HP BYPASS SYSTEM
Control Philosophy
and Protection
General
The Bypass System comprises
Two HP Bypass valve to take Main Steam
from before HPESV to Reheater inlet
bypassing the HP Turbine and
Two LP Bypass Valves that direct Steam from
Reheater outlet to Condenser bypassing the
IP & LP Turbines.
The HPLP Bypass system designed to pass
60% of the rated Turbine Steam flow [which
is 741 Te/hr].
Why Bypass System is required?
The system is intended for use at the following
times:
– For cold starts, if necessary for Boiler
temperature control.
– On hot starts, to facilitate matching of Boiler
Steam temperature and Turbine Metal
Temperature, prior to Steam admission to the
Turbines, thus achieving a faster start and
reduced thermal stress in the Turbine.
– To accommodate transient excesses in Boiler
Steam flow, thus stabilizing Boiler Steam flow
and helping to avoid operation of Boiler safety
valves.
– On load rejection or Turbine trip, the Bypass
system will handle sufficient Steam flow to
avoid a Boiler Trip, thus allowing rapid
reloading when the fault condition clears.
Operational and economic benefits for
HPLP Bypass system
 More flexible operation of Boiler & Turbine, thereby decreasing
and saving oil consumption works power due to faster cold,
warm and hot start-ups.
 Matching of Main Steam and HP Turbine metal temperatures as
well as Hot Reheat and IP Turbine metal temperatures, thus
reducing rotor and cylinder thermal stresses.
 Efficient cooling of all Boiler heating surfaces including
Reheaters.
 Less operation of Boiler and Reheater Safety valves thereby
reducing loss of costly DM Water and reduction in Noise
pollution.
 House Load operation of the Unit during Grid disturbances,
thereby remaining available for taking up external load
whenever conditions permit.
Checking required before HPBP charging.
Ensure that all permits are returned.
Physical checking of the oil tanks level.
Ensure the power supply of OSU P/p-1 & OSU
P/P-2 are healthy.
Hydraulic oil supply line up is ok.
Manual isolating v/v of BD valve is kept
open.
At least one BFP is running.
Cut in & cut out of the OSU p/p.( observe
that p/p cuts in at pr. below 100 kg/cm2 and
cuts out at pr.110 kg/cm2).
LINE UP OF HPBP
Charging of HPBP
Drum pressure > 15 kg/cm2.
Drum level is normal.
Charge the MS line keeping drains at flash tank open.
Open BP-5, BP-6, BP-7& BP-8 for removal of condensed steam in
the line. This is required to prevent the water hammering in the
line.
Warming up the line by opening BP-3,BP-9 and BP-4, BP-10.
Observe the downstream temp of HPBP. When this temp nearly
matches with MS temp open BP-1 & BP-2 manually to maintain
Pr. and Temp. Put BP-1 & BP-2 into auto giving a pr. set point in
the DCS.
Always keep BPE-1 & BPE-2 in auto and observe that BD valve is
opened when BP-1 & BP-2 opening >2%.
HP BYPASS INTERLOCKS &
PROTECTIONS
HPBP Pr CV BP-1 & BP-2 will priority close if
a) Condenser vacuum is > 0.6 kg/cm2.
b) Downstream temp. of CV is>380°C
HPBP Pr. CV BP-1 & BP-2
OUT BLOCK INC
1.) MFT & MS Press < 108 kg/cm2
Or
2.) Auto mode and (Valve Cmd > Pre defined
Cmd as per Load)
HPBP Pr. CV BP-1 & BP-2
OUT BLOCK DEC
1.) No MFT and (MS Pr <35 kg/cm2 or Load<50
MW or HRH Pr<5 kg/cm2)
And
2.) MS Press SP in Auto
And
3.) Valve position < HPBP min open i.e 10%
&
Ton: 20sec
MFT
MS Pr <35
kg/cm2 or
Load<50 MW or
HRH Pr<5
kg/cm2
&
MS Press SP in Auto
Valve position < HPBP min open
i.e. 10%
OUT BLOCK
DEC
FAST OPENING CONDITION OF
HPBP
BP-1 & BP-2 will fast open if
1.) No Priority Close and
2.) a.) Turbine trips or
b.) Generator breaker open or
c.) Turbine load shedding relay
operated or
d.)Fast open push button operated or
e.)RH Protection.
3.) Pressure deviation>5 and Pressure
>175 kg/cm2
&
NO PRIORITY CLOSE
CONDITION
TPULSE
GEN BKR OPEN OR
LSR ON(D12) OR
TURBINE TRIP(D10) OR
TURBINE TRIP (ATT) OR
RH PROTECTION(D13) OR
MANUAL FO PB OR
OTHER FO CRITERIA(D6)
3 SEC
IN 2
IN 1
IN 2 & MFT Ton(2 sec)
&
(MS Pr. – MS Pr. SP)<5
&
MS Pr. < 173 kg/cm2
Ton
1 s
Toff
2 s
&
IN 2
MFT
IN 3
FAST OPEN
AUTO MODE CONDITION OF HPBP
VALVES
BP-1 & BP-2 will automatically come in Auto
mode when FAST OPEN logic is initiated with
10 sec pulse.
MANUAL MODE CONDITION OF
HPBP VALVES
BP-1 & BP-2 will automatically come in Manual
mode when:
1.) Priority Close
2.) Valve PFT Tx fail.
3.) O.S.U 1 and O.S.U 2 Oil pressure V. low
OPERATING CONDITIONS OF SPRAY CV.
Spray CV BPE-1 & BPE-2 will close if
BP-1/BP-2 opening is< 2%.
BPE-1/BPE-2 will open in the case of
fast opening.
BPE-1/BPE-2 switch over to auto if BP-
1/BP-2 opening>2%.
BPE-1/BPE-2 get auto block if oil
pressure is very low.

