SlideShare a Scribd company logo
1 of 3
WARREN HALL
1604 Adview Road, SE, Palm Bay, FL 32909
(321) 373-1656 – Home (919) 949-8268 - Cell
Email:whall8268@gmail.com
https://www.linkedin.com/in/warren-hall-65460135
ELECTRICAL SYSTEMS ENGINEER
Highly motivated ElectricalEngineer with experience excelling in Network Telecommunications and Product
Management.
Highly technical Electrical Engineer with vast experience managing new product roll out, Telecommunications
networks, prototypes, drawings and bill of materials (BOM’s) for designs. Demonstrated skills in Investigating and
implementing product design changes and manufacturing process improvements forexisting products. Specialty in
new product introduction (NPI),Engineering change management, Supplier interface and equipment procurement.
Excellent problem solving, communication and product management skills. Ability to participate in customer new
product development teams.
AREA OF EXPERTISE
 New product roll out
 Hardware configuration
 Engineering change orders
(ECOs)
 Documents/Parts
revision control
 System cabling/Harness
 Schematics
 Prototyping
 Equipment sourcing
 SAP data management
 Google Docs/MS OfficeSuites
 SAP parts set up/SAP BOM
 Supplier interface
 Plexus ERP system
 VoIP
 Electronicsmanufacturing
 System test
 NetworkEngineering
 LAN/WAN
 IEEE802.xStandards
 Near field communication
 SONET
 ISO Process
ACCOMPLISHMENTS
 Project Management: Configured LAN/WAN telecommunications networks, managed from concept to close,
ensuring on time completion and customer delivery within budgetary constraints. Resulted in $90 million in
revenue annually; received award forexcellent teamworkand strong leadership skills.
 Product Improvement: Teamed with manufacturing, product integrity and installation to redesign outside
plant fiber/copper networkswitch, whichtranslated into $200,000 savings per year.
 ProcessImprovement:Partnered with information technology (IT) to develop automated design process that
completed customer orders more efficiently with100% accuracy,resulted in costsavings of $178,000 annually.
Received award for key cost saving idea.
PROFESSIONALEXPERIENCE
ARCA, Mebane NC
ProductEngineer/ProductManagementSpecialist
Oct.'2013- Jan.'2016
 Managed new product introductions, Engineering prototype builds and system cabling to deploy cash
automation systems at customer sites. Collaborated with Project managers, Testing, Production, Supply Chain,
Sales and Marketing to ensure all production schedules are met.
 Chaired the Engineering Change Review Board (ECRB) weekly, to approve or rejected engineer change notices
(ECNs)that impacted new or existing products.
 Created new part numbers in SAP, negotiated prices with suppliers, implemented price changes and generated
Bill of Materials (BOM’s)to drive production builds for on time customer product delivery.
 Managed parts database that drives Engineering, Supply chain and Production. Conducted product naming,
component sourcing, new supplier’s qualification, parts obsolescence and documentation update.
 Generated purchase orders in SAP ERP system to procure new equipment for engineering prototype build and
test, in preparation for proof of conceptat customers locations.
 Drove the cut in of new products into manufacturing, worked with supply chain to phase in/out materials and
monitored inventory use up to drive new material sourcing.
 Interfacedwithkey suppliers toaddress component technicalissues and managed return of damaged orrejected
materials.
 Managed multiple product schedules, provided weekly status to program directors on cash automation system
deployment, Engineering changes and metrics of parts set up in SAP.
 Created point to point system interconnect cabling and assembly drawing information that drove supplier
development of cable harnesses and assembly drawings for new products.
Durham TechnicalCommunity College, NC
EngineeringLab Consultantinkind (Temporary)
Aug.'2011 - Apr.'2012
 Conducted electrical experiments, documented results and created standard operating procedures (SOP) to
assist engineering students withelectrical designs and lab exercises.
 Performed electrical system assembly with integrated circuits, discrete components and hook up wires. Tested
analyzed, debugged problems and documented system performances.
 Simulated equipment control using discrete components, microcontrollers, C# and assembly language
programming.
 Researched and developed lab procedures to assist students with Microchip’s MPLAB IDE software
implementation.
Quality EducationInstitute of Durham, NC
Business OperationsManager
Jan.'2006 - June'2011
 Interpreted government policies, developed programs to ensure compliance, increased communications with
multiple departments to increase productivity.
 Prepared accurate specifications to drive purchasing of materials and equipment for continuous business
operation.
 Developed strong working relationships with businesses, community leaders and volunteers which increased
cash and service donations to the organization.
 Managed project scope, prioritization, estimating, planning, scheduling and implementing to drive customer
satisfaction.
Tek Systems/ MCI, Cary, NC
NetworkImplementationEngineer (Temporary Contract)
April'2005 - Sept.’ 2005
 Master scheduler for broadband LAN/WAN upgrades, installation and activation of Cisco Routers, DSL/Frame
relay, point-to-point, DS-1, DS-3, Satellite and Wireless equipment.
 Managed projectexecution, including ongoing management of risks/issues/change control,communication, and
reporting.
 Providedtechnical support to designers, managers, marketing, installation and peer engineers to drive projects
through the implementation processes.
Kelly Services/Solectron, RTP, NC
Test Engineer (Temporary Contract)
Feb.’ 2004 – May’ 2004
 Utilized GSM and CDMA protocols to perform automated test on mobile phones, installed latest software,
optimized performance and verified functionality.
 Inspected electronicsequipment to ensure compliance to specifications and government safety standards
 Analyzed failed equipment, identified root cause and solved problems to maintain high customer satisfaction
Northern Telecom/Nortel/Solectron, RTP, NC
Systems/Design/Interconnect/Applications Engineer
June’ 1984 – July’2001
 Analyzed and translated customer requirements into hardware and softwarespecifications, produced quotes,
generated telecommunications network officerecords, created 2D drawings, configurednetwork switches and
created documentation forCLEC/ILEC/IXCcustomers.
 Created computer models to simulate hardware configuration, generated schematics and bill of materials, to
drive supply chain, manufacturing, testing and installation of telecommunications networks.
 Created system connectivity fromscaled blue print drawings per IEEE 802.x standards. Procuredcustom cable
designs forVoIP,SS7, T1, DS0-DS3, SONET, OC3 - 0C192, COAX and power interfaces, to drive system test and
installation of telecommunications network switches.
 Managed introductions of new products, developed projectteams, created product release schedule and
conductweekly product review meetings.
 Engaged in component qualification to meet military and standard specifications. Negotiating with vendors,
ordered components and prototypes and maintaining approved vendor list (AVLs).
 Skilled in creating and reviewing bill of materials (BOMs), workingwithin procurement policies to identify,
evaluate and qualify new suppliers to drive just in time manufacturing.
EDUCATION AND TRAININGS
New Jersey Institute ofTechnology, Newark,NJ
 Bachelor of Science in ElectricalEngineering
DurhamTechnicalCommunity College
 Computer Networking/Hardware/Software upgrade
Trainings:
 First line supervisor training, managing difficultpeople seminar, negotiating to yes seminar.

