CASE STUDY - SELECT CITY WALK MALL,DELHI
Location Saket District Centre,Delhi
Type Mall(commercial)
Construction Period 2004-2007
Site area 6 acres.
Built up area 11 lakh sq.ft
Architect Dparchitects,TCS(DFI)
No. of stores & services 180
No. of anchor tenants 8
Retail floor area 1,300,000sq.ft(120,000sq.m)
No.of floors 3
Landscape plaza area 8,992sq.m
Total area without basements 43,970.30sq.m
Total area with basements 91,623.80sq.m
Permissible ground coverage 9686.86sq.m
Ground coverage 39%
Permissible floor area(without basement) 44623.44sq.m
Permissible floor area(with basement) 92276.94sq.m
Max height of building 38m
Multiplex block height 19m
Basement parking 1300
Basement 1 parking 370
Basement 2 parking 470
Basement 3 parking 270
Basement height 3.5m
Grid 6X6m
Mall floor to floor height 4m
No.of lifts connecting basement 4
Column size 600X450mm
Corridors 2.5m wide
2
Introduction
• Select CITYWALK is a 1.3 million Sq. ft airconditioned, vibrant and upscale
destination Shopping Centre.
• Select CITYWALK houses • 3 floors of shopping area • 2 separate 5-storey
blocks containing I. Office space II. Serviced Apartments • Outdoor open-air
plaza, approx. 1 lakh sq. ft. • Water bodies & fountains • An amphitheatre • Six
screen PVR Cinemas.
• The mall is divided into three broad zones: There are eight anchor tenants
including GAP, H&M, Goodearth, Pantaloons, Crossword Bookstore, Zara,
and Home Stop.
• The mall also has 180 stores representing over 500 major Indian and
international brands of clothes and apparels including Aldo, Nine
West, Charles & Keith, Calvin Klein, Armani Jeans etc
Criteria for selection
It is one of the most successful mall of india, with right brand mix that keeps it
churning throughout the day, the mall is set with luxury and entertaining spaces
and contains all the aspects of an ideal mall.
Fig 3.118Select city mall
Source - author
3
Location map
Site Plan
N
Fig 3.119Location Map
https://www.google.co.in/maps?dcr=0&q=select+city+mall+saket&um=1&ie=UTF-
8&sa=X&ved=0ahUKEwj28v_D1abZAhWJuI8KHSqJDJEQ_AUICigB
Fig 3.120Site Plan
https://www.slideshare.net/hamzaaaaaah/select-citywalk-mall-jamia-millia-islamia-delhi
N
4
Site Context
• Bust stop- Khirki Village, 100m.
• Malviya nagar metro station -1km.
• IGI airport-15.6 km.
• DLF place mall-200 m.
• MGF metropolitan mall-100 m.
• Qutub minar-3.7 km
Built & Unbuilt Spaces
• Built-up space / open space activities ratio = 6 acres / 2 acres = 3:1.
• Activities ratio:
Retail= 40%
Recreational= 20%
Dining=10%
Cinemas= 15%
Services/facilities= 15%
Fig 3.121Mall dimension
https://www.slideshare.net/hamzaaaaaah/select-citywalk-mall-jamia-millia-islamia-delhi
N
Fig 3.121Activities Ratio
Source-Author
5
Floor Plans
N
Fig 3.123Ground floor plan with marking
https://www.google.co.in/search?q=select+city+walk+floor+plans&dcr=0&source=lnms&tbm=isch&sa=X&ved=0ahUKEwjFs5DhmabZA
N
Shop area ranges from 50sq.m to
1500sq.m.
Ground floor Area = 11378.81sq.m
Fig 3.122Ground floor plan
https://www.google.co.in/search?q=select+city+walk+floor+plans&dcr=0&source=lnms&tbm=isch&sa=X&ved=0ahUKEwjFs5DhmabZA
hUENY8KHfrBCXwQ_AUICigB&biw=1536&bih=684#imgrc=TotFPlgT19eFcM:
6Fig 3.124First floor plan
https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-6-638.jpg?cb=1489675720
N
Fig 3.124Entrance A
Source - Author
Fig 3.124Entrance B
Source - Author
Fig 3.124Entrance D
Source - Author
Fig 3.124Rear Entrance
Source - Author
Shop area ranges from 50sq.m to
1500sq.m.
First floor Area = 12816.04sq.m
7
Fig 3.125Second floor plan
https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720
Second floor Area = 6568.08sq.m
N
N
8
Fig 3.125Lower ground floor plan
https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720
Fig 3.125Lower ground floor plan
https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720
Fig 3.125First floor plan
https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720
9
Fig 3.125Second floor plan
https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-
638.jpg?cb=1489675720
Fig 3.125Theatre
https://image.slidesharecdn.com/scw-
160104100607/95/selectcity-walk-mall-7-
638.jpg?cb=1489675720
TableTheatre sizes
https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720
10
• One lift lobby available to reach the floors of the dome.
• The third and fourth floor consists of gaming zone and Pa PaYa(restaurant).
• Fifth and sixth floor is occupied by gym.
