School of Architecture, Building and Design
Bachelor of Quantity Surveying (Honours)
Construction Technology 3[QSB 2514/BLD 60304]
Group Assignment
Name : Tan Shen Sin 0324602
Thasia 0329051
Wong Sher Sheng 0329950
Topic :Steel Framing System
[ Cold-Form Structures + Composite Floor Slab ]
Lecturer : Mr Chai Voon Chiet
2
Table of content Pages
Introduction of Steel framing system 3
Cold form structures 4-7
Composite floor slab 8
Installation of compositeslab 9
Advantages & disadvantages of cold form structures 10-11
Advantages & disadvantages of compositeslab 12-13
Case study 14-18
Reference 19
3
Steel framing system
Introduction
Steel was first produced in the Middle Ages, but it was only used for building structural
purposes until just over a century ago. Today many remarkable structures demonstrate the
possibilities of using this material in their appearances. Among which include the Eiffel Tower.
The strength-to-volume ratio, the wide range of possible applications, the reliability of the
material and the ability to give shape to nearly all architectural wishes are the reasons to choose
this material for the main structure of a building.
For the structural framing purposes, the steel sections are normally used for beams,
columns and roof truss constructions. In Malaysia, these steel sections are manufactured to
specific British Standards. These sections could be either hot-rolled or welded. Universal Beam
(UB) is a common section used for structural beam, while Universal Column (UC) is a common
section for structural column. The main difference between the UB and UC is the depth (D) to
width (B) ratio of the section.
Houses that adopted Steel Framing System
4
Cold form structure
Cold-formed steel framing is made from strips of structural quality sheet steel that are fed
through roll forming machines with a series of dies that progressively shape the steel into C-
shaped sections, or formed into a variety of other shapes, including “U”, “Z”, and even hat-
shaped sections. Cold-formed steel framing members can be formed from a wide range of
material thickness that enables them to meet the requirements of nearly all structural and non-
structural applications.
Manufacturing process
1. Cold-formed steel starts with the production of raw steel, which is made by combining
iron ore or steel scrap with small amounts of carbon in a Basic Oxygen Furnace (BOF) or
Electric Arc Furnace (EAF)
5
2. Molten steel is poured into slabs that are reduced into thinner strips of steel, called “hot
band.” Increasingly, steel mills are employing a new, very efficient process called direct
reduction to make “hot band.”
3. In the steel finishing process, the hot band is reduced once again into “cold rolled
steel.” A protective coating of zinc is then added through the galvanization process. The
final product is called a “coil.”
6
4. To convert coils into cold-formed steel framing members, they are first slit into widths
that match the intended dimensions of the final product.
5. The slit coils of cold-formed steel are formed into C-sections and other shapes usually by
roll forming the steel through a series of dies. Penetrations for plumbing and electrical
runs are also punched at pre-determined locations, helping reduce installation times. No
heat is required to form the shapes and thus the name cold-formed steel.
7
6. The cold-formed steel framing materials are then either used to build wall and floor
panels, and roof trusses, or delivered to the job site in bundles.
8
Composite floor slab
Composite slabs comprise reinforced concrete cast on top of profiled steel decking. This acts as
formwork during construction and external reinforcement at the final stage. The decking can be
either re-entrant or trapezoidal. Trapezoidal decking may be over 200 mm deep which known as
deep decking. Additional reinforcing bars may be placed in the decking troughs, particularly for
deep decking. They are sometimes required in shallow decking when heavy loads are combined
with high periods of fire resistance.
Trapezoidal decking Re-entrant decking
Re-entrant or trapezoidal decking of 50 to 60 mm depth can span around 3 m unpropped, 80 mm
deep trapezoidal profiles can span up to around 4.5 m unpropped, and deep decking can achieve
around 6 m. Overall slab depths range from 130 mm upwards.
9
Installation of Composite Slab
1. Installation of decking
First, the contractor will place metal decking on the structural steel at predetermined
points in the erection sequences. Powder actuated tools can be used as an alternative of
welding to attach metal decking to the structural steel. A nail-like fastener is driven
through the metal deck into the steel beam.
2. Shear connectors
Installing shear connector to create a strong bond between the steel beam and the
concrete floor slab which is poured on top of the metal decking. The tip of the shear
connector may be placed in a ceramic ferrule to retain the weld during the welding
process.
The ferrules are removed before the concrete is poured.
3. Installation of concrete
Lastly, after the decking has been installed, concrete contractor will cast the concrete,
