HP/LP BY PASS
SYSTEM
During short trip outs the supply of steam to
turbine has to be totally cut off from the
boiler. Once short tripping is over, turbine
requires steam at high temperature as the
temperature of the turbine parts have not
reduced much during the short period due to
effective insulation and high mass of
materials.
BY PASS SYSTEM
But boiler will not give in a sudden during
restart. If low temperature steam admitted
turbine will be affected. Other words, TPS
will idle until the turbine cool and match
with steam parameters. This period will be
very long since cooling rate is very low for
the turbine.
BY PASS SYSTEM
*By pass system comprises a pipe work system
with valves and pressure dropping devices to
enable live steam from the boiler to by pass the
turbine completely and be dumped into the
condenser.
* For matching live steam and turbine metal
temperature for a quick start-up, By pass
stations have been provided.
BY PASS SYSTEM
WHEN BY PASS IS REQUIRED
1.During Startup
2.During a Turbine Trip
3.Higher Steam Pressure (Exceeding
design limit)
4 Flexible load and ramp up change
WHEN STEM FLOW IS NECESSARY
THROUGH REHEATER
1.The higher steam temperature required
by the turbine during Startup
2. During sudden trip
CLASSIFICATION OF BY PASS
SYSTEM
1. HP By Pass System
2. LP By Pass System
HP BY PASS SYSTEM
FUNCTIONS OF HP BY PASS
SYSTEM
1. To establish flow at the outlet of super heater for
raising boiler parameters during startup.
2. To maintain or control steam pressure at preset
valve in main steam line during startup.
3. To warm up steam lines.
4. To control steam temperature down steam of HP
By Pass at the present value.
5. To dump steam from boiler into condenser in case
the generator circuit breaker opens.
FUNCTIONS OF LP BY PASS
SYSTEM
1. Control of steam after reheater
2. Establish flow of steam from reheat line to
condenser by its opening, proportional to the
opening of by pass valve.
3. Release of stem entrapped in HP and
reheater circuit in case generator circuit
breaker opens.
HP BY PASS SYSTEM
1. HP By Pass Valve
2. Spray water pressure control valve
3. Spray water flow control valve
4. Break down orifice
Design Pressure 200 Kg/Sq.cm-
Design Temperature545°C
(Parameters based on the system
requirement of unit)
Combined Pressure
reducing and
Desuperheating Valve
Spherical Shaped body
to optimize Stress
levels
Zero leak valve
HP BYPASS VALVE
HP BYPASS VALVE- one type
COMPONENTS OF HP
BY PASS VALVE
1. Valve body
2. Valve stem
3. Valve seat
4. Jet case
5. Pressure seal plug
6. Bearing carrier
7. Packing net
HP BYPASS SPRAY VALVES
• Design Pressure
350 Kg/Sq.cm
Design Temperature
300°C
 Provide spray Water
control to HP
Bypass valves
 Zero Leak Valve
HP BYPASS SPRAY
VALVE
COMPONENTS OF SPRAY WATER PRESSURE
CONTROL VALVE AND FLOW CONTROL VALVE
1. Valve body
2. Valve stem
3. Valve seat
4. Guide bush
5. Gland nut
6. Pressure seal plug
LP BY PASS SYSTEM
1. LP By Pass valve
2. Spray water flow control valve
3. Cooler
LP BYPASS VALVE
 Design Pressure
64 Kg/Sq.cm
Design Temperature 540°C
 Pressure Reducing valve
 Spherical Shaped Body To
Optimize the Stresses
 Zero Leak valve
COMPONENTS OF LP
BY PASS VALVE
1. Valve body
2. Valve stem
3. Valve plug
4. Valve seat
5. Bonnet
6. Bearing carrier
7. Packing net
Design Pressure
50 Kg/Sq.cm
Design temperature
300°C
Provides Spray Water Control
To LP Bypass valve
Zero Leak valve
LP BYPASS SPRAY VALVE
ADVANTAGES OF HPAND LP
BY PASS SYSTEM
1. To cut down unit startup time.
2. To allow boiler operation during short turbine trips.
3. To warm up steam lines during startup.
4. It gives smooth warm up of boiler components,
including reheater. A most rapid boiler run-up may be
possible. It is saves fuel.
5. Enables the boiler to take up heavy rejection trip to
house load operation advantageously.
ADVANTAGES OF HPAND LP
BY PASS SYSTEM
6. To allow better matching of boiler and turbine.
7. Water loss during startup is minimised.
8. To help conserve demineralised water during start
up and sudden load sheddings.
9. Independent operation of boiler is achievable.
10. To prevents frequent flowing of safety valves.
INTERLOCKS IN BY PASS
SYSTEM
1. Generator Circuit Breaker
2. Condenser vacuum too low
3. HP by pass valve position less than 2%
4. Temperature too high
5. HP by pass valve position more than 2%
6. Close - signal for spray water control
PROBLEMS WITH BY PASS
SYSTEM
1. Noise:
a. Reduced by employing adiabatic flow with friction.
b. Increasing thickness and covering acoustic
insulation.
2. Water ingress:
Pressure control valves are shut, a large build up
condensation will occur in the steam lines. To avoid
this drains are located at suitable positions.
PROBLEMS WITH BY PASS
SYSTEM
3. Thermal shock
4. Leakage flows
5. Heating of turbine blade
6. Turbine Exhaust Pressure Increasing
BY PASS VALVE COMPONENTS
1. Valve Body:
Low alloy steel, 2.25% Cr, 1% Mo (with stand high
pressure & temperature)
2. Valve Stem:
High alloy steel, 2.25% Cr, 1% Mb (Valve throttle from
high pressure to low pressure)
3. Valve Seat:
Low alloy steel (it is pre-stressed before welding, to
avoid high heat transfer stress to the welding position).
BY PASS VALVE COMPONENTS
4. Jet Case: Low alloy steel (it should be flexible for
avoiding direct impingement of spray valve)
5. Pressure seal plug: Low alloy steel
6. Bearing Carrier: Stellite
7. Packing Net: Low alloy steel, sufficiently tightened.
SPRAY WATER FLOW CONTROL
VALVE AND PRESSURE VALVE
Cylindrical nature, flow medium is erosive in nature,
total pressure drop in the valve has been divided
between 3 stages.
1. Valve Body:
Carbon molybdenium steel, 2.25% Cr, 1% Mo
2. Valve Stem:
13% Cr. (High chromium alloy steel)
SPRAY WATER FLOW CONTROL VALVE
AND PRESSURE VALVE
3. Valve Seat: High alloy steel
4. Guide Bush: Monel material (Hardened
quality)
5. Gland Net: Low alloy steel
6. Pressure Seal Plug: Graphite, Asbestos & oil
mixed loosely
BREAKDOWN ORIFICE
Limit outlet velocity by increasing pressure low
vibration.
Low alloy steel, 1%Cr, 1/2 % Mo
Personal research
Any queries
bobenntpc@yahoo.co.uk