• Seventh floor is empty
N
Fig 3.125Dome fourth floor plan
Source - author
Fourth floor Area = 2776.216sq.m
11
Fire Evacuation Plans
Fig 3.125Ground floor evacuation plan
Source - author
Fig 3.125First floor evacuation plan
Source - author
N
N
12
Basement
N
Fig 3.125Second floor evacuation plan
Source - author
Fig 3.125First basement Plan
Source - author
13
Fig 3.125Second basement
Plan
Source - author
Fig 3.125Third basement Plan
Source - author
14
• 1300 cars can be parked in 3 different floors of basement at one time.
• Basement 1- Parking for 370 cars, Loading & unloading area, Garbage
disposal area
• Basement 2- Parking 470 cars.
• Basement 3- Parking 270 cars.
• Basement height- 3.5m.
• BASEMENTS =41578.5 sq.m (3L VLS).
• There were two separate entries which were connecting to the parking, from
ground floor.
• One was used for general entry of cars & The other was used by service
vehicles.
Services in basements
• Water tanks.
• HSD tanks.
• Pump room.
• Loading/unloading bay.
• Bin centre.
• Maintenance rooms.
• Ventilation rooms(20sq.m).
• Management office(360sq.m).
• Air washer(190sq.m).
• A/C Plant room(352sq.m).
Fig 3.125Bay in basement
Source - author
Fig 3.125Skylight in basement
Source - author
Fig 3.125Toilets in basement
Source - author
15
• BSES room.
• Dg set room(358sq.m).
• Boiler room(72sq.m).
• Electrical panel room (700sq.m).
• Store.
• Meter Room(10sq.m).
• Help Desk(18sq.m).
• Engineering office.
• Toilets.
• Air Extractors. Fig 3.125Ventilation Room
Source - author
Fig 3.125Electrical Panels
Source - author
Fig 3.125Electric Room
Source - author
Fig 3.125Air Extractors in
basement
Source - author
Fig 3.125Escape staircase from
basement to site outside
Source - author
16
Garbage Area
The waste from restaurants was collected in basement, through shaft.
There were 3 separate areas, which were dividing the waste into different
categories.
After separation, waste is dispose of through garbage trucks.
External Finish
• The entire complex is finished with combination of
- Granite
- ACP cladding
- Acrylic paint
- Structural glazing
• At the upper level on the front facade, space has been provided for - -
- Advertisements
- Forthcoming attractions
- Cinema posters which are visible from a distance governing the external
elevation.
Fire safety
Fig 3.125Composting Area
Source - author
Fig 3.125Segregation Area
Source - author
17
Fig 3.125 Hose reel system
Source - author
Fig 3.125 Fire Hose Box
outside mall
Source - author
Fig 3.125 Fire Door for escape
staircase
Source - author
Fig 3.125 Fire Extinguisher
Source - author
18
Select City walk Mall
Success of a mall depends on :
Ambience of a mall depends on :
Footfall of a mall depends on :
Recreational element of the mall is categorized as :
19
Positive points:
• Sufficient sitting area is provided inside as well as outside.
• Glazing is used for aesthetic purpose.
• Planning is done keeping in mind the commercial aspect forshops to have
maximum frontage and making the shops more visible.
• Proper circulation-lifts, escalators and staircase are provided.
• Funneling up atriums to enable better sightlines and visibility of the shops at
upper floors.
• L-shape plan provides an enclosure space between its wing where a
walking plaza could be created.
• Restricted vehicular movement inside the site.
• Well segregated pedestrian and vehicular movement.
• Landscaping done so as to provide interactive spaces.
• Adequate accesses for the handicapped people.
• Escalators to basement from ground floor.
• Conveniences for the drivers in the basements, toilets and locker room
provided.
Fig 3.125 Funneling up of atriums
Source - author
20
• Adequate natural light inside the mall.
• Terraces provided on the first and second floor.
Negative Points:
• Basement parking provided, surface parking should be more.
• ACP cladding on exterior which is flammable material.
Area Analysis
Spaces Areas(sq.m)
Shops 50-1500
Gaming zone 2000
Gym 4000
Papaya(restaurant) 950
Hangout(terrace cafe) 750
My square(food court) 1130(200 persons)
Cinemas – Audi1 162(40 seats)
Cinemas – Audi2 150(40 seats)
Cinemas – Audi3 480(371 seats)
Cinemas – Audi4 550(422 seats)
Cinemas – Audi5 240(181 seats)
Cinemas – Audi6 260(181 seats)
Ventilation room 20
Management office 360
Air washer 190
A/C plant room 352
DG set 358
Boiler room 72
Electric panel room services 700
Meter room 10
21
Help dekh 18

