March 21, 2023
Eglinton Crosstown LRT
Western Works Construction
Liaison Committee Meeting
LAND ACKNOWLEDGEMENT
2
Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many
Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples.
We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the
trans-Atlantic slave trade, in this generation, or generations past.
We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful
reconciliation with the original caretakers of this land.
We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value
the rights of Indigenous communities, Nations and Peoples.
We understand the importance of working towards reconciliation with the original caretakers of this land. At
Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.
Caledonia Station
CALEDONIA STATION UPDATE
4
ACTIVITY LOCATION APPROX. DATE AND DURATION
Handrail Installations Throughout the station Completed March 2023
Presto Fare Gates
Presto Self-Serve Reload Machines
Concourse Level Completed March 2023
Urban Tapestry Installation Track level Completed February 2023
Streetlight Commissioning and Line
Painting Works
Along Eglinton Avenue West, between
Gabian Way and Blackthorn Avenue
Beginning as early as late-March 2023,
for approximately five (5) days
Architectural Works:
Tile installations, glazing, cladding,
painting, signage installations
Throughout the station Ongoing through Spring 2023
Mechanical and Electrical Installations:
Elevator & escalator adjustments and
inspections, lighting installations, and
systems installations
Throughout the station Ongoing through Spring 2023
Streetscape Works Bus loop/terminal Ongoing through Spring 2023
CALEDONIA STATION CONFIGURATION
5
PERIODIC LANE CLOSURES FOR STREETLIGHT COMMISSIONING AND LINE
PAINTING WORKS
6
Work is beginning as early as late-March 2023, for approximately five (5) days
โ€ข Periodic lane closures will be required
on Eglinton Avenue West, between
Gabian Way and Blackthorn Avenue.
โ€ข This work is expected to take place
between 7:00 a.m. โ€“ 5:00 p.m.
โ€ข One lane of traffic in each direction will
be maintained.
โ€ข All turning movements at the Gabian-
Eglinton and Blackthorn-Eglinton
intersections will be maintained.
โ€ข Temporary pedestrian rerouting may be
implemented periodically during this
work.
โ€ข Expect delays while travelling through
the area.
CALEDONIA PROGRESS PHOTOS
7
URBAN TAPESTRY INSTALLATION AT
TRACK LEVEL (COMPLETED)
PRESTO SELF-SERVE RELOAD
MACHINES โ€“ CONCOURSE LEVEL
(COMPLETED)
PRESTO FARE GATE INSTALLATION โ€“
CONCOURSE LEVEL (COMPLETED)
Keelesdale Station
KEELESDALE STATION UPDATE
9
ACTIVITY LOCATION APPROX. DATE AND DURATION
Escalator Testing
Platform Level
Concourse Level
Street Level
Completed February 2023
Concrete Wall Sanding Platform Level Completed February 2023
Presto Fare Gate Installation Concourse Level Ongoing through early 2023
Station Testing Throughout the Station Ongoing through early 2023
Station Inspections Throughout the Station Ongoing through early 2023
Train Testing and Commissioning Throughout the Station Ongoing through early 2023
KEELESDALE STATION FINAL CONFIGURATION
10
KEELESDALE PROGRESS PHOTOS
11
INSTALLATION OF PRESTO FARE GATES โ€“
CONCOURSE LEVEL (ONGOING)
CONCRETE WALL SANDING COMPLETE โ€“
PLATFORM LEVEL
ESCALATOR SAT (SITE ACCEPTANCE
TESTING) COMPLETED
Mount Dennis Station & Rail
Corridor
MOUNT DENNIS & RAIL CORRIDOR UPDATE
13
ACTIVITY LOCATION APPROX. DATE & DURATION
New GO & UPE Platform
โ€ข Platform construction: concrete finishing works,
tiling installation, railing installation, cladding,
and glazing
โ€ข Platform utility, mechanical, and electrical
installations
Railway corridor Ongoing through Spring 2023
Finishing activities
โ€ข Cladding, glazing, sign installations, electrical
finishes and other architectural finishes
โ€ข TTC bus testing
โ€ข Systems testing and inspections
Mount Dennis station
โ€ข Bus terminal
โ€ข Pedestrian corridor
โ€ข Former Kodak building
โ€ข Throughout the station box
Ongoing through Spring 2023
Landscaping works (complete remaining planting)
Along Eglinton Avenue and at EMSF
- Industry St and Todd Baylis Blvd
Resuming in late-March, and ongoing through Spring 2023
Landscaping works (grading and decorative fence
installation)
Along Eglinton Avenue and at EMSF
- Industry St and Todd Baylis Blvd
Ongoing through Spring 2023
Heat Trace Installation Works
Along Eglinton Avenue West,
between Weston Road and Black
Creek Drive
Resuming as early as Monday, March 13, 2023, for
approximately two (2) weeks
Ornamental Fence Installation Elevated Guideway Ongoing through Spring 2023
Train testing and commissioning Mount Dennis to Caledonia Ongoing through 2023
WESTON ROAD TO BLACK CREEK DRIVE TRAFFIC CONFIGURATION
14
LANE REDUCTIONS ON EGLINTON AVENUE WEST BETWEEN WESTON ROAD AND
BLACK CREEK DRIVE FOR HEAT TRACE INSTALLATION WORKS
15
Work is resuming as early as Monday, March 13, 2023, for approximately two (2) weeks
โ€ข Eastbound and westbound traffic on Eglinton Avenue West will be reduced to one lane in each direction
between Weston Road and Black Creek Drive
โ€ข Work will take place on Monday โ€“ Friday between 6:00 a.m. and 6:00 p.m.
โ€ข No changes to the current pedestrian routes
โ€ข Expect delays while travelling through the area
RAIL CORRIDOR STAGING โ€“ HAUL ROUTES
16
Through 2023
Barr Avenue is a haul route from
the Rail Corridor into early 2023
Locus Street is a
haul route from
the Rail Corridor
into early 2023
The double westbound lane will continue to be a
haul route. It will primarily be used for concrete,
formwork, and rebar deliveries.
A crane will also be placed here on occasion for
tunnel construction.
MOUNT DENNIS PROGRESS PHOTOS
17
BUS TERMINAL โ€“ TTC BUS
TESTING (COMPLETED)
ELEVATED GUIDEWAY โ€“
ORNAMENTAL FENCE INSTALLATION
(ONGOING)
RAIL CORRIDOR PROGRESS PHOTOS
18
EAST UPE PLATFORM โ€“
ELEVATOR VESTIBULE GLAZING
(ONGOING)
UPE CENTER PLATFORM โ€“
ARCHITECTURAL CEILING/LIGHTING
(ONGOING)
Eglinton Maintenance &
Storage Facility (EMSF)
Testing & Commissioning
EMSF, TESTING & COMMISSIONING UPDATE
20
Ongoing through 2023
โ€ข Eglinton Crosstown LRVs are now being
tested, as single and coupled vehicles,
on the mainline between Mount Dennis
Station and Caledonia Station
โ€ข Each train that will operate daily service
on the line must go through rigorous
testing to ensure safety and reliability
โ€ข Testing includes clearance tests, signal
and wayside equipment testing, testing
multiple vehicles, speed and brake tests
- to name a few
EMSF, TESTING & COMMISSIONING UPDATE
21
Ongoing through 2023
โ€ข Each of the 76 trains that will operate
daily service between Mount Dennis
and Kennedy must go through rigorous
testing to ensure everything is working
safely and reliably
โ€ข Testing activities must be done in
stages โ€“ hereโ€™s a roadmap of our
process:
EMSF PROGRESS PHOTOS
22
FENCE INSTALLATION
(ONGOING)
FENCE INSTALLATION
(ONGOING)
Western Works CLC - March, 21 2023