More Related Content

What's hot

Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer
 
Ashten koontz resume
Ashten koontz resumeAshten koontz resume
Ashten koontz resumeAshten Koontz
 
Electrical Engineer (David Modin)
Electrical Engineer (David Modin)Electrical Engineer (David Modin)
Electrical Engineer (David Modin)PaceMail13
 
Charles jost resume
Charles jost resumeCharles jost resume
Charles jost resumecharles jost
 
marty barrett 05162016
marty barrett 05162016marty barrett 05162016
marty barrett 05162016Marty Barrett
 
Carlos Espino - Resume
Carlos Espino - ResumeCarlos Espino - Resume
Carlos Espino - ResumeCarlos Espino
 
Labview & Test stand Development Engineer
Labview & Test stand Development EngineerLabview & Test stand Development Engineer
Labview & Test stand Development Engineersankar Linklingam
 
John Allen - Resume
John Allen - ResumeJohn Allen - Resume
John Allen - ResumeJohn Allen
 
Naveen_Reddy_Resume
Naveen_Reddy_ResumeNaveen_Reddy_Resume
Naveen_Reddy_Resumereddhun
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
Joel Amzallag
Joel AmzallagJoel Amzallag
Joel Amzallagjamzallag
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarcoKeith DiMarco
 
Bush Carley Resume
Bush Carley ResumeBush Carley Resume
Bush Carley ResumeCarley Bush
 

What's hot (20)

Aw green resume 2017
Aw green resume 2017Aw green resume 2017
Aw green resume 2017
 
LinkRes
LinkResLinkRes
LinkRes
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16
 
Ashten koontz resume
Ashten koontz resumeAshten koontz resume
Ashten koontz resume
 
Electrical Engineer (David Modin)
Electrical Engineer (David Modin)Electrical Engineer (David Modin)
Electrical Engineer (David Modin)
 
