The 2005 Nonresidential Title 24
Standards
Compliance and Beyond
Introduction
• Envelope
– Insulation
– Fenestration
– Additions/Alterations
– Mandatory Measures
• Indoor Lighting
– General Requirements
– Complete Building
– Area Category
– Tailored
– Mandatory Measures
• Outdoor Lighting
– Lighting Zones
– LPD Requirements
– Mandatory Measures
• Mechanical
– General Requirements
– Additions/Alterations
– Mandatory Measures
Insulation
Envelope
Envelope Rules Changed
• Framing percent used in calculating assembly U-
Factors increased from 15% up to 25%
• Decreases Assembly Performance
• Load Calculations Affected
Examples:
R-13 Wood Frame Wall Old = 0.084 New = 0.102
R-11 Wood Frame Wall Old = 0.092 New = 0.110
R-11 Metal Frame Wall Old = 0.189 New = 0.268
Envelope Prescriptive Minimums
• Table 143-A
– Prescriptive Criteria for Nonresidential Buildings
– Portable Public School Buildings used only in specific Climate
Zones
Envelope
2005 Joint Appendix IV
• Determining U-factors of wall, roof and floor constructions
is simplified with the addition of ACM Appendix IV.
• The values in this appendix must be used for all residential
and nonresidential compliance calculations: prescriptive,
overall envelope, and whole building performance.
• CEC Approved computer programs may make adjustments
to the values in these tables using procedures described in
this appendix.
• If a construction assembly is not adequately represented in
the tables below, the permit applicant or the manufacturer
of the product may request approval from the CEC.
Envelope
Table IV.1 –U-factors of Wood
Framed Attic Roofs
Rated R-value of Continuous Insulation1
None R-2 R-4 R-6 R-7 R-8 R-10 R-14
Truss
Spacing
R-value of
Attic
Insulation A B C D E F G H
None 1 0.300 0.186 0.135 0.106 0.096 0.087 0.074 0.057
R-11 2 0.079 0.067 0.059 0.053 0.050 0.047 0.043 0.037
R-13 3 0.071 0.061 0.054 0.049 0.046 0.044 0.040 0.035
R-19 4 0.049 0.045 0.041 0.038 0.036 0.035 0.033 0.029
R-22 5 0.043 0.039 0.036 0.034 0.033 0.032 0.030 0.026
R-25 6 0.038 0.035 0.033 0.031 0.030 0.029 0.027 0.024
R-30 7 0.032 0.030 0.028 0.027 0.026 0.025 0.024 0.022
R-38 8 0.026 0.024 0.023 0.022 0.022 0.021 0.020 0.019
R-49 9 0.020 0.019 0.019 0.018 0.018 0.017 0.017 0.015
16 in. OC
R-60 10 0.017 0.016 0.016 0.015 0.015 0.015 0.014 0.013
Table IV.1
U-factors of
Wood Framed
Attic Roofs
Rated R-value of Continuous Insulation1
None R-2 R-4 R-6 R-7 R-8 R-10 R-14
Truss
Spacing
R-value of
Attic
Insulation A B C D E F G H
None 1 0.300 0.186 0.135 0.106 0.096 0.087 0.074 0.057
R-11 2 0.079 0.067 0.059 0.053 0.050 0.047 0.043 0.037
R-13 3 0.071 0.061 0.054 0.049 0.046 0.044 0.040 0.035
R-19 4 0.049 0.045 0.041 0.038 0.036 0.035 0.033 0.029
R-22 5 0.043 0.039 0.036 0.034 0.033 0.032 0.030 0.026
R-25 6 0.038 0.035 0.033 0.031 0.030 0.029 0.027 0.024
R-30 7 0.032 0.030 0.028 0.027 0.026 0.025 0.024 0.022
R-38 8 0.026 0.024 0.023 0.022 0.022 0.021 0.020 0.019
R-49 9 0.020 0.019 0.019 0.018 0.018 0.017 0.017 0.015
16 in. OC
R-60 10 0.017 0.016 0.016 0.015 0.015 0.015 0.014 0.013
Envelope
Table IV.9 –U-factors of Wood
Framed Walls
Rated R-value of Continuous Insulation 2
R-0 R-2 R-4 R-6 R-7 R-8 R-10 R-14
Spacing
Cavity
Insulation
Nominal
Framing
Size A B C D E F G H
16 in. OC None Any 1 0.356 0.204 0.144 0.111 0.100 0.091 0.077 0.059
R-11 batt 2x4 2 0.110 0.087 0.073 0.063 0.059 0.056 0.050 0.041
R-13 batt 2x4 3 0.102 0.081 0.068 0.059 0.056 0.052 0.047 0.039
R-15 batt 2x4 4 0.095 0.076 0.064 0.056 0.053 0.050 0.045 0.038
R-19 batt 1 2x6 5 0.074 0.063 0.055 0.049 0.046 0.044 0.040 0.034
R-21 batt 2x6 6 0.069 0.058 0.051 0.046 0.043 0.041 0.038 0.032
R-19 batt 2x8 7 0.065 0.057 0.050 0.045 0.043 0.041 0.038 0.033
R-22 batt 2x8 8 0.061 0.053 0.047 0.042 0.040 0.039 0.036 0.031
R-25 batt 2x8 9 0.057 0.050 0.044 0.040 0.038 0.037 0.034 0.030
R-30 batt 1 2x8 10 0.056 0.049 0.043 0.039 0.038 0.036 0.033 0.029
R-30 batt 2x10 11 0.047 0.042 0.038 0.035 0.034 0.032 0.030 0.027
R-38 batt 1 2x10 12 0.046 0.041 0.037 0.034 0.033 0.031 0.029 0.026
R-38 batt 2x12 13 0.039 0.035 0.032 0.030 0.029 0.028 0.026 0.023
2x4 14 0.103 0.082 0.069 0.060 0.056 0.053 0.048 0.040
2x6 15 0.071 0.060 0.052 0.047 0.044 0.042 0.039 0.033
2x8 16 0.056 0.049 0.043 0.039 0.038 0.036 0.033 0.029
2x10 17 0.045 0.040 0.036 0.033 0.032 0.031 0.029 0.025
Foamed
Plastic or
Cellulose
Insulation3
2x12 18 0.038 0.034 0.031 0.029 0.028 0.027 0.025 0.023
Envelope
Envelope
Cool Roof Requirement
Section 112(a) Labeling Requirements.
– Every roofing product installed in construction to
take compliance credit for reflectance and
emittance under Sections 141, 142, and 151(b)
shall have a clearly visible packaging label that
lists the reflectance and emittance tested in
accordance with CRRC-1.
Envelope
Prescriptive Cool Roof Requirement
Section 143(a) 1.A
– Required under Prescriptive Component
– Trade-off under Prescriptive Overall Envelope
– Trade-off under Performance
– Requirement
• Applies to Low Slope Roofs (2:12 slope or less)
• Minimum solar reflectance of 0.70
• Minimum Thermal Emittance of 0.75
• Certified by Cool Roof Rating Council
Envelope
Cool Roof Applications
• www.coolroofs.org
• www.coolroofs.info
• www.energystar.gov
Taken from http://www.pstvnrg.com/homebase/
Beyond Title 24
• Cool Roof
– Better Reflectance
• Initial Reflectance > 0.70
– Coating
– Better Emittance
• Initial Thermal Emittance > 0.75
– Coating
– Steep Slope Application
Fenestration
Fenestration Prescriptive Minimums
• Table 143-A
– Prescriptive Criteria for Nonresidential Buildings
– Portable Classrooms for use in a specific Climate Zone
NFRC Certification
– Buildings with more than 10,000 ft2 of site built
vertical fenestration will be required to have the
fenestration certified under the NFRC-100SB
rating and labeling procedures
– Or, must use the Table 116-A & B defaults.
– A typical office building will now trigger this
requirement at about 60,000 ft2.
Envelope
New Envelope Language
Section 143(a) 5.A:
– West Facing Fenestration
• The area shall be no greater than 40 percent of the
gross west exterior wall area
– Required under Prescriptive Component
– Trade-off under Prescriptive Overall Envelope
– Trade-off under Performance
Envelope
Minimum Skylight Area
Section 143(c)
– Applies to Prescriptive Compliance
– Enclosed spaces over 25,000 ft2 and
– Ceiling heights greater than 15 ft and
– Lighting Power Density greater than 0.5 W/ft2
– Unconditioned buildings must also comply
– Would also be used in the baseline under the performance approach
– EXCEPTION 1 to Section 143 (c): Buildings in climate zones 1 or 16.
– EXCEPTION 2 to Section 143 (c): Auditoriums, movie theaters,
museums, and refrigerated warehouses.
Envelope
Minimum Skylight Area
• Standard Baseline - Half of the floor area shall be
in the daylit zone area.
• Beyond Title 24 – Daylit area beyond 50%.
Daylit Area Calculation
Envelope
Minimum Skylight Area
Lighting shall be controlled
Standard Baseline –
Multi-level astronomical time switch
Beyond Title 24 –
Automatic multi-level daylighting
control that meets the
requirements of Section 119 (i)
Minimum Skylight Area
Minimum Skylight Effective Aperture
Additions & Alterations
Additions & Alterations
Additions & Alterations
Section 149 (b) 1 B – Roofs
Replacements of the exterior surface of existing nonresidential low-sloped
roofs shall meet Subsection i or ii where more than fifty percent of the roof
or more than 2,000 square feet of roof, whichever is less, is being replaced.
Roof replacements subject to this requirement shall include replacement or
recovering of the exterior surface of the roof.
– i. The solar reflectance and thermal emittance shall meet the requirements of
Section 143 (a) 1; or
Additions & Alterations
Additions & Alterations
Section 149 (b) 1 B – Roofs (cont)
– ii. The building envelope for which a permit is
sought, which has a roof replacement subject to this
requirement, shall comply with Section 143(b)3,
where the standard building has a solar reflectance
which meets the requirements of Section 143(a)1 and
the other terms in Equation 143-D correspond to the
existing building at the time of the application of the
permit, and the proposed building has the actual solar
reflectance of the roof replacement and other
improvements to the building envelope necessary to
comply.
Additions & Alterations
Additions & Alterations
Section 149 (b) 1 B – Roofs (cont)
EXCEPTION to Section 149 (b) 1 B: Roof recoverings allowed by the CBC
are not required to meet Section 149 (b) 1 B when all of the following occur:
• The existing roof has a rock or gravel surface, and
• The new roof has a rock or gravel surface, and
• There is no removal of existing layers of roof coverings of more than fifty
percent of the roof or more than 2,000 square feet of roof, whichever is less;
and
• There is no recoating with a liquid applied coating; and
• There is no installation of a recover board, rigid insulation or other rigid,
smooth substrate to separate and protect the new roof recovering from the
existing roof.
Envelope
New Envelope Language
Section 118(e) 3
• Insulation installed on ceilings with
removable panels – ceiling is considered to
be un-insulated.
Envelope
New Envelope Language
Section 118(e) 3
• EXCEPTION: When there are conditioned
spaces with a combined floor area no greater
than 2,000 square feet in an otherwise
unconditioned building, and when the average
height of the space between the ceiling and the
roof over these spaces is greater than 12 feet.
Mandatory Measures
New Mandatory Measure
Section 118(e) 3
• Insulation shall be installed in direct contact with a
continuous roof or ceiling which is sealed to limit
infiltration and exfiltration.
• Valid locations include:
– Placing insulation above the roof deck.
– Placing insulation below the roof deck
– Placing insulation on top of a drywall ceiling;
Mandatory Measures
New Mandatory Measure
Section 118(f)
– Opaque portions of framed demising walls shall
have insulation with no less than R-13.
– Wood framed demising ceilings and floors in NR
buildings shall have insulation with no less than
R-13.
New Mandatory Measure
Mandatory Measures
Section 118(g) – Heated Slab Floors
– Must be insulated according to the
requirements in Table 118-B
Indoor
Lighting
Indoor Lighting
New Lighting Language
Section 146(b) 5.S
Qualified Historic Buildings
– Only fixtures consisting of historic lighting
components, or replicas of historic components are
exempt.
– All other lighting systems must comply the LPD
allowances
Scope
Scope of Standards
A new category is added to the definitions in the
2005 Standards, unconditioned.
Unconditioned spaces in Nonresidential Buildings
must comply with all lighting requirements in
Title 24 including maximum LPD requirements
and mandatory measures.
Scope
Scope of Standards (cont)
CALIFORNIA CODE OF REGULATIONS: TITLE 24, PART 6,
SUBCHAPTER 1
SECTION 100 – SCOPE
(a) Buildings Covered. The provisions of Title 24, Part 6, apply to all buildings:
1. That are of Occupancy Group A, B, E, F, H, M, R, S, or U; and