More Related Content

What's hot

Case study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARCase study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARPrince Pathania
 
Express avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennaiExpress avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennaiAIN UL HAQ PUNEKAR
 
Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016MOHAMMED RABIN
 
Standards Requirement For Multiplexes And Bye Laws Of NOIDA
Standards Requirement For Multiplexes And Bye Laws Of NOIDAStandards Requirement For Multiplexes And Bye Laws Of NOIDA
Standards Requirement For Multiplexes And Bye Laws Of NOIDAJai Vardhan Singh
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013ROHIT SINGLA
 
dlf-mall-of-india-case-study.pdf
dlf-mall-of-india-case-study.pdfdlf-mall-of-india-case-study.pdf
dlf-mall-of-india-case-study.pdfPradeepKumar3041
 
Amanora town centre pune presentation - 02.09.15
Amanora town centre  pune presentation - 02.09.15Amanora town centre  pune presentation - 02.09.15
Amanora town centre pune presentation - 02.09.15Shadab Khan
 
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.simrandeo3
 
case study of Select city walk, saket, new delhi
case study of Select city walk, saket, new delhicase study of Select city walk, saket, new delhi
case study of Select city walk, saket, new delhiSumit Jha
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.Milan Jain
 
Urban Entertainment Center, introduction, live case study, literature case st...
Urban Entertainment Center, introduction, live case study, literature case st...Urban Entertainment Center, introduction, live case study, literature case st...
Urban Entertainment Center, introduction, live case study, literature case st...Sumit Jha
 
CHENNAI TRADE CENTER CASE STUDY
CHENNAI TRADE CENTER CASE STUDYCHENNAI TRADE CENTER CASE STUDY
CHENNAI TRADE CENTER CASE STUDYbrysonsolomon
 
Mall Architecture
Mall ArchitectureMall Architecture
Mall ArchitectureAnurag Dua
 
Nid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyNid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyYash Kotgirwar
 
NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN Ar Naveen Naveen
 
shopping mall case study
shopping mall case studyshopping mall case study
shopping mall case studyAtul Verma
 

What's hot (20)

City center kolkata
City center kolkataCity center kolkata
City center kolkata
 
INORBIT MALL CASE STUDY
 INORBIT MALL CASE STUDY  INORBIT MALL CASE STUDY
INORBIT MALL CASE STUDY
 
Case study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARCase study trilium MALL AMRITSAR
Case study trilium MALL AMRITSAR
 
Express avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennaiExpress avenue mall architectural case study,chennai
Express avenue mall architectural case study,chennai
 
Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016
 
Standards Requirement For Multiplexes And Bye Laws Of NOIDA
Standards Requirement For Multiplexes And Bye Laws Of NOIDAStandards Requirement For Multiplexes And Bye Laws Of NOIDA
Standards Requirement For Multiplexes And Bye Laws Of NOIDA
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013
 
dlf-mall-of-india-case-study.pdf
dlf-mall-of-india-case-study.pdfdlf-mall-of-india-case-study.pdf
dlf-mall-of-india-case-study.pdf
 
Amanora town centre pune presentation - 02.09.15
Amanora town centre  pune presentation - 02.09.15Amanora town centre  pune presentation - 02.09.15
Amanora town centre pune presentation - 02.09.15
 
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
 
case study of Select city walk, saket, new delhi
case study of Select city walk, saket, new delhicase study of Select city walk, saket, new delhi
case study of Select city walk, saket, new delhi
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.
 
