EAST ELEVATION
NORTH ELEVATION SOUTH ELEVATION
MASTER BEDROOM
NEW WALK IN
CLOSET
BALCONY
NEW EN-SUITE
UP
KITCHEN
LOUNGE
BEDROOM 1
ENTRANCE
HALL
PATIO
DINING
BATHROOM
180 4830 90 2260 90 4620 180
1240 3000 1100 1800 1140 3000 1000
12262
1801807100180
3000101022502700770
13740
5580
18055801802140902353180
2250333022502020
630
3000
13740
1500630
1320180
180 2360 2510 180 1250 90 3890 180
2170 900 1200 1500
12260
1320 18090
180 7040 180 4670 180
1240 3000 4040 3000 1000
12262
1804940903500902750180
30006302250333018003690
13740
1801320
1500
180 2360 2510 180 1250 90 3890 180
1700 800 1260 1500
12260
1320 18090
800103089080015908001100
1801807100180
3000101022502700
13740
5580
291018002570
22504270
10003409106003650
Marseilles tiled roof
Roof tiles on 38x38 battens on 250
microns plastic underlay on
pre-fabricated trusses (gangnailed) on
114x38mm wall plates tied down at
least 8 courses into brickwork
Marseilles tiled roof
Roof tiles on 38x38 battens on 250
microns plastic underlay on
pre-fabricated trusses (gangnailed) on
114x38mm wall plates tied down at
least 8 courses into brickwork
Marseilles tiled roof
Roof tiles on 38x38 battens on 250
microns plastic underlay on
pre-fabricated trusses (gangnailed) on
114x38mm wall plates tied down at
least 8 courses into brickwork
Marseilles tiled roof
Roof tiles on 38x38 battens on 250
microns plastic underlay on
pre-fabricated trusses (gangnailed) on
114x38mm wall plates tied down at
least 8 courses into brickwork
30mm raised plaster coping
surround to inset to take
dry-stack rockwork to detail
1050m high wrought-iron
balustrading to architects
detail
1050m high wrought-iron
balustrading to architects
detail
30mm raised plaster coping
surround to inset to take
dry-stack rockwork to detail
30mm raised plaster coping
surround to inset to take
dry-stack rockwork to detail
30mm raised plaster coping
surround to inset to take
dry-stack rockwork to detail
30mm raised plaster coping
surround to inset to take
dry-stack rockwork to detail
1050m high wrought-iron
balustrading to architects
detail
1050m high wrought-iron
balustrading to architects
detail
W3
W4
W2
W1
W8W7
W6W5
D2
D2 D1
NGL
FFL
WALL PLATE LEVEL
700 X 230 700 X 230 700 X 230
WALL PLATE LEVEL WALL PLATE LEVEL
WALL PLATE LEVEL
WALL PLATE LEVEL
KITCHENBEDROOM 1
NEW WALK IN
CLOSET
NEW LOUNGE
Marseilles tiled roof
Roof tiles on 38x38 battens on 250
microns plastic underlay on
pre-fabricated trusses (gangnailed) on
114x38mm wall plates tied down at
least 8 courses into brickwork
30mm raised plaster coping
surround to inset to take
dry-stack rockwork to detail
100mm concrete slab reinforced with
BRC mesh (ref 193) on plastic underlay
in well compacted soil.
A A
TOP OF SLAB
archarch
concrete slab to engineers
detail
WEST ELEVATION
SECTION A-A
GROUND STOREY FIRST STOREY
ROOF PLAN
shower
bidet
w.c
w.h.b w.h.b
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
01 of 02
PLANS & ELEVATIONS
STUDIOWORK III
PROPOSED ADDITIONS AND ALTERATIONS
TO EXISTING DWELLING
KNY12
06 OCT 2014
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
1:100 Y.SEWPERSAD
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF URIEL CHRISTOPHER ARCHITECTS CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
A A
gully
ie
gully
ie
re3
ie
re2iere1
MH
to municipal
sewer
TOP OF SLAB
TOP OF SLAB
TOP OF SLAB
TOP OF SLAB
NGL
FFL
NGL
FFL
NGL
FFL
NGL
FFL
3670
1100
SCHEDULE OF AREAS
GROUND FLOOR
Living Areas
Patios
FIRST FLOOR
Living Areas
Patios
37 sq.m.
37 sq.m.
137 sq.m.
143 sq.m.
Stair well 6 sq.m.
Total
Total
180 sq.m.
180 sq.m.
PROPOSED F.A.R
PROPOSED COVERAGE
PROPOSED WORK
TOTAL PROPOSED WORK
N/A.
N/A.
360 sq.m.
1500
1500
750750
2250
2100
F.F.L
1000
1500
750750
1800
2100
F.F.L
800
1900
F.F.L
2100
F.F.L
1500 1500
3000
2100
2100
900
WINDOW NO.
FRAME
DIAGRAM
25 MICRONS NATURAL ANNODIZED
ALUMINUM FRAME.
