EXCAVATION WORKS
Tantish Kamaruddin
UTM Skudai
Adapted from Rosli Abdul Rashid
SECTION D:
EXCAVATION AND
EARTHWORKS
G E N E R A L L Y
GENERALLY
D.I Soil description
Particulars of the following shall be given:
a. Ground water level and the date when it was established,
hereinafter described as the pre-contract water level.
The ground water level shall be re-established at the time the
various excavation works are earned out and is described
hereinafter as the post contract water level.
Where ground water levels are subject to periodic changes due
to tidal or similar effects they shall be so described and the
average of the mean high and low levels given.
SECTION ‘D’ - EXCAVATION AND EARTHWORKS
GENERALLY
D.1 Soil description (Cont’d)
b. Trial pits or bore holes stating their location.
c Over or underground services.
If the above information is not available a description of the
ground and strata which is to be assumed shall be stated.
SECTION ‘D’ - EXCAVATION AND EARTHWORKS
WATER TABLE
Ground water level
Ground level
Clause D1.a - Ground water level and the date when it was
established, hereinafter described as the pre-contract water level.
Ground level
TRIAL PIT BORE HOLE
Clause D1.1. b. - Trial pits or bore holes stating their location.
Trial pit
: Shallow excavation
Depth Excavation Method
0 -2m By Hand
2-4m Wheeled Back Hoe
4-6m Hydraulic Excavator
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
The pre-contract ground water level is 3.50m below ground
level. It was established on 25th May 2003.
There are 2 Nos. Trial pits located next to the entrance of
the site. See Drawings No. ADE/04/235/S/01 for the
location of underground and overhead services
Bill 1 – Excavation & Earthworks 1
Particulars that must be given
Ground level
SEWER
ELECTRICAL
CABLE
OVERHEAD
TELEPHONE CABLE
Clause D1.1.c - Over or underground services.
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
The pre-contract ground water level is 3.50m below ground
level. It was established on 25th May 2003.
There are 2 Nos. Trial pits located next to the entrance of
the site. See Drawings No. ADE/04/235/S/01 for the
location of underground and overhead services
Bill 1 – Excavation & Earthworks 2
These are particulars that must be given in the
description box
SECTIOND - EXCAVATION AND EARTHWORKS
SITE PREPARATION
WORKS
SITE PLAN
TRIAL PIT 2
BORE HOLE
TRIAL PIT 1
TRIAL PIT 3
EXISTING
SEWER
Dwg.No. ADE/04/235/S/01
Lot 2185
TT1
TT2
TT3
T1
T4
T3
T2
Notes:
Trees to be removed
T1 – 450mm girth
T2 – 270mm girth
T3 – 770mm girth
T4 – 950mm girth
Tree Trunk to be removed
TT1 – 500mm girth
TT2 – 650mm girth
TT3 – 250mm girth
HEDGES
HEDGES
Clause D.2 - Removing hedges
Cutting down hedges and grubbing up their roots, which shall be deemed
to include their disposal, shall be given in METRES stating the nature and
height of each hedge or its location.
Hedges
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
Cutting down bamboo hedges approximately
900mm high x 400mm wide at the entrance of the of
the site
Bill 1 – Exc. & Earthworks 3
m
2.10
------
4.30
-------
3.25
-------
TK
Clause D2
Clause D.3 Clearing undergrowth
Clearing site of undergrowth, bushes, scrub and the like and grubbing up their
roots, which shall be deemed to include their disposal, shall be given in square
metres.
Clause D.3 Clearing undergrowth
Clearing site of undergrowth, bushes, scrub and the like and grubbing up their
roots, which shall be deemed to include their disposal, shall be given in square
metres.
Undergrowth, bushes, shrubs
Clause D.3 Clearing undergrowth
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
Clearing site of undergrowth, bushes, scrub and the
like and grubbing up their roots including its
disposal.
Bill 1 – Exc. & Earthworks 4
7.25
6.50
------
7.10
9.85
------
69.94
-------
47.13
117.07
-------
117
m2
TK
Clause D3
Girth
Ground level
1.00 m
Clause D.4 Removing trees
Cutting down trees and grubbing up
their roots, which shall be deemed
to include their disposal, shall be
enumerated and classified in stages
of 300mm girth (measured at
height of 1.00m above ground).
Filling in voids, if required, after
removal of tree roots shall be given
in the description.
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
Not exceeding 300mm girth
Bill 1 – Exc. & Earthworks 5
No.
4
------
3
2 4
------
8
-------