usually by pumping method on top of the composite metal decking, shear connectors, and
welded wire fabric or rebar grid.
10
Advantages of cold form structures
 Strength
Steel has the highest strength to weight ratio of any building material. The strength of
cold-formed steel provides architects with greater flexibility.
 Durable
Steel can last hundreds of years without any deterioration due to the fact that steel is
inorganic, and thus impervious to termites and rot. A protective layer is used to provide
high resistance to corrosion.
 Non-combustible
Steel will not contribute to the spread of a fire. Because of this, cold-formed steel projects
can easily be designed to meet code fire rating requirements. This gives lower costs and
broader coverage for many types of construction insurance.
 Sustainable
Steel is the only building material that is infinitely recyclable. As a recognized green
building material, cold-formed steel framing projects can earn credits for green building
ratings such as LEED.
 Cost-effective
By helping to minimize the risk, the use of cold-formed steel results in lower insurance
costs for builders and owners. The cold-formed steel construction methods allowing
builders to complete the projects months faster than with other framing materials due to
shorter construction cycles,
 Lightweight
Cold-formed steel are usually lightweight, making it easy to transport and erect
11
Disadvantages of cold-form structure
 Low fire resistance
Even though light gauge steel won’t burn, it can still lose strength in a fire.
 Unit price
Cold rolling process is expensive compare to hot-rolled system due to the equipment and
labour cost in production.
 Careful requirement
Careful treatment is required when assembling as it can caused buckling as cold-formed
steel is not as strong in physical structure compare to hot-rolled steel.
 Difficult connecting
Due to the thinness of cold-form steel, connecting steel section must be done in caution,
especially for welded joints.
 Thermal and sound insulation
It has low thermal and sound insulation. Steel also transmit sound more readily than
wood therefore installing internal soundproofing may be required.
 Rusting
Steel is subject to rusting due to moisture or water.
12
Advantages of composite slab
 Versatility
Composite slab can be adapted to many practical cases and a multitude of solutions.
 Resistance weight ratio
Have a great resistance with less weight, thus enabling a global reduction of the
structure’s weight. The minimum slab edge measures is only 12 cm.
 Quick installation
The time taken for installation is shorter than timber flooring. The absence of props
means that more than one floor can be concreted at the same time, thus reducing
construction time per floor.
 Cost reduction
Cost reduction in both in terms of labour costs and material cost as there is no need for
props, and less concrete is used.
 Safe
The concrete slab is being poured progress is not hindered in other areas e.g. the floors
above.
 Strength
Steel decking provides flexible reinforcement, combined with the comprehensive strength
of the concrete, for an all-round stronger slab.
 Easy on site handling
Steel decking is transported to site in pre-cut lengths, and in pre-packaged bundles.
13
Disadvantages of composite slab
 Brittle
Composite is more brittle than wrought metal thus it is easily damaged.
 Crack
The biggest problem for composite slab is cracking.
 Temperature sensitive
Can cause expands and contracts with temperature change
 Might cause overloading
During placement on concrete, care should be taken to avoid overloading the decking or
supporting structural member.
 Replacement
Damaged or faded material must be replaced, and it is a soft material that wears easily.
14
CASE STUDY
Embassy Suites ,Columbus, OH
Background
Building: Embassy Suites
Location: Columbus Ohio
Size: 135000 square foot
Capacity: 224 guest rooms, 7 storey
Completion: 2009
Designteam
Project architect: Bird Houk Collaboration
Project Engineer: Jezerinca Geers
General contractor: Brackett Builder
15
CFS Use at Embassy Suites
Cold form steel(CFS) framing was used for interior and exterior load-bearing and non load-
bearing walls, and floor and roof joists. A very small amount of structural steel was used within
the top six floors of the cold-form steel portion of the structure. The podium level was
constructed of a 3 1/2” concrete over 3” deep composite metal deck on top of structural steel. In
order to provide the fire-resistance necessary in a residential building of this type, the floors and
flat roof are constructed with the Trade-Ready joist system supporting metal deck. The Trade-
Ready system is a proprietary system that allows for ease of utility installation through pre-
fabricated holes in the joists.
Cost Vs Competition
The general contractor initially estimated the cost of hotel buildings of this type to evaluate the
differences between steel and concrete. They determined that steel beats the competition by a
wide margin. The contractor estimates that the cost savings of CFS compared to concrete is at
