SlideShare a Scribd company logo
1 of 12
Download to read offline
Assignment (1) WRM (34) Group (8) Anatomy Flood event in Kapasi 13 May 2015
Prepared by: kakajan (Ailmy) - Mohammad Ismail and mubarz )Azizi(
Presented to : Dr. Piet Filet
Ass.professor Hamidullah TurabiDrDr Piet Filet
Piet Filet
1
KPU- IWRM (WRM-34)
5 June 2022
Ministry of Higher Education
Kabul Polytechnic University
Table of contents
1. Introduction.
2. Factors influencing floods.
3. Key factors in floods in Kapisa province.
4. The amount of rainfall that has caused floods.
5. Topography of flood catchment areas in Kapisa province using (GIS).
6. Flood management and prevention strategies in Kapisa province.
7. Challenges.
8. Solution
9. Conclusion
2
KPU- IWRM (WRM-34)
5 June 2022
1. Introduction:
Flood is a natural phenomenon that has been accepted by human societies as an
inevitable event and is considered one of the most costly natural disasters. But
the event, size and frequency of floods are due to several factors that vary
depending on the climatic, natural and geographical conditions of each region.
Due to the fact that floods and damages in most provinces of the country have
an increasing trend and cause death every year, Kapisa province in northeastern
Afghanistan has an area of ​​1908 square kilometers and a population density of
252 people per square kilometer in one of the most vulnerable province.
Date of flood : 13 May 2015 (5/6/1399)
Location : Hesa-e-awal and Kuhband districts
Flood damage :
20 people were killed
19 people were injured
Destruction of 3500Hec of agricultural land
Extinction of livestock
Demolition of hydraulic buildings
KPU- IWRM (WRM-34) 3
5 June 2022
2.Influential factors in creating floods :
4
KPU- IWRM (WRM-34)
5 June 2022
1. Rapid precipitation and lack of capacity of the place of descent.
2. Impenetrability of the ground and rapid melting of snow.
3. Lack of capacity and lack of proper design of river route and
floods.
4. Lack of use of flood dams and protective walls in flood-prone
areas Mountain collapse.
5. Lack of river dredging and accumulation of heavy and abnormal
sediments behind dams.
6. Damage to flood dams, dams and water tanks.
3. Key factors in floods in Kapisa province
5
KPU- IWRM (WRM-34)
5 June 2022
1. More desire for catchment areas.
2. Deforestation in catchment areas.
3. Lack of material in catchment areas.
4. Taking the sides of waterways by people.
5. Lack of rain gauges in most places.
6. Low awareness of people about floods.
7. Impacts of Climate Change and Drought.
4. The amount of rainfall that has caused floods
According to the statistics of the Meteorological Department, the rainfall in the mentioned areas is between 10-40 mm
and according to the records, the flood is estimated at 30 mm, which shows about 1 hour. The rainfall is in the form of
urographic graphics. Villages in Hesa-e-Awal and Kuhband districts have been affected by valleys. Depending on the
severity of the flood in this area, the Rational Method has been used and the amount of water flow from the floods has
been received as shown in the table below.
No Q_peak(m3/sec) Value C I(mm/hr) A (km2)
Sanjan(A) 70.1 0.278 0.2 30 42
Bolaghain(B) 91.7 0.278 0.2 30 55
Dornama(C) 127 0.278 0.2 30 76
Total 289
6
KPU- IWRM (WRM-34)
5 June 2022
5. Topography of flood catchment areas in Kapisa province using (GIS).
In the following forms, the study and evaluation of GIS software and the use of satellite images obtained the
physiographic characteristics of the watersheds that were most likely to be flooded.
Map of urban rivers in Kapisa province
7
KPU- IWRM (WRM-34)
5 June 2022
6. Flood management and prevention strategies in Kapisa province:
Flood management and appropriate
solutions in Kapisa province:
1. Construction of hydraulic
buildings (shoreline
consolidation, canal gates) .
2. Rehabilitation of green areas
and development of forest
areas.
3. Raising public awareness
through mosques and councils
about floods and preventive
measures about it.
4. Installation of flood warning
signs and rain gauges.
5. Construction of local storage
ponds in catchment areas by
the people.
8
KPU- IWRM (WRM-34)
5 June 2022
7- Challenges:
1. Weak management and low technical capacity of some
relevant departments for flood control before
operation.
2. Lack of flood control buildings.
3. Lack of sufficient budget for the implementation of
infrastructure projects.
4. Uncertainty about private sector investment right now.
5. Lack of infrastructure projects at the provincial level.
6. Construction of residential houses on the banks of
rivers and by the people.
7. Low public awareness and lack of flood warning
devices.
9
KPU- IWRM (WRM-34)
5 June 2022
8- Solution :
1) Upgrading the technical capacity of the relevant departments
to control floods before they occur.
2) Construction of flood control buildings.
3) Allocate sufficient funds to implement projects.
4) Attracting domestic and foreign NGOs and institutions to
invest in the water sector.
5) Arranging complex plans to implement public benefit projects.
6) Public awareness through water associations and local
councils.
7) Implement the laws and regulations of the water sector.
8) Installation of flood warning devices in the path of river and
floods.
10
5 June 2022 KPU- IWRM (WRM-34)
To manage floods in Kapisa province, the following results have been achieved, which are as follows.
 Comprehensive management and control of water resources.
 Strengthening groundwater by separating drains and control buildings.
 Increased rains and snow with increasing forests and the creation of tourist and recreational areas.
 Creating immunity and protecting the lives and property of the people of Kapisa province.
 Preservation of agricultural lands near the coast.
 Prevent the destruction of the shores on both sides and the possibility of revitalizing agricultural lands.
 Prevent illegal immigration.
 Growing people's economy and improving the environment.
9- Conclusion:
11
KPU- IWRM (WRM-34)
5 June 2022
Thanks for
your
attention
5 June 2022 12
KPU- IWRM (WRM-34)