More Related Content

What's hot

Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
Amardeep Jadeja
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
SHIVAJI CHOUDHURY
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
SURAJ KUMAR
 

What's hot (20)

Steam turbine losses
Steam turbine  lossesSteam turbine  losses
Steam turbine losses
 
turbine governing oil system
turbine governing oil systemturbine governing oil system
turbine governing oil system
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
boiler turbine emergency
boiler turbine emergencyboiler turbine emergency
boiler turbine emergency
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overview
 
TURBINE FUNDAMENTAL
TURBINE FUNDAMENTALTURBINE FUNDAMENTAL
TURBINE FUNDAMENTAL
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 
Turbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & WorkingTurbine Stress Control Logic, Calculation & Working
Turbine Stress Control Logic, Calculation & Working
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedure
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater control
 
Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPE
 

Similar to Hp/ lp bypass system for steam turbines

Bhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regaliBhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regali
Baroda
 
Steam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfSteam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdf
GaluhAjeng26
 

Similar to Hp/ lp bypass system for steam turbines (20)

mech 2nd yr lab report.pdf
mech 2nd yr lab report.pdfmech 2nd yr lab report.pdf
mech 2nd yr lab report.pdf
 
Bhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regaliBhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regali
 
Boiler mountings and accessories 222.pptx
Boiler mountings and accessories 222.pptxBoiler mountings and accessories 222.pptx
Boiler mountings and accessories 222.pptx
 
Steam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap SinghSteam distribution system by Varun Pratap Singh
Steam distribution system by Varun Pratap Singh
 
BOILER MOUNTING AND ACCESSORIES
BOILER MOUNTING AND ACCESSORIES BOILER MOUNTING AND ACCESSORIES
BOILER MOUNTING AND ACCESSORIES
 
BOILER MOUNTINGS & ACCESSORIES
BOILER MOUNTINGS & ACCESSORIESBOILER MOUNTINGS & ACCESSORIES
BOILER MOUNTINGS & ACCESSORIES
 
Boiler mountings
Boiler mountingsBoiler mountings
Boiler mountings
 
Steam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfSteam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdf
 