More Related Content

Similar to Western Works CLC - March, 21 2023

Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxCrosstown TO
ย 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxCrosstown TO
ย 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfCrosstown TO
ย 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCrosstown TO
ย 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxCrosstown TO
ย 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfCrosstown TO
ย 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfCrosstown TO
ย 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfCrosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
ย 
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptxChaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptxCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
ย 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxCrosstown TO
ย 
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxChaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxCrosstown TO
ย 
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdf
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdfChaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdf
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdfCrosstown TO
ย 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxCrosstown TO
ย 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Crosstown TO
ย 
Central East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCentral East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCrosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: March 3, 2021
Avenue & Chaplin CLC - Construction Update: March 3, 2021Avenue & Chaplin CLC - Construction Update: March 3, 2021
Avenue & Chaplin CLC - Construction Update: March 3, 2021Crosstown TO
ย 

Similar to Western Works CLC - March, 21 2023 (20)

Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
ย 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
ย 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdf
ย 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
ย 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
ย 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
ย 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
ย 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
ย 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
ย 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
ย 
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptxChaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
Chaplin-Avenue CLC - Sept 14, 2022 compressed .pptx
ย 
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
ย 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
ย 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
ย 
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxChaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
ย 
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdf
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdfChaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdf
Chaplin-Avenue CLC - Presentation Deck - July 6, 2022.pdf
ย 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
ย 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
ย 
Central East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCentral East Crosstown Open House Presentation
Central East Crosstown Open House Presentation
ย 
Avenue & Chaplin CLC - Construction Update: March 3, 2021
Avenue & Chaplin CLC - Construction Update: March 3, 2021Avenue & Chaplin CLC - Construction Update: March 3, 2021
Avenue & Chaplin CLC - Construction Update: March 3, 2021
ย 

More from Crosstown TO

Leaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdfLeaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdfCrosstown TO
ย 
Eglinton - Mt Pleasant CLC - November 9, 2022.pdf
Eglinton - Mt Pleasant CLC - November 9, 2022.pdfEglinton - Mt Pleasant CLC - November 9, 2022.pdf
Eglinton - Mt Pleasant CLC - November 9, 2022.pdfCrosstown TO
ย 
Leaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfLeaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfCrosstown TO
ย 
Leaside-Laird CLC - March 14 2022 - v2.pdf
Leaside-Laird CLC - March 14 2022 - v2.pdfLeaside-Laird CLC - March 14 2022 - v2.pdf
Leaside-Laird CLC - March 14 2022 - v2.pdfCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdfCLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdfCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdfCLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdfCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdfCrosstown TO
ย 
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptxCLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptxCrosstown TO
ย 

More from Crosstown TO (9)

Leaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdfLeaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdf
ย 
Eglinton - Mt Pleasant CLC - November 9, 2022.pdf
Eglinton - Mt Pleasant CLC - November 9, 2022.pdfEglinton - Mt Pleasant CLC - November 9, 2022.pdf
Eglinton - Mt Pleasant CLC - November 9, 2022.pdf
ย 
Test
TestTest
Test
ย 
Leaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfLeaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdf
ย 
Leaside-Laird CLC - March 14 2022 - v2.pdf
Leaside-Laird CLC - March 14 2022 - v2.pdfLeaside-Laird CLC - March 14 2022 - v2.pdf
Leaside-Laird CLC - March 14 2022 - v2.pdf
ย 
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdfCLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - July 7 2022.pdf
ย 
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdfCLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - May 5 2022.pdf
ย 
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - March 3 2022.pdf
ย 
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptxCLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
CLC Pharmacy to Kennedy - July 26, 2022 Compressed.pptx
ย 

Recently uploaded

The Outlook for the Budget and the Economy
The Outlook for the Budget and the EconomyThe Outlook for the Budget and the Economy
The Outlook for the Budget and the EconomyCongressional Budget Office
ย 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438ahcitycouncil
ย 
Women Call Girls in gaya 8250092165 Call Girls Advance Cash On Delivery Service
Women Call Girls in gaya  8250092165 Call Girls Advance Cash On Delivery ServiceWomen Call Girls in gaya  8250092165 Call Girls Advance Cash On Delivery Service
Women Call Girls in gaya 8250092165 Call Girls Advance Cash On Delivery ServiceSareena Khatun
ย 
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...Inaayaeventcompany
ย 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
ย 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
ย 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehousesubs7
ย 
Erotic Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
Erotic  Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...Erotic  Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
Erotic Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...vershagrag
ย 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationCuyahoga County Planning Commission
ย 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberSareena Khatun
ย 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...Sareena Khatun
ย 
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...vershagrag
ย 
Call Girls in North Sikkim 9332606886 HOT & SEXY Models beautiful and charmi...
Call Girls in North Sikkim  9332606886 HOT & SEXY Models beautiful and charmi...Call Girls in North Sikkim  9332606886 HOT & SEXY Models beautiful and charmi...
Call Girls in North Sikkim 9332606886 HOT & SEXY Models beautiful and charmi...Sareena Khatun
ย 
NGO working for orphan childrenโ€™s education
NGO working for orphan childrenโ€™s educationNGO working for orphan childrenโ€™s education
NGO working for orphan childrenโ€™s educationSERUDS INDIA
ย 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31JSchaus & Associates
ย 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...kumargunjan9515
ย 
Just Call VIP Call Girls In Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...HyderabadDolls
ย 
Premium Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
Premium  Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort ServicePremium  Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
Premium Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Servicevershagrag
ย 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Partito democratico
ย 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...kumargunjan9515
ย 

Recently uploaded (20)

The Outlook for the Budget and the Economy
The Outlook for the Budget and the EconomyThe Outlook for the Budget and the Economy
The Outlook for the Budget and the Economy
ย 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
ย 
Women Call Girls in gaya 8250092165 Call Girls Advance Cash On Delivery Service
Women Call Girls in gaya  8250092165 Call Girls Advance Cash On Delivery ServiceWomen Call Girls in gaya  8250092165 Call Girls Advance Cash On Delivery Service
Women Call Girls in gaya 8250092165 Call Girls Advance Cash On Delivery Service
ย 
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
Call Girls in Sarita Vihar Delhi Just Call ๐Ÿ‘‰๐Ÿ‘‰7065000506 Independent Female Es...
ย 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
ย 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
ย 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
ย 
Erotic Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
Erotic  Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...Erotic  Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
Erotic Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
ย 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
ย 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
ย 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
ย 
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
Call Girl In Prayagraj Call Girls Service ๐Ÿ‘‰ 6378878445 ๐Ÿ‘‰ Just๐Ÿ“ฒ Call Ruhi Call...
ย 
Call Girls in North Sikkim 9332606886 HOT & SEXY Models beautiful and charmi...
Call Girls in North Sikkim  9332606886 HOT & SEXY Models beautiful and charmi...Call Girls in North Sikkim  9332606886 HOT & SEXY Models beautiful and charmi...
Call Girls in North Sikkim 9332606886 HOT & SEXY Models beautiful and charmi...
ย 
NGO working for orphan childrenโ€™s education
NGO working for orphan childrenโ€™s educationNGO working for orphan childrenโ€™s education
NGO working for orphan childrenโ€™s education
ย 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
ย 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
ย 
Just Call VIP Call Girls In Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram โ˜Ž๏ธ 6378878445 Independent Fem...
ย 
Premium Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
Premium  Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort ServicePremium  Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
Premium Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
ย 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
ย 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
ย 