12
20
-------
20
Cutting down trees and grubbing up their roots
TK
Clause D4
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
Exceeding 300mm but not exceeding 600mm girth
Bill 1 – Exc. & Earthworks 6
No.
4
------
2 4
------
8
---------
4
12
---------
12
Cutting down trees and grubbing up their roots
TK
Girth
TREE STUMP
Ground level
1.00m
Clause D.5 Tree stumps
Removing existing tree stumps and
grubbing up their roots which shall
be deemed to Include their disposal,
shall be enumerated and classified
in stages of 300mm girth measured
at height of 1.00m above ground or
at their tops if lower in height). Filling
in voids, if required, after removal of
tree roots shall be given in the
description.
Tree Stump & Removing Roots
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
Exceeding 300mm but not exceeding 600mm girth
Bill 1 – Exc. & Earthworks 7
No.
2
------
3
2 2
------ 4
-------
6
10
-------
10
Removing existing tree stumps and grubbing up their roots
TK
Clause D5
D6 Lifting turf
Lifting turf which is required to be preserved shall be given in SQUARE
METRES stating the method of preservation and disposal.
* D6 Lifting turf
Lifting turf which is required to be preserved shall be given in SQUARE
METRES stating the method of preservation and disposal.
TURF
EARTH/GROUND
CROSS SECTION OF THE TURF AND GROUND
REDUCED LEVEL
D6 Lifting turf
Lifting turf which is required to be preserved shall be given in square
metres stating the method of preservation and disposal.
TURF
EARTH/GROUND
CROSS SECTION OF THE TURF AND GROUND
REDUCED LEVEL
*D6 Lifting turf
Lifting turf which is required to be preserved shall be given in square
metres stating the method of preservation and disposal.
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
Lifting turf, set aside and preserve by stacking
under shade, for re-use
Bill 1 – Exc. & Earthworks 8
m2
3.25
4.50
------
2
2 4.10
3.85
------
31.57
-------
29.25
60.82
------
61
TK
Clause D6
CLAUSED7–Excavationfortopvegetablesoil
TOP VEGETABLE SOIL
150mm thick
EARTH/GROUND
CROSS SECTION OF THE VEGETABLE SOIL
D.7 Topsoil
Excavating topsoil which is required to be preserved shall be given in
SQUARE METRES slating the average depth. Handling and disposal of
topsoil shall be given in accordance with clauses D1. 7-22.
TOP VEGETABLE SOIL
150mm thick
EARTH/GROUND
CROSS SECTION OF THE VEGETABLE SOIL
*D.7 Topsoil
Excavating topsoil which is required to be preserved shall be given in
SQUARE METRES slating the average depth. Handling and disposal of
topsoil shall be given in accordance with clauses D1.7-22.
Project Element/Trade Slip No
Heading
Description: Unit
Quantity
Taker Off
Squaring
Chk. Squaring
Rate
Excavating top vegetable soil average 150mm deep
set aside, preserve for-reuse within the site
Bill 1 – Exc. & Earthworks 9
m2
4.25
5.20
------
2 6.10
4.80
------
58.56
-------
22.10
80.66
-------
81
TK
Terrace House
Clause D7
D.8 Alternative method of measurement
Cutting down trees and removing tree
stumps (irrespective of girth) and grubbing
up their roots, which shall be deemed to
include their disposal, may be given as an
item stating the area.
Clearing of undergrowth within
such areas and grubbing up
their roots shall be given in the
description.
• 1st you excavate including taking out the earth and putting the
excavated materials aside
• 2nd you fill back – putting back the excavated material or the
earth into the excavation i.e. pits, holes or trenches
• Finally, you dispose – removing the extra excavated materials
to a location within the site or away from the site
EXCAVATION, FILLING AND DISPOSAL
The next several slides will show you the various items associated with
EXCAVATION, FILLING and DISPOSAL
Excavation or “gali, korek” involves the following operations:
The main aim of the clauses related to EXCAVATION, FILLING and DISPOSAL is to
provide a guideline how you measure, calculate and quantify the:
• The quantity or volume of earth that has
to be taken out from the pit or trench
• The quantity or volume of earth that has to
be returned to fill up the pit or trench;
• The extra quantity or volume of earth that
has to be remove within the site or away
from the excavation.
The method of measurement and quantification of
excavation, filling and disposal are described under
different sub-clause of section ‘D’ of the SMM2.