More Related Content

What's hot

Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTTahoor Alam Khan
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING Nitin Patel
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownNitin Mahalle
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection systemSachin Pyasi
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Manohar Tatwawadi
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Manohar Tatwawadi
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operationNitin Patel
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGSURAJ KUMAR
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protectionanujkumarsingh79
 
Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxBhimarajuKanireddy
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overviewGaurav Kaushik
 
660 mw turbo governing &amp; protection system
660 mw turbo  governing &amp; protection system660 mw turbo  governing &amp; protection system
660 mw turbo governing &amp; protection systemAshvani Shukla
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW Manohar Tatwawadi
 

What's hot (20)

boiler turbine emergency
boiler turbine emergencyboiler turbine emergency
boiler turbine emergency
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFT
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection system
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
TURBINE_GOVERNING KWU.pdf
TURBINE_GOVERNING KWU.pdfTURBINE_GOVERNING KWU.pdf
TURBINE_GOVERNING KWU.pdf
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
 
Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overview
 
660 mw turbo governing &amp; protection system
660 mw turbo  governing &amp; protection system660 mw turbo  governing &amp; protection system
660 mw turbo governing &amp; protection system
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
 

Similar to Hplpbp

HPLP bypass HPLP bypass HPLP bypass ET 2010.ppt
HPLP bypass HPLP bypass HPLP bypass ET 2010.pptHPLP bypass HPLP bypass HPLP bypass ET 2010.ppt
HPLP bypass HPLP bypass HPLP bypass ET 2010.pptBhaiyaKamalendu1
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEManohar Tatwawadi
 
SIPAT 660 MW Turbo- Governing & Protection System.ppt
SIPAT 660 MW Turbo- Governing & Protection System.pptSIPAT 660 MW Turbo- Governing & Protection System.ppt
SIPAT 660 MW Turbo- Governing & Protection System.pptMarcWorld
 
660 mw turbo generator &amp; its auxiliaries
660 mw turbo generator &amp; its auxiliaries660 mw turbo generator &amp; its auxiliaries
660 mw turbo generator &amp; its auxiliariesAshvani Shukla
 
Minimum flow system
Minimum flow systemMinimum flow system
Minimum flow systemtaylorpo
 
Hrsg startup proceudre
Hrsg startup proceudreHrsg startup proceudre
Hrsg startup proceudrekamaraprasad
 
Sample Question and answer for power plants
Sample Question and answer for power plantsSample Question and answer for power plants
Sample Question and answer for power plantsVikeshgond2
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptxssuser0cdaa1
 
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptxE70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptxSATYANARAYANABODDULA
 
Kiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfKiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfHamedMostafa10
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdownAshvani Shukla
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing SystemSalil Vaidya
 
Operation of urea fertilizers plant
Operation of urea fertilizers plantOperation of urea fertilizers plant
Operation of urea fertilizers plantPrem Baboo
 