2. For which an application for a building permit or renewal of an existing permit is filed
(or is required by law to be filed) on or after the effective date of the provisions, or which
are constructed by a governmental agency; and
3. That are:
A. Unconditioned, indirectly or directly conditioned by mechanical heating or
mechanical cooling; or
B. Low-rise residential buildings that are heated with a wood heater or another non-
mechanical heating system.
Scope of Standards (cont)
Scope
Area derived from take-offs
LPD x Area
LTG-5-C
•Lighting allowance
•Unconditioned Spaces
Scope of Standards (cont)
Scope
LTG-2-C
•Installed lighting
•Unconditioned Spaces
Scope of Standards (cont)
Scope
LTG-1-C
•Installed Watts
must be less than the
Allowed Watts
Conditioned vs. Unconditioned
• No trade offs available between the
Conditioned areas and the Unconditioned
Indoor Lighting
New Lighting Language
Section 146(c) 1
Complete building method LPD
– Retail allowance can only be used for single tenant buildings
– Sales area must by 70% or greater of the building area
– Cannot be used for Lease Space if Tenant is not known.
New Lighting Language
Indoor Lighting
Section 146
Complete Building LPD
New Lighting Language
Section 146 – Area Category LPD
Indoor Lighting
New Lighting Language
Indoor Lighting
Section 146 – New Area Category LPD (cont)
New Lighting Language
Indoor Lighting
Section 146 – New Area Category LPD (cont)
Indoor Lighting
New Lighting Language
Section 146(c) 3 Tailored Method
– Tailored Method. The Tailored Method shall only be used for spaces
whose combined area does not exceed 30 percent of the entire building
that is otherwise using the Area Category Method.
– Trade-offs of lighting power between the Tailored Method and Area
Category Methods are not allowed.
– EXCEPTION 1 TO 146 (b) 3. The Tailored Method may be used for
up to 100% of the entire building area of Retail Merchandise Sales and
Museums.
– EXCEPTION 2 TO 146 (b) 3. If a single function area within the
building exceeds 30 percent of the floor area of the entire building, the
Tailored Method may be used for that entire function area alone, with
the remaining spaces using the Area Category Method.
New Lighting Language
Indoor Lighting
New Lighting Language
Indoor Lighting
Section 146 – Lighting Control Credits
Changed
New Lighting Language
Section 146 – Lighting Control Credits Changed (cont)
Indoor Lighting
New Lighting Language
Acceptance Requirements
Indoor Lighting
Indoor Lighting
New Lighting Language
Section 131(c) Lighting Controls
Multilevel controls shall have at least one control step that is between 50% and
70% of design lighting power and at least one step of minimum light output
operating at less than 35% of full rated lighting system power (this control
step could be completely off, creating a bi-level control).
A reasonably uniform level of illuminance in an area shall be achieved by any
of the following:
1. Dimming all lamps or luminaires; or
2. Switching alternate lamps in luminaires, alternate luminaires, and alternate
rows of luminaires.
Indoor Lighting
New Lighting Language
Section 131(c) 2 Lighting Controls
– Daylit Area > 2,500 sqft
– Space has Skylight(s)
– Must install Multi-Level Lighting Controls
• Baseline - Astronomical Timeclock
• Beyond Title 24 - Automatic Control (photocell)
Indoor Lighting
New Residential Lighting Language
Section 130 – Lighting
– Interior Lighting in High-rise Residential Living
Quarters and Hotel/Motel Guest Rooms.
• The design and installation of all lighting systems and
equipment in high-rise residential living quarters and in
hotel/motel guest rooms shall comply with Section 150(k)
Indoor Lighting
New Residential Lighting Language
(cont)
Section 150(k)
• High Efficacy Luminaires: High Efficacy Luminaires for
residential lighting shall contain only high efficacy lamps and
shall not contain a medium screw base socket (E24/E26).
• A high efficacy lamp has a lamp efficacy that is no lower than
the efficacies contained in TABLE 150-C. Ballasts for lamps
rated 18 Watts or greater shall be electronic and shall have an
output frequency no less than 20 kHz. Electronic ballasts for
residential lighting shall comply with the requirements for
electromagnetic interference (EMI) and radio frequency
interference (RFI) contained in FCC Part 18 and shall be labeled
as meeting the requirements for consumer limits.
Indoor Lighting
New Residential Lighting Language
(cont)
Indoor Lighting
New Residential Lighting Language
(cont)
Section 150(k)
• Permanently installed luminaires in kitchens
shall be high efficacy luminaires.
• EXCEPTION: Up to 50 percent of the total rated wattage of
permanently installed luminaires in kitchens may be in
luminaires that are not high efficacy luminaires, provided that
these luminaires are controlled by switches separate from those
controlling the high efficacy luminaires.
Indoor Lighting
New Residential Lighting Language
(cont)
Section 150(k)
• Permanently installed luminaires in bathrooms,
garages, laundry rooms, and utility rooms shall
be high efficacy luminaires.
• EXCEPTION: Permanently installed luminaires that are not
high efficacy shall be allowed provided that they are controlled
by an occupant sensor(s) certified to comply with Section 119
(d).
Indoor Lighting
New Residential Lighting Language
(cont)
Section 150(k)
• Permanently installed luminaires located other than in
kitchens, bathrooms, garages, laundry rooms, and utility rooms
shall be high efficacy luminaires.
• EXCEPTION 1: Permanently installed luminaires that are not high efficacy
luminaires shall be allowed provided they are controlled by a dimmer switch.
• EXCEPTION 2: Permanently installed luminaires that are not high efficacy shall
be allowed provided that they are controlled by an occupant sensor(s) certified to
comply with Section 119 (d).
• EXCEPTION 3: Permanently installed luminaires that are not high efficacy
luminaires shall be allowed in closets less than 70 square feet.
Outdoor
Lighting
Outdoor Lighting
Outdoor Lighting
Outdoor lighting, including
parking garages, parking
lots and site lighting must
comply with all lighting
requirements in Title 24
including maximum LPD
requirements and
mandatory measures.
Outdoor Lighting
New Lighting Language
Section 147 –
• This section applies to all outdoor lighting,
whether attached to buildings, poles,
structures or self supporting, including but
not limited to, hardscape areas including
parking lots, lighting for building entrances,
sales and non-sales canopies; lighting for all
outdoor sales areas; and lighting for building
facades.
Outdoor Lighting
New Lighting Language
EXCEPTIONS TO Section 147 (a)
1. Temporary outdoor lighting.
2. Lighting required and regulated by the Federal Aviation Administration, and the Coast Guard.
3. Lighting for public streets, roadways, highways, and traffic signage lighting, including lighting for
driveway entrances occurring in the public right-of-way.
4. Lighting for sports and athletic fields.
5. Lighting for industrial sites, including but not limited to, rail yards, shipyards and docks, chemical
and petroleum processing plants, and aviation facilities.
6. Automated Teller Machine lighting.
7. Lighting of public monuments.
8. Internally illuminated, externally illuminated, and unfiltered signs.
9. Lighting used in or around swimming pools, water features, or other locations subject to Article 680
of the California Electrical Code.
10. Lighting of tunnels, bridges, stairs, and ramps.
11. Landscape lighting.
Additions & Alterations
Additions & Alterations
Section 149 –
H. Alterations to existing outdoor lighting systems that
increase the connected lighting load or replace more
than 50 percent of the lighting fixtures shall meet
the requirements of Section 147 & 148.
New Lighting Language
Section 10–114
Definition of Outdoor Lighting Zones
Outdoor Lighting
New Lighting Language
Section 147 – Requirements for Outdoor Lighting
General Site Illumination
Outdoor Lighting
New Lighting Language
Section 147 – Requirements for Outdoor Lighting
Specific Applications
Outdoor Lighting
New Lighting Language
Section 130(d) – Luminaire Cutoff Requirements
– All outdoor luminaires that use lamps rated 175 watts or greater in
hardscape areas including parking lots, building entrances and
sales and non-sales canopies, and all outdoor sales areas shall be
designated Cutoff for light distribution. To comply with this
requirement the luminaire shall be rated Cutoff in a photometric
test report that includes any tilt or other non-level mounting
condition of the installed luminaire. Cutoff is a luminaire light
distribution classification where the candela per 1000 lamp lumens
does not numerically exceed 25 at or above a vertical angle of
ninety degrees above nadir, and 100 at or above a vertical angle of
eighty degrees above nadir.
Outdoor Lighting
Mandatory Measures
• Cutoff Luminaires
– A cutoff luminaire is one where
no more than 2.5% of the light
output extends above the horizon
(90 degrees above nadir) and no
more than 90% of the light
output extends more than 80
degrees above nadir.
New Lighting Language
EXCEPTIONS TO Section 130 (d)
– 1. Lighting for signs.
– 2. Lighting for building facades.
– 3. Lighting required by a health or life safety statute, ordinance, or
regulation, including but not limited to, emergency lighting
– 4. Temporary outdoor lighting
– 5. Temporary outdoor theatrical equipment lighting for live
performances.
– 6. Lighting used in or around swimming pools, water features, or
other locations subject to Article 680 of the California Electrical
Code.
Outdoor Lighting
Mechanical
Compliance
Mechanical
New Mechanical Language
Section 124 Air Distribution System Ducts and Plenums
– Portions of ductwork conveying heated or cooled air located in one or more
of the following spaces shall be insulated to a minimum installed level of
R-8:
1. Outdoors, or
2. In a space between the roof and an insulated ceiling, or
3. In a space directly under a roof with fixed vents or openings to the outside
or unconditioned spaces, or
4. In an unconditioned crawlspace; or
5. In other unconditioned spaces.
Portions of supply air ductwork that are not in one of these spaces shall be
insulated to a minimum installed level of R-4.2 (or any higher level
required by CMC Section 605) or be enclosed in directly conditioned
space.
New Mechanical Language
Mechanical
Certificate of Acceptance.
For all new Nonresidential buildings, High-rise Residential buildings and Hotels and
Motels designated to allow a conditioned use of an occupancy group or type
regulated by Part 6, the applicant shall file Certificate(s) of Acceptance with the
enforcement agency prior to receiving a final occupancy permit. The signer (s)
shall be eligible under Division 3 of the Business and Professions code to sign
such documents. The Certificate(s) shall be readily legible and of substantially
similar format and informational order and content to the Certificate(s) of
Acceptance in the Nonresidential Manual, as defined in Part 6. The Certificate(s)