least $10/SF of floor area. For the Embassy Suites, this would equate to approximately
$1,350,000 for the 135,000 square foot of floor area framed with CFS.
Construction Cycle Time
For hotel owners, timing is extremely important. The time from groundbreaking to finish was 13
months. The CFS framing was complete in 96 days. According to Hoying, “ the panelised
Worthington Integrated Building Systemschedule is very dependable and predictable. Panelized
steel systems obviously do not experience weather delays during cold weather was you would
see with concrete, block, and precast planks.” Because there is no concrete shoring to get in the
way, mechanical and electrical trades can get started quicker with their rough-in work.
16
17
Case Study II
Background
Building: Poly Canyon Village Student Housing
Location: San Luis Obispo, California
Size: 1,400,000 square foot
Year completed: 2009
Contract value: $250,000,000
Certification: LEED Gold
Designteam
Client: California Polytechnic State University
Architect: Niles Bolton Associates
CFS Use At Poly Canyon Village
CFS for this project was used for the wall framing exclusively relying on four-inch studs ranging
from 33 to 78 mil thickness. The thicker 68 mil studs were used at the ground floor and the stud
thickness decreased as additional floors were added. Floor framing was accomplished with
Dietrich TradeReady CFS floor joins with 9/16-inch shallow metal decking, and USG Levelrock
was poured one inch over the top of the decking for the subfloor. Roof framing consisted of steel
trusses fabricated by Pacific Coast Truss Fabricator, a CEMCO Company. Fire-treated structural
plywood was used on the roof.
18
Tegan Sullivan of Clark Design/Build, who has served as the captain for the team, confirmed the
LEED certification requirement is one of the main reasons steel framing was selected. Cold-
formed steel and the panaelization process was attractive because of the off-site plant. In addition
to qualifying for LEED credit because of steel’s recycled content, the project also earned LEED
points because the manufacturing plant was located within 500 miles of the job site. The project
achieved a LEED Gold Certification from the U.S. Green Building Council.
Construction Cycle Time ( Schedule )
The construction was completed in six months less time using CFS framing compared to the
schedule for a concrete structural frame. The entire project could have been turned over a year
early but the lead time for some of the logistics like furnishings, retail build-out and training of
facility managers was not enough to advertise and lease the rooms.
The flexibility to pre-fabricate panels off-site definitely contributed to the project’s success, and
the speed at which the steel framing installer, KHS&S of California, was able to install the
structures on site allowed for all the subcontractors to be productive. The efficiencies gained
through pre-fabrication made it possible to start several components in several places at the same
time, which significantly cut down on any potential downtime for workers and subcontractors.”
The use of new techniques using steel helps reduce costs of the overall project and makes project
like Poly Canyon Village more marketable since steel is a stable, engineered material with
consistent properties. On completion inmate 2009, Poly Canyon Village is an impressive
apartment development for Cal Poly students with amenities including a swimming pool,
community center and a central retail plaza.
19
Reference:
Emma Goodgion(2016). How Cold-Formed Steel is Made. Retrieved from 1 December 2017
from https://sfia.memberclicks.net/how-cold-formed-steel-is-made
Composite construction. Retrieved from 1 December 1, 2017 from
https://www.steelconstruction.info/Composite_construction
Composite construction. Retrieved from 1 December 2017 from
http://www.enme.umd.edu/~ccfu/ref/CompConstCamber1_Fu.pdf
Advantages of Composite Slabs. Retrieved from 1 December 2017 from
https://www.incoperfil.com/advantages-cms-1-51-189/
Metal deck(2017).The Advantages of Steel Decking. Retrieved from 1 December 2017 from
https://www.raisedfloor.co.uk/the-advantages-of-steel-decking/
Bill Hutchison(2007).Advantages-and-6-disadvantages-of-composite-decking. Retrieved from 1
December 2017 from http://www.renovateaustralia.com/2007/03/03/6-advantages-and-6-
disadvantages-of-composite-decking/
Emma Goodgion(2016). Advantages of Cold-Formed Steel Framing. Retrieved from 1
December 2017 from http://www.cfsteel.org/advantages-of-cold-formed-steel-framing
Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar(2015). Design of Steel Structures.
Retrieved from 1 December 2017 from
http://nptel.ac.in/courses/105106113/5_cold_form_steel/2_advantages.pdf
Steel framing alliance(2016). The Embassy suites is a seven story hotel built by Brackett Builder
of Troy, Ohio. Retrieved from 1 December 2017 from
http://www.steelframing.org/PDF/cycletime/EmbassySuites.PDF
Steel framing alliance(2016). Park 4200 is a six story apartment project built over a three story
parking garage. Retrieved from 1 December 2017 from
http://www.steelframing.org/PDF/cycletime/PolyCanyonVillage-FINAL-1.pdf