GLAZING
25 MICRONS NATURAL
ANNODIZED ALUMINUM
FRAME.
4mm CLEAR FLOAT GLASS. 4mm CLEAR
FLOAT GLASS.
NOTE
GLAZING TO COMPLY WITH SANS 10400, PART N.
25 MICRONS NATURAL ANNODIZED
ALUMINUM FRAME.
4mm CLEAR FLOAT GLASS.
25 MICRONS NATURAL ANNODIZED
ALUMINUM FRAME.
No glazing
DOOR NO.
FRAME
DIAGRAM
GLAZING
IRONMONGERY
SCHEDULE
WINDOWDOOR
25 MICRONS NATURAL ANNODIZED
ALUMINUM FRAME.
6.5mm FIXED TOUGHENED SAFETY GLASS.
WINDOW 5,6,7 & 8 WINDOW 1 & 4 WINDOW 2 & 3
1,2. 3.- ALL STANDARD INTERNAL DOORS
steel bearing hinge
rose
case and strike plate (double cylinder)
escutcheons
cam action overhead door closers, with
adjustable closing speed, latch action, back
check and delayed action
square corner kick plate
and bottom of one leaf
stainless steel bearing hinge
rose
case and strike plate (double cylinder)
escutcheons
cam action overhead door closers, with
adjustable closing speed, latch action, back
check and delayed action
square corner kick plate
top and bottom of one leaf.
F.F.L
wc
basin
bidet
ie
re3
vp
ie
vp
wc
ie
gully
ie
shower
re2
ie
gully
1:60 gradient
1:60 gradient
sink
re1
2
REVISIONS
DATE NO. REVISION
OWNER'S SIGNATURE
STUDIOWORK III
PROPOSED ADDITIONS AND ALTERATIONS
TO EXISTING DWELLING
PROJECT TITLE
DRAWING TITLE
PROJECT No. DRAWING No.
SCALE DATE DESIGNED/DRAWN
Y.SEWPERSAD
THIS DRAWING IS THE COPYRIGHT INTERLECTUAL
PROPERTY OF URIEL CHRISTOPHER ARCHITECTS CC.
AND MAY NOT BE COPIED, SHARED OR REPRODUCED
WITHOUT THE WRITTEN CONSENT.
NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE
APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS
10400
PART D - PUBLIC SAFETY
ALL BALUSTRADES TO COMPLY WITH PART DD2
PART M - STAIRWAYS
DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 &
BALUSTRADES TO COMPLY WITH MM3
PART N - GLAZING
ALL GLAZING TO COMPLY WITH PART N-N.B.R.
PART 0 - LIGHTING AND VENTILATION
ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES &
OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux
ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO
BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS.
AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS
PART S - FACILITIES FOR DISABLED PERSONS
RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2
TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5
PARKING BAYS TO COMPLY WITH SS8
SIGNAGE TO COMPLY WITH SS9
PART U - REFUSE DISPOSAL
REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE,
BIBTAP & SUMP
PART T - FIRE PROTECTION
OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2
ALL MATERIALS TO COMPLY WITH TT5
ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7.
LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10
ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B
2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN
ACCORDANCE WITH TT19.9.
ALL CEILING MATERIALS TO COMPLY WITH TT13
ALL FLOOR COVERINGS TO COMPLY WITH TT14
ALL WALL FINISHES TO COMPLY WITH TT15
LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9
STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23
ALL OPENINGS IN FLOORS TO COMPLY WITH TT26
SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5
EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY
PROF. ENGINEER & CERTIFIED ON COMPLETION
FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH
TT31 - TO BE CERTIFIED BY PROFESSIONAL
SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36
FIRE RETICULATION TO COMPLY WITH TT33 & WW5
HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35
PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH
TT37
ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF
5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39
SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41
OCCUPANCY : OFFICE - G1
STORAGE - J3
FIRE HOSE REELS TO COMPLY WITH TT37
25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS
3% ROOF VENTILATION TO BE PROVIDED TO N.B.R.
MAX. HEIGHT OF STORAGE = 3M
DRAINAGE NOTES
- ALL WORK IS TO COMPLY TO SANS 10400
- HEAD OF DRAIN IS TO BE VENTED
- ANY DAMAGED FITTINGS TO BE REPLACED
- ALL GULLEY SURROUNDS & MANHOLE
COVERS TO BE 75 mm ABOVE GROUND LEVEL
- SEWER MANHOLES TO BE EXPOSED BEFORE
COMMENCING WORK AND ADJUST LEVELS
ACCORDINGLY
- IE'S TO ALL BENDS AND JUNCTIONS
- SOIL PIPES TO BE 110 diameter PVC
- SEWER UNDER BUILDINGS TO BE
110 mm UPVC RIBBED PTPE
- ANCHOR BLOCKS TO BE USED WHEN
GRADIENTS EXCEED 1:5
FLASHING TO COMPLY WITH PART LL5.2
TWO COURES OF BRICKWORK TO BE REINFORCED
WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE
WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL.
EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL
WALLS TO BE BAGGED AND WATERPROOFED
WITH TWO COATS OF BITUMEN PAINT.
6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38
BRANDERING AT MAX 300mm CENTRES BOTH WAYS.
375 mic DPC TO BE PROVIDED TO WALLS AT SLAB
LEVEL AND UNDER ALL CILLS.
CONTRACTOR TO ENSURE THAT NO CHANGES IN
LEVELS ARE MADE OVER LOCAL AUTHORITY
SERVITUDES OR UNDER GROUND SERVICES UNLESS
PERMISSION HAS BEEN GIVEN IN WRITING BY
THE LOCAL AUTHORITY.
ANY DISCREPANCIES AND OMISSIONS ARE TO BE
BROUGHT TO THE ARCHITECTS ATTENTION
IMMEDIATELY.
IF ON EXCAVATION THE SITE IS FOUND TO
CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER
OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL
FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL
ENGINEERS DETAILS & UNDER HIS SUPERVISION.
NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE
PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY
DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS
AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS
10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING
OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND
MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT
SUB-FLOOR AND FOUNDATION TRENCHES TO
BE POISONED WITH "CLORODANE" SOLUTION
IN ACCORDANCE WITH SABS CODES OF
PRACTICE BY SPECIALIST.
GENERAL NOTES
ALL WORK TO COMPLY WITH SANS 10400.
CORNER BEACONS TO BE LOCATED AND
EXPOSED BEFORE WORK ON SITE
COMMENCES.CONTRACTOR TO CHECK ALL
DIMENSIONS AND LEVELS (SCHEDULES AND
DETAILS) BEFORE THE RELEVANT WORK IS
PLACED IN HAND AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
ALL WRITTEN DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING.
SOIL TO BE WELL COMPACTED BEHIND IN
LAYERS NOT EXCEEDING 150 mm.
ALL FOUNDATIONS TO BE TAKEN BELOW
NATURAL GROUND LEVEL.
NO BACK FILLING OF OVER EXCAVATED
AREAS WILLBE PERMITTED.
THE CONTRACTOR IS TO INSPECT THE
OFFICIAL APPROVED COPIES OF THE
DRAWINGS TO ENSURE THAT ALL
AMENDMENTS HAVE BEEN TAKEN INTO
ACCOUNT .THE ATTENTION OF THE
OWNER/CONTACTORIS DRAWN TO THE FACT
THAT CHANGERS TO THE PLAN&/OR
SPECIFICATION AFTER OFFICIAL APPROVAL
IS LIKELY TO INVALIDATE THAT APPROVAL.
ALL EARTHWORKS TO BE CONTAINED WITHIN
SITE BOUNDARIES & WITHIN 1.0 m OF ANY of
ANY BOUNDARY.BANKS TO BE CUT AT A
MAXIMUM OF 26 degrees.
NATURAL GROUND LINE IN APPROXIMATE
POSITION ONLY & NO CLAIM CAN BE MADE
FOR ANY DISCREPANCIES
ON SITE.
Marseilles tiled roof
Roof tiles on 38x38 battens on 250
microns plastic underlay on
pre-fabricated trusses (gangnailed) on
114x38mm wall plates tied down at
least 8 courses into brickwork
30mm raised plaster coping
surround to inset to take
dry-stack rockwork to detail
Marseilles tiled roof
Roof tiles on 38x38 battens on 250
microns plastic underlay on
pre-fabricated trusses (gangnailed) on
114x38mm wall plates tied down at
least 8 courses into brickwork
30mm raised plaster coping
surround to inset to take
dry-stack rockwork to detail
TOP OF SLAB TOP OF SLAB
NGL
FFL
NGL
FFL
02 of 02
SEWER & SCHEDULES
KNY12
06 OCT 20141:100 Y.SEWPERSAD
NORTH ELEVATION EAST ELEVATION