Psv scenario-and-calculation
Psv scenario-and-calculationPsv scenario-and-calculation
Psv scenario-and-calculationChingLuh Nike
 
Basic ccpp overview Power plant
Basic ccpp overview Power plantBasic ccpp overview Power plant
Basic ccpp overview Power plantMARLON RAMIREZ
 

Similar to Hplpbp (20)

HPLP bypass HPLP bypass HPLP bypass ET 2010.ppt
HPLP bypass HPLP bypass HPLP bypass ET 2010.pptHPLP bypass HPLP bypass HPLP bypass ET 2010.ppt
HPLP bypass HPLP bypass HPLP bypass ET 2010.ppt
 
PUMPS.ppt
PUMPS.pptPUMPS.ppt
PUMPS.ppt
 
CMC.pptx
CMC.pptxCMC.pptx
CMC.pptx
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
 
SIPAT 660 MW Turbo- Governing & Protection System.ppt
SIPAT 660 MW Turbo- Governing & Protection System.pptSIPAT 660 MW Turbo- Governing & Protection System.ppt
SIPAT 660 MW Turbo- Governing & Protection System.ppt
 
660 mw turbo generator &amp; its auxiliaries
660 mw turbo generator &amp; its auxiliaries660 mw turbo generator &amp; its auxiliaries
660 mw turbo generator &amp; its auxiliaries
 
Minimum flow system
Minimum flow systemMinimum flow system
Minimum flow system
 
Hrsg startup proceudre
Hrsg startup proceudreHrsg startup proceudre
Hrsg startup proceudre
 
Boiler p&i
Boiler p&iBoiler p&i
Boiler p&i
 
Sample Question and answer for power plants
Sample Question and answer for power plantsSample Question and answer for power plants
Sample Question and answer for power plants
 
HYDRAULIC POWER PACK 230LPM/210 BAR
HYDRAULIC POWER PACK 230LPM/210 BARHYDRAULIC POWER PACK 230LPM/210 BAR
HYDRAULIC POWER PACK 230LPM/210 BAR
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptx
 
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptxE70 CCB2 Brake system for WAG 9 Locomotive.pptx
E70 CCB2 Brake system for WAG 9 Locomotive.pptx
 
Kiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfKiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdf
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
Operation of urea fertilizers plant
Operation of urea fertilizers plantOperation of urea fertilizers plant
Operation of urea fertilizers plant
 
Psv scenario-and-calculation
Psv scenario-and-calculationPsv scenario-and-calculation
Psv scenario-and-calculation
 
Basic ccpp overview Power plant
Basic ccpp overview Power plantBasic ccpp overview Power plant
Basic ccpp overview Power plant
 
Turbine operation.pptx
Turbine operation.pptxTurbine operation.pptx
Turbine operation.pptx
 

More from vishal laddha

Case study on EHTC.pdf
Case study on EHTC.pdfCase study on EHTC.pdf
Case study on EHTC.pdfvishal laddha
 
Super critcal_sub critical_higher capacity sets - Copy.pdf
Super critcal_sub critical_higher capacity sets - Copy.pdfSuper critcal_sub critical_higher capacity sets - Copy.pdf
Super critcal_sub critical_higher capacity sets - Copy.pdfvishal laddha
 
Real Python 🐍👨_💻-1.pdf
Real Python 🐍👨_💻-1.pdfReal Python 🐍👨_💻-1.pdf
Real Python 🐍👨_💻-1.pdfvishal laddha
 
Brief Writeup on BCVMS.pdf
Brief Writeup on BCVMS.pdfBrief Writeup on BCVMS.pdf
Brief Writeup on BCVMS.pdfvishal laddha
 
BASICS OF VIBRATION.ppt
BASICS OF VIBRATION.pptBASICS OF VIBRATION.ppt
BASICS OF VIBRATION.pptvishal laddha
 
EXCITATION SYSTEM.ppt
EXCITATION SYSTEM.pptEXCITATION SYSTEM.ppt
EXCITATION SYSTEM.pptvishal laddha
 
December'2022 Maintenance review1.pptx
December'2022 Maintenance review1.pptxDecember'2022 Maintenance review1.pptx
December'2022 Maintenance review1.pptxvishal laddha
 
Case Studies on Vibrations.ppt
Case Studies on Vibrations.pptCase Studies on Vibrations.ppt
Case Studies on Vibrations.pptvishal laddha
 