shall be approved by the local enforcement agency by stamp or authorized
signature and shall indicate that:
– 1. The applicant has demonstrated acceptance requirements as indicated in the plans
and specifications submitted under section 10-103(a);
– 2. Installation certificates described in section 10-103(a)3 are posted, or made
available with the building permit(s) issued for the building; and
– 3. That operating and maintenance information described in sections 10-103(b) and 10-
103(c) were provided to the building owner.
Mechanical
New Mechanical Language
Acceptance Requirements
Mechanical
New Mechanical Language
New Certificate of Acceptance Requirements apply to:
• Demand Control Ventilation Devices (CO2 Sensors)
• Outside Air
• Space Conditioning Controls
• Hydronic System Controls
• Economizers
• Air Distribution ducts and plenums
• VSDs on fans
Mechanical
New Mechanical Language
Air Distribution System Duct Leakage Sealing.
All duct systems shall be sealed to a leakage rate not to exceed 6% of the fan flow if the
duct system:
• 1. Is connected to a constant volume, single zone, air conditioners, heat pumps or
furnaces, and
• 2. Serving less than 5,000 square feet of floor area; and
• 3. Having more than 25% duct surface area located in one or more of the following
spaces:
– A. Outdoors, or
– B. In a space directly under a roof where the U-factor of the roof is greater than the U-
factor of the ceiling, or
– C. In a space directly under a roof with fixed vents or openings to the outside or
unconditioned spaces, or
– D. In an unconditioned crawlspace; or
– E. In other unconditioned spaces.
• The leakage rate shall be confirmed through field verification and diagnostic testing,
in accordance with procedures set forth in the Nonresidential ACM Manual.
EXCEPTION TO Section 144(k) 3 B: Where the roof meets the requirements of
143(a) 1 C.
Mechanical
New Mechanical Language
Section 144 –
New prescriptive requirements include:
• VSDs required on VAV systems 10 HP and above
• Static pressure sensors will be required to be placed in a position such
that the controller set point is no greater than one-third the total design
fan static pressure.
• The static pressure set point will be required to be reset based on the
zone requiring the most pressure.
• Series Fan Terminal Boxes 1 HP and less must have electrically-
commutated motors
Mechanical
New Mechanical Language
Section 144 –
New prescriptive requirements include:
• Open Towers over 900 gpm must be propeller
• Open cooling towers configured with multiple condenser
water pumps shall be designed so that all cells can be run in
parallel with the larger of:
A. The flow that’s produced by the smallest pump, or
B. 33% of the design flow for the cell.
• Chilled water plants with more than 300 tons total capacity
shall not have more than 100 tons provided by air-cooled
chillers
Mechanical
New Mechanical Language
Section 144 –
2 Way Valves on Hydronic Systems:
1. Hydronic Variable Flow Systems. HVAC chilled and hot water pumping shall be
designed for variable fluid flow and shall be capable of reducing pump flow rates to
no more than the larger of:
a) 50% or less of the design flow rate;
or b) the minimum flow required by the equipment manufacturer for the proper
operation of equipment served by the system.
EXCEPTION to Section 144 (j) 1: Systems that include no more than three control
valves.
Note – Does not apply to Primary portion of Primary/Secondary loops.
Mechanical
New Mechanical Language
Section 144 –
New Hydronic System requirements:
2. Chiller Isolation. When a chilled water plant includes more than one
chiller, provisions shall be made so that flow through any chiller is
automatically shut off when that chiller is shut off while still
maintaining flow through other operating chiller(s). Chillers that are
piped in series for the purpose of increased temperature differential,
shall be considered as one chiller.
3. Boiler Isolation. When a hot water plant includes more than one
boiler, provisions shall be made so that flow through any boiler is
automatically shut off when that boiler is shut off while still
maintaining flow through other operating boiler(s).
Mechanical
New Mechanical Language
Section 144 –
New Hydronic System requirements:
4. Chilled and Hot Water Temperature Reset Controls. Chilled and
hot water systems with a design capacity exceeding 500,000 Btu/h
supplying chilled or heated water (or both) shall include controls that
automatically reset supply water temperatures as a function of
representative building loads or outside air temperature.
EXCEPTION to Section 144 (j) 4: Hydronic systems that use variable
flow to reduce pumping energy in accordance with 144(j) 1.
Mechanical
New Mechanical Language
Section 144 –
New Hydronic System requirements:
5. Water Loop Heat Pump Systems. Water-Loop Heat Pump Systems
having a total pump system power exceeding 5 hp shall have flow
controls that meet the requirements of 144(j) 6 (Variable Speed
Drive). Each heat pump shall have a two-position automatic valve
interlocked to shut off water flow when the compressor is off.
Mechanical
New Mechanical Language
Section 144 –
New Hydronic System requirements:
6. Variable Speed Drives. Individual pumps serving variable flow
systems and having a motor horsepower exceeding 5 hp shall have
controls and/or devices (such as variable speed control) that will
result in pump motor demand of no more than 30% of design
wattage at 50% of design water flow. The controls or devices shall
be controlled as a function of desired flow or to maintain a minimum
required differential pressure. Differential pressure shall be
measured at or near the most remote heat exchanger or the heat
exchanger requiring the greatest differential pressure.
EXCEPTION 1 to Section 144 (j) 6 Heating hot water systems.
Additions & Alterations
Additions & Alterations
Section 149 (b) 1. D
When new or replacement space-conditioning ducts are installed to
serve an existing building, the new ducts shall meet the requirements
of Section 124, and if they meet the criteria of Section 144 (k) 1, 2,
and 3, the duct system shall be sealed and labeled as confirmed
through field verification and diagnostic testing in accordance with
procedures for duct sealing of existing duct systems as specified in
the Nonresidential ACM manual, to meet one of the following
requirements:
i. If the new ducts form an entirely new duct system directly connected
to the air handler, the measured duct leakage shall be less than 6% of
fan flow; or
Additions & Alterations
Additions & Alterations
Section 149 (b) 1. D (cont)
ii. If the new ducts are an extension of an existing duct system, the combined
new and existing duct system shall meet one of the following
requirements:
a. The measured duct leakage shall be less than 15% of fan flow; or
b. The duct leakage shall be reduced by more than 60% relative to the
leakage prior to the equipment having been replaced and a visual
inspection shall demonstrate that all accessible leaks have been sealed; or
c. If it is not possible to meet the duct sealing requirements of Subsections a.
or b., all accessible leaks shall be sealed and verified through a visual
inspection by a certified HERS rater.
EXCEPTION to Section 149 (b) 1 D ii: Existing duct systems that are
extended, which are constructed, insulated or sealed with asbestos.
Additions & Alterations
Additions & Alterations
Section 149 (b) 1. E
• When a space conditioning system is altered by the
installation or replacement of space conditioning
equipment (including replacement of the air handler,
outdoor condensing unit of a split system air conditioner
or heat pump, cooling or heating coil, or the furnace heat
exchanger), the duct system that is connected to the new
or replaced space conditioning equipment, if the duct
system meets the criteria of Section 144 (k) 1, 2., and 3.,
shall be sealed, as confirmed through field verification
and diagnostic testing in accordance with procedures for
duct sealing of existing duct systems as specified in the
Nonresidential ACM manual, to one of the requirements
of Section 149 (b) 1 D;
Additions & Alterations
Additions & Alterations
Section 149 (b) 1. E (cont)
• EXCEPTION 1 to Section 149 (b) 1. E: Buildings altered so that the
duct system no longer meets the criteria of Section 144(k)1, 2, and 3.
• EXCEPTION 2 to Section 149 (b) 1 E: Duct systems that are
documented to have been previously sealed as confirmed through field
verification and diagnostic testing in accordance with procedures in the
Non-Residential ACM manual.
• EXCEPTION 3 to Section 149 (b) 1 E: Existing duct systems
constructed, insulated or sealed with asbestos.
Mechanical
New Mechanical Language
Section 121(b) Demand Control Ventilation Devices
– Required Demand Control Ventilation
• HVAC single zone systems with the following characteristics shall have
demand ventilation controls complying with 121 (c) 4:
• They have an outdoor air economizer; and
• They serve a space with a design occupant density greater than or equal to
25 people per 1000 ft2 (40 square foot per person), or a space whose
occupancy type per Chapter 10 of the CBC is “Assembly Areas,”
“Concentrated Use (without fixed seats),” “Auction Rooms,” “Assembly
Areas, Less-Concentrated Use.”
• Exception - Classrooms
Mechanical
New Mechanical Language
Section 121(b) Demand Control Ventilation Devices
Where demand control ventilation is required by Section 121 (c) 3, CO2
sensors shall be installed in each room that meets the criteria of 121 (c) 3
B;
• CO2 sensors shall be located in the room between 1 ft and 6 ft above the
floor;
• Demand ventilation controls shall maintain CO2 concentrations less than
or equal to 700 ppm plus the outdoor air CO2 concentration in all rooms
with CO2 sensors;
Mechanical
New Mechanical Language
Section 121(b) Demand Control Ventilation Devices
– Outdoor air CO2 concentration shall be determined by one of the
following:
• CO2 concentration shall be assumed to be 400 ppm without any
direct measurement; or
• CO2 concentration shall be dynamically measured using a CO2
sensor located near the position of the outdoor air intake; or
• CO2 concentration shall be measured one time at building
completion at the position of the outdoor air intake;
Mechanical
New Mechanical Language
Section 121(b) Demand Control Ventilation Devices
– When the system is operating during hours of expected occupancy, the
controls shall maintain system outdoor air ventilation rates no less than
the rate listed in Table 121-A times the conditioned floor area for
spaces with CO2 sensors, plus the rate required by 121 (b) 2 for other
spaces served by the system;
Mechanical
New Mechanical Language
Section 121(b) Demand Control Ventilation Devices
– CO2 sensors shall be certified by the manufacturer to have an accuracy
of no less than 75 ppm, factory calibrated or calibrated at start-up, and
certified by the manufacturer to require calibration no more frequently
than once every 5 years.

