Brentcliffe to Victoria Park - March 4, 2021 Slide 1 Brentcliffe to Victoria Park - March 4, 2021 Slide 2 Brentcliffe to Victoria Park - March 4, 2021 Slide 3 Brentcliffe to Victoria Park - March 4, 2021 Slide 4 Brentcliffe to Victoria Park - March 4, 2021 Slide 5 Brentcliffe to Victoria Park - March 4, 2021 Slide 6 Brentcliffe to Victoria Park - March 4, 2021 Slide 7 Brentcliffe to Victoria Park - March 4, 2021 Slide 8 Brentcliffe to Victoria Park - March 4, 2021 Slide 9 Brentcliffe to Victoria Park - March 4, 2021 Slide 10 Brentcliffe to Victoria Park - March 4, 2021 Slide 11 Brentcliffe to Victoria Park - March 4, 2021 Slide 12 Brentcliffe to Victoria Park - March 4, 2021 Slide 13 Brentcliffe to Victoria Park - March 4, 2021 Slide 14 Brentcliffe to Victoria Park - March 4, 2021 Slide 15 Brentcliffe to Victoria Park - March 4, 2021 Slide 16 Brentcliffe to Victoria Park - March 4, 2021 Slide 17 Brentcliffe to Victoria Park - March 4, 2021 Slide 18
Upcoming SlideShare
What to Upload to SlideShare
Next
Download to read offline and view in fullscreen.

0 Likes

Share

Download to read offline

Brentcliffe to Victoria Park - March 4, 2021

Download to read offline

Construction Liaison Meeting for Brentcliffe Road to Victoria Park Avenue

  • Be the first to like this

Brentcliffe to Victoria Park - March 4, 2021

  1. 1. March 4, 2021 Eglinton Crosstown LRT Construction Liaison Meeting Brentcliffe Road to Victoria Park Avenue
  2. 2. Section One At-Grade: Brentcliffe Portal to Sunnybrook Park Stop
  3. 3. SECTION ONE AT-GRADE UPDATE 3 Activity Location Approx. Date & Duration Brentcliffe Retaining Wall Construction North side of Eglinton Ave, east of Brentcliffe Rd On hold North curb concrete pour Waterproofing West Don River Bridge Completed February Ongoing through March • Shelter finishing activities • Platform ramps • Platform walls • Handrails Sunnybrook Park Stop Ongoing through March Track Works: Overnight OCS wiring installation Closures at Leslie Rd March 1 – April 2 Multi-use path construction: backfill and compaction Serena Gundy Park – West of Leslie St. Ongoing through Spring 2021 Pedestrian staircase installation Backfill on Leslie Trail Eglinton and Leslie St. – South side Ongoing through Spring 2021 Concrete and road works Don Mills Rd & Eglinton Ave E Ongoing through 2021
  4. 4. RETAINING WALL CONSTRUCTION NORTH SIDE OF EGLINTON EAST OF BRENTCLIFFE ROAD 4 • This retaining wall is required to hold the embankment created from the widened Eglinton Ave. • Retaining wall construction was put on hold while temporary slope stabilization work took place • Slope stabilization work is now complete and retaining wall construction will resume in March 2021 • Slope restoration design is in review by CTS and the City of Toronto
  5. 5. TRACK WORK: OCS WIRING INSTALLATION 5 Overnight, March 1 – April 2
  6. 6. RAMP CONSTRUCTION, WEST OF LESLIE STREET MULTI-USE PATH CONNECTING EGLINTON AVE E TO SERENA GUNDY PARK 6 • Construction activities for path construction include: Excavation, backfill and installation of topsoil • Landscaping will take place this year as part of the final restoration plan Mid-July 2020 through Spring 2021
  7. 7. PARKING LOT CLOSURE FOR NEW PEDESTRIAN STAIRCASE INSTALLATION EGLINTON AVENUE EAST AT LESLIE STREET – SOUTH SIDE 7 • Crews will be installing structural steel to form the new pedestrian staircase. A crane is installed installed at the work zone to lift materials into place. • To accommodate these activities, a section of the E.T Seton Park north parking lot will be closed. Access for pedestrian, cyclists and vehicles will be maintained. • No changes to traffic on Eglinton Avenue East. Ongoing until Spring 2021
  8. 8. CONSTRUCTION PROGRESS PHOTOS 8 BACKFILLING LESLIE TRAIL CURBS COMPLETE EAST DON RIVER BRIDGE
  9. 9. Science Centre Station
  10. 10. SCIENCE CENTRE STATION UPDATE 10 Activity Location Approx. Date & Duration Artwork tiling Electrical equipment installation Station box Completed February Roofing installation Bus terminal Completed February Wall tiling Elevator installation Main entrance Completed February Ceiling grid & tile installation Pedestrian tunnel Bus terminal Main entrance Station box Ongoing through Spring 2021 Wall & floor tiling Second art wall installation Mechanical and electrical installation Station box Ongoing through Spring 2021 Drywall installation Wall & floor tiling Sliding door installation Bus terminal Ongoing through Spring 2021 Electrical finishes Floor tiling Sliding door installation Main entrance Ongoing through Spring 2021
  11. 11. SCIENCE CENTRE TRAFFIC CONFIGURATION 11 December 6, 2020 for approx. eight months
  12. 12. CONSTRUCTION PROGRESS PHOTOS 12 STAIR TILE AND RAILING INSTALLATION CONCOURSE LEVEL ARCHITECTURAL FINISHES PEDESTRIAN TUNNEL
  13. 13. CONSTRUCTION PROGRESS PHOTOS 13 GLASS RAILING INSTALLATION MAIN ENTRANCE LIGHT PORTAL INSTALLATION BUS TERMINAL
  14. 14. Section Two At-Grade Aga Khan Park & Museum Stop to O’Connor Stop
  15. 15. SECTION TWO AT-GRADE UPDATE 15 Activity Location Approx. Date & Duration • Shelter finishing activities • Platform curbs Aga Khan Park & Museum Stop Ongoing through March Retaining walls Swift Drive & Eglinton Ave E Ongoing through March (North) Road widening Swift Drive to Bermondsey Road Ongoing through mid-March Barrier curbs East Don River Bridge Ongoing through March • Shelter structure installation • Platform curbs • Handrails • North sidewalk Sloane Stop Completed February Ongoing through March Track Works: Overnight OCS wiring installation Closures at Sloane Ave March 1 – April 2 • Shelter finishing activities • Platform curbs • Platform ramps O’Connor Stop Ongoing through March
  16. 16. TRACK WORK: OCS WIRING INSTALLATION 16 Overnight, March 1 – April 2
  17. 17. CONSTRUCTION PROGRESS PHOTOS 17 SHELTER INSTALLATION SLOANE STOP HANDRAILS INSTALLATION SLOANE STOP

Construction Liaison Meeting for Brentcliffe Road to Victoria Park Avenue