Urban Entertainment Center, introduction, live case study, literature case st...
Urban Entertainment Center, introduction, live case study, literature case st...Urban Entertainment Center, introduction, live case study, literature case st...
Urban Entertainment Center, introduction, live case study, literature case st...
 
CHENNAI TRADE CENTER CASE STUDY
CHENNAI TRADE CENTER CASE STUDYCHENNAI TRADE CENTER CASE STUDY
CHENNAI TRADE CENTER CASE STUDY
 
Mall Architecture
Mall ArchitectureMall Architecture
Mall Architecture
 
Literature ; shopping mall
Literature ; shopping mallLiterature ; shopping mall
Literature ; shopping mall
 
Nid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyNid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case study
 
Data collection of malls
Data collection of mallsData collection of malls
Data collection of malls
 
NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN
 
shopping mall case study
shopping mall case studyshopping mall case study
shopping mall case study
 

Similar to Select city mall

Project bowstring : A perspective on revitalizing Janata Bazaar
Project bowstring : A perspective on revitalizing Janata BazaarProject bowstring : A perspective on revitalizing Janata Bazaar
Project bowstring : A perspective on revitalizing Janata BazaarNishanth Patil
 
Commercial Mall Literature Review
Commercial Mall Literature ReviewCommercial Mall Literature Review
Commercial Mall Literature ReviewRajayBajracharya
 
study of a shopping mall
study of a shopping mallstudy of a shopping mall
study of a shopping mallAbhiniti Garg
 
Labim Mall & Kalimati Trade Center.pptx
Labim Mall & Kalimati Trade Center.pptxLabim Mall & Kalimati Trade Center.pptx
Labim Mall & Kalimati Trade Center.pptxOkizz Dokizz
 
finaldesignpresentation-181230145312.pptx
finaldesignpresentation-181230145312.pptxfinaldesignpresentation-181230145312.pptx
finaldesignpresentation-181230145312.pptxAmirTimory
 
Elante mall chandigarh
Elante mall chandigarhElante mall chandigarh
Elante mall chandigarhHarshita Singh
 
Shopping mall case study
Shopping mall case studyShopping mall case study
Shopping mall case studyankita20111994
 
New PPT PresentationFGSGSGF.pptx
New PPT PresentationFGSGSGF.pptxNew PPT PresentationFGSGSGF.pptx
New PPT PresentationFGSGSGF.pptxdharanesh5
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)iftekhar rafat
 
Multi stories parking lot
Multi stories parking lotMulti stories parking lot
Multi stories parking lotRAFFIDELUX
 
Case study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworCase study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworEeelsa shrestha
 
Commercial projects thirty six capital
Commercial projects   thirty six capitalCommercial projects   thirty six capital
Commercial projects thirty six capitalRakesh Agarwal
 

Similar to Select city mall (20)

Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
Project bowstring : A perspective on revitalizing Janata Bazaar
Project bowstring : A perspective on revitalizing Janata BazaarProject bowstring : A perspective on revitalizing Janata Bazaar
Project bowstring : A perspective on revitalizing Janata Bazaar
 
Commercial Mall Literature Review
Commercial Mall Literature ReviewCommercial Mall Literature Review
Commercial Mall Literature Review
 
study of a shopping mall
study of a shopping mallstudy of a shopping mall
study of a shopping mall
 
Shopping centers
Shopping centersShopping centers
Shopping centers
 
Nehru place - Case Study
Nehru place - Case StudyNehru place - Case Study
Nehru place - Case Study
 
Labim Mall & Kalimati Trade Center.pptx
Labim Mall & Kalimati Trade Center.pptxLabim Mall & Kalimati Trade Center.pptx
Labim Mall & Kalimati Trade Center.pptx
 
finaldesignpresentation-181230145312.pptx
finaldesignpresentation-181230145312.pptxfinaldesignpresentation-181230145312.pptx
finaldesignpresentation-181230145312.pptx
 