More Related Content

What's hot

BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...bccomfort
 
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENTVISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENTMessung Electrical Engineering
 
Magnetic Level Indicators (MLIs) and Bridle Combination Units
Magnetic Level Indicators (MLIs) and Bridle Combination UnitsMagnetic Level Indicators (MLIs) and Bridle Combination Units
Magnetic Level Indicators (MLIs) and Bridle Combination UnitsClassic Controls, Inc.
 
Catalog biến tần Frenic eHVAC - beeteco.com
Catalog biến tần Frenic eHVAC - beeteco.comCatalog biến tần Frenic eHVAC - beeteco.com
Catalog biến tần Frenic eHVAC - beeteco.comBeeteco
 
1dsc200023b0201_apresentacao
1dsc200023b0201_apresentacao1dsc200023b0201_apresentacao
1dsc200023b0201_apresentacaoSAFETY CONTROL
 
Solutions for Drive Technology
Solutions for Drive TechnologySolutions for Drive Technology
Solutions for Drive TechnologyChristian Holder
 
Numatics Express Catalog: Pneumatic and Motion Control Products
Numatics Express Catalog: Pneumatic and Motion Control ProductsNumatics Express Catalog: Pneumatic and Motion Control Products
Numatics Express Catalog: Pneumatic and Motion Control ProductsProcess Control Solutions, LLC
 
Beijer hvac inverter_h2_brochure
Beijer hvac inverter_h2_brochureBeijer hvac inverter_h2_brochure
Beijer hvac inverter_h2_brochureElectromate
 
Goniospectroradiometer with-moving-mirror
Goniospectroradiometer with-moving-mirrorGoniospectroradiometer with-moving-mirror
Goniospectroradiometer with-moving-mirror世满 江
 
Fundamentals of Practical Building Automation Systems
Fundamentals of Practical Building Automation SystemsFundamentals of Practical Building Automation Systems
Fundamentals of Practical Building Automation SystemsLiving Online
 
Carier vvt an alternative for vav system published by morgan pope
Carier vvt    an alternative for vav system published  by morgan popeCarier vvt    an alternative for vav system published  by morgan pope
Carier vvt an alternative for vav system published by morgan popealone160162
 
Nidec asi silcovert h series
Nidec asi silcovert h seriesNidec asi silcovert h series
Nidec asi silcovert h seriesNidec Corporation
 
Electrical services seminar
Electrical services seminarElectrical services seminar
Electrical services seminarmichaeljmack
 
Catalog Biến tần Frenic-HVAC (Fuji Electric)
Catalog Biến tần Frenic-HVAC (Fuji Electric)Catalog Biến tần Frenic-HVAC (Fuji Electric)
Catalog Biến tần Frenic-HVAC (Fuji Electric)Beeteco
 
Electrical p[lan
Electrical p[lanElectrical p[lan
Electrical p[lanEdi Na
 
Webinar managing instrument obsolence in nuclear edited
Webinar   managing instrument obsolence in nuclear editedWebinar   managing instrument obsolence in nuclear edited
Webinar managing instrument obsolence in nuclear editedYokogawa1
 

What's hot (17)

BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects...
 
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENTVISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
 
Magnetic Level Indicators (MLIs) and Bridle Combination Units
Magnetic Level Indicators (MLIs) and Bridle Combination UnitsMagnetic Level Indicators (MLIs) and Bridle Combination Units
Magnetic Level Indicators (MLIs) and Bridle Combination Units
 
Catalog biến tần Frenic eHVAC - beeteco.com
Catalog biến tần Frenic eHVAC - beeteco.comCatalog biến tần Frenic eHVAC - beeteco.com
Catalog biến tần Frenic eHVAC - beeteco.com
 
1dsc200023b0201_apresentacao
1dsc200023b0201_apresentacao1dsc200023b0201_apresentacao
1dsc200023b0201_apresentacao
 
Solutions for Drive Technology
Solutions for Drive TechnologySolutions for Drive Technology
Solutions for Drive Technology
 
Numatics Express Catalog: Pneumatic and Motion Control Products
Numatics Express Catalog: Pneumatic and Motion Control ProductsNumatics Express Catalog: Pneumatic and Motion Control Products
Numatics Express Catalog: Pneumatic and Motion Control Products
 
Beijer hvac inverter_h2_brochure
Beijer hvac inverter_h2_brochureBeijer hvac inverter_h2_brochure
Beijer hvac inverter_h2_brochure
 
Goniospectroradiometer with-moving-mirror
Goniospectroradiometer with-moving-mirrorGoniospectroradiometer with-moving-mirror
Goniospectroradiometer with-moving-mirror
 
Fundamentals of Practical Building Automation Systems
Fundamentals of Practical Building Automation SystemsFundamentals of Practical Building Automation Systems
Fundamentals of Practical Building Automation Systems
 
Carier vvt an alternative for vav system published by morgan pope
Carier vvt    an alternative for vav system published  by morgan popeCarier vvt    an alternative for vav system published  by morgan pope
Carier vvt an alternative for vav system published by morgan pope
 
Nidec asi silcovert h series
Nidec asi silcovert h seriesNidec asi silcovert h series
Nidec asi silcovert h series
 
Electrical services seminar
Electrical services seminarElectrical services seminar
Electrical services seminar
 
Catalog Biến tần Frenic-HVAC (Fuji Electric)
Catalog Biến tần Frenic-HVAC (Fuji Electric)Catalog Biến tần Frenic-HVAC (Fuji Electric)
Catalog Biến tần Frenic-HVAC (Fuji Electric)
 
Electrical p[lan
Electrical p[lanElectrical p[lan
Electrical p[lan
 
Riello aros-central-transformer-based-solar-inverters
Riello aros-central-transformer-based-solar-invertersRiello aros-central-transformer-based-solar-inverters
Riello aros-central-transformer-based-solar-inverters
 
Webinar managing instrument obsolence in nuclear edited
Webinar   managing instrument obsolence in nuclear editedWebinar   managing instrument obsolence in nuclear edited
Webinar managing instrument obsolence in nuclear edited
 

Viewers also liked

Palestra do CaridadX no Google Business Group (GBG Curitiba)
Palestra do CaridadX no Google Business Group (GBG Curitiba)Palestra do CaridadX no Google Business Group (GBG Curitiba)
Palestra do CaridadX no Google Business Group (GBG Curitiba)CaridadX
 
Danh sách học sinh mượn sách quá hạn lớp 10 v
Danh sách học sinh mượn sách quá hạn lớp 10 vDanh sách học sinh mượn sách quá hạn lớp 10 v
Danh sách học sinh mượn sách quá hạn lớp 10 vThuvien Nqd
 
Tarea comunicacion
Tarea comunicacionTarea comunicacion
Tarea comunicaciondaria1455
 