More Related Content

What's hot

Building services
Building servicesBuilding services
Building servicestzex22
 
Presentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof HousePresentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof HouseJoyeeLee0131
 
Safety and security for buildings
Safety and security for buildingsSafety and security for buildings
Safety and security for buildingsKhaled Ali
 
Project of traditional Malay house
Project of traditional Malay houseProject of traditional Malay house
Project of traditional Malay houseAdib Ramli
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan ReportFarah Sham
 
Aluminium Architectural Section Profiles Manufacturer & Supplier
Aluminium Architectural Section Profiles Manufacturer & SupplierAluminium Architectural Section Profiles Manufacturer & Supplier
Aluminium Architectural Section Profiles Manufacturer & SupplierBanco Aluminium
 
Manual of tropical housing-koenigsberger
Manual of tropical housing-koenigsbergerManual of tropical housing-koenigsberger
Manual of tropical housing-koenigsbergerYashvi Dalal
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
modular coordination
modular coordinationmodular coordination
modular coordinationShailja km
 
Space frames-modular construction technology
Space frames-modular construction technologySpace frames-modular construction technology
Space frames-modular construction technologyAnjith Augustine
 
building construction documentation
building construction documentation building construction documentation
building construction documentation Weng Chuan
 
Lecture 3 - climate and architecture
Lecture 3 - climate and architectureLecture 3 - climate and architecture
Lecture 3 - climate and architectureYosef Yemane
 
site analysis
site analysis site analysis
site analysis Arch Mgaya
 
Case study of ms1525 energy efficiency and renewable energy code of practice.
Case study of ms1525   energy efficiency and renewable energy code of practice.Case study of ms1525   energy efficiency and renewable energy code of practice.
Case study of ms1525 energy efficiency and renewable energy code of practice.Steve Lojuntin
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compileTimun Loh
 

What's hot (20)

Building services
Building servicesBuilding services
Building services
 
Presentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof HousePresentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof House
 
Windresistive building
Windresistive buildingWindresistive building
Windresistive building
 
Safety and security for buildings
Safety and security for buildingsSafety and security for buildings
Safety and security for buildings
 
SPACE FRAME
SPACE FRAME SPACE FRAME
SPACE FRAME
 
Project of traditional Malay house
Project of traditional Malay houseProject of traditional Malay house
Project of traditional Malay house
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan Report
 
Aluminium Architectural Section Profiles Manufacturer & Supplier
Aluminium Architectural Section Profiles Manufacturer & SupplierAluminium Architectural Section Profiles Manufacturer & Supplier
Aluminium Architectural Section Profiles Manufacturer & Supplier
 
Manual of tropical housing-koenigsberger
Manual of tropical housing-koenigsbergerManual of tropical housing-koenigsberger
Manual of tropical housing-koenigsberger
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Beirut Terraces
Beirut TerracesBeirut Terraces
Beirut Terraces
 
Drafting and Design
Drafting and DesignDrafting and Design
Drafting and Design
 
modular coordination
modular coordinationmodular coordination
modular coordination
 
Space frames-modular construction technology
Space frames-modular construction technologySpace frames-modular construction technology
Space frames-modular construction technology
 
building construction documentation
building construction documentation building construction documentation
building construction documentation
 
Lecture 3 - climate and architecture
Lecture 3 - climate and architectureLecture 3 - climate and architecture
Lecture 3 - climate and architecture
 
site analysis
site analysis site analysis
site analysis
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
Case study of ms1525 energy efficiency and renewable energy code of practice.
Case study of ms1525   energy efficiency and renewable energy code of practice.Case study of ms1525   energy efficiency and renewable energy code of practice.
Case study of ms1525 energy efficiency and renewable energy code of practice.
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 

Similar to Working drawings

Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMLuciano D'Amico Rebord
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad SubmissionYolanda Sewpersad
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurantkristienadana
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksMaja Myall
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingMaja Myall
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSunit Dhingra
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorJayson Ang
 

Similar to Working drawings (20)

Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
House Dhanilal Submission
House Dhanilal SubmissionHouse Dhanilal Submission
House Dhanilal Submission
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
 
8 months work
8 months work8 months work
8 months work
 
working drawings
working drawingsworking drawings
working drawings
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurant
 
Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson Portfolio
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
Delhi bye
Delhi bye Delhi bye
Delhi bye
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 Building
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
Modelo 1
Modelo 1Modelo 1
Modelo 1
 
EcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th FloorEcoTech Floor Plans - 3rd to 8th Floor
EcoTech Floor Plans - 3rd to 8th Floor
 

More from Yolanda Sewpersad (11)

Office Layout
Office LayoutOffice Layout
Office Layout
 
Showroom
ShowroomShowroom
Showroom
 
Urban Space Furniture Catalogue
Urban Space Furniture Catalogue Urban Space Furniture Catalogue
Urban Space Furniture Catalogue
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Time square Casino
Time square CasinoTime square Casino
Time square Casino
 
Premier Foods
Premier FoodsPremier Foods
Premier Foods
 
Furniture Layout
Furniture LayoutFurniture Layout
Furniture Layout
 
Aspen Building Layouts
Aspen Building LayoutsAspen Building Layouts
Aspen Building Layouts
 
Render competition
Render competitionRender competition
Render competition
 
House 2
House 2House 2
House 2
 
House 1
House 1House 1
House 1
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Working drawings