Assignment business comm
Assignment business commAssignment business comm
Assignment business commvishal laddha
 
Plant operation manual
Plant operation manualPlant operation manual
Plant operation manualvishal laddha
 
Cable fault-finding-guide
Cable fault-finding-guideCable fault-finding-guide
Cable fault-finding-guidevishal laddha
 

More from vishal laddha (20)

Case study on EHTC.pdf
Case study on EHTC.pdfCase study on EHTC.pdf
Case study on EHTC.pdf
 
Super critcal_sub critical_higher capacity sets - Copy.pdf
Super critcal_sub critical_higher capacity sets - Copy.pdfSuper critcal_sub critical_higher capacity sets - Copy.pdf
Super critcal_sub critical_higher capacity sets - Copy.pdf
 
Gun Kaizen.pptx
Gun Kaizen.pptxGun Kaizen.pptx
Gun Kaizen.pptx
 
MAR,23.pptx
MAR,23.pptxMAR,23.pptx
MAR,23.pptx
 
Real Python 🐍👨_💻-1.pdf
Real Python 🐍👨_💻-1.pdfReal Python 🐍👨_💻-1.pdf
Real Python 🐍👨_💻-1.pdf
 
Brief Writeup on BCVMS.pdf
Brief Writeup on BCVMS.pdfBrief Writeup on BCVMS.pdf
Brief Writeup on BCVMS.pdf
 
BASICS OF VIBRATION.ppt
BASICS OF VIBRATION.pptBASICS OF VIBRATION.ppt
BASICS OF VIBRATION.ppt
 
Flame Scanner.ppt
Flame Scanner.pptFlame Scanner.ppt
Flame Scanner.ppt
 
EXCITATION SYSTEM.ppt
EXCITATION SYSTEM.pptEXCITATION SYSTEM.ppt
EXCITATION SYSTEM.ppt
 
HR.pptx
HR.pptxHR.pptx
HR.pptx
 
battery.ppt
battery.pptbattery.ppt
battery.ppt
 
December'2022 Maintenance review1.pptx
December'2022 Maintenance review1.pptxDecember'2022 Maintenance review1.pptx
December'2022 Maintenance review1.pptx
 
Case Studies on Vibrations.ppt
Case Studies on Vibrations.pptCase Studies on Vibrations.ppt
Case Studies on Vibrations.ppt
 
Assignment business comm
Assignment business commAssignment business comm
Assignment business comm
 
Assignment accounts
Assignment  accountsAssignment  accounts
Assignment accounts
 
Assignment hrm
Assignment hrmAssignment hrm
Assignment hrm
 
Plant operation manual
Plant operation manualPlant operation manual
Plant operation manual
 
Cable fault-finding-guide
Cable fault-finding-guideCable fault-finding-guide
Cable fault-finding-guide
 