Christian Center Missions Partners
Christian Center Missions PartnersChristian Center Missions Partners
Christian Center Missions Partnersstyletech
 

Viewers also liked (6)

Palestra do CaridadX no Google Business Group (GBG Curitiba)
Palestra do CaridadX no Google Business Group (GBG Curitiba)Palestra do CaridadX no Google Business Group (GBG Curitiba)
Palestra do CaridadX no Google Business Group (GBG Curitiba)
 
Danh sách học sinh mượn sách quá hạn lớp 10 v
Danh sách học sinh mượn sách quá hạn lớp 10 vDanh sách học sinh mượn sách quá hạn lớp 10 v
Danh sách học sinh mượn sách quá hạn lớp 10 v
 
CHINA
CHINACHINA
CHINA
 
Tarea comunicacion
Tarea comunicacionTarea comunicacion
Tarea comunicacion
 
Convocatoriaprevaed
ConvocatoriaprevaedConvocatoriaprevaed
Convocatoriaprevaed
 
Christian Center Missions Partners
Christian Center Missions PartnersChristian Center Missions Partners
Christian Center Missions Partners
 

Similar to Title 24 Compliance and Beyond

2015 IECC Key Highlights & Updates
2015 IECC Key Highlights & Updates2015 IECC Key Highlights & Updates
2015 IECC Key Highlights & UpdatesMichael Brown
 
Building Design Factors that Affect LEED Energy Credits
Building Design Factors that Affect LEED Energy CreditsBuilding Design Factors that Affect LEED Energy Credits
Building Design Factors that Affect LEED Energy CreditsSam Abdelfattah
 
2014 BCBC Envelope Compliance - ASHRAE 90.1 and NECB
2014 BCBC Envelope Compliance - ASHRAE 90.1 and NECB2014 BCBC Envelope Compliance - ASHRAE 90.1 and NECB
2014 BCBC Envelope Compliance - ASHRAE 90.1 and NECBSophie Mercier
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
What is ASHRAE 90.1?
What is ASHRAE 90.1?What is ASHRAE 90.1?
What is ASHRAE 90.1?CannonDesign
 
ADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfDeniseMathre1
 
Preliminary design submittal presentation
Preliminary design submittal presentationPreliminary design submittal presentation
Preliminary design submittal presentationJefferson Brewer
 
The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyShailja km
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Ian de Mink
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsmichaeljmack
 
Min ambient temp considerations
Min ambient temp considerationsMin ambient temp considerations
Min ambient temp considerationsRajendra Chakole
 
Điêu hòa âm trần 36000BTU 2 chiều
Điêu hòa âm trần 36000BTU 2 chiềuĐiêu hòa âm trần 36000BTU 2 chiều
Điêu hòa âm trần 36000BTU 2 chiềuMyravn1
 
Máy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMáy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMyLnhGiGc
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdfShahrukhKhan424745
 

Similar to Title 24 Compliance and Beyond (20)

2009 IECC: Residential Provisions
2009 IECC: Residential Provisions2009 IECC: Residential Provisions
2009 IECC: Residential Provisions
 
AIA Chicago Presentation
AIA Chicago PresentationAIA Chicago Presentation
AIA Chicago Presentation
 
2015 IECC Key Highlights & Updates
2015 IECC Key Highlights & Updates2015 IECC Key Highlights & Updates
2015 IECC Key Highlights & Updates
 
Building Design Factors that Affect LEED Energy Credits
Building Design Factors that Affect LEED Energy CreditsBuilding Design Factors that Affect LEED Energy Credits
Building Design Factors that Affect LEED Energy Credits
 
2014 BCBC Envelope Compliance - ASHRAE 90.1 and NECB
2014 BCBC Envelope Compliance - ASHRAE 90.1 and NECB2014 BCBC Envelope Compliance - ASHRAE 90.1 and NECB
2014 BCBC Envelope Compliance - ASHRAE 90.1 and NECB
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
What is ASHRAE 90.1?
What is ASHRAE 90.1?What is ASHRAE 90.1?
What is ASHRAE 90.1?
 
2009 IECC: Commercial
2009 IECC: Commercial2009 IECC: Commercial
2009 IECC: Commercial
 
IECC 2009 Training
IECC 2009 TrainingIECC 2009 Training
IECC 2009 Training
 
ADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdf
 
Preliminary design submittal presentation
Preliminary design submittal presentationPreliminary design submittal presentation
Preliminary design submittal presentation
 
The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case study
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
 
Min ambient temp considerations
Min ambient temp considerationsMin ambient temp considerations
Min ambient temp considerations
 
Điêu hòa âm trần 36000BTU 2 chiều
Điêu hòa âm trần 36000BTU 2 chiềuĐiêu hòa âm trần 36000BTU 2 chiều
Điêu hòa âm trần 36000BTU 2 chiều
 
Máy lạnh Daikin âm trần
Máy lạnh Daikin âm trầnMáy lạnh Daikin âm trần
Máy lạnh Daikin âm trần
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
54937130 nbs-reference-specification
54937130 nbs-reference-specification54937130 nbs-reference-specification
54937130 nbs-reference-specification
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
 

More from michaeljmack

Auburn, NY - 200 Years of History 1793-1993
Auburn, NY - 200 Years of History  1793-1993Auburn, NY - 200 Years of History  1793-1993
Auburn, NY - 200 Years of History 1793-1993michaeljmack
 
Auburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 YearbookAuburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 Yearbookmichaeljmack
 
Auburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 YearbookAuburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 Yearbookmichaeljmack
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systemsmichaeljmack
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flashmichaeljmack
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgearmichaeljmack
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrushmichaeljmack
 
Building information modeling
Building information modelingBuilding information modeling
Building information modelingmichaeljmack
 
15 years of experience stator ground fault protection
15 years of experience stator ground fault protection15 years of experience stator ground fault protection
15 years of experience stator ground fault protectionmichaeljmack
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systemsmichaeljmack
 
Lighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit SpacesLighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit Spacesmichaeljmack
 
COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708michaeljmack
 
Seismic Compliance of Electrical Distribution
Seismic Compliance of Electrical DistributionSeismic Compliance of Electrical Distribution
Seismic Compliance of Electrical Distributionmichaeljmack
 
Generator Set Transient Performance
Generator Set Transient PerformanceGenerator Set Transient Performance
Generator Set Transient Performancemichaeljmack
 
Modeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital SimulatorModeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital Simulatormichaeljmack
 
Facts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind PlantsFacts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind Plantsmichaeljmack
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Storiesmichaeljmack
 
Blackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load SheddingBlackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load Sheddingmichaeljmack
 
Transformer Fundamentals
Transformer FundamentalsTransformer Fundamentals
Transformer Fundamentalsmichaeljmack
 

More from michaeljmack (20)

Auburn, NY - 200 Years of History 1793-1993
Auburn, NY - 200 Years of History  1793-1993Auburn, NY - 200 Years of History  1793-1993
Auburn, NY - 200 Years of History 1793-1993
 
Auburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 YearbookAuburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 Yearbook
 
Auburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 YearbookAuburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 Yearbook
 
Surge Protection
Surge ProtectionSurge Protection
Surge Protection
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systems
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flash
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgear
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrush
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
15 years of experience stator ground fault protection
15 years of experience stator ground fault protection15 years of experience stator ground fault protection
15 years of experience stator ground fault protection
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
 
Lighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit SpacesLighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit Spaces
 
COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708
 
Seismic Compliance of Electrical Distribution
Seismic Compliance of Electrical DistributionSeismic Compliance of Electrical Distribution
Seismic Compliance of Electrical Distribution
 
Generator Set Transient Performance
Generator Set Transient PerformanceGenerator Set Transient Performance
Generator Set Transient Performance
 
Modeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital SimulatorModeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital Simulator
 
Facts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind PlantsFacts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind Plants
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Stories
 
Blackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load SheddingBlackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load Shedding
 
Transformer Fundamentals
Transformer FundamentalsTransformer Fundamentals
Transformer Fundamentals
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