Sabardairy Training Report
Sabardairy Training ReportSabardairy Training Report
Sabardairy Training Report
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plant
 
Turbine operation.pptx
Turbine operation.pptxTurbine operation.pptx
Turbine operation.pptx
 
Steam generating unit
Steam generating unitSteam generating unit
Steam generating unit
 
mounting and accessories of boiler in eme
mounting and accessories  of boiler in eme mounting and accessories  of boiler in eme
mounting and accessories of boiler in eme
 
BOILER MOUNTING & ACCESSORIES PPT
BOILER MOUNTING & ACCESSORIES  PPTBOILER MOUNTING & ACCESSORIES  PPT
BOILER MOUNTING & ACCESSORIES PPT
 
High pressure boiler
High pressure boilerHigh pressure boiler
High pressure boiler
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptx
 
Heat recovery steam generator
Heat recovery steam generatorHeat recovery steam generator
Heat recovery steam generator
 
210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING 210 mw LMZ Turbine rolling and its GOVERNING
210 mw LMZ Turbine rolling and its GOVERNING
 
Regenerative feed water heating system
Regenerative feed water heating systemRegenerative feed water heating system
Regenerative feed water heating system
 
Boilers
BoilersBoilers
Boilers
 

More from Boben Anto Chemmannoor (6)

Vibration monitoring and its features for corelation
Vibration monitoring and its features for corelationVibration monitoring and its features for corelation
Vibration monitoring and its features for corelation
 
Boiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plant
 
Chp equipments in indian power scenario
Chp  equipments in indian power scenarioChp  equipments in indian power scenario
Chp equipments in indian power scenario
 
Study on Excitation system in Power sector
Study on Excitation system in Power sectorStudy on Excitation system in Power sector
Study on Excitation system in Power sector
 
High speed mills for coal pulverisation
High speed mills  for coal pulverisationHigh speed mills  for coal pulverisation
High speed mills for coal pulverisation
 
Boiler layout engineering
Boiler layout engineeringBoiler layout engineering
Boiler layout engineering
 