More Related Content

What's hot

Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1KhangWei Chin
 
Cube test REPORT - DCC2042
Cube test REPORT - DCC2042Cube test REPORT - DCC2042
Cube test REPORT - DCC2042Pavitrah Segaran
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Make Mannan
 
Site report
Site reportSite report
Site reportYunshi94
 
Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
Specifications of rcc foundation
Specifications of rcc foundation Specifications of rcc foundation
Specifications of rcc foundation Prabhat chhirolya
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick WallI'mMiss Lily
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Industrialised Building Solution
Industrialised Building SolutionIndustrialised Building Solution
Industrialised Building SolutionLee Wan Xuan
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 

What's hot (20)

Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Spun pile
Spun pileSpun pile
Spun pile
 
Cofferdams
Cofferdams Cofferdams
Cofferdams
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 
Cube test REPORT - DCC2042
Cube test REPORT - DCC2042Cube test REPORT - DCC2042
Cube test REPORT - DCC2042
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
Site report
Site reportSite report
Site report
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Specifications of rcc foundation
Specifications of rcc foundation Specifications of rcc foundation
Specifications of rcc foundation
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick Wall
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Industrialised Building Solution
Industrialised Building SolutionIndustrialised Building Solution
Industrialised Building Solution
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Cube test report
Cube test reportCube test report
Cube test report
 

Similar to Steel framing system report

Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]w ss
 
ct3 presentation slides
ct3 presentation slides ct3 presentation slides
ct3 presentation slides shensin1015
 
Steel members of the building
Steel members of the buildingSteel members of the building
Steel members of the buildingKsuhail156
 
2120 Ch 9 PowerPoint.pptx
2120 Ch 9 PowerPoint.pptx2120 Ch 9 PowerPoint.pptx
2120 Ch 9 PowerPoint.pptxNickPalmisano2
 
Welding of steel bridges
Welding of steel bridgesWelding of steel bridges
Welding of steel bridgesGopi Nadh
 
Metal roofing (mmbc 2 seminar 2020) 1
Metal roofing (mmbc 2 seminar 2020) 1Metal roofing (mmbc 2 seminar 2020) 1
Metal roofing (mmbc 2 seminar 2020) 1yomask Kv
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design SolutionJia Xin Chee
 