Cable construction
Cable constructionCable construction
Cable construction
 
Mvar management
Mvar managementMvar management
Mvar management
 

Recently uploaded

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Hplpbp

  • 1. HP BYPASS SYSTEM Control Philosophy and Protection
  • 2. General The Bypass System comprises Two HP Bypass valve to take Main Steam from before HPESV to Reheater inlet bypassing the HP Turbine and Two LP Bypass Valves that direct Steam from Reheater outlet to Condenser bypassing the IP & LP Turbines. The HPLP Bypass system designed to pass 60% of the rated Turbine Steam flow [which is 741 Te/hr].
  • 3. Why Bypass System is required? The system is intended for use at the following times: – For cold starts, if necessary for Boiler temperature control. – On hot starts, to facilitate matching of Boiler Steam temperature and Turbine Metal Temperature, prior to Steam admission to the Turbines, thus achieving a faster start and reduced thermal stress in the Turbine. – To accommodate transient excesses in Boiler Steam flow, thus stabilizing Boiler Steam flow and helping to avoid operation of Boiler safety valves. – On load rejection or Turbine trip, the Bypass system will handle sufficient Steam flow to avoid a Boiler Trip, thus allowing rapid reloading when the fault condition clears.
  • 4.
  • 5. Operational and economic benefits for HPLP Bypass system  More flexible operation of Boiler & Turbine, thereby decreasing and saving oil consumption works power due to faster cold, warm and hot start-ups.  Matching of Main Steam and HP Turbine metal temperatures as well as Hot Reheat and IP Turbine metal temperatures, thus reducing rotor and cylinder thermal stresses.  Efficient cooling of all Boiler heating surfaces including Reheaters.  Less operation of Boiler and Reheater Safety valves thereby reducing loss of costly DM Water and reduction in Noise pollution.  House Load operation of the Unit during Grid disturbances, thereby remaining available for taking up external load whenever conditions permit.
  • 6. Checking required before HPBP charging. Ensure that all permits are returned. Physical checking of the oil tanks level. Ensure the power supply of OSU P/p-1 & OSU P/P-2 are healthy. Hydraulic oil supply line up is ok. Manual isolating v/v of BD valve is kept open. At least one BFP is running. Cut in & cut out of the OSU p/p.( observe that p/p cuts in at pr. below 100 kg/cm2 and cuts out at pr.110 kg/cm2).
  • 7. LINE UP OF HPBP
  • 8. Charging of HPBP Drum pressure > 15 kg/cm2. Drum level is normal. Charge the MS line keeping drains at flash tank open. Open BP-5, BP-6, BP-7& BP-8 for removal of condensed steam in the line. This is required to prevent the water hammering in the line. Warming up the line by opening BP-3,BP-9 and BP-4, BP-10. Observe the downstream temp of HPBP. When this temp nearly matches with MS temp open BP-1 & BP-2 manually to maintain Pr. and Temp. Put BP-1 & BP-2 into auto giving a pr. set point in the DCS. Always keep BPE-1 & BPE-2 in auto and observe that BD valve is opened when BP-1 & BP-2 opening >2%.
  • 9.
  • 10. HP BYPASS INTERLOCKS & PROTECTIONS HPBP Pr CV BP-1 & BP-2 will priority close if a) Condenser vacuum is > 0.6 kg/cm2. b) Downstream temp. of CV is>380°C
  • 11.
  • 12. HPBP Pr. CV BP-1 & BP-2 OUT BLOCK INC 1.) MFT & MS Press < 108 kg/cm2 Or 2.) Auto mode and (Valve Cmd > Pre defined Cmd as per Load)
  • 13.
  • 14.
  • 15. HPBP Pr. CV BP-1 & BP-2 OUT BLOCK DEC 1.) No MFT and (MS Pr <35 kg/cm2 or Load<50 MW or HRH Pr<5 kg/cm2) And 2.) MS Press SP in Auto And 3.) Valve position < HPBP min open i.e 10%
  • 16. & Ton: 20sec MFT MS Pr <35 kg/cm2 or Load<50 MW or HRH Pr<5 kg/cm2 & MS Press SP in Auto Valve position < HPBP min open i.e. 10% OUT BLOCK DEC
  • 17. FAST OPENING CONDITION OF HPBP BP-1 & BP-2 will fast open if 1.) No Priority Close and 2.) a.) Turbine trips or b.) Generator breaker open or c.) Turbine load shedding relay operated or d.)Fast open push button operated or e.)RH Protection. 3.) Pressure deviation>5 and Pressure >175 kg/cm2
  • 18. & NO PRIORITY CLOSE CONDITION TPULSE GEN BKR OPEN OR LSR ON(D12) OR TURBINE TRIP(D10) OR TURBINE TRIP (ATT) OR RH PROTECTION(D13) OR MANUAL FO PB OR OTHER FO CRITERIA(D6) 3 SEC IN 2 IN 1 IN 2 & MFT Ton(2 sec) & (MS Pr. – MS Pr. SP)<5 & MS Pr. < 173 kg/cm2 Ton 1 s Toff 2 s & IN 2 MFT IN 3 FAST OPEN
  • 19.
  • 20.
  • 21. AUTO MODE CONDITION OF HPBP VALVES BP-1 & BP-2 will automatically come in Auto mode when FAST OPEN logic is initiated with 10 sec pulse.
  • 22.
  • 23. MANUAL MODE CONDITION OF HPBP VALVES BP-1 & BP-2 will automatically come in Manual mode when: 1.) Priority Close 2.) Valve PFT Tx fail. 3.) O.S.U 1 and O.S.U 2 Oil pressure V. low
  • 24. OPERATING CONDITIONS OF SPRAY CV. Spray CV BPE-1 & BPE-2 will close if BP-1/BP-2 opening is< 2%. BPE-1/BPE-2 will open in the case of fast opening. BPE-1/BPE-2 switch over to auto if BP- 1/BP-2 opening>2%. BPE-1/BPE-2 get auto block if oil pressure is very low.