  • 1. EAST ELEVATION NORTH ELEVATION SOUTH ELEVATION MASTER BEDROOM NEW WALK IN CLOSET BALCONY NEW EN-SUITE UP KITCHEN LOUNGE BEDROOM 1 ENTRANCE HALL PATIO DINING BATHROOM 180 4830 90 2260 90 4620 180 1240 3000 1100 1800 1140 3000 1000 12262 1801807100180 3000101022502700770 13740 5580 18055801802140902353180 2250333022502020 630 3000 13740 1500630 1320180 180 2360 2510 180 1250 90 3890 180 2170 900 1200 1500 12260 1320 18090 180 7040 180 4670 180 1240 3000 4040 3000 1000 12262 1804940903500902750180 30006302250333018003690 13740 1801320 1500 180 2360 2510 180 1250 90 3890 180 1700 800 1260 1500 12260 1320 18090 800103089080015908001100 1801807100180 3000101022502700 13740 5580 291018002570 22504270 10003409106003650 Marseilles tiled roof Roof tiles on 38x38 battens on 250 microns plastic underlay on pre-fabricated trusses (gangnailed) on 114x38mm wall plates tied down at least 8 courses into brickwork Marseilles tiled roof Roof tiles on 38x38 battens on 250 microns plastic underlay on pre-fabricated trusses (gangnailed) on 114x38mm wall plates tied down at least 8 courses into brickwork Marseilles tiled roof Roof tiles on 38x38 battens on 250 microns plastic underlay on pre-fabricated trusses (gangnailed) on 114x38mm wall plates tied down at least 8 courses into brickwork Marseilles tiled roof Roof tiles on 38x38 battens on 250 microns plastic underlay on pre-fabricated trusses (gangnailed) on 114x38mm wall plates tied down at least 8 courses into brickwork 30mm raised plaster coping surround to inset to take dry-stack rockwork to detail 1050m high wrought-iron balustrading to architects detail 1050m high wrought-iron balustrading to architects detail 30mm raised plaster coping surround to inset to take dry-stack rockwork to detail 30mm raised plaster coping surround to inset to take dry-stack rockwork to detail 30mm raised plaster coping surround to inset to take dry-stack rockwork to detail 30mm raised plaster coping surround to inset to take dry-stack rockwork to detail 1050m high wrought-iron balustrading to architects detail 1050m high wrought-iron balustrading to architects detail W3 W4 W2 W1 W8W7 W6W5 D2 D2 D1 NGL FFL WALL PLATE LEVEL 700 X 230 700 X 230 700 X 230 WALL PLATE LEVEL WALL PLATE LEVEL WALL PLATE LEVEL WALL PLATE LEVEL KITCHENBEDROOM 1 NEW WALK IN CLOSET NEW LOUNGE Marseilles tiled roof Roof tiles on 38x38 battens on 250 microns plastic underlay on pre-fabricated trusses (gangnailed) on 114x38mm wall plates tied down at least 8 courses into brickwork 30mm raised plaster coping surround to inset to take dry-stack rockwork to detail 100mm concrete slab reinforced with BRC mesh (ref 193) on plastic underlay in well compacted soil. A A TOP OF SLAB archarch concrete slab to engineers detail WEST ELEVATION SECTION A-A GROUND STOREY FIRST STOREY ROOF PLAN shower bidet w.c w.h.b w.h.b REVISIONS DATE NO. REVISION OWNER'S SIGNATURE 01 of 02 PLANS & ELEVATIONS STUDIOWORK III PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING DWELLING KNY12 06 OCT 2014 PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN 1:100 Y.SEWPERSAD THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF URIEL CHRISTOPHER ARCHITECTS CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT. A A gully ie gully ie re3 ie re2iere1 MH to municipal sewer TOP OF SLAB TOP OF SLAB TOP OF SLAB TOP OF SLAB NGL FFL NGL FFL NGL FFL NGL FFL 3670 1100
