations, concrete works North west corner of Eglinton Ave E and Mt Pleasant Rd. Underway through 2021 Secondary Entrance Construction • Masonry works, pre-cast panel, TPSS equipment and mechanical electrical installations North side of Eglinton Ave, between 801 Mt Pleasant Rd and 300 Eglinton Ave E Underway into Fall 2021 • Occupation of the parking lot at 801 Mt Pleasant Rd ongoing until July 21, 2021 Utility Reinstatement Works North and south sides of Eglinton Avenue Periodically through 2021
  12. 12. CURRENT TRAFFIC CONFIGURATION 12 Expected to remain in place through late-Summer 2021
  13. 13. CONSTRUCTION PROGRESS PHOTOS 13 CENTRAL WEST WORKS MONTHLY MEETING MEDIUM VOLTAGE ROOM CEILING FRAME INSTALLATION – STATION BOX
  14. 14. CONSTRUCTION PROGRESS PHOTOS 14 CENTRAL WEST WORKS MONTHLY MEETING MAIN ENTRANCE TRACK INSTALLATION

Eglinton & Mount Pleasant CLC - 14July2021

Views

Total views

4,148

On Slideshare

0

From embeds

0

Number of embeds

4,083

Actions

Downloads

1

Shares

0

Comments

0

Likes

0

×