Elante mall chandigarh
Elante mall chandigarhElante mall chandigarh
Elante mall chandigarh
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
lucknow.pptx
lucknow.pptxlucknow.pptx
lucknow.pptx
 
Shopping mall case study
Shopping mall case studyShopping mall case study
Shopping mall case study
 
New PPT PresentationFGSGSGF.pptx
New PPT PresentationFGSGSGF.pptxNew PPT PresentationFGSGSGF.pptx
New PPT PresentationFGSGSGF.pptx
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
 
dragbaf.ppt
dragbaf.pptdragbaf.ppt
dragbaf.ppt
 
Multi stories parking lot
Multi stories parking lotMulti stories parking lot
Multi stories parking lot
 
1334 fact sheet snl
1334 fact sheet snl1334 fact sheet snl
1334 fact sheet snl
 
group 1.pptx
group 1.pptxgroup 1.pptx
group 1.pptx
 
Case study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworCase study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshwor
 
Commercial projects thirty six capital
Commercial projects   thirty six capitalCommercial projects   thirty six capital
Commercial projects thirty six capital
 

More from Shubham Jain

Neighbourhood planning
Neighbourhood planningNeighbourhood planning
Neighbourhood planningShubham Jain
 
National urban transport policy
National urban transport policyNational urban transport policy
National urban transport policyShubham Jain
 
Modular coordination
Modular coordinationModular coordination
Modular coordinationShubham Jain
 
Supertech supernova
Supertech supernovaSupertech supernova
Supertech supernovaShubham Jain
 
Indoor air quality
Indoor air qualityIndoor air quality
Indoor air qualityShubham Jain
 
JOSEPH ALLEN STEIN
JOSEPH ALLEN STEINJOSEPH ALLEN STEIN
JOSEPH ALLEN STEINShubham Jain
 

More from Shubham Jain (9)

Neighbourhood planning
Neighbourhood planningNeighbourhood planning
Neighbourhood planning
 
National urban transport policy
National urban transport policyNational urban transport policy
National urban transport policy
 
Gopaldas bhawan
Gopaldas bhawanGopaldas bhawan
Gopaldas bhawan
 
World trade tower
World trade towerWorld trade tower
World trade tower
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
Supertech supernova
Supertech supernovaSupertech supernova
Supertech supernova
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Indoor air quality
Indoor air qualityIndoor air quality
Indoor air quality
 
JOSEPH ALLEN STEIN
JOSEPH ALLEN STEINJOSEPH ALLEN STEIN
JOSEPH ALLEN STEIN
 

Recently uploaded

Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...EADTU
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFVivekanand Anglo Vedic Academy
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjMohammed Sikander
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...Gary Wood
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnershipsexpandedwebsite
 
ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptxPoojaSen20
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportBasic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportDenish Jangid
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17Celine George
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint23600690
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...Nguyen Thanh Tu Collection
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024Borja Sotomayor
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...Nguyen Thanh Tu Collection
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17Celine George
 
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...Nguyen Thanh Tu Collection
 

Recently uploaded (20)

Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptx
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportBasic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint
 
Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17
 
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
 

Select city mall

  • 1. 1 CASE STUDY - SELECT CITY WALK MALL,DELHI Location Saket District Centre,Delhi Type Mall(commercial) Construction Period 2004-2007 Site area 6 acres. Built up area 11 lakh sq.ft Architect Dparchitects,TCS(DFI) No. of stores & services 180 No. of anchor tenants 8 Retail floor area 1,300,000sq.ft(120,000sq.m) No.of floors 3 Landscape plaza area 8,992sq.m Total area without basements 43,970.30sq.m Total area with basements 91,623.80sq.m Permissible ground coverage 9686.86sq.m Ground coverage 39% Permissible floor area(without basement) 44623.44sq.m Permissible floor area(with basement) 92276.94sq.m Max height of building 38m Multiplex block height 19m Basement parking 1300 Basement 1 parking 370 Basement 2 parking 470 Basement 3 parking 270 Basement height 3.5m Grid 6X6m Mall floor to floor height 4m No.of lifts connecting basement 4 Column size 600X450mm Corridors 2.5m wide
  • 2. 2 Introduction • Select CITYWALK is a 1.3 million Sq. ft airconditioned, vibrant and upscale destination Shopping Centre. • Select CITYWALK houses • 3 floors of shopping area • 2 separate 5-storey blocks containing I. Office space II. Serviced Apartments • Outdoor open-air plaza, approx. 1 lakh sq. ft. • Water bodies & fountains • An amphitheatre • Six screen PVR Cinemas. • The mall is divided into three broad zones: There are eight anchor tenants including GAP, H&M, Goodearth, Pantaloons, Crossword Bookstore, Zara, and Home Stop. • The mall also has 180 stores representing over 500 major Indian and international brands of clothes and apparels including Aldo, Nine West, Charles & Keith, Calvin Klein, Armani Jeans etc Criteria for selection It is one of the most successful mall of india, with right brand mix that keeps it churning throughout the day, the mall is set with luxury and entertaining spaces and contains all the aspects of an ideal mall. Fig 3.118Select city mall Source - author
  • 3. 3 Location map Site Plan N Fig 3.119Location Map https://www.google.co.in/maps?dcr=0&q=select+city+mall+saket&um=1&ie=UTF- 8&sa=X&ved=0ahUKEwj28v_D1abZAhWJuI8KHSqJDJEQ_AUICigB Fig 3.120Site Plan https://www.slideshare.net/hamzaaaaaah/select-citywalk-mall-jamia-millia-islamia-delhi N
  • 4. 4 Site Context • Bust stop- Khirki Village, 100m. • Malviya nagar metro station -1km. • IGI airport-15.6 km. • DLF place mall-200 m. • MGF metropolitan mall-100 m. • Qutub minar-3.7 km Built & Unbuilt Spaces • Built-up space / open space activities ratio = 6 acres / 2 acres = 3:1. • Activities ratio: Retail= 40% Recreational= 20% Dining=10% Cinemas= 15% Services/facilities= 15% Fig 3.121Mall dimension https://www.slideshare.net/hamzaaaaaah/select-citywalk-mall-jamia-millia-islamia-delhi N Fig 3.121Activities Ratio Source-Author
  • 5. 5 Floor Plans N Fig 3.123Ground floor plan with marking https://www.google.co.in/search?q=select+city+walk+floor+plans&dcr=0&source=lnms&tbm=isch&sa=X&ved=0ahUKEwjFs5DhmabZA N Shop area ranges from 50sq.m to 1500sq.m. Ground floor Area = 11378.81sq.m Fig 3.122Ground floor plan https://www.google.co.in/search?q=select+city+walk+floor+plans&dcr=0&source=lnms&tbm=isch&sa=X&ved=0ahUKEwjFs5DhmabZA hUENY8KHfrBCXwQ_AUICigB&biw=1536&bih=684#imgrc=TotFPlgT19eFcM:
  • 6. 6Fig 3.124First floor plan https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-6-638.jpg?cb=1489675720 N Fig 3.124Entrance A Source - Author Fig 3.124Entrance B Source - Author Fig 3.124Entrance D Source - Author Fig 3.124Rear Entrance Source - Author Shop area ranges from 50sq.m to 1500sq.m. First floor Area = 12816.04sq.m
  • 7. 7 Fig 3.125Second floor plan https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720 Second floor Area = 6568.08sq.m N N
  • 8. 8 Fig 3.125Lower ground floor plan https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720 Fig 3.125Lower ground floor plan https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720 Fig 3.125First floor plan https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720
  • 9. 9 Fig 3.125Second floor plan https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7- 638.jpg?cb=1489675720 Fig 3.125Theatre https://image.slidesharecdn.com/scw- 160104100607/95/selectcity-walk-mall-7- 638.jpg?cb=1489675720 TableTheatre sizes https://image.slidesharecdn.com/scw-160104100607/95/selectcity-walk-mall-7-638.jpg?cb=1489675720