Charles jost resume
Charles jost resumeCharles jost resume
Charles jost resume
 
marty barrett 05162016
marty barrett 05162016marty barrett 05162016
marty barrett 05162016
 
Carlos Espino - Resume
Carlos Espino - ResumeCarlos Espino - Resume
Carlos Espino - Resume
 
EntryLevel Resume
EntryLevel ResumeEntryLevel Resume
EntryLevel Resume
 
Labview & Test stand Development Engineer
Labview & Test stand Development EngineerLabview & Test stand Development Engineer
Labview & Test stand Development Engineer
 
John Allen - Resume
John Allen - ResumeJohn Allen - Resume
John Allen - Resume
 
msanjuan_RESUME
msanjuan_RESUMEmsanjuan_RESUME
msanjuan_RESUME
 
Naveen_Reddy_Resume
Naveen_Reddy_ResumeNaveen_Reddy_Resume
Naveen_Reddy_Resume
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Joel Amzallag
Joel AmzallagJoel Amzallag
Joel Amzallag
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarco
 
Bush Carley Resume
Bush Carley ResumeBush Carley Resume
Bush Carley Resume
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
RESUME98[1]. (1)
RESUME98[1]. (1)RESUME98[1]. (1)
RESUME98[1]. (1)
 

Viewers also liked

Monografia planeamento estratégico como ferramenta de retenção dos colabora...
Monografia   planeamento estratégico como ferramenta de retenção dos colabora...Monografia   planeamento estratégico como ferramenta de retenção dos colabora...
Monografia planeamento estratégico como ferramenta de retenção dos colabora...Universidade Pedagogica
 
Monografia liderança no sucesso empresarial
Monografia   liderança no sucesso empresarialMonografia   liderança no sucesso empresarial
Monografia liderança no sucesso empresarialUniversidade Pedagogica
 
Introduction to Risk and Efficiency among CDFIs: A Statistical Evaluation usi...
Introduction to Risk and Efficiency among CDFIs: A Statistical Evaluation usi...Introduction to Risk and Efficiency among CDFIs: A Statistical Evaluation usi...
Introduction to Risk and Efficiency among CDFIs: A Statistical Evaluation usi...nc_initiative
 
Monografia gestão de material médico-cirúrgico nas unidades sanitárias
Monografia   gestão de material médico-cirúrgico nas unidades sanitáriasMonografia   gestão de material médico-cirúrgico nas unidades sanitárias
Monografia gestão de material médico-cirúrgico nas unidades sanitáriasUniversidade Pedagogica
 
Programmes de formation SiSTM
Programmes de formation SiSTMProgrammes de formation SiSTM
Programmes de formation SiSTMkhalid mechkouri
 
Maximizing information and communications technologies for development in fai...
Maximizing information and communications technologies for development in fai...Maximizing information and communications technologies for development in fai...
Maximizing information and communications technologies for development in fai...Ed Dodds
 
Udi 5º acogida, 1ºtrimestre
Udi  5º acogida, 1ºtrimestreUdi  5º acogida, 1ºtrimestre
Udi 5º acogida, 1ºtrimestrevanderweb
 
Low fi prototype par Pol Gaosdoué
Low fi prototype par Pol GaosdouéLow fi prototype par Pol Gaosdoué
Low fi prototype par Pol Gaosdouéantopensource
 
Ins Gespräch kommen - Employer Branding in der Baloise
Ins Gespräch kommen - Employer Branding in der BaloiseIns Gespräch kommen - Employer Branding in der Baloise
Ins Gespräch kommen - Employer Branding in der BaloiseMarcus Fischer
 
PCIX Gigabit Ethernet Card Design
PCIX Gigabit Ethernet Card DesignPCIX Gigabit Ethernet Card Design
PCIX Gigabit Ethernet Card DesignMohamad Tisani
 
Moemen EL Walily CV - IT
Moemen EL Walily CV - ITMoemen EL Walily CV - IT
Moemen EL Walily CV - ITMomin El Walily
 

Viewers also liked (20)

Notes
NotesNotes
Notes
 
Monografia planeamento estratégico como ferramenta de retenção dos colabora...
Monografia   planeamento estratégico como ferramenta de retenção dos colabora...Monografia   planeamento estratégico como ferramenta de retenção dos colabora...
Monografia planeamento estratégico como ferramenta de retenção dos colabora...
 