Structural steel
Structural steelStructural steel
Structural steelvinod singh
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdfPrakashM970621
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsJing Fan Koh
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) correctedYap Xin
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxanik7nziza
 
07 april 2015 the making of steel then & now by maria reza nebril
07 april 2015  the making of steel then & now by maria reza nebril07 april 2015  the making of steel then & now by maria reza nebril
07 april 2015 the making of steel then & now by maria reza nebrilEngr. Maria Reza Nebril
 
The steel frame structures
The steel frame structuresThe steel frame structures
The steel frame structuresnajeeb muhamed
 
More About STEEL FRAME STRUCTURES
More About STEEL FRAME STRUCTURESMore About STEEL FRAME STRUCTURES
More About STEEL FRAME STRUCTURESLubina Anas
 
Steel as a material_ for building construction
Steel as a material_ for building constructionSteel as a material_ for building construction
Steel as a material_ for building constructionmitalikedia251
 
Ch 9 Noncombustible Construction
Ch 9 Noncombustible ConstructionCh 9 Noncombustible Construction
Ch 9 Noncombustible Constructionsnoshoesam
 

Similar to Steel framing system report (20)

Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
 
ct3 presentation slides
ct3 presentation slides ct3 presentation slides
ct3 presentation slides
 
Steel members of the building
Steel members of the buildingSteel members of the building
Steel members of the building
 
2120 Ch 9 PowerPoint.pptx
2120 Ch 9 PowerPoint.pptx2120 Ch 9 PowerPoint.pptx
2120 Ch 9 PowerPoint.pptx
 
Welding of steel bridges
Welding of steel bridgesWelding of steel bridges
Welding of steel bridges
 
Metal roofing (mmbc 2 seminar 2020) 1
Metal roofing (mmbc 2 seminar 2020) 1Metal roofing (mmbc 2 seminar 2020) 1
Metal roofing (mmbc 2 seminar 2020) 1
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 
Structural steel
Structural steelStructural steel
Structural steel
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdf
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) corrected
 
Lecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptxLecture 3-Composites construction (1).pptx
Lecture 3-Composites construction (1).pptx
 
07 april 2015 the making of steel then & now by maria reza nebril
07 april 2015  the making of steel then & now by maria reza nebril07 april 2015  the making of steel then & now by maria reza nebril
07 april 2015 the making of steel then & now by maria reza nebril
 
The steel frame structures
The steel frame structuresThe steel frame structures
The steel frame structures
 
More About STEEL FRAME STRUCTURES
More About STEEL FRAME STRUCTURESMore About STEEL FRAME STRUCTURES
More About STEEL FRAME STRUCTURES
 
Steel as a material_ for building construction
Steel as a material_ for building constructionSteel as a material_ for building construction
Steel as a material_ for building construction
 
Ch 9 Noncombustible Construction
Ch 9 Noncombustible ConstructionCh 9 Noncombustible Construction
Ch 9 Noncombustible Construction
 
Steel
Steel Steel
Steel
 
structural_steel.pptx
structural_steel.pptxstructural_steel.pptx
structural_steel.pptx
 
steelfinal
steelfinalsteelfinal
steelfinal
 

More from w ss

Est 22222
Est 22222Est 22222
Est 22222w ss
 
Course outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsCourse outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsw ss
 
Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)w ss
 
Pp presentation 1
Pp presentation 1Pp presentation 1
Pp presentation 1w ss
 
Assignment brief qsb2134 tender
Assignment brief qsb2134 tenderAssignment brief qsb2134 tender
Assignment brief qsb2134 tenderw ss
 
Evaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderEvaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderw ss
 
Management science
Management scienceManagement science
Management sciencew ss
 
Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017w ss
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done w ss
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done w ss
 
Final presentation
Final presentationFinal presentation
Final presentationw ss
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done w ss
 
Building services assignment
Building services assignmentBuilding services assignment
Building services assignmentw ss
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1 w ss
 