More Related Content

What's hot

50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Anne Allan
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compileTimun Loh
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Foundation and Retaining Wall Design Presentation 2.pptx
Foundation and Retaining Wall Design Presentation 2.pptxFoundation and Retaining Wall Design Presentation 2.pptx
Foundation and Retaining Wall Design Presentation 2.pptxyeah43
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Anne Allan
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparationNoshad Ahmed Wahocho
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bqJeanne Hoo
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel doorEst
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructureguasiya
 
Backfilling 2014a-Lecture4
Backfilling 2014a-Lecture4Backfilling 2014a-Lecture4
Backfilling 2014a-Lecture4Anne Allan
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA FormKai Yun Pang
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of QuantityArissa Loh
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 

What's hot (20)

50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Foundation and Retaining Wall Design Presentation 2.pptx
Foundation and Retaining Wall Design Presentation 2.pptxFoundation and Retaining Wall Design Presentation 2.pptx
Foundation and Retaining Wall Design Presentation 2.pptx
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bq
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
Backfilling 2014a-Lecture4
Backfilling 2014a-Lecture4Backfilling 2014a-Lecture4
Backfilling 2014a-Lecture4
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
Building construction
Building constructionBuilding construction
Building construction
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 

Similar to Site preparation works

216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdfRaj Bakhtani
 
Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013Design South East
 
General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement DrawingsMark Flynn
 
Title 24 Compliance and Beyond
Title 24 Compliance and BeyondTitle 24 Compliance and Beyond
Title 24 Compliance and Beyondmichaeljmack
 
1.0 Flyover 0+620.pdf
1.0 Flyover 0+620.pdf1.0 Flyover 0+620.pdf
1.0 Flyover 0+620.pdfssuser471126
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-ajulio-civil
 
1 T1 Bigler Site 2 6-1-2022.pdf
1 T1 Bigler Site 2 6-1-2022.pdf1 T1 Bigler Site 2 6-1-2022.pdf
1 T1 Bigler Site 2 6-1-2022.pdfImanbirSinghMann
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problemdhineshkumar002
 
2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary ModernizationJohnGartman1
 
Drawings of Revit project for D type qtr.
Drawings of Revit project for  D type qtr.Drawings of Revit project for  D type qtr.
Drawings of Revit project for D type qtr.mahfooz alam khan
 
BFC 31802 Chapter 4a - Copy.ppt
BFC 31802 Chapter 4a - Copy.pptBFC 31802 Chapter 4a - Copy.ppt
BFC 31802 Chapter 4a - Copy.pptArdeeArdee
 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Emeka Ngwobia
 
Plumbing_Fire_Fighting_Qty_Takeoff_Procedure_and_Process_1572714084.pdf
Plumbing_Fire_Fighting_Qty_Takeoff_Procedure_and_Process_1572714084.pdfPlumbing_Fire_Fighting_Qty_Takeoff_Procedure_and_Process_1572714084.pdf
Plumbing_Fire_Fighting_Qty_Takeoff_Procedure_and_Process_1572714084.pdfssuser201ba0
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction ReportSheau Hui Tan
 

Similar to Site preparation works (20)

M.i tank
M.i  tankM.i  tank
M.i tank
 
1200 27
1200 271200 27
1200 27
 
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
 
smartparkannb.pdf
smartparkannb.pdfsmartparkannb.pdf
smartparkannb.pdf
 
Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013
 
General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement Drawings
 
Title 24 Compliance and Beyond
Title 24 Compliance and BeyondTitle 24 Compliance and Beyond
Title 24 Compliance and Beyond
 
1.0 Flyover 0+620.pdf
1.0 Flyover 0+620.pdf1.0 Flyover 0+620.pdf
1.0 Flyover 0+620.pdf
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-a
 
1 T1 Bigler Site 2 6-1-2022.pdf
1 T1 Bigler Site 2 6-1-2022.pdf1 T1 Bigler Site 2 6-1-2022.pdf
1 T1 Bigler Site 2 6-1-2022.pdf
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization
 
Drawings of Revit project for D type qtr.
Drawings of Revit project for  D type qtr.Drawings of Revit project for  D type qtr.
Drawings of Revit project for D type qtr.
 
BFC 31802 Chapter 4a - Copy.ppt
BFC 31802 Chapter 4a - Copy.pptBFC 31802 Chapter 4a - Copy.ppt
BFC 31802 Chapter 4a - Copy.ppt
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.
 