Title 24 Compliance and Beyond

  • 1. The 2005 Nonresidential Title 24 Standards Compliance and Beyond
  • 2. Introduction • Envelope – Insulation – Fenestration – Additions/Alterations – Mandatory Measures • Indoor Lighting – General Requirements – Complete Building – Area Category – Tailored – Mandatory Measures • Outdoor Lighting – Lighting Zones – LPD Requirements – Mandatory Measures • Mechanical – General Requirements – Additions/Alterations – Mandatory Measures
  • 4. Envelope Envelope Rules Changed • Framing percent used in calculating assembly U- Factors increased from 15% up to 25% • Decreases Assembly Performance • Load Calculations Affected Examples: R-13 Wood Frame Wall Old = 0.084 New = 0.102 R-11 Wood Frame Wall Old = 0.092 New = 0.110 R-11 Metal Frame Wall Old = 0.189 New = 0.268
  • 5. Envelope Prescriptive Minimums • Table 143-A – Prescriptive Criteria for Nonresidential Buildings – Portable Public School Buildings used only in specific Climate Zones
  • 6. Envelope 2005 Joint Appendix IV • Determining U-factors of wall, roof and floor constructions is simplified with the addition of ACM Appendix IV. • The values in this appendix must be used for all residential and nonresidential compliance calculations: prescriptive, overall envelope, and whole building performance. • CEC Approved computer programs may make adjustments to the values in these tables using procedures described in this appendix. • If a construction assembly is not adequately represented in the tables below, the permit applicant or the manufacturer of the product may request approval from the CEC.
  • 7. Envelope Table IV.1 –U-factors of Wood Framed Attic Roofs Rated R-value of Continuous Insulation1 None R-2 R-4 R-6 R-7 R-8 R-10 R-14 Truss Spacing R-value of Attic Insulation A B C D E F G H None 1 0.300 0.186 0.135 0.106 0.096 0.087 0.074 0.057 R-11 2 0.079 0.067 0.059 0.053 0.050 0.047 0.043 0.037 R-13 3 0.071 0.061 0.054 0.049 0.046 0.044 0.040 0.035 R-19 4 0.049 0.045 0.041 0.038 0.036 0.035 0.033 0.029 R-22 5 0.043 0.039 0.036 0.034 0.033 0.032 0.030 0.026 R-25 6 0.038 0.035 0.033 0.031 0.030 0.029 0.027 0.024 R-30 7 0.032 0.030 0.028 0.027 0.026 0.025 0.024 0.022 R-38 8 0.026 0.024 0.023 0.022 0.022 0.021 0.020 0.019 R-49 9 0.020 0.019 0.019 0.018 0.018 0.017 0.017 0.015 16 in. OC R-60 10 0.017 0.016 0.016 0.015 0.015 0.015 0.014 0.013
  • 8. Table IV.1 U-factors of Wood Framed Attic Roofs Rated R-value of Continuous Insulation1 None R-2 R-4 R-6 R-7 R-8 R-10 R-14 Truss Spacing R-value of Attic Insulation A B C D E F G H None 1 0.300 0.186 0.135 0.106 0.096 0.087 0.074 0.057 R-11 2 0.079 0.067 0.059 0.053 0.050 0.047 0.043 0.037 R-13 3 0.071 0.061 0.054 0.049 0.046 0.044 0.040 0.035 R-19 4 0.049 0.045 0.041 0.038 0.036 0.035 0.033 0.029 R-22 5 0.043 0.039 0.036 0.034 0.033 0.032 0.030 0.026 R-25 6 0.038 0.035 0.033 0.031 0.030 0.029 0.027 0.024 R-30 7 0.032 0.030 0.028 0.027 0.026 0.025 0.024 0.022 R-38 8 0.026 0.024 0.023 0.022 0.022 0.021 0.020 0.019 R-49 9 0.020 0.019 0.019 0.018 0.018 0.017 0.017 0.015 16 in. OC R-60 10 0.017 0.016 0.016 0.015 0.015 0.015 0.014 0.013 Envelope
  • 9. Table IV.9 –U-factors of Wood Framed Walls Rated R-value of Continuous Insulation 2 R-0 R-2 R-4 R-6 R-7 R-8 R-10 R-14 Spacing Cavity Insulation Nominal Framing Size A B C D E F G H 16 in. OC None Any 1 0.356 0.204 0.144 0.111 0.100 0.091 0.077 0.059 R-11 batt 2x4 2 0.110 0.087 0.073 0.063 0.059 0.056 0.050 0.041 R-13 batt 2x4 3 0.102 0.081 0.068 0.059 0.056 0.052 0.047 0.039 R-15 batt 2x4 4 0.095 0.076 0.064 0.056 0.053 0.050 0.045 0.038 R-19 batt 1 2x6 5 0.074 0.063 0.055 0.049 0.046 0.044 0.040 0.034 R-21 batt 2x6 6 0.069 0.058 0.051 0.046 0.043 0.041 0.038 0.032 R-19 batt 2x8 7 0.065 0.057 0.050 0.045 0.043 0.041 0.038 0.033 R-22 batt 2x8 8 0.061 0.053 0.047 0.042 0.040 0.039 0.036 0.031 R-25 batt 2x8 9 0.057 0.050 0.044 0.040 0.038 0.037 0.034 0.030 R-30 batt 1 2x8 10 0.056 0.049 0.043 0.039 0.038 0.036 0.033 0.029 R-30 batt 2x10 11 0.047 0.042 0.038 0.035 0.034 0.032 0.030 0.027 R-38 batt 1 2x10 12 0.046 0.041 0.037 0.034 0.033 0.031 0.029 0.026 R-38 batt 2x12 13 0.039 0.035 0.032 0.030 0.029 0.028 0.026 0.023 2x4 14 0.103 0.082 0.069 0.060 0.056 0.053 0.048 0.040 2x6 15 0.071 0.060 0.052 0.047 0.044 0.042 0.039 0.033 2x8 16 0.056 0.049 0.043 0.039 0.038 0.036 0.033 0.029 2x10 17 0.045 0.040 0.036 0.033 0.032 0.031 0.029 0.025 Foamed Plastic or Cellulose Insulation3 2x12 18 0.038 0.034 0.031 0.029 0.028 0.027 0.025 0.023 Envelope
  • 10. Envelope Cool Roof Requirement Section 112(a) Labeling Requirements. – Every roofing product installed in construction to take compliance credit for reflectance and emittance under Sections 141, 142, and 151(b) shall have a clearly visible packaging label that lists the reflectance and emittance tested in accordance with CRRC-1.
  • 11. Envelope Prescriptive Cool Roof Requirement Section 143(a) 1.A – Required under Prescriptive Component – Trade-off under Prescriptive Overall Envelope – Trade-off under Performance – Requirement • Applies to Low Slope Roofs (2:12 slope or less) • Minimum solar reflectance of 0.70 • Minimum Thermal Emittance of 0.75 • Certified by Cool Roof Rating Council
  • 12. Envelope Cool Roof Applications • www.coolroofs.org • www.coolroofs.info • www.energystar.gov Taken from http://www.pstvnrg.com/homebase/
  • 13. Beyond Title 24 • Cool Roof – Better Reflectance • Initial Reflectance > 0.70 – Coating – Better Emittance • Initial Thermal Emittance > 0.75 – Coating – Steep Slope Application
  • 15. Fenestration Prescriptive Minimums • Table 143-A – Prescriptive Criteria for Nonresidential Buildings – Portable Classrooms for use in a specific Climate Zone
  • 16. NFRC Certification – Buildings with more than 10,000 ft2 of site built vertical fenestration will be required to have the fenestration certified under the NFRC-100SB rating and labeling procedures – Or, must use the Table 116-A & B defaults. – A typical office building will now trigger this requirement at about 60,000 ft2.
  • 17. Envelope New Envelope Language Section 143(a) 5.A: – West Facing Fenestration • The area shall be no greater than 40 percent of the gross west exterior wall area – Required under Prescriptive Component – Trade-off under Prescriptive Overall Envelope – Trade-off under Performance
  • 18. Envelope Minimum Skylight Area Section 143(c) – Applies to Prescriptive Compliance – Enclosed spaces over 25,000 ft2 and – Ceiling heights greater than 15 ft and – Lighting Power Density greater than 0.5 W/ft2 – Unconditioned buildings must also comply – Would also be used in the baseline under the performance approach – EXCEPTION 1 to Section 143 (c): Buildings in climate zones 1 or 16. – EXCEPTION 2 to Section 143 (c): Auditoriums, movie theaters, museums, and refrigerated warehouses.
  • 19. Envelope Minimum Skylight Area • Standard Baseline - Half of the floor area shall be in the daylit zone area. • Beyond Title 24 – Daylit area beyond 50%.
  • 21. Envelope Minimum Skylight Area Lighting shall be controlled Standard Baseline – Multi-level astronomical time switch Beyond Title 24 – Automatic multi-level daylighting control that meets the requirements of Section 119 (i)
  • 22. Minimum Skylight Area Minimum Skylight Effective Aperture
  • 24. Additions & Alterations Additions & Alterations Section 149 (b) 1 B – Roofs Replacements of the exterior surface of existing nonresidential low-sloped roofs shall meet Subsection i or ii where more than fifty percent of the roof or more than 2,000 square feet of roof, whichever is less, is being replaced. Roof replacements subject to this requirement shall include replacement or recovering of the exterior surface of the roof. – i. The solar reflectance and thermal emittance shall meet the requirements of Section 143 (a) 1; or
  • 25. Additions & Alterations Additions & Alterations Section 149 (b) 1 B – Roofs (cont) – ii. The building envelope for which a permit is sought, which has a roof replacement subject to this requirement, shall comply with Section 143(b)3, where the standard building has a solar reflectance which meets the requirements of Section 143(a)1 and the other terms in Equation 143-D correspond to the existing building at the time of the application of the permit, and the proposed building has the actual solar reflectance of the roof replacement and other improvements to the building envelope necessary to comply.
  • 26. Additions & Alterations Additions & Alterations Section 149 (b) 1 B – Roofs (cont) EXCEPTION to Section 149 (b) 1 B: Roof recoverings allowed by the CBC are not required to meet Section 149 (b) 1 B when all of the following occur: • The existing roof has a rock or gravel surface, and • The new roof has a rock or gravel surface, and • There is no removal of existing layers of roof coverings of more than fifty percent of the roof or more than 2,000 square feet of roof, whichever is less; and • There is no recoating with a liquid applied coating; and • There is no installation of a recover board, rigid insulation or other rigid, smooth substrate to separate and protect the new roof recovering from the existing roof.
  • 27. Envelope New Envelope Language Section 118(e) 3 • Insulation installed on ceilings with removable panels – ceiling is considered to be un-insulated.
  • 28. Envelope New Envelope Language Section 118(e) 3 • EXCEPTION: When there are conditioned spaces with a combined floor area no greater than 2,000 square feet in an otherwise unconditioned building, and when the average height of the space between the ceiling and the roof over these spaces is greater than 12 feet.
  • 29. Mandatory Measures New Mandatory Measure Section 118(e) 3 • Insulation shall be installed in direct contact with a continuous roof or ceiling which is sealed to limit infiltration and exfiltration. • Valid locations include: – Placing insulation above the roof deck. – Placing insulation below the roof deck – Placing insulation on top of a drywall ceiling;
  • 30. Mandatory Measures New Mandatory Measure Section 118(f) – Opaque portions of framed demising walls shall have insulation with no less than R-13. – Wood framed demising ceilings and floors in NR buildings shall have insulation with no less than R-13.
  • 31. New Mandatory Measure Mandatory Measures Section 118(g) – Heated Slab Floors – Must be insulated according to the requirements in Table 118-B
  • 33. Indoor Lighting New Lighting Language Section 146(b) 5.S Qualified Historic Buildings – Only fixtures consisting of historic lighting components, or replicas of historic components are exempt. – All other lighting systems must comply the LPD allowances
  • 34. Scope Scope of Standards A new category is added to the definitions in the 2005 Standards, unconditioned. Unconditioned spaces in Nonresidential Buildings must comply with all lighting requirements in Title 24 including maximum LPD requirements and mandatory measures.