Scorpion
ScorpionScorpion
Scorpion
 
Monografia liderança no sucesso empresarial
Monografia   liderança no sucesso empresarialMonografia   liderança no sucesso empresarial
Monografia liderança no sucesso empresarial
 
Alcoholismo
AlcoholismoAlcoholismo
Alcoholismo
 
Calendario Viernes 15 Abril 2016
Calendario Viernes 15 Abril 2016Calendario Viernes 15 Abril 2016
Calendario Viernes 15 Abril 2016
 
Presentación ambiente grupo 3
Presentación ambiente grupo 3Presentación ambiente grupo 3
Presentación ambiente grupo 3
 
Introduction to Risk and Efficiency among CDFIs: A Statistical Evaluation usi...
Introduction to Risk and Efficiency among CDFIs: A Statistical Evaluation usi...Introduction to Risk and Efficiency among CDFIs: A Statistical Evaluation usi...
Introduction to Risk and Efficiency among CDFIs: A Statistical Evaluation usi...
 
Monografia gestão de material médico-cirúrgico nas unidades sanitárias
Monografia   gestão de material médico-cirúrgico nas unidades sanitáriasMonografia   gestão de material médico-cirúrgico nas unidades sanitárias
Monografia gestão de material médico-cirúrgico nas unidades sanitárias
 
U4 t1 aa1_gabriela_navarro
U4 t1 aa1_gabriela_navarroU4 t1 aa1_gabriela_navarro
U4 t1 aa1_gabriela_navarro
 
Programmes de formation SiSTM
Programmes de formation SiSTMProgrammes de formation SiSTM
Programmes de formation SiSTM
 
Estres HIDRICO
Estres HIDRICOEstres HIDRICO
Estres HIDRICO
 
Maximizing information and communications technologies for development in fai...
Maximizing information and communications technologies for development in fai...Maximizing information and communications technologies for development in fai...
Maximizing information and communications technologies for development in fai...
 
Udi 5º acogida, 1ºtrimestre
Udi  5º acogida, 1ºtrimestreUdi  5º acogida, 1ºtrimestre
Udi 5º acogida, 1ºtrimestre
 
Low fi prototype par Pol Gaosdoué
Low fi prototype par Pol GaosdouéLow fi prototype par Pol Gaosdoué
Low fi prototype par Pol Gaosdoué
 
Ins Gespräch kommen - Employer Branding in der Baloise
Ins Gespräch kommen - Employer Branding in der BaloiseIns Gespräch kommen - Employer Branding in der Baloise
Ins Gespräch kommen - Employer Branding in der Baloise
 
Ley 43 1990
Ley 43 1990Ley 43 1990
Ley 43 1990
 
Fin de la guerra fría
Fin de la guerra fríaFin de la guerra fría
Fin de la guerra fría
 
PCIX Gigabit Ethernet Card Design
PCIX Gigabit Ethernet Card DesignPCIX Gigabit Ethernet Card Design
PCIX Gigabit Ethernet Card Design
 
Moemen EL Walily CV - IT
Moemen EL Walily CV - ITMoemen EL Walily CV - IT
Moemen EL Walily CV - IT
 

Similar to W.Hall_Resume_4_11_16

Khan Umair Resume Feb2010
Khan Umair Resume Feb2010Khan Umair Resume Feb2010
Khan Umair Resume Feb2010Umair Khan
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015Jeff Merrill
 
Abbas_Renewable energy_Solar_3 years
Abbas_Renewable energy_Solar_3 yearsAbbas_Renewable energy_Solar_3 years
Abbas_Renewable energy_Solar_3 yearsshaik Abbas
 
Abbas renewable energy solar_3 years
Abbas renewable energy solar_3 yearsAbbas renewable energy solar_3 years
Abbas renewable energy solar_3 yearsshaik Abbas
 
Ashten koontz resume
Ashten koontz resumeAshten koontz resume
Ashten koontz resumeAshten Koontz
 
Scott Jenney resume 5JUL2106
Scott Jenney resume 5JUL2106Scott Jenney resume 5JUL2106
Scott Jenney resume 5JUL2106Scott Jenney
 
Bill Delano Resume
Bill Delano ResumeBill Delano Resume
Bill Delano ResumeBill Delano
 
Bob fugerer resume
Bob fugerer  resumeBob fugerer  resume
Bob fugerer resumeBob Fugerer
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resumeSteve Majors
 
CV_EN
CV_ENCV_EN
CV_ENBal
 
Rls resume sepm_12_dec12
Rls resume sepm_12_dec12Rls resume sepm_12_dec12
Rls resume sepm_12_dec12Rudy Schneider
 

Similar to W.Hall_Resume_4_11_16 (20)