Western Works CLC - March, 21 2023

  • 1. March 21, 2023 Eglinton Crosstown LRT Western Works Construction Liaison Committee Meeting
  • 2. LAND ACKNOWLEDGEMENT 2 Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples. We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the trans-Atlantic slave trade, in this generation, or generations past. We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful reconciliation with the original caretakers of this land. We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value the rights of Indigenous communities, Nations and Peoples. We understand the importance of working towards reconciliation with the original caretakers of this land. At Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.
  • 4. CALEDONIA STATION UPDATE 4 ACTIVITY LOCATION APPROX. DATE AND DURATION Handrail Installations Throughout the station Completed March 2023 Presto Fare Gates Presto Self-Serve Reload Machines Concourse Level Completed March 2023 Urban Tapestry Installation Track level Completed February 2023 Streetlight Commissioning and Line Painting Works Along Eglinton Avenue West, between Gabian Way and Blackthorn Avenue Beginning as early as late-March 2023, for approximately five (5) days Architectural Works: Tile installations, glazing, cladding, painting, signage installations Throughout the station Ongoing through Spring 2023 Mechanical and Electrical Installations: Elevator & escalator adjustments and inspections, lighting installations, and systems installations Throughout the station Ongoing through Spring 2023 Streetscape Works Bus loop/terminal Ongoing through Spring 2023
  • 6. PERIODIC LANE CLOSURES FOR STREETLIGHT COMMISSIONING AND LINE PAINTING WORKS 6 Work is beginning as early as late-March 2023, for approximately five (5) days โ€ข Periodic lane closures will be required on Eglinton Avenue West, between Gabian Way and Blackthorn Avenue. โ€ข This work is expected to take place between 7:00 a.m. โ€“ 5:00 p.m. โ€ข One lane of traffic in each direction will be maintained. โ€ข All turning movements at the Gabian- Eglinton and Blackthorn-Eglinton intersections will be maintained. โ€ข Temporary pedestrian rerouting may be implemented periodically during this work. โ€ข Expect delays while travelling through the area.
  • 7. CALEDONIA PROGRESS PHOTOS 7 URBAN TAPESTRY INSTALLATION AT TRACK LEVEL (COMPLETED) PRESTO SELF-SERVE RELOAD MACHINES โ€“ CONCOURSE LEVEL (COMPLETED) PRESTO FARE GATE INSTALLATION โ€“ CONCOURSE LEVEL (COMPLETED)
  • 9. KEELESDALE STATION UPDATE 9 ACTIVITY LOCATION APPROX. DATE AND DURATION Escalator Testing Platform Level Concourse Level Street Level Completed February 2023 Concrete Wall Sanding Platform Level Completed February 2023 Presto Fare Gate Installation Concourse Level Ongoing through early 2023 Station Testing Throughout the Station Ongoing through early 2023 Station Inspections Throughout the Station Ongoing through early 2023 Train Testing and Commissioning Throughout the Station Ongoing through early 2023
  • 10. KEELESDALE STATION FINAL CONFIGURATION 10
  • 11. KEELESDALE PROGRESS PHOTOS 11 INSTALLATION OF PRESTO FARE GATES โ€“ CONCOURSE LEVEL (ONGOING) CONCRETE WALL SANDING COMPLETE โ€“ PLATFORM LEVEL ESCALATOR SAT (SITE ACCEPTANCE TESTING) COMPLETED
  • 12. Mount Dennis Station & Rail Corridor
  • 13. MOUNT DENNIS & RAIL CORRIDOR UPDATE 13 ACTIVITY LOCATION APPROX. DATE & DURATION New GO & UPE Platform โ€ข Platform construction: concrete finishing works, tiling installation, railing installation, cladding, and glazing โ€ข Platform utility, mechanical, and electrical installations Railway corridor Ongoing through Spring 2023 Finishing activities โ€ข Cladding, glazing, sign installations, electrical finishes and other architectural finishes โ€ข TTC bus testing โ€ข Systems testing and inspections Mount Dennis station โ€ข Bus terminal โ€ข Pedestrian corridor โ€ข Former Kodak building โ€ข Throughout the station box Ongoing through Spring 2023 Landscaping works (complete remaining planting) Along Eglinton Avenue and at EMSF - Industry St and Todd Baylis Blvd Resuming in late-March, and ongoing through Spring 2023 Landscaping works (grading and decorative fence installation) Along Eglinton Avenue and at EMSF - Industry St and Todd Baylis Blvd Ongoing through Spring 2023 Heat Trace Installation Works Along Eglinton Avenue West, between Weston Road and Black Creek Drive Resuming as early as Monday, March 13, 2023, for approximately two (2) weeks Ornamental Fence Installation Elevated Guideway Ongoing through Spring 2023 Train testing and commissioning Mount Dennis to Caledonia Ongoing through 2023
  • 14. WESTON ROAD TO BLACK CREEK DRIVE TRAFFIC CONFIGURATION 14
  • 15. LANE REDUCTIONS ON EGLINTON AVENUE WEST BETWEEN WESTON ROAD AND BLACK CREEK DRIVE FOR HEAT TRACE INSTALLATION WORKS 15 Work is resuming as early as Monday, March 13, 2023, for approximately two (2) weeks โ€ข Eastbound and westbound traffic on Eglinton Avenue West will be reduced to one lane in each direction between Weston Road and Black Creek Drive โ€ข Work will take place on Monday โ€“ Friday between 6:00 a.m. and 6:00 p.m. โ€ข No changes to the current pedestrian routes โ€ข Expect delays while travelling through the area
  • 16. RAIL CORRIDOR STAGING โ€“ HAUL ROUTES 16 Through 2023 Barr Avenue is a haul route from the Rail Corridor into early 2023 Locus Street is a haul route from the Rail Corridor into early 2023 The double westbound lane will continue to be a haul route. It will primarily be used for concrete, formwork, and rebar deliveries. A crane will also be placed here on occasion for tunnel construction.
  • 17. MOUNT DENNIS PROGRESS PHOTOS 17 BUS TERMINAL โ€“ TTC BUS TESTING (COMPLETED) ELEVATED GUIDEWAY โ€“ ORNAMENTAL FENCE INSTALLATION (ONGOING)
  • 18. RAIL CORRIDOR PROGRESS PHOTOS 18 EAST UPE PLATFORM โ€“ ELEVATOR VESTIBULE GLAZING (ONGOING) UPE CENTER PLATFORM โ€“ ARCHITECTURAL CEILING/LIGHTING (ONGOING)
  • 19. Eglinton Maintenance & Storage Facility (EMSF) Testing & Commissioning
  • 20. EMSF, TESTING & COMMISSIONING UPDATE 20 Ongoing through 2023 โ€ข Eglinton Crosstown LRVs are now being tested, as single and coupled vehicles, on the mainline between Mount Dennis Station and Caledonia Station โ€ข Each train that will operate daily service on the line must go through rigorous testing to ensure safety and reliability โ€ข Testing includes clearance tests, signal and wayside equipment testing, testing multiple vehicles, speed and brake tests - to name a few
  • 21. EMSF, TESTING & COMMISSIONING UPDATE 21 Ongoing through 2023 โ€ข Each of the 76 trains that will operate daily service between Mount Dennis and Kennedy must go through rigorous testing to ensure everything is working safely and reliably โ€ข Testing activities must be done in stages โ€“ hereโ€™s a roadmap of our process:
  • 22. EMSF PROGRESS PHOTOS 22 FENCE INSTALLATION (ONGOING) FENCE INSTALLATION (ONGOING)