More Related Content

Similar to Presentation(1) -ٌWRM 34Gruop (8) (1).pdf

Water Resources Management Financing in Indonesia
Water Resources Management Financing in IndonesiaWater Resources Management Financing in Indonesia
Water Resources Management Financing in Indonesia
GWP SOUTHEAST ASIA
 
Mid-Columbia Report - For Printing
Mid-Columbia Report - For PrintingMid-Columbia Report - For Printing
Mid-Columbia Report - For Printing
Andrea Watson
 

Similar to Presentation(1) -ٌWRM 34Gruop (8) (1).pdf (20)

Gadama pw
Gadama pwGadama pw
Gadama pw
 
DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...
DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...
DSD-INT 2022 Salt intrusion modelling in Aveiro Lagoon under morphological an...
 
Nguyenducanh iwrm in vietnam
Nguyenducanh iwrm in vietnamNguyenducanh iwrm in vietnam
Nguyenducanh iwrm in vietnam
 
Floods in Pakistan
Floods in PakistanFloods in Pakistan
Floods in Pakistan
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on Flooding
 
Water Resources Management Financing in Indonesia
Water Resources Management Financing in IndonesiaWater Resources Management Financing in Indonesia
Water Resources Management Financing in Indonesia
 
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
Advanced Survey of Groundwater Resources of Northern and Central Turkana Coun...
 
Challenges in global flood hazard mapping
Challenges in global flood hazard mappingChallenges in global flood hazard mapping
Challenges in global flood hazard mapping
 
The Heat Is On
The Heat Is OnThe Heat Is On
The Heat Is On
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
 
Impact of Climate Change on Water Resources in Somalia
Impact of Climate Change on Water Resources in SomaliaImpact of Climate Change on Water Resources in Somalia
Impact of Climate Change on Water Resources in Somalia
 
Draft PPT for panel Discussion.pptx
Draft PPT for panel Discussion.pptxDraft PPT for panel Discussion.pptx
Draft PPT for panel Discussion.pptx
 
ESDA_Workshop_Mishra1.pdf
ESDA_Workshop_Mishra1.pdfESDA_Workshop_Mishra1.pdf
ESDA_Workshop_Mishra1.pdf
 
Presentation (WRM 42) kakajan(Ailmy).pdf
Presentation (WRM 42) kakajan(Ailmy).pdfPresentation (WRM 42) kakajan(Ailmy).pdf
Presentation (WRM 42) kakajan(Ailmy).pdf
 
Mid-Columbia Report - For Printing
Mid-Columbia Report - For PrintingMid-Columbia Report - For Printing
Mid-Columbia Report - For Printing
 
10 - CSIRO - WRM technologies and tools-Sep-16
10 - CSIRO - WRM technologies and tools-Sep-1610 - CSIRO - WRM technologies and tools-Sep-16
10 - CSIRO - WRM technologies and tools-Sep-16
 
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptxE1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Suai_v1a.pptx
 
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptxE1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
E1405_2020.12.09.Municipal_presentation_Ainaro_v1a.pptx
 
Coupling of Surface water and Groundwater Models
Coupling of Surface water and Groundwater Models Coupling of Surface water and Groundwater Models
Coupling of Surface water and Groundwater Models
 

Recently uploaded

Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
MaherOthman7
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
benjamincojr
 

Recently uploaded (20)

Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 

Presentation(1) -ٌWRM 34Gruop (8) (1).pdf

  • 1. Assignment (1) WRM (34) Group (8) Anatomy Flood event in Kapasi 13 May 2015 Prepared by: kakajan (Ailmy) - Mohammad Ismail and mubarz )Azizi( Presented to : Dr. Piet Filet Ass.professor Hamidullah TurabiDrDr Piet Filet Piet Filet 1 KPU- IWRM (WRM-34) 5 June 2022 Ministry of Higher Education Kabul Polytechnic University
  • 2. Table of contents 1. Introduction. 2. Factors influencing floods. 3. Key factors in floods in Kapisa province. 4. The amount of rainfall that has caused floods. 5. Topography of flood catchment areas in Kapisa province using (GIS). 6. Flood management and prevention strategies in Kapisa province. 7. Challenges. 8. Solution 9. Conclusion 2 KPU- IWRM (WRM-34) 5 June 2022
  • 3. 1. Introduction: Flood is a natural phenomenon that has been accepted by human societies as an inevitable event and is considered one of the most costly natural disasters. But the event, size and frequency of floods are due to several factors that vary depending on the climatic, natural and geographical conditions of each region. Due to the fact that floods and damages in most provinces of the country have an increasing trend and cause death every year, Kapisa province in northeastern Afghanistan has an area of ​​1908 square kilometers and a population density of 252 people per square kilometer in one of the most vulnerable province. Date of flood : 13 May 2015 (5/6/1399) Location : Hesa-e-awal and Kuhband districts Flood damage : 20 people were killed 19 people were injured Destruction of 3500Hec of agricultural land Extinction of livestock Demolition of hydraulic buildings KPU- IWRM (WRM-34) 3 5 June 2022
  • 4. 2.Influential factors in creating floods : 4 KPU- IWRM (WRM-34) 5 June 2022 1. Rapid precipitation and lack of capacity of the place of descent. 2. Impenetrability of the ground and rapid melting of snow. 3. Lack of capacity and lack of proper design of river route and floods. 4. Lack of use of flood dams and protective walls in flood-prone areas Mountain collapse. 5. Lack of river dredging and accumulation of heavy and abnormal sediments behind dams. 6. Damage to flood dams, dams and water tanks.
  • 5. 3. Key factors in floods in Kapisa province 5 KPU- IWRM (WRM-34) 5 June 2022 1. More desire for catchment areas. 2. Deforestation in catchment areas. 3. Lack of material in catchment areas. 4. Taking the sides of waterways by people. 5. Lack of rain gauges in most places. 6. Low awareness of people about floods. 7. Impacts of Climate Change and Drought.
  • 6. 4. The amount of rainfall that has caused floods According to the statistics of the Meteorological Department, the rainfall in the mentioned areas is between 10-40 mm and according to the records, the flood is estimated at 30 mm, which shows about 1 hour. The rainfall is in the form of urographic graphics. Villages in Hesa-e-Awal and Kuhband districts have been affected by valleys. Depending on the severity of the flood in this area, the Rational Method has been used and the amount of water flow from the floods has been received as shown in the table below. No Q_peak(m3/sec) Value C I(mm/hr) A (km2) Sanjan(A) 70.1 0.278 0.2 30 42 Bolaghain(B) 91.7 0.278 0.2 30 55 Dornama(C) 127 0.278 0.2 30 76 Total 289 6 KPU- IWRM (WRM-34) 5 June 2022
  • 7. 5. Topography of flood catchment areas in Kapisa province using (GIS). In the following forms, the study and evaluation of GIS software and the use of satellite images obtained the physiographic characteristics of the watersheds that were most likely to be flooded. Map of urban rivers in Kapisa province 7 KPU- IWRM (WRM-34) 5 June 2022
  • 8. 6. Flood management and prevention strategies in Kapisa province: Flood management and appropriate solutions in Kapisa province: 1. Construction of hydraulic buildings (shoreline consolidation, canal gates) . 2. Rehabilitation of green areas and development of forest areas. 3. Raising public awareness through mosques and councils about floods and preventive measures about it. 4. Installation of flood warning signs and rain gauges. 5. Construction of local storage ponds in catchment areas by the people. 8 KPU- IWRM (WRM-34) 5 June 2022
  • 9. 7- Challenges: 1. Weak management and low technical capacity of some relevant departments for flood control before operation. 2. Lack of flood control buildings. 3. Lack of sufficient budget for the implementation of infrastructure projects. 4. Uncertainty about private sector investment right now. 5. Lack of infrastructure projects at the provincial level. 6. Construction of residential houses on the banks of rivers and by the people. 7. Low public awareness and lack of flood warning devices. 9 KPU- IWRM (WRM-34) 5 June 2022
  • 10. 8- Solution : 1) Upgrading the technical capacity of the relevant departments to control floods before they occur. 2) Construction of flood control buildings. 3) Allocate sufficient funds to implement projects. 4) Attracting domestic and foreign NGOs and institutions to invest in the water sector. 5) Arranging complex plans to implement public benefit projects. 6) Public awareness through water associations and local councils. 7) Implement the laws and regulations of the water sector. 8) Installation of flood warning devices in the path of river and floods. 10 5 June 2022 KPU- IWRM (WRM-34)
  • 11. To manage floods in Kapisa province, the following results have been achieved, which are as follows.  Comprehensive management and control of water resources.  Strengthening groundwater by separating drains and control buildings.  Increased rains and snow with increasing forests and the creation of tourist and recreational areas.  Creating immunity and protecting the lives and property of the people of Kapisa province.  Preservation of agricultural lands near the coast.  Prevent the destruction of the shores on both sides and the possibility of revitalizing agricultural lands.  Prevent illegal immigration.  Growing people's economy and improving the environment. 9- Conclusion: 11 KPU- IWRM (WRM-34) 5 June 2022
  • 12. Thanks for your attention 5 June 2022 12 KPU- IWRM (WRM-34)