Khan Umair Resume Feb2010
Khan Umair Resume Feb2010Khan Umair Resume Feb2010
Khan Umair Resume Feb2010
 
ResumeAug14
ResumeAug14ResumeAug14
ResumeAug14
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015
 
Resume Rac
Resume RacResume Rac
Resume Rac
 
Abbas_Renewable energy_Solar_3 years
Abbas_Renewable energy_Solar_3 yearsAbbas_Renewable energy_Solar_3 years
Abbas_Renewable energy_Solar_3 years
 
Abbas renewable energy solar_3 years
Abbas renewable energy solar_3 yearsAbbas renewable energy solar_3 years
Abbas renewable energy solar_3 years
 
Resume - 2016
Resume - 2016Resume - 2016
Resume - 2016
 
Ashten koontz resume
Ashten koontz resumeAshten koontz resume
Ashten koontz resume
 
Scott Jenney resume 5JUL2106
Scott Jenney resume 5JUL2106Scott Jenney resume 5JUL2106
Scott Jenney resume 5JUL2106
 
Bill Delano Resume
Bill Delano ResumeBill Delano Resume
Bill Delano Resume
 
Resume2015
Resume2015Resume2015
Resume2015
 
MICHAEL ALLEN
MICHAEL ALLENMICHAEL ALLEN
MICHAEL ALLEN
 
Bob fugerer resume
Bob fugerer  resumeBob fugerer  resume
Bob fugerer resume
 
Mathew Bibin_2016
Mathew Bibin_2016Mathew Bibin_2016
Mathew Bibin_2016
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
resume 5.4
resume 5.4resume 5.4
resume 5.4
 
CV_EN
CV_ENCV_EN
CV_EN
 
Rls resume sepm_12_dec12
Rls resume sepm_12_dec12Rls resume sepm_12_dec12
Rls resume sepm_12_dec12
 