Plumbing_Fire_Fighting_Qty_Takeoff_Procedure_and_Process_1572714084.pdf
Plumbing_Fire_Fighting_Qty_Takeoff_Procedure_and_Process_1572714084.pdfPlumbing_Fire_Fighting_Qty_Takeoff_Procedure_and_Process_1572714084.pdf
Plumbing_Fire_Fighting_Qty_Takeoff_Procedure_and_Process_1572714084.pdf
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
Fabrication Drawings
Fabrication DrawingsFabrication Drawings
Fabrication Drawings
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 

Recently uploaded

Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Recently uploaded (20)

Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

Site preparation works

  • 1. EXCAVATION WORKS Tantish Kamaruddin UTM Skudai Adapted from Rosli Abdul Rashid
  • 3. GENERALLY D.I Soil description Particulars of the following shall be given: a. Ground water level and the date when it was established, hereinafter described as the pre-contract water level. The ground water level shall be re-established at the time the various excavation works are earned out and is described hereinafter as the post contract water level. Where ground water levels are subject to periodic changes due to tidal or similar effects they shall be so described and the average of the mean high and low levels given. SECTION ‘D’ - EXCAVATION AND EARTHWORKS
  • 4. GENERALLY D.1 Soil description (Cont’d) b. Trial pits or bore holes stating their location. c Over or underground services. If the above information is not available a description of the ground and strata which is to be assumed shall be stated. SECTION ‘D’ - EXCAVATION AND EARTHWORKS
  • 5. WATER TABLE Ground water level Ground level Clause D1.a - Ground water level and the date when it was established, hereinafter described as the pre-contract water level.
  • 6. Ground level TRIAL PIT BORE HOLE Clause D1.1. b. - Trial pits or bore holes stating their location.
  • 7. Trial pit : Shallow excavation Depth Excavation Method 0 -2m By Hand 2-4m Wheeled Back Hoe 4-6m Hydraulic Excavator
  • 8.
  • 9. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate The pre-contract ground water level is 3.50m below ground level. It was established on 25th May 2003. There are 2 Nos. Trial pits located next to the entrance of the site. See Drawings No. ADE/04/235/S/01 for the location of underground and overhead services Bill 1 – Excavation & Earthworks 1 Particulars that must be given
  • 11. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate The pre-contract ground water level is 3.50m below ground level. It was established on 25th May 2003. There are 2 Nos. Trial pits located next to the entrance of the site. See Drawings No. ADE/04/235/S/01 for the location of underground and overhead services Bill 1 – Excavation & Earthworks 2 These are particulars that must be given in the description box
  • 12. SECTIOND - EXCAVATION AND EARTHWORKS SITE PREPARATION WORKS
  • 13. SITE PLAN TRIAL PIT 2 BORE HOLE TRIAL PIT 1 TRIAL PIT 3 EXISTING SEWER Dwg.No. ADE/04/235/S/01 Lot 2185 TT1 TT2 TT3 T1 T4 T3 T2 Notes: Trees to be removed T1 – 450mm girth T2 – 270mm girth T3 – 770mm girth T4 – 950mm girth Tree Trunk to be removed TT1 – 500mm girth TT2 – 650mm girth TT3 – 250mm girth
  • 14. HEDGES HEDGES Clause D.2 - Removing hedges Cutting down hedges and grubbing up their roots, which shall be deemed to include their disposal, shall be given in METRES stating the nature and height of each hedge or its location.
  • 16. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate Cutting down bamboo hedges approximately 900mm high x 400mm wide at the entrance of the of the site Bill 1 – Exc. & Earthworks 3 m 2.10 ------ 4.30 ------- 3.25 ------- TK Clause D2
  • 17. Clause D.3 Clearing undergrowth Clearing site of undergrowth, bushes, scrub and the like and grubbing up their roots, which shall be deemed to include their disposal, shall be given in square metres.
  • 18. Clause D.3 Clearing undergrowth Clearing site of undergrowth, bushes, scrub and the like and grubbing up their roots, which shall be deemed to include their disposal, shall be given in square metres.
  • 20. Clause D.3 Clearing undergrowth
  • 21. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate Clearing site of undergrowth, bushes, scrub and the like and grubbing up their roots including its disposal. Bill 1 – Exc. & Earthworks 4 7.25 6.50 ------ 7.10 9.85 ------ 69.94 ------- 47.13 117.07 ------- 117 m2 TK Clause D3
  • 22. Girth Ground level 1.00 m Clause D.4 Removing trees Cutting down trees and grubbing up their roots, which shall be deemed to include their disposal, shall be enumerated and classified in stages of 300mm girth (measured at height of 1.00m above ground). Filling in voids, if required, after removal of tree roots shall be given in the description.