  • 35. Scope Scope of Standards (cont) CALIFORNIA CODE OF REGULATIONS: TITLE 24, PART 6, SUBCHAPTER 1 SECTION 100 – SCOPE (a) Buildings Covered. The provisions of Title 24, Part 6, apply to all buildings: 1. That are of Occupancy Group A, B, E, F, H, M, R, S, or U; and 2. For which an application for a building permit or renewal of an existing permit is filed (or is required by law to be filed) on or after the effective date of the provisions, or which are constructed by a governmental agency; and 3. That are: A. Unconditioned, indirectly or directly conditioned by mechanical heating or mechanical cooling; or B. Low-rise residential buildings that are heated with a wood heater or another non- mechanical heating system.
  • 36. Scope of Standards (cont) Scope Area derived from take-offs LPD x Area LTG-5-C •Lighting allowance •Unconditioned Spaces
  • 37. Scope of Standards (cont) Scope LTG-2-C •Installed lighting •Unconditioned Spaces
  • 38. Scope of Standards (cont) Scope LTG-1-C •Installed Watts must be less than the Allowed Watts
  • 39. Conditioned vs. Unconditioned • No trade offs available between the Conditioned areas and the Unconditioned
  • 40. Indoor Lighting New Lighting Language Section 146(c) 1 Complete building method LPD – Retail allowance can only be used for single tenant buildings – Sales area must by 70% or greater of the building area – Cannot be used for Lease Space if Tenant is not known.
  • 41. New Lighting Language Indoor Lighting Section 146 Complete Building LPD
  • 42. New Lighting Language Section 146 – Area Category LPD Indoor Lighting
  • 43. New Lighting Language Indoor Lighting Section 146 – New Area Category LPD (cont)
  • 44. New Lighting Language Indoor Lighting Section 146 – New Area Category LPD (cont)
  • 45. Indoor Lighting New Lighting Language Section 146(c) 3 Tailored Method – Tailored Method. The Tailored Method shall only be used for spaces whose combined area does not exceed 30 percent of the entire building that is otherwise using the Area Category Method. – Trade-offs of lighting power between the Tailored Method and Area Category Methods are not allowed. – EXCEPTION 1 TO 146 (b) 3. The Tailored Method may be used for up to 100% of the entire building area of Retail Merchandise Sales and Museums. – EXCEPTION 2 TO 146 (b) 3. If a single function area within the building exceeds 30 percent of the floor area of the entire building, the Tailored Method may be used for that entire function area alone, with the remaining spaces using the Area Category Method.
  • 47. New Lighting Language Indoor Lighting Section 146 – Lighting Control Credits Changed
  • 48. New Lighting Language Section 146 – Lighting Control Credits Changed (cont) Indoor Lighting
  • 49. New Lighting Language Acceptance Requirements Indoor Lighting
  • 50. Indoor Lighting New Lighting Language Section 131(c) Lighting Controls Multilevel controls shall have at least one control step that is between 50% and 70% of design lighting power and at least one step of minimum light output operating at less than 35% of full rated lighting system power (this control step could be completely off, creating a bi-level control). A reasonably uniform level of illuminance in an area shall be achieved by any of the following: 1. Dimming all lamps or luminaires; or 2. Switching alternate lamps in luminaires, alternate luminaires, and alternate rows of luminaires.
  • 51. Indoor Lighting New Lighting Language Section 131(c) 2 Lighting Controls – Daylit Area > 2,500 sqft – Space has Skylight(s) – Must install Multi-Level Lighting Controls • Baseline - Astronomical Timeclock • Beyond Title 24 - Automatic Control (photocell)
  • 52. Indoor Lighting New Residential Lighting Language Section 130 – Lighting – Interior Lighting in High-rise Residential Living Quarters and Hotel/Motel Guest Rooms. • The design and installation of all lighting systems and equipment in high-rise residential living quarters and in hotel/motel guest rooms shall comply with Section 150(k)
  • 53. Indoor Lighting New Residential Lighting Language (cont) Section 150(k) • High Efficacy Luminaires: High Efficacy Luminaires for residential lighting shall contain only high efficacy lamps and shall not contain a medium screw base socket (E24/E26). • A high efficacy lamp has a lamp efficacy that is no lower than the efficacies contained in TABLE 150-C. Ballasts for lamps rated 18 Watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. Electronic ballasts for residential lighting shall comply with the requirements for electromagnetic interference (EMI) and radio frequency interference (RFI) contained in FCC Part 18 and shall be labeled as meeting the requirements for consumer limits.
  • 54. Indoor Lighting New Residential Lighting Language (cont)
  • 55. Indoor Lighting New Residential Lighting Language (cont) Section 150(k) • Permanently installed luminaires in kitchens shall be high efficacy luminaires. • EXCEPTION: Up to 50 percent of the total rated wattage of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires.
  • 56. Indoor Lighting New Residential Lighting Language (cont) Section 150(k) • Permanently installed luminaires in bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires. • EXCEPTION: Permanently installed luminaires that are not high efficacy shall be allowed provided that they are controlled by an occupant sensor(s) certified to comply with Section 119 (d).
  • 57. Indoor Lighting New Residential Lighting Language (cont) Section 150(k) • Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires. • EXCEPTION 1: Permanently installed luminaires that are not high efficacy luminaires shall be allowed provided they are controlled by a dimmer switch. • EXCEPTION 2: Permanently installed luminaires that are not high efficacy shall be allowed provided that they are controlled by an occupant sensor(s) certified to comply with Section 119 (d). • EXCEPTION 3: Permanently installed luminaires that are not high efficacy luminaires shall be allowed in closets less than 70 square feet.
  • 59. Outdoor Lighting Outdoor Lighting Outdoor lighting, including parking garages, parking lots and site lighting must comply with all lighting requirements in Title 24 including maximum LPD requirements and mandatory measures.
  • 60. Outdoor Lighting New Lighting Language Section 147 – • This section applies to all outdoor lighting, whether attached to buildings, poles, structures or self supporting, including but not limited to, hardscape areas including parking lots, lighting for building entrances, sales and non-sales canopies; lighting for all outdoor sales areas; and lighting for building facades.
  • 61. Outdoor Lighting New Lighting Language EXCEPTIONS TO Section 147 (a) 1. Temporary outdoor lighting. 2. Lighting required and regulated by the Federal Aviation Administration, and the Coast Guard. 3. Lighting for public streets, roadways, highways, and traffic signage lighting, including lighting for driveway entrances occurring in the public right-of-way. 4. Lighting for sports and athletic fields. 5. Lighting for industrial sites, including but not limited to, rail yards, shipyards and docks, chemical and petroleum processing plants, and aviation facilities. 6. Automated Teller Machine lighting. 7. Lighting of public monuments. 8. Internally illuminated, externally illuminated, and unfiltered signs. 9. Lighting used in or around swimming pools, water features, or other locations subject to Article 680 of the California Electrical Code. 10. Lighting of tunnels, bridges, stairs, and ramps. 11. Landscape lighting.
  • 62. Additions & Alterations Additions & Alterations Section 149 – H. Alterations to existing outdoor lighting systems that increase the connected lighting load or replace more than 50 percent of the lighting fixtures shall meet the requirements of Section 147 & 148.
  • 63. New Lighting Language Section 10–114 Definition of Outdoor Lighting Zones Outdoor Lighting
  • 64. New Lighting Language Section 147 – Requirements for Outdoor Lighting General Site Illumination Outdoor Lighting
  • 65. New Lighting Language Section 147 – Requirements for Outdoor Lighting Specific Applications Outdoor Lighting
  • 66. New Lighting Language Section 130(d) – Luminaire Cutoff Requirements – All outdoor luminaires that use lamps rated 175 watts or greater in hardscape areas including parking lots, building entrances and sales and non-sales canopies, and all outdoor sales areas shall be designated Cutoff for light distribution. To comply with this requirement the luminaire shall be rated Cutoff in a photometric test report that includes any tilt or other non-level mounting condition of the installed luminaire. Cutoff is a luminaire light distribution classification where the candela per 1000 lamp lumens does not numerically exceed 25 at or above a vertical angle of ninety degrees above nadir, and 100 at or above a vertical angle of eighty degrees above nadir. Outdoor Lighting
  • 67. Mandatory Measures • Cutoff Luminaires – A cutoff luminaire is one where no more than 2.5% of the light output extends above the horizon (90 degrees above nadir) and no more than 90% of the light output extends more than 80 degrees above nadir.
  • 68. New Lighting Language EXCEPTIONS TO Section 130 (d) – 1. Lighting for signs. – 2. Lighting for building facades. – 3. Lighting required by a health or life safety statute, ordinance, or regulation, including but not limited to, emergency lighting – 4. Temporary outdoor lighting – 5. Temporary outdoor theatrical equipment lighting for live performances. – 6. Lighting used in or around swimming pools, water features, or other locations subject to Article 680 of the California Electrical Code. Outdoor Lighting
  • 70. Mechanical New Mechanical Language Section 124 Air Distribution System Ducts and Plenums – Portions of ductwork conveying heated or cooled air located in one or more of the following spaces shall be insulated to a minimum installed level of R-8: 1. Outdoors, or 2. In a space between the roof and an insulated ceiling, or 3. In a space directly under a roof with fixed vents or openings to the outside or unconditioned spaces, or 4. In an unconditioned crawlspace; or 5. In other unconditioned spaces. Portions of supply air ductwork that are not in one of these spaces shall be insulated to a minimum installed level of R-4.2 (or any higher level required by CMC Section 605) or be enclosed in directly conditioned space.
  • 71. New Mechanical Language Mechanical Certificate of Acceptance. For all new Nonresidential buildings, High-rise Residential buildings and Hotels and Motels designated to allow a conditioned use of an occupancy group or type regulated by Part 6, the applicant shall file Certificate(s) of Acceptance with the enforcement agency prior to receiving a final occupancy permit. The signer (s) shall be eligible under Division 3 of the Business and Professions code to sign such documents. The Certificate(s) shall be readily legible and of substantially similar format and informational order and content to the Certificate(s) of Acceptance in the Nonresidential Manual, as defined in Part 6. The Certificate(s) shall be approved by the local enforcement agency by stamp or authorized signature and shall indicate that: – 1. The applicant has demonstrated acceptance requirements as indicated in the plans and specifications submitted under section 10-103(a); – 2. Installation certificates described in section 10-103(a)3 are posted, or made available with the building permit(s) issued for the building; and – 3. That operating and maintenance information described in sections 10-103(b) and 10- 103(c) were provided to the building owner.