JCC RESUME 12.15.2015
JCC RESUME 12.15.2015JCC RESUME 12.15.2015
JCC RESUME 12.15.2015
 
Anbazhagan_Resume
Anbazhagan_ResumeAnbazhagan_Resume
Anbazhagan_Resume
 

W.Hall_Resume_4_11_16

  • 1. WARREN HALL 1604 Adview Road, SE, Palm Bay, FL 32909 (321) 373-1656 – Home (919) 949-8268 - Cell Email:whall8268@gmail.com https://www.linkedin.com/in/warren-hall-65460135 ELECTRICAL SYSTEMS ENGINEER Highly motivated ElectricalEngineer with experience excelling in Network Telecommunications and Product Management. Highly technical Electrical Engineer with vast experience managing new product roll out, Telecommunications networks, prototypes, drawings and bill of materials (BOM’s) for designs. Demonstrated skills in Investigating and implementing product design changes and manufacturing process improvements forexisting products. Specialty in new product introduction (NPI),Engineering change management, Supplier interface and equipment procurement. Excellent problem solving, communication and product management skills. Ability to participate in customer new product development teams. AREA OF EXPERTISE  New product roll out  Hardware configuration  Engineering change orders (ECOs)  Documents/Parts revision control  System cabling/Harness  Schematics  Prototyping  Equipment sourcing  SAP data management  Google Docs/MS OfficeSuites  SAP parts set up/SAP BOM  Supplier interface  Plexus ERP system  VoIP  Electronicsmanufacturing  System test  NetworkEngineering  LAN/WAN  IEEE802.xStandards  Near field communication  SONET  ISO Process ACCOMPLISHMENTS  Project Management: Configured LAN/WAN telecommunications networks, managed from concept to close, ensuring on time completion and customer delivery within budgetary constraints. Resulted in $90 million in revenue annually; received award forexcellent teamworkand strong leadership skills.  Product Improvement: Teamed with manufacturing, product integrity and installation to redesign outside plant fiber/copper networkswitch, whichtranslated into $200,000 savings per year.  ProcessImprovement:Partnered with information technology (IT) to develop automated design process that completed customer orders more efficiently with100% accuracy,resulted in costsavings of $178,000 annually. Received award for key cost saving idea. PROFESSIONALEXPERIENCE ARCA, Mebane NC ProductEngineer/ProductManagementSpecialist Oct.'2013- Jan.'2016  Managed new product introductions, Engineering prototype builds and system cabling to deploy cash automation systems at customer sites. Collaborated with Project managers, Testing, Production, Supply Chain, Sales and Marketing to ensure all production schedules are met.  Chaired the Engineering Change Review Board (ECRB) weekly, to approve or rejected engineer change notices (ECNs)that impacted new or existing products.  Created new part numbers in SAP, negotiated prices with suppliers, implemented price changes and generated Bill of Materials (BOM’s)to drive production builds for on time customer product delivery.  Managed parts database that drives Engineering, Supply chain and Production. Conducted product naming, component sourcing, new supplier’s qualification, parts obsolescence and documentation update.
  • 2.  Generated purchase orders in SAP ERP system to procure new equipment for engineering prototype build and test, in preparation for proof of conceptat customers locations.  Drove the cut in of new products into manufacturing, worked with supply chain to phase in/out materials and monitored inventory use up to drive new material sourcing.  Interfacedwithkey suppliers toaddress component technicalissues and managed return of damaged orrejected materials.  Managed multiple product schedules, provided weekly status to program directors on cash automation system deployment, Engineering changes and metrics of parts set up in SAP.  Created point to point system interconnect cabling and assembly drawing information that drove supplier development of cable harnesses and assembly drawings for new products. Durham TechnicalCommunity College, NC EngineeringLab Consultantinkind (Temporary) Aug.'2011 - Apr.'2012  Conducted electrical experiments, documented results and created standard operating procedures (SOP) to assist engineering students withelectrical designs and lab exercises.  Performed electrical system assembly with integrated circuits, discrete components and hook up wires. Tested analyzed, debugged problems and documented system performances.  Simulated equipment control using discrete components, microcontrollers, C# and assembly language programming.  Researched and developed lab procedures to assist students with Microchip’s MPLAB IDE software implementation. Quality EducationInstitute of Durham, NC Business OperationsManager Jan.'2006 - June'2011  Interpreted government policies, developed programs to ensure compliance, increased communications with multiple departments to increase productivity.  Prepared accurate specifications to drive purchasing of materials and equipment for continuous business operation.  Developed strong working relationships with businesses, community leaders and volunteers which increased cash and service donations to the organization.  Managed project scope, prioritization, estimating, planning, scheduling and implementing to drive customer satisfaction. Tek Systems/ MCI, Cary, NC NetworkImplementationEngineer (Temporary Contract) April'2005 - Sept.’ 2005  Master scheduler for broadband LAN/WAN upgrades, installation and activation of Cisco Routers, DSL/Frame relay, point-to-point, DS-1, DS-3, Satellite and Wireless equipment.  Managed projectexecution, including ongoing management of risks/issues/change control,communication, and reporting.  Providedtechnical support to designers, managers, marketing, installation and peer engineers to drive projects through the implementation processes. Kelly Services/Solectron, RTP, NC Test Engineer (Temporary Contract) Feb.’ 2004 – May’ 2004  Utilized GSM and CDMA protocols to perform automated test on mobile phones, installed latest software, optimized performance and verified functionality.  Inspected electronicsequipment to ensure compliance to specifications and government safety standards  Analyzed failed equipment, identified root cause and solved problems to maintain high customer satisfaction
  • 3. Northern Telecom/Nortel/Solectron, RTP, NC Systems/Design/Interconnect/Applications Engineer June’ 1984 – July’2001  Analyzed and translated customer requirements into hardware and softwarespecifications, produced quotes, generated telecommunications network officerecords, created 2D drawings, configurednetwork switches and created documentation forCLEC/ILEC/IXCcustomers.  Created computer models to simulate hardware configuration, generated schematics and bill of materials, to drive supply chain, manufacturing, testing and installation of telecommunications networks.  Created system connectivity fromscaled blue print drawings per IEEE 802.x standards. Procuredcustom cable designs forVoIP,SS7, T1, DS0-DS3, SONET, OC3 - 0C192, COAX and power interfaces, to drive system test and installation of telecommunications network switches.  Managed introductions of new products, developed projectteams, created product release schedule and conductweekly product review meetings.  Engaged in component qualification to meet military and standard specifications. Negotiating with vendors, ordered components and prototypes and maintaining approved vendor list (AVLs).  Skilled in creating and reviewing bill of materials (BOMs), workingwithin procurement policies to identify, evaluate and qualify new suppliers to drive just in time manufacturing. EDUCATION AND TRAININGS New Jersey Institute ofTechnology, Newark,NJ  Bachelor of Science in ElectricalEngineering DurhamTechnicalCommunity College  Computer Networking/Hardware/Software upgrade Trainings:  First line supervisor training, managing difficultpeople seminar, negotiating to yes seminar.