2. LAND ACKNOWLEDGEMENT
2
Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many
Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples.
We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the
trans-Atlantic slave trade, in this generation, or generations past.
We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful
reconciliation with the original caretakers of this land.
We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value
the rights of Indigenous communities, Nations and Peoples.
We understand the importance of working towards reconciliation with the original caretakers of this land. At
Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.
4. CALEDONIA STATION UPDATE
4
ACTIVITY LOCATION APPROX. DATE AND DURATION
Handrail Installations Throughout the station Completed March 2023
Presto Fare Gates
Presto Self-Serve Reload Machines
Concourse Level Completed March 2023
Urban Tapestry Installation Track level Completed February 2023
Streetlight Commissioning and Line
Painting Works
Along Eglinton Avenue West, between
Gabian Way and Blackthorn Avenue
Beginning as early as late-March 2023,
for approximately five (5) days
Architectural Works:
Tile installations, glazing, cladding,
painting, signage installations
Throughout the station Ongoing through Spring 2023
Mechanical and Electrical Installations:
Elevator & escalator adjustments and
inspections, lighting installations, and
systems installations
Throughout the station Ongoing through Spring 2023
Streetscape Works Bus loop/terminal Ongoing through Spring 2023
6. PERIODIC LANE CLOSURES FOR STREETLIGHT COMMISSIONING AND LINE
PAINTING WORKS
6
Work is beginning as early as late-March 2023, for approximately five (5) days
โข Periodic lane closures will be required
on Eglinton Avenue West, between
Gabian Way and Blackthorn Avenue.
โข This work is expected to take place
between 7:00 a.m. โ 5:00 p.m.
โข One lane of traffic in each direction will
be maintained.
โข All turning movements at the Gabian-
Eglinton and Blackthorn-Eglinton
intersections will be maintained.
โข Temporary pedestrian rerouting may be
implemented periodically during this
work.
โข Expect delays while travelling through
the area.
9. KEELESDALE STATION UPDATE
9
ACTIVITY LOCATION APPROX. DATE AND DURATION
Escalator Testing
Platform Level
Concourse Level
Street Level
Completed February 2023
Concrete Wall Sanding Platform Level Completed February 2023
Presto Fare Gate Installation Concourse Level Ongoing through early 2023
Station Testing Throughout the Station Ongoing through early 2023
Station Inspections Throughout the Station Ongoing through early 2023
Train Testing and Commissioning Throughout the Station Ongoing through early 2023
13. MOUNT DENNIS & RAIL CORRIDOR UPDATE
13
ACTIVITY LOCATION APPROX. DATE & DURATION
New GO & UPE Platform
โข Platform construction: concrete finishing works,
tiling installation, railing installation, cladding,
and glazing
โข Platform utility, mechanical, and electrical
installations
Railway corridor Ongoing through Spring 2023
Finishing activities
โข Cladding, glazing, sign installations, electrical
finishes and other architectural finishes
โข TTC bus testing
โข Systems testing and inspections
Mount Dennis station
โข Bus terminal
โข Pedestrian corridor
โข Former Kodak building
โข Throughout the station box
Ongoing through Spring 2023
Landscaping works (complete remaining planting)
Along Eglinton Avenue and at EMSF
- Industry St and Todd Baylis Blvd
Resuming in late-March, and ongoing through Spring 2023
Landscaping works (grading and decorative fence
installation)
Along Eglinton Avenue and at EMSF
- Industry St and Todd Baylis Blvd
Ongoing through Spring 2023
Heat Trace Installation Works
Along Eglinton Avenue West,
between Weston Road and Black
Creek Drive
Resuming as early as Monday, March 13, 2023, for
approximately two (2) weeks
Ornamental Fence Installation Elevated Guideway Ongoing through Spring 2023
Train testing and commissioning Mount Dennis to Caledonia Ongoing through 2023
14. WESTON ROAD TO BLACK CREEK DRIVE TRAFFIC CONFIGURATION
14
15. LANE REDUCTIONS ON EGLINTON AVENUE WEST BETWEEN WESTON ROAD AND
BLACK CREEK DRIVE FOR HEAT TRACE INSTALLATION WORKS
15
Work is resuming as early as Monday, March 13, 2023, for approximately two (2) weeks
โข Eastbound and westbound traffic on Eglinton Avenue West will be reduced to one lane in each direction
between Weston Road and Black Creek Drive
โข Work will take place on Monday โ Friday between 6:00 a.m. and 6:00 p.m.
โข No changes to the current pedestrian routes
โข Expect delays while travelling through the area
16. RAIL CORRIDOR STAGING โ HAUL ROUTES
16
Through 2023
Barr Avenue is a haul route from
the Rail Corridor into early 2023
Locus Street is a
haul route from
the Rail Corridor
into early 2023
The double westbound lane will continue to be a
haul route. It will primarily be used for concrete,
formwork, and rebar deliveries.
A crane will also be placed here on occasion for
tunnel construction.
17. MOUNT DENNIS PROGRESS PHOTOS
17
BUS TERMINAL โ TTC BUS
TESTING (COMPLETED)
ELEVATED GUIDEWAY โ
ORNAMENTAL FENCE INSTALLATION
(ONGOING)
18. RAIL CORRIDOR PROGRESS PHOTOS
18
EAST UPE PLATFORM โ
ELEVATOR VESTIBULE GLAZING
(ONGOING)
UPE CENTER PLATFORM โ
ARCHITECTURAL CEILING/LIGHTING
(ONGOING)
20. EMSF, TESTING & COMMISSIONING UPDATE
20
Ongoing through 2023
โข Eglinton Crosstown LRVs are now being
tested, as single and coupled vehicles,
on the mainline between Mount Dennis
Station and Caledonia Station
โข Each train that will operate daily service
on the line must go through rigorous
testing to ensure safety and reliability
โข Testing includes clearance tests, signal
and wayside equipment testing, testing
multiple vehicles, speed and brake tests
- to name a few
21. EMSF, TESTING & COMMISSIONING UPDATE
21
Ongoing through 2023
โข Each of the 76 trains that will operate
daily service between Mount Dennis
and Kennedy must go through rigorous
testing to ensure everything is working
safely and reliably
โข Testing activities must be done in
stages โ hereโs a roadmap of our
process: