Site preparation involves the demolition or wrecking
of buildings and other structures, clearing of building
sites and sale of materials from demolished
structures. Site preparation also entails blasting,
test drilling, landfill, leveling, earth-moving,
excavating, land drainage and other land
preparation. Site preparation also includes fixing
position of the site office, go downs, the guard and
the labor shed, the access and existing roads for
trucks and carts etc.
FEW MAJOR FACTORS
TAKEN IN ACCOUNT WHILE
PREPARING SITE
SITE PREPARATION PROCESS;
STEP BY STEP
SITE PREPARATION PROCESS;
THE STEP BY STEP
Site Development we know that the site
preparation process is the first task that must be
completed. Engineers need a clear and properly
prepared site to. To start a new project in a site
that is unfriendly to the project can destroy plans,
hinder building permits and damage the overall
project. It is a challenging activity that must be
dealt with before any building project can begin in
earnest.
With civil engineering projects, the site preparation can be
demolition (both above and below ground), soil clearing,
soil testing, site plan designs, zoning restrictions,
environmental concern and coordinating how everything
on the project should run. Preparing your site properly to
begin with means a much safer, more productive working
environment, and a total project that is up to standard and
in code.
STEPS OF SITE PREPARATION
1- SITE CLEARING
This is the first task of site preparation. The site
should be in a cleared and graded condition. It
involves the removal of trees, demolishing buildings,
removing any and all old underground infrastructure,
and any other obstacles that might affect the
construction process in the future or hinder the project
to be done.
2- SITE SURVEYING
 If your building block is not clearly identified by survey
pegs, you cannot be certain that you are building on the
correct block. A surveyor will survey the site and line out
exactly where the structure or road project is to be built.
The Surveying process is not an option it is a requirement
for most zoning and permitting processes. Surveying is the
translation of a contractor’s set of construction plans into
a physical representation on the project site.
 The function of the surveyor is to locate the
boundaries of the structure to be built and is
denoted with physical markers, usually a lathe, pin,
or survey stake in a horizontal position. However,
the surveyor’s marks are also communication to the
contractor as to the actual elevation and the
required cut or fill necessary to obtain the design
elevation. It also includes the checking of
improvements and temporary construction items
placed to construct those improvements.
Contractors use the surveyor’s marks to verify the
horizontal and vertical location to the construction
plans.
3- SOIL TESTING
Soil testing is a vital important task that needs to be done before the
site is purchased. The composition of the soil must be known so as to
examine the ability to withstand structure and to test the ability to
absorb water. The site Engineer will insist that you do all necessary
soil testing before commencing any structural task on the soil. If the
soil at the site is not suitable for the future project, then there may be
no choice but to look for another site which has soil suitable for the
project.
4- SITE PLAN DESIGN
After the soil testing is done all necessary drainage and septic tanks
are installed, the next step is to modify the design to indicate
placement of septic systems and all necessary fixtures. Nothing can
be done without designing the site, and above all making permanent
record of what is underground. A construction site is a living
breathing thing, it changes daily, as placement of a water tank
underground changes slightly because of underground rock
formations for instance, this must be noted for future reference.
THE SITE PLAN WILL SHOW NEWLY DEVELOPED
ACCESS ROADS FOR CONSTRUCTION VEHICLES AND
TEMPORARY STORAGE AREAS FOR SUPPLIES TO BE
DELIVERED. THE SITE PLAN WILL ALSO DEPICT
WHERE THE BUILDING SHOULD BE AFTER IT IS BUILT.
UNLIKE OTHER STEPS TAKEN IN SITE PREPARATION,
THE SITE PLAN IS UPDATED IN THE FIELD AND
REVISIONS ARE CARRIED OUT IN OFFICE BY
CONSULTANTS.
5- SITE INVESTIGATION
 Geotechnical site investigation performed in order
to characterize soil, rock and groundwater condition
of the proposed site. A geotechnical site
investigation is the process of collecting information
and evaluating the conditions of the site for the
purpose of designing and constructing the
foundation for a structure, such as a building, plant,
road, parking lot or bridge.
 The steps taken to do Geotechnical site
investigation are listed below. Good planning and
management of a geotechnical site investigation is
the key to obtaining sufficient and correct site
information. This information is then used for
designing a structure in a timely manner and with
minimum cost and surprises for the estimates of
effort needed.
THE END

More Related Content

What's hot

What's hot (20)

Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
BRICK MASONRY
BRICK MASONRYBRICK MASONRY
BRICK MASONRY
 
Roof truss
Roof trussRoof truss
Roof truss
 
Formwork
FormworkFormwork
Formwork
 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
 
Shoring
ShoringShoring
Shoring
 
113 site layout design
113 site layout design113 site layout design
113 site layout design
 
Building construction
Building constructionBuilding construction
Building construction
 
Formwork
FormworkFormwork
Formwork
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Masonry construction (Building Construction)
Masonry construction (Building Construction)Masonry construction (Building Construction)
Masonry construction (Building Construction)
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Building construction notes pdf
Building construction notes pdfBuilding construction notes pdf
Building construction notes pdf
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 

Similar to 9. introduction to site preparation

Construction manual chapter 2
Construction manual chapter 2Construction manual chapter 2
Construction manual chapter 2vps1968
 
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docxBUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docxSudas Duddey
 
Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )Mumtaz Ahmad
 
The Significance of a Site Survey in The Construction Industry
The Significance of a Site Survey in The Construction IndustryThe Significance of a Site Survey in The Construction Industry
The Significance of a Site Survey in The Construction IndustryAussie Hydro-Vac Services
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphbhlksd
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4ahsanrabbani
 
Introduction to Site Investigation Methods
Introduction to Site Investigation MethodsIntroduction to Site Investigation Methods
Introduction to Site Investigation MethodsMohdBilal430488
 
NAVI MUMBAI SPECIAL ECONOMIC ZONE
NAVI MUMBAI SPECIAL ECONOMIC ZONENAVI MUMBAI SPECIAL ECONOMIC ZONE
NAVI MUMBAI SPECIAL ECONOMIC ZONEmihir Das
 
The Importance of Utility Location and Geotechnical Testing in Construction P...
The Importance of Utility Location and Geotechnical Testing in Construction P...The Importance of Utility Location and Geotechnical Testing in Construction P...
The Importance of Utility Location and Geotechnical Testing in Construction P...Aussie Hydro-Vac Services
 
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...SEO Tech Solution
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
Final Report
Final Report Final Report
Final Report Jack Ng
 

Similar to 9. introduction to site preparation (20)

Construction manual chapter 2
Construction manual chapter 2Construction manual chapter 2
Construction manual chapter 2
 
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docxBUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
 
Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
The Significance of a Site Survey in The Construction Industry
The Significance of a Site Survey in The Construction IndustryThe Significance of a Site Survey in The Construction Industry
The Significance of a Site Survey in The Construction Industry
 
CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4
 
Introduction to Site Investigation Methods
Introduction to Site Investigation MethodsIntroduction to Site Investigation Methods
Introduction to Site Investigation Methods
 
Unit1 hbn
Unit1 hbnUnit1 hbn
Unit1 hbn
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Shib
ShibShib
Shib
 
NAVI MUMBAI SPECIAL ECONOMIC ZONE
NAVI MUMBAI SPECIAL ECONOMIC ZONENAVI MUMBAI SPECIAL ECONOMIC ZONE
NAVI MUMBAI SPECIAL ECONOMIC ZONE
 
The Importance of Utility Location and Geotechnical Testing in Construction P...
The Importance of Utility Location and Geotechnical Testing in Construction P...The Importance of Utility Location and Geotechnical Testing in Construction P...
The Importance of Utility Location and Geotechnical Testing in Construction P...
 
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Final Report
Final Report Final Report
Final Report
 

More from Noshad Ahmed Wahocho

Village as a focal point of planning and development
Village  as  a  focal  point of planning and developmentVillage  as  a  focal  point of planning and development
Village as a focal point of planning and developmentNoshad Ahmed Wahocho
 
Zoning plan, planning and design for land use
Zoning plan, planning and design for land useZoning plan, planning and design for land use
Zoning plan, planning and design for land useNoshad Ahmed Wahocho
 
Town park , elements for design a town park
Town park , elements for design a town parkTown park , elements for design a town park
Town park , elements for design a town parkNoshad Ahmed Wahocho
 
The need of integrated approach towards planning of various components parts
The need of integrated approach towards planning of various components partsThe need of integrated approach towards planning of various components parts
The need of integrated approach towards planning of various components partsNoshad Ahmed Wahocho
 
Space standards and requirments for different land use activites, densities
Space standards and requirments for different land use activites, densitiesSpace standards and requirments for different land use activites, densities
Space standards and requirments for different land use activites, densitiesNoshad Ahmed Wahocho
 
Process of planning and designing a new town
Process  of  planning and designing  a  new townProcess  of  planning and designing  a  new town
Process of planning and designing a new townNoshad Ahmed Wahocho
 
Planning concept of chandigrah city
Planning concept of chandigrah cityPlanning concept of chandigrah city
Planning concept of chandigrah cityNoshad Ahmed Wahocho
 
Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Noshad Ahmed Wahocho
 
Layout plan of housing blocks and public facilities and services
Layout plan of housing blocks and public facilities and servicesLayout plan of housing blocks and public facilities and services
Layout plan of housing blocks and public facilities and servicesNoshad Ahmed Wahocho
 
13. british planning practices in india and pakistan
13. british planning practices in india and pakistan13. british planning practices in india and pakistan
13. british planning practices in india and pakistanNoshad Ahmed Wahocho
 

More from Noshad Ahmed Wahocho (20)

Village as a focal point of planning and development
Village  as  a  focal  point of planning and developmentVillage  as  a  focal  point of planning and development
Village as a focal point of planning and development
 
Zoning plan, planning and design for land use
Zoning plan, planning and design for land useZoning plan, planning and design for land use
Zoning plan, planning and design for land use
 
Town park , elements for design a town park
Town park , elements for design a town parkTown park , elements for design a town park
Town park , elements for design a town park
 
Town center plan
Town center planTown center plan
Town center plan
 
The need of integrated approach towards planning of various components parts
The need of integrated approach towards planning of various components partsThe need of integrated approach towards planning of various components parts
The need of integrated approach towards planning of various components parts
 
Space standards and requirments for different land use activites, densities
Space standards and requirments for different land use activites, densitiesSpace standards and requirments for different land use activites, densities
Space standards and requirments for different land use activites, densities
 
Process of planning and designing a new town
Process  of  planning and designing  a  new townProcess  of  planning and designing  a  new town
Process of planning and designing a new town
 
Planning of parking for cbd
Planning of parking for cbdPlanning of parking for cbd
Planning of parking for cbd
 
Planning concept of new delhi
Planning concept of new delhiPlanning concept of new delhi
Planning concept of new delhi
 
Planning concept of chandigrah city
Planning concept of chandigrah cityPlanning concept of chandigrah city
Planning concept of chandigrah city
 
Planning concept of Chandigarh city.
Planning concept of Chandigarh city.Planning concept of Chandigarh city.
Planning concept of Chandigarh city.
 
Neighbourhood city
Neighbourhood cityNeighbourhood city
Neighbourhood city
 
Neighborhood planning
Neighborhood planningNeighborhood planning
Neighborhood planning
 
Modern city islamabad
Modern city islamabadModern city islamabad
Modern city islamabad
 
Modern city brasilia
Modern city brasiliaModern city brasilia
Modern city brasilia
 
Layout plan of housing
Layout plan of housingLayout plan of housing
Layout plan of housing
 
Layout plan of housing blocks and public facilities and services
Layout plan of housing blocks and public facilities and servicesLayout plan of housing blocks and public facilities and services
Layout plan of housing blocks and public facilities and services
 
Layout of roads and streets
Layout of roads and streetsLayout of roads and streets
Layout of roads and streets
 
Landscaping and open spaces
Landscaping and open spacesLandscaping and open spaces
Landscaping and open spaces
 
13. british planning practices in india and pakistan
13. british planning practices in india and pakistan13. british planning practices in india and pakistan
13. british planning practices in india and pakistan
 

Recently uploaded

Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 

Recently uploaded (20)

Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 

9. introduction to site preparation

  • 2. INTRODUCTION TO SITE PREPARATION Site preparation involves the demolition or wrecking of buildings and other structures, clearing of building sites and sale of materials from demolished structures. Site preparation also entails blasting, test drilling, landfill, leveling, earth-moving, excavating, land drainage and other land preparation. Site preparation also includes fixing position of the site office, go downs, the guard and the labor shed, the access and existing roads for trucks and carts etc.
  • 3.
  • 4. FEW MAJOR FACTORS TAKEN IN ACCOUNT WHILE PREPARING SITE
  • 5.
  • 6.
  • 7.
  • 9. SITE PREPARATION PROCESS; THE STEP BY STEP Site Development we know that the site preparation process is the first task that must be completed. Engineers need a clear and properly prepared site to. To start a new project in a site that is unfriendly to the project can destroy plans, hinder building permits and damage the overall project. It is a challenging activity that must be dealt with before any building project can begin in earnest.
  • 10. With civil engineering projects, the site preparation can be demolition (both above and below ground), soil clearing, soil testing, site plan designs, zoning restrictions, environmental concern and coordinating how everything on the project should run. Preparing your site properly to begin with means a much safer, more productive working environment, and a total project that is up to standard and in code.
  • 11. STEPS OF SITE PREPARATION
  • 12. 1- SITE CLEARING This is the first task of site preparation. The site should be in a cleared and graded condition. It involves the removal of trees, demolishing buildings, removing any and all old underground infrastructure, and any other obstacles that might affect the construction process in the future or hinder the project to be done.
  • 13. 2- SITE SURVEYING  If your building block is not clearly identified by survey pegs, you cannot be certain that you are building on the correct block. A surveyor will survey the site and line out exactly where the structure or road project is to be built. The Surveying process is not an option it is a requirement for most zoning and permitting processes. Surveying is the translation of a contractor’s set of construction plans into a physical representation on the project site.
  • 14.  The function of the surveyor is to locate the boundaries of the structure to be built and is denoted with physical markers, usually a lathe, pin, or survey stake in a horizontal position. However, the surveyor’s marks are also communication to the contractor as to the actual elevation and the required cut or fill necessary to obtain the design elevation. It also includes the checking of improvements and temporary construction items placed to construct those improvements. Contractors use the surveyor’s marks to verify the horizontal and vertical location to the construction plans.
  • 15. 3- SOIL TESTING Soil testing is a vital important task that needs to be done before the site is purchased. The composition of the soil must be known so as to examine the ability to withstand structure and to test the ability to absorb water. The site Engineer will insist that you do all necessary soil testing before commencing any structural task on the soil. If the soil at the site is not suitable for the future project, then there may be no choice but to look for another site which has soil suitable for the project.
  • 16. 4- SITE PLAN DESIGN After the soil testing is done all necessary drainage and septic tanks are installed, the next step is to modify the design to indicate placement of septic systems and all necessary fixtures. Nothing can be done without designing the site, and above all making permanent record of what is underground. A construction site is a living breathing thing, it changes daily, as placement of a water tank underground changes slightly because of underground rock formations for instance, this must be noted for future reference.
  • 17. THE SITE PLAN WILL SHOW NEWLY DEVELOPED ACCESS ROADS FOR CONSTRUCTION VEHICLES AND TEMPORARY STORAGE AREAS FOR SUPPLIES TO BE DELIVERED. THE SITE PLAN WILL ALSO DEPICT WHERE THE BUILDING SHOULD BE AFTER IT IS BUILT. UNLIKE OTHER STEPS TAKEN IN SITE PREPARATION, THE SITE PLAN IS UPDATED IN THE FIELD AND REVISIONS ARE CARRIED OUT IN OFFICE BY CONSULTANTS.
  • 18. 5- SITE INVESTIGATION  Geotechnical site investigation performed in order to characterize soil, rock and groundwater condition of the proposed site. A geotechnical site investigation is the process of collecting information and evaluating the conditions of the site for the purpose of designing and constructing the foundation for a structure, such as a building, plant, road, parking lot or bridge.
  • 19.  The steps taken to do Geotechnical site investigation are listed below. Good planning and management of a geotechnical site investigation is the key to obtaining sufficient and correct site information. This information is then used for designing a structure in a timely manner and with minimum cost and surprises for the estimates of effort needed.