  • 2. SCHEDULE OF AREAS GROUND FLOOR Living Areas Patios FIRST FLOOR Living Areas Patios 37 sq.m. 37 sq.m. 137 sq.m. 143 sq.m. Stair well 6 sq.m. Total Total 180 sq.m. 180 sq.m. PROPOSED F.A.R PROPOSED COVERAGE PROPOSED WORK TOTAL PROPOSED WORK N/A. N/A. 360 sq.m. 1500 1500 750750 2250 2100 F.F.L 1000 1500 750750 1800 2100 F.F.L 800 1900 F.F.L 2100 F.F.L 1500 1500 3000 2100 2100 900 WINDOW NO. FRAME DIAGRAM 25 MICRONS NATURAL ANNODIZED ALUMINUM FRAME. GLAZING 25 MICRONS NATURAL ANNODIZED ALUMINUM FRAME. 4mm CLEAR FLOAT GLASS. 4mm CLEAR FLOAT GLASS. NOTE GLAZING TO COMPLY WITH SANS 10400, PART N. 25 MICRONS NATURAL ANNODIZED ALUMINUM FRAME. 4mm CLEAR FLOAT GLASS. 25 MICRONS NATURAL ANNODIZED ALUMINUM FRAME. No glazing DOOR NO. FRAME DIAGRAM GLAZING IRONMONGERY SCHEDULE WINDOWDOOR 25 MICRONS NATURAL ANNODIZED ALUMINUM FRAME. 6.5mm FIXED TOUGHENED SAFETY GLASS. WINDOW 5,6,7 & 8 WINDOW 1 & 4 WINDOW 2 & 3 1,2. 3.- ALL STANDARD INTERNAL DOORS steel bearing hinge rose case and strike plate (double cylinder) escutcheons cam action overhead door closers, with adjustable closing speed, latch action, back check and delayed action square corner kick plate and bottom of one leaf stainless steel bearing hinge rose case and strike plate (double cylinder) escutcheons cam action overhead door closers, with adjustable closing speed, latch action, back check and delayed action square corner kick plate top and bottom of one leaf. F.F.L wc basin bidet ie re3 vp ie vp wc ie gully ie shower re2 ie gully 1:60 gradient 1:60 gradient sink re1 2 REVISIONS DATE NO. REVISION OWNER'S SIGNATURE STUDIOWORK III PROPOSED ADDITIONS AND ALTERATIONS TO EXISTING DWELLING PROJECT TITLE DRAWING TITLE PROJECT No. DRAWING No. SCALE DATE DESIGNED/DRAWN Y.SEWPERSAD THIS DRAWING IS THE COPYRIGHT INTERLECTUAL PROPERTY OF URIEL CHRISTOPHER ARCHITECTS CC. AND MAY NOT BE COPIED, SHARED OR REPRODUCED WITHOUT THE WRITTEN CONSENT. NOTES IN RESPECT OF S.A. STANDARD CODE OF PRACTICE FOR THE APPLICATION OF THE NATIONAL BUILDING REGULATIONS (N.B.R.) SANS 10400 PART D - PUBLIC SAFETY ALL BALUSTRADES TO COMPLY WITH PART DD2 PART M - STAIRWAYS DIMENSIONS OF STAIRWAYS TO BE IN ACCORDANCE WITH MM2 & BALUSTRADES TO COMPLY WITH MM3 PART N - GLAZING ALL GLAZING TO COMPLY WITH PART N-N.B.R. PART 0 - LIGHTING AND VENTILATION ALL AREAS TO BE ARTIFICIALLY LIT IN COMPLIANCE WITH 006, OFFICES & OTHER HABITAL ROOMS MIN. 350lux, TOILETS 160lux ALL AREAS TO BE MECHANICALLY VENTILATED IN ACCORDANCE WITH 007 - FRESH AIR TO BE SUPPLIED AT A RATE OF 7,5l/s/p & TO BE UNIFORMALLY DISTRIBUTED THROUGHOUT HABITAL AREAS. AIR VELOCITY NOT TO EXCEED 0,5m/s TO OFFICES & SHOPS PART S - FACILITIES FOR DISABLED PERSONS RAMPS TO BE PROVIDED IN ACCORDANCE WITH SS2 TOILET FACILITIES TO BE PROVIDED IN ACCORDANCE WITH SS5 PARKING BAYS TO COMPLY WITH SS8 SIGNAGE TO COMPLY WITH SS9 PART U - REFUSE DISPOSAL REFUSE AREA TO BE CONSTRUCTED & PROVIDED WITH HOSE, BIBTAP & SUMP PART T - FIRE PROTECTION OCCUPANCY CLASSIFICATION TO COMPLY WITH B2 &F2 ALL MATERIALS TO COMPLY WITH TT5 ALL STRUCTURAL ELEMENTS AND COMPONENTS TO COMPLY WITH TT7. LL OPENINGS TO BE PROTECTED IN COMPLIANCE WITH TT10 ALL ACCESS DOORS TO EMERGENCY ROUTES TO BE SABS CLASS B 2 HOUR RATED. DOORS FIT WITH SELF-CLOSING DEVICE TT10.4 & LOCKS IN ACCORDANCE WITH TT19.9. ALL CEILING MATERIALS TO COMPLY WITH TT13 ALL FLOOR COVERINGS TO COMPLY WITH TT14 ALL WALL FINISHES TO COMPLY WITH TT15 LOCKS TO ESCAPE AND ACCESS DOORS TO COMPLY WITH TT19.9 STAIRWAYS FORMING ESCAPE ROUTES TO COMPLY WITH TT23 ALL OPENINGS IN FLOORS TO COMPLY WITH TT26 SIGNAGE TO BE PROVIDED IN ACCORDANCE WITH TT29,TT32, TT55.4 & TT55.5 EMERGENCY ROUTES TO BE LIT IN ACCORDANCE WITH TT30 - DESIGNED BY PROF. ENGINEER & CERTIFIED ON COMPLETION FIR DETECTION AND ALARM SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT31 - TO BE CERTIFIED BY PROFESSIONAL SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH TT33/36 FIRE RETICULATION TO COMPLY WITH TT33 & WW5 HYDRANTS TO BE PROVIDED IN ACCORDANCE WITH TT35 PORTABLE FIRE EXTINGUISHES TO BE PROVIDED IN ACCORDANCE WITH TT37 ANY ACCESSIBLE CONCEALED SPACE WITH A MAX. DIMENSION OF 5M TO BE FIRE STOPPED IN ACCORDANCE WITH TT39 SERVICE PIPES, CONDUITS AND SLEEVES TO COMPLY WITH TT41 OCCUPANCY : OFFICE - G1 STORAGE - J3 FIRE HOSE REELS TO COMPLY WITH TT37 25mm dia. WATER SUPPLY TO ALL FIRE PROTECTION COMPONENTS 3% ROOF VENTILATION TO BE PROVIDED TO N.B.R. MAX. HEIGHT OF STORAGE = 3M DRAINAGE NOTES - ALL WORK IS TO COMPLY TO SANS 10400 - HEAD OF DRAIN IS TO BE VENTED - ANY DAMAGED FITTINGS TO BE REPLACED - ALL GULLEY SURROUNDS & MANHOLE COVERS TO BE 75 mm ABOVE GROUND LEVEL - SEWER MANHOLES TO BE EXPOSED BEFORE COMMENCING WORK AND ADJUST LEVELS ACCORDINGLY - IE'S TO ALL BENDS AND JUNCTIONS - SOIL PIPES TO BE 110 diameter PVC - SEWER UNDER BUILDINGS TO BE 110 mm UPVC RIBBED PTPE - ANCHOR BLOCKS TO BE USED WHEN GRADIENTS EXCEED 1:5 FLASHING TO COMPLY WITH PART LL5.2 TWO COURES OF BRICKWORK TO BE REINFORCED WITH BRICKFORCE BELOW WALL PLATE LEVEL, ABOVE WINDOW HEAD HEIGHT & BELOW WINDOW CILL LEVEL. EXTERNAL FACE OF INNER SKIN OF ALL EXTERNAL WALLS TO BE BAGGED AND WATERPROOFED WITH TWO COATS OF BITUMEN PAINT. 6.4 mm GYPSUM CEILING BOARDS FIXED TO 38 X 38 BRANDERING AT MAX 300mm CENTRES BOTH WAYS. 375 mic DPC TO BE PROVIDED TO WALLS AT SLAB LEVEL AND UNDER ALL CILLS. CONTRACTOR TO ENSURE THAT NO CHANGES IN LEVELS ARE MADE OVER LOCAL AUTHORITY SERVITUDES OR UNDER GROUND SERVICES UNLESS PERMISSION HAS BEEN GIVEN IN WRITING BY THE LOCAL AUTHORITY. ANY DISCREPANCIES AND OMISSIONS ARE TO BE BROUGHT TO THE ARCHITECTS ATTENTION IMMEDIATELY. IF ON EXCAVATION THE SITE IS FOUND TO CONTAIN EXPANSIVE CLAY, SHALE, GROUND WATER OR OTHER SUSPECT SOIL CONDITIONS : THEN ALL FOUNDATIONS ARE TO BE BUILT TO PROFESSIONAL ENGINEERS DETAILS & UNDER HIS SUPERVISION. NOTE: ALL DIMENSIONS - LEVELS ETC. ARE TO BE VERIFIED ON SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TO REPORT ANY DECREPANCIES IMMEDIATELY TO THE ARCHITECT.ALL MATERIALS AND LABOUR PRACTICE IS TO COMPLY WITH PART-B OF SANS 10400 AND NATIONAL BUILDING REGULATIONS.THIS DRAWING OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECT AND MUST NOTBE RE-PRODUCED IN ANY FORM WITHOUT CONSENT SUB-FLOOR AND FOUNDATION TRENCHES TO BE POISONED WITH "CLORODANE" SOLUTION IN ACCORDANCE WITH SABS CODES OF PRACTICE BY SPECIALIST. GENERAL NOTES ALL WORK TO COMPLY WITH SANS 10400. CORNER BEACONS TO BE LOCATED AND EXPOSED BEFORE WORK ON SITE COMMENCES.CONTRACTOR TO CHECK ALL DIMENSIONS AND LEVELS (SCHEDULES AND DETAILS) BEFORE THE RELEVANT WORK IS PLACED IN HAND AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. ALL WRITTEN DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. SOIL TO BE WELL COMPACTED BEHIND IN LAYERS NOT EXCEEDING 150 mm. ALL FOUNDATIONS TO BE TAKEN BELOW NATURAL GROUND LEVEL. NO BACK FILLING OF OVER EXCAVATED AREAS WILLBE PERMITTED. THE CONTRACTOR IS TO INSPECT THE OFFICIAL APPROVED COPIES OF THE DRAWINGS TO ENSURE THAT ALL AMENDMENTS HAVE BEEN TAKEN INTO ACCOUNT .THE ATTENTION OF THE OWNER/CONTACTORIS DRAWN TO THE FACT THAT CHANGERS TO THE PLAN&/OR SPECIFICATION AFTER OFFICIAL APPROVAL IS LIKELY TO INVALIDATE THAT APPROVAL. ALL EARTHWORKS TO BE CONTAINED WITHIN SITE BOUNDARIES & WITHIN 1.0 m OF ANY of ANY BOUNDARY.BANKS TO BE CUT AT A MAXIMUM OF 26 degrees. NATURAL GROUND LINE IN APPROXIMATE POSITION ONLY & NO CLAIM CAN BE MADE FOR ANY DISCREPANCIES ON SITE. Marseilles tiled roof Roof tiles on 38x38 battens on 250 microns plastic underlay on pre-fabricated trusses (gangnailed) on 114x38mm wall plates tied down at least 8 courses into brickwork 30mm raised plaster coping surround to inset to take dry-stack rockwork to detail Marseilles tiled roof Roof tiles on 38x38 battens on 250 microns plastic underlay on pre-fabricated trusses (gangnailed) on 114x38mm wall plates tied down at least 8 courses into brickwork 30mm raised plaster coping surround to inset to take dry-stack rockwork to detail TOP OF SLAB TOP OF SLAB NGL FFL NGL FFL 02 of 02 SEWER & SCHEDULES KNY12 06 OCT 20141:100 Y.SEWPERSAD NORTH ELEVATION EAST ELEVATION