  • 23. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate Not exceeding 300mm girth Bill 1 – Exc. & Earthworks 5 No. 4 ------ 3 2 4 ------ 8 ------- 12 20 ------- 20 Cutting down trees and grubbing up their roots TK Clause D4
  • 24. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate Exceeding 300mm but not exceeding 600mm girth Bill 1 – Exc. & Earthworks 6 No. 4 ------ 2 4 ------ 8 --------- 4 12 --------- 12 Cutting down trees and grubbing up their roots TK
  • 25. Girth TREE STUMP Ground level 1.00m Clause D.5 Tree stumps Removing existing tree stumps and grubbing up their roots which shall be deemed to Include their disposal, shall be enumerated and classified in stages of 300mm girth measured at height of 1.00m above ground or at their tops if lower in height). Filling in voids, if required, after removal of tree roots shall be given in the description.
  • 26. Tree Stump & Removing Roots
  • 27. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate Exceeding 300mm but not exceeding 600mm girth Bill 1 – Exc. & Earthworks 7 No. 2 ------ 3 2 2 ------ 4 ------- 6 10 ------- 10 Removing existing tree stumps and grubbing up their roots TK Clause D5
  • 28. D6 Lifting turf Lifting turf which is required to be preserved shall be given in SQUARE METRES stating the method of preservation and disposal.
  • 29. * D6 Lifting turf Lifting turf which is required to be preserved shall be given in SQUARE METRES stating the method of preservation and disposal.
  • 30. TURF EARTH/GROUND CROSS SECTION OF THE TURF AND GROUND REDUCED LEVEL D6 Lifting turf Lifting turf which is required to be preserved shall be given in square metres stating the method of preservation and disposal.
  • 31. TURF EARTH/GROUND CROSS SECTION OF THE TURF AND GROUND REDUCED LEVEL *D6 Lifting turf Lifting turf which is required to be preserved shall be given in square metres stating the method of preservation and disposal.
  • 32.
  • 33. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate Lifting turf, set aside and preserve by stacking under shade, for re-use Bill 1 – Exc. & Earthworks 8 m2 3.25 4.50 ------ 2 2 4.10 3.85 ------ 31.57 ------- 29.25 60.82 ------ 61 TK Clause D6
  • 35. TOP VEGETABLE SOIL 150mm thick EARTH/GROUND CROSS SECTION OF THE VEGETABLE SOIL D.7 Topsoil Excavating topsoil which is required to be preserved shall be given in SQUARE METRES slating the average depth. Handling and disposal of topsoil shall be given in accordance with clauses D1. 7-22.
  • 36. TOP VEGETABLE SOIL 150mm thick EARTH/GROUND CROSS SECTION OF THE VEGETABLE SOIL *D.7 Topsoil Excavating topsoil which is required to be preserved shall be given in SQUARE METRES slating the average depth. Handling and disposal of topsoil shall be given in accordance with clauses D1.7-22.
  • 37. Project Element/Trade Slip No Heading Description: Unit Quantity Taker Off Squaring Chk. Squaring Rate Excavating top vegetable soil average 150mm deep set aside, preserve for-reuse within the site Bill 1 – Exc. & Earthworks 9 m2 4.25 5.20 ------ 2 6.10 4.80 ------ 58.56 ------- 22.10 80.66 ------- 81 TK Terrace House Clause D7
  • 38. D.8 Alternative method of measurement Cutting down trees and removing tree stumps (irrespective of girth) and grubbing up their roots, which shall be deemed to include their disposal, may be given as an item stating the area. Clearing of undergrowth within such areas and grubbing up their roots shall be given in the description.
  • 39. • 1st you excavate including taking out the earth and putting the excavated materials aside • 2nd you fill back – putting back the excavated material or the earth into the excavation i.e. pits, holes or trenches • Finally, you dispose – removing the extra excavated materials to a location within the site or away from the site EXCAVATION, FILLING AND DISPOSAL The next several slides will show you the various items associated with EXCAVATION, FILLING and DISPOSAL Excavation or “gali, korek” involves the following operations:
  • 40. The main aim of the clauses related to EXCAVATION, FILLING and DISPOSAL is to provide a guideline how you measure, calculate and quantify the: • The quantity or volume of earth that has to be taken out from the pit or trench • The quantity or volume of earth that has to be returned to fill up the pit or trench; • The extra quantity or volume of earth that has to be remove within the site or away from the excavation. The method of measurement and quantification of excavation, filling and disposal are described under different sub-clause of section ‘D’ of the SMM2.