  • 10. 10 • One lift lobby available to reach the floors of the dome. • The third and fourth floor consists of gaming zone and Pa PaYa(restaurant). • Fifth and sixth floor is occupied by gym. • Seventh floor is empty N Fig 3.125Dome fourth floor plan Source - author Fourth floor Area = 2776.216sq.m
  • 11. 11 Fire Evacuation Plans Fig 3.125Ground floor evacuation plan Source - author Fig 3.125First floor evacuation plan Source - author N N
  • 12. 12 Basement N Fig 3.125Second floor evacuation plan Source - author Fig 3.125First basement Plan Source - author
  • 13. 13 Fig 3.125Second basement Plan Source - author Fig 3.125Third basement Plan Source - author
  • 14. 14 • 1300 cars can be parked in 3 different floors of basement at one time. • Basement 1- Parking for 370 cars, Loading & unloading area, Garbage disposal area • Basement 2- Parking 470 cars. • Basement 3- Parking 270 cars. • Basement height- 3.5m. • BASEMENTS =41578.5 sq.m (3L VLS). • There were two separate entries which were connecting to the parking, from ground floor. • One was used for general entry of cars & The other was used by service vehicles. Services in basements • Water tanks. • HSD tanks. • Pump room. • Loading/unloading bay. • Bin centre. • Maintenance rooms. • Ventilation rooms(20sq.m). • Management office(360sq.m). • Air washer(190sq.m). • A/C Plant room(352sq.m). Fig 3.125Bay in basement Source - author Fig 3.125Skylight in basement Source - author Fig 3.125Toilets in basement Source - author
  • 15. 15 • BSES room. • Dg set room(358sq.m). • Boiler room(72sq.m). • Electrical panel room (700sq.m). • Store. • Meter Room(10sq.m). • Help Desk(18sq.m). • Engineering office. • Toilets. • Air Extractors. Fig 3.125Ventilation Room Source - author Fig 3.125Electrical Panels Source - author Fig 3.125Electric Room Source - author Fig 3.125Air Extractors in basement Source - author Fig 3.125Escape staircase from basement to site outside Source - author
  • 16. 16 Garbage Area The waste from restaurants was collected in basement, through shaft. There were 3 separate areas, which were dividing the waste into different categories. After separation, waste is dispose of through garbage trucks. External Finish • The entire complex is finished with combination of - Granite - ACP cladding - Acrylic paint - Structural glazing • At the upper level on the front facade, space has been provided for - - - Advertisements - Forthcoming attractions - Cinema posters which are visible from a distance governing the external elevation. Fire safety Fig 3.125Composting Area Source - author Fig 3.125Segregation Area Source - author
  • 17. 17 Fig 3.125 Hose reel system Source - author Fig 3.125 Fire Hose Box outside mall Source - author Fig 3.125 Fire Door for escape staircase Source - author Fig 3.125 Fire Extinguisher Source - author
  • 18. 18 Select City walk Mall Success of a mall depends on : Ambience of a mall depends on : Footfall of a mall depends on : Recreational element of the mall is categorized as :
  • 19. 19 Positive points: • Sufficient sitting area is provided inside as well as outside. • Glazing is used for aesthetic purpose. • Planning is done keeping in mind the commercial aspect forshops to have maximum frontage and making the shops more visible. • Proper circulation-lifts, escalators and staircase are provided. • Funneling up atriums to enable better sightlines and visibility of the shops at upper floors. • L-shape plan provides an enclosure space between its wing where a walking plaza could be created. • Restricted vehicular movement inside the site. • Well segregated pedestrian and vehicular movement. • Landscaping done so as to provide interactive spaces. • Adequate accesses for the handicapped people. • Escalators to basement from ground floor. • Conveniences for the drivers in the basements, toilets and locker room provided. Fig 3.125 Funneling up of atriums Source - author
  • 20. 20 • Adequate natural light inside the mall. • Terraces provided on the first and second floor. Negative Points: • Basement parking provided, surface parking should be more. • ACP cladding on exterior which is flammable material. Area Analysis Spaces Areas(sq.m) Shops 50-1500 Gaming zone 2000 Gym 4000 Papaya(restaurant) 950 Hangout(terrace cafe) 750 My square(food court) 1130(200 persons) Cinemas – Audi1 162(40 seats) Cinemas – Audi2 150(40 seats) Cinemas – Audi3 480(371 seats) Cinemas – Audi4 550(422 seats) Cinemas – Audi5 240(181 seats) Cinemas – Audi6 260(181 seats) Ventilation room 20 Management office 360 Air washer 190 A/C plant room 352 DG set 358 Boiler room 72 Electric panel room services 700 Meter room 10