Recently uploaded

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

Hp/ lp bypass system for steam turbines

  • 2. During short trip outs the supply of steam to turbine has to be totally cut off from the boiler. Once short tripping is over, turbine requires steam at high temperature as the temperature of the turbine parts have not reduced much during the short period due to effective insulation and high mass of materials. BY PASS SYSTEM
  • 3. But boiler will not give in a sudden during restart. If low temperature steam admitted turbine will be affected. Other words, TPS will idle until the turbine cool and match with steam parameters. This period will be very long since cooling rate is very low for the turbine. BY PASS SYSTEM
  • 4. *By pass system comprises a pipe work system with valves and pressure dropping devices to enable live steam from the boiler to by pass the turbine completely and be dumped into the condenser. * For matching live steam and turbine metal temperature for a quick start-up, By pass stations have been provided. BY PASS SYSTEM
  • 5. WHEN BY PASS IS REQUIRED 1.During Startup 2.During a Turbine Trip 3.Higher Steam Pressure (Exceeding design limit) 4 Flexible load and ramp up change
  • 6. WHEN STEM FLOW IS NECESSARY THROUGH REHEATER 1.The higher steam temperature required by the turbine during Startup 2. During sudden trip
  • 7. CLASSIFICATION OF BY PASS SYSTEM 1. HP By Pass System 2. LP By Pass System
  • 8.
  • 9. HP BY PASS SYSTEM
  • 10. FUNCTIONS OF HP BY PASS SYSTEM 1. To establish flow at the outlet of super heater for raising boiler parameters during startup. 2. To maintain or control steam pressure at preset valve in main steam line during startup. 3. To warm up steam lines. 4. To control steam temperature down steam of HP By Pass at the present value. 5. To dump steam from boiler into condenser in case the generator circuit breaker opens.
  • 11. FUNCTIONS OF LP BY PASS SYSTEM 1. Control of steam after reheater 2. Establish flow of steam from reheat line to condenser by its opening, proportional to the opening of by pass valve. 3. Release of stem entrapped in HP and reheater circuit in case generator circuit breaker opens.
  • 12. HP BY PASS SYSTEM 1. HP By Pass Valve 2. Spray water pressure control valve 3. Spray water flow control valve 4. Break down orifice
  • 13. Design Pressure 200 Kg/Sq.cm- Design Temperature545°C (Parameters based on the system requirement of unit) Combined Pressure reducing and Desuperheating Valve Spherical Shaped body to optimize Stress levels Zero leak valve HP BYPASS VALVE
  • 14. HP BYPASS VALVE- one type
  • 15. COMPONENTS OF HP BY PASS VALVE 1. Valve body 2. Valve stem 3. Valve seat 4. Jet case 5. Pressure seal plug 6. Bearing carrier 7. Packing net
  • 16. HP BYPASS SPRAY VALVES • Design Pressure 350 Kg/Sq.cm Design Temperature 300°C  Provide spray Water control to HP Bypass valves  Zero Leak Valve
  • 18. COMPONENTS OF SPRAY WATER PRESSURE CONTROL VALVE AND FLOW CONTROL VALVE 1. Valve body 2. Valve stem 3. Valve seat 4. Guide bush 5. Gland nut 6. Pressure seal plug
  • 19. LP BY PASS SYSTEM 1. LP By Pass valve 2. Spray water flow control valve 3. Cooler
  • 20. LP BYPASS VALVE  Design Pressure 64 Kg/Sq.cm Design Temperature 540°C  Pressure Reducing valve  Spherical Shaped Body To Optimize the Stresses  Zero Leak valve
  • 21. COMPONENTS OF LP BY PASS VALVE 1. Valve body 2. Valve stem 3. Valve plug 4. Valve seat 5. Bonnet 6. Bearing carrier 7. Packing net
  • 22. Design Pressure 50 Kg/Sq.cm Design temperature 300°C Provides Spray Water Control To LP Bypass valve Zero Leak valve LP BYPASS SPRAY VALVE
  • 23. ADVANTAGES OF HPAND LP BY PASS SYSTEM 1. To cut down unit startup time. 2. To allow boiler operation during short turbine trips. 3. To warm up steam lines during startup. 4. It gives smooth warm up of boiler components, including reheater. A most rapid boiler run-up may be possible. It is saves fuel. 5. Enables the boiler to take up heavy rejection trip to house load operation advantageously.
  • 24. ADVANTAGES OF HPAND LP BY PASS SYSTEM 6. To allow better matching of boiler and turbine. 7. Water loss during startup is minimised. 8. To help conserve demineralised water during start up and sudden load sheddings. 9. Independent operation of boiler is achievable. 10. To prevents frequent flowing of safety valves.
  • 25. INTERLOCKS IN BY PASS SYSTEM 1. Generator Circuit Breaker 2. Condenser vacuum too low 3. HP by pass valve position less than 2% 4. Temperature too high 5. HP by pass valve position more than 2% 6. Close - signal for spray water control
  • 26. PROBLEMS WITH BY PASS SYSTEM 1. Noise: a. Reduced by employing adiabatic flow with friction. b. Increasing thickness and covering acoustic insulation. 2. Water ingress: Pressure control valves are shut, a large build up condensation will occur in the steam lines. To avoid this drains are located at suitable positions.
  • 27. PROBLEMS WITH BY PASS SYSTEM 3. Thermal shock 4. Leakage flows 5. Heating of turbine blade 6. Turbine Exhaust Pressure Increasing
  • 28. BY PASS VALVE COMPONENTS 1. Valve Body: Low alloy steel, 2.25% Cr, 1% Mo (with stand high pressure & temperature) 2. Valve Stem: High alloy steel, 2.25% Cr, 1% Mb (Valve throttle from high pressure to low pressure) 3. Valve Seat: Low alloy steel (it is pre-stressed before welding, to avoid high heat transfer stress to the welding position).
  • 29. BY PASS VALVE COMPONENTS 4. Jet Case: Low alloy steel (it should be flexible for avoiding direct impingement of spray valve) 5. Pressure seal plug: Low alloy steel 6. Bearing Carrier: Stellite 7. Packing Net: Low alloy steel, sufficiently tightened.
  • 30. SPRAY WATER FLOW CONTROL VALVE AND PRESSURE VALVE Cylindrical nature, flow medium is erosive in nature, total pressure drop in the valve has been divided between 3 stages. 1. Valve Body: Carbon molybdenium steel, 2.25% Cr, 1% Mo 2. Valve Stem: 13% Cr. (High chromium alloy steel)
  • 31. SPRAY WATER FLOW CONTROL VALVE AND PRESSURE VALVE 3. Valve Seat: High alloy steel 4. Guide Bush: Monel material (Hardened quality) 5. Gland Net: Low alloy steel 6. Pressure Seal Plug: Graphite, Asbestos & oil mixed loosely
  • 32. BREAKDOWN ORIFICE Limit outlet velocity by increasing pressure low vibration. Low alloy steel, 1%Cr, 1/2 % Mo