  • 73. Mechanical New Mechanical Language New Certificate of Acceptance Requirements apply to: • Demand Control Ventilation Devices (CO2 Sensors) • Outside Air • Space Conditioning Controls • Hydronic System Controls • Economizers • Air Distribution ducts and plenums • VSDs on fans
  • 74. Mechanical New Mechanical Language Air Distribution System Duct Leakage Sealing. All duct systems shall be sealed to a leakage rate not to exceed 6% of the fan flow if the duct system: • 1. Is connected to a constant volume, single zone, air conditioners, heat pumps or furnaces, and • 2. Serving less than 5,000 square feet of floor area; and • 3. Having more than 25% duct surface area located in one or more of the following spaces: – A. Outdoors, or – B. In a space directly under a roof where the U-factor of the roof is greater than the U- factor of the ceiling, or – C. In a space directly under a roof with fixed vents or openings to the outside or unconditioned spaces, or – D. In an unconditioned crawlspace; or – E. In other unconditioned spaces. • The leakage rate shall be confirmed through field verification and diagnostic testing, in accordance with procedures set forth in the Nonresidential ACM Manual. EXCEPTION TO Section 144(k) 3 B: Where the roof meets the requirements of 143(a) 1 C.
  • 75. Mechanical New Mechanical Language Section 144 – New prescriptive requirements include: • VSDs required on VAV systems 10 HP and above • Static pressure sensors will be required to be placed in a position such that the controller set point is no greater than one-third the total design fan static pressure. • The static pressure set point will be required to be reset based on the zone requiring the most pressure. • Series Fan Terminal Boxes 1 HP and less must have electrically- commutated motors
  • 76. Mechanical New Mechanical Language Section 144 – New prescriptive requirements include: • Open Towers over 900 gpm must be propeller • Open cooling towers configured with multiple condenser water pumps shall be designed so that all cells can be run in parallel with the larger of: A. The flow that’s produced by the smallest pump, or B. 33% of the design flow for the cell. • Chilled water plants with more than 300 tons total capacity shall not have more than 100 tons provided by air-cooled chillers
  • 77. Mechanical New Mechanical Language Section 144 – 2 Way Valves on Hydronic Systems: 1. Hydronic Variable Flow Systems. HVAC chilled and hot water pumping shall be designed for variable fluid flow and shall be capable of reducing pump flow rates to no more than the larger of: a) 50% or less of the design flow rate; or b) the minimum flow required by the equipment manufacturer for the proper operation of equipment served by the system. EXCEPTION to Section 144 (j) 1: Systems that include no more than three control valves. Note – Does not apply to Primary portion of Primary/Secondary loops.
  • 78. Mechanical New Mechanical Language Section 144 – New Hydronic System requirements: 2. Chiller Isolation. When a chilled water plant includes more than one chiller, provisions shall be made so that flow through any chiller is automatically shut off when that chiller is shut off while still maintaining flow through other operating chiller(s). Chillers that are piped in series for the purpose of increased temperature differential, shall be considered as one chiller. 3. Boiler Isolation. When a hot water plant includes more than one boiler, provisions shall be made so that flow through any boiler is automatically shut off when that boiler is shut off while still maintaining flow through other operating boiler(s).
  • 79. Mechanical New Mechanical Language Section 144 – New Hydronic System requirements: 4. Chilled and Hot Water Temperature Reset Controls. Chilled and hot water systems with a design capacity exceeding 500,000 Btu/h supplying chilled or heated water (or both) shall include controls that automatically reset supply water temperatures as a function of representative building loads or outside air temperature. EXCEPTION to Section 144 (j) 4: Hydronic systems that use variable flow to reduce pumping energy in accordance with 144(j) 1.
  • 80. Mechanical New Mechanical Language Section 144 – New Hydronic System requirements: 5. Water Loop Heat Pump Systems. Water-Loop Heat Pump Systems having a total pump system power exceeding 5 hp shall have flow controls that meet the requirements of 144(j) 6 (Variable Speed Drive). Each heat pump shall have a two-position automatic valve interlocked to shut off water flow when the compressor is off.
  • 81. Mechanical New Mechanical Language Section 144 – New Hydronic System requirements: 6. Variable Speed Drives. Individual pumps serving variable flow systems and having a motor horsepower exceeding 5 hp shall have controls and/or devices (such as variable speed control) that will result in pump motor demand of no more than 30% of design wattage at 50% of design water flow. The controls or devices shall be controlled as a function of desired flow or to maintain a minimum required differential pressure. Differential pressure shall be measured at or near the most remote heat exchanger or the heat exchanger requiring the greatest differential pressure. EXCEPTION 1 to Section 144 (j) 6 Heating hot water systems.
  • 82. Additions & Alterations Additions & Alterations Section 149 (b) 1. D When new or replacement space-conditioning ducts are installed to serve an existing building, the new ducts shall meet the requirements of Section 124, and if they meet the criteria of Section 144 (k) 1, 2, and 3, the duct system shall be sealed and labeled as confirmed through field verification and diagnostic testing in accordance with procedures for duct sealing of existing duct systems as specified in the Nonresidential ACM manual, to meet one of the following requirements: i. If the new ducts form an entirely new duct system directly connected to the air handler, the measured duct leakage shall be less than 6% of fan flow; or
  • 83. Additions & Alterations Additions & Alterations Section 149 (b) 1. D (cont) ii. If the new ducts are an extension of an existing duct system, the combined new and existing duct system shall meet one of the following requirements: a. The measured duct leakage shall be less than 15% of fan flow; or b. The duct leakage shall be reduced by more than 60% relative to the leakage prior to the equipment having been replaced and a visual inspection shall demonstrate that all accessible leaks have been sealed; or c. If it is not possible to meet the duct sealing requirements of Subsections a. or b., all accessible leaks shall be sealed and verified through a visual inspection by a certified HERS rater. EXCEPTION to Section 149 (b) 1 D ii: Existing duct systems that are extended, which are constructed, insulated or sealed with asbestos.
  • 84. Additions & Alterations Additions & Alterations Section 149 (b) 1. E • When a space conditioning system is altered by the installation or replacement of space conditioning equipment (including replacement of the air handler, outdoor condensing unit of a split system air conditioner or heat pump, cooling or heating coil, or the furnace heat exchanger), the duct system that is connected to the new or replaced space conditioning equipment, if the duct system meets the criteria of Section 144 (k) 1, 2., and 3., shall be sealed, as confirmed through field verification and diagnostic testing in accordance with procedures for duct sealing of existing duct systems as specified in the Nonresidential ACM manual, to one of the requirements of Section 149 (b) 1 D;
  • 85. Additions & Alterations Additions & Alterations Section 149 (b) 1. E (cont) • EXCEPTION 1 to Section 149 (b) 1. E: Buildings altered so that the duct system no longer meets the criteria of Section 144(k)1, 2, and 3. • EXCEPTION 2 to Section 149 (b) 1 E: Duct systems that are documented to have been previously sealed as confirmed through field verification and diagnostic testing in accordance with procedures in the Non-Residential ACM manual. • EXCEPTION 3 to Section 149 (b) 1 E: Existing duct systems constructed, insulated or sealed with asbestos.
  • 86. Mechanical New Mechanical Language Section 121(b) Demand Control Ventilation Devices – Required Demand Control Ventilation • HVAC single zone systems with the following characteristics shall have demand ventilation controls complying with 121 (c) 4: • They have an outdoor air economizer; and • They serve a space with a design occupant density greater than or equal to 25 people per 1000 ft2 (40 square foot per person), or a space whose occupancy type per Chapter 10 of the CBC is “Assembly Areas,” “Concentrated Use (without fixed seats),” “Auction Rooms,” “Assembly Areas, Less-Concentrated Use.” • Exception - Classrooms
  • 87. Mechanical New Mechanical Language Section 121(b) Demand Control Ventilation Devices Where demand control ventilation is required by Section 121 (c) 3, CO2 sensors shall be installed in each room that meets the criteria of 121 (c) 3 B; • CO2 sensors shall be located in the room between 1 ft and 6 ft above the floor; • Demand ventilation controls shall maintain CO2 concentrations less than or equal to 700 ppm plus the outdoor air CO2 concentration in all rooms with CO2 sensors;
  • 88. Mechanical New Mechanical Language Section 121(b) Demand Control Ventilation Devices – Outdoor air CO2 concentration shall be determined by one of the following: • CO2 concentration shall be assumed to be 400 ppm without any direct measurement; or • CO2 concentration shall be dynamically measured using a CO2 sensor located near the position of the outdoor air intake; or • CO2 concentration shall be measured one time at building completion at the position of the outdoor air intake;
  • 89. Mechanical New Mechanical Language Section 121(b) Demand Control Ventilation Devices – When the system is operating during hours of expected occupancy, the controls shall maintain system outdoor air ventilation rates no less than the rate listed in Table 121-A times the conditioned floor area for spaces with CO2 sensors, plus the rate required by 121 (b) 2 for other spaces served by the system;
  • 90. Mechanical New Mechanical Language Section 121(b) Demand Control Ventilation Devices – CO2 sensors shall be certified by the manufacturer to have an accuracy of no less than 75 ppm, factory calibrated or calibrated at start-up, and certified by the manufacturer to require calibration no more frequently than once every 5 years.