M2 project assignment mar 2017
M2 project assignment mar 2017M2 project assignment mar 2017
M2 project assignment mar 2017w ss
 
Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017w ss
 
Assignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingAssignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingw ss
 
Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)w ss
 
Flooring presentation(t 4 b)
Flooring presentation(t 4 b)Flooring presentation(t 4 b)
Flooring presentation(t 4 b)w ss
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site reportw ss
 

More from w ss (20)

Est 22222
Est 22222Est 22222
Est 22222
 
Course outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsCourse outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qs
 
Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)
 
Pp presentation 1
Pp presentation 1Pp presentation 1
Pp presentation 1
 
Assignment brief qsb2134 tender
Assignment brief qsb2134 tenderAssignment brief qsb2134 tender
Assignment brief qsb2134 tender
 
Evaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderEvaluation brief qsb2134 tender
Evaluation brief qsb2134 tender
 
Management science
Management scienceManagement science
Management science
 
Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
 
Building services assignment
Building services assignmentBuilding services assignment
Building services assignment
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
 
M2 project assignment mar 2017
M2 project assignment mar 2017M2 project assignment mar 2017
M2 project assignment mar 2017
 
Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017
 
Assignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingAssignment 2 bld60204 sketching
Assignment 2 bld60204 sketching
 
Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)
 
Flooring presentation(t 4 b)
Flooring presentation(t 4 b)Flooring presentation(t 4 b)
Flooring presentation(t 4 b)
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 

Recently uploaded

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 

Recently uploaded (20)

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 

Steel framing system report

  • 1. 1 School of Architecture, Building and Design Bachelor of Quantity Surveying (Honours) Construction Technology 3[QSB 2514/BLD 60304] Group Assignment Name : Tan Shen Sin 0324602 Thasia 0329051 Wong Sher Sheng 0329950 Topic :Steel Framing System [ Cold-Form Structures + Composite Floor Slab ] Lecturer : Mr Chai Voon Chiet
  • 2. 2 Table of content Pages Introduction of Steel framing system 3 Cold form structures 4-7 Composite floor slab 8 Installation of compositeslab 9 Advantages & disadvantages of cold form structures 10-11 Advantages & disadvantages of compositeslab 12-13 Case study 14-18 Reference 19
  • 3. 3 Steel framing system Introduction Steel was first produced in the Middle Ages, but it was only used for building structural purposes until just over a century ago. Today many remarkable structures demonstrate the possibilities of using this material in their appearances. Among which include the Eiffel Tower. The strength-to-volume ratio, the wide range of possible applications, the reliability of the material and the ability to give shape to nearly all architectural wishes are the reasons to choose this material for the main structure of a building. For the structural framing purposes, the steel sections are normally used for beams, columns and roof truss constructions. In Malaysia, these steel sections are manufactured to specific British Standards. These sections could be either hot-rolled or welded. Universal Beam (UB) is a common section used for structural beam, while Universal Column (UC) is a common section for structural column. The main difference between the UB and UC is the depth (D) to width (B) ratio of the section. Houses that adopted Steel Framing System
  • 4. 4 Cold form structure Cold-formed steel framing is made from strips of structural quality sheet steel that are fed through roll forming machines with a series of dies that progressively shape the steel into C- shaped sections, or formed into a variety of other shapes, including “U”, “Z”, and even hat- shaped sections. Cold-formed steel framing members can be formed from a wide range of material thickness that enables them to meet the requirements of nearly all structural and non- structural applications. Manufacturing process 1. Cold-formed steel starts with the production of raw steel, which is made by combining iron ore or steel scrap with small amounts of carbon in a Basic Oxygen Furnace (BOF) or Electric Arc Furnace (EAF)
  • 5. 5 2. Molten steel is poured into slabs that are reduced into thinner strips of steel, called “hot band.” Increasingly, steel mills are employing a new, very efficient process called direct reduction to make “hot band.” 3. In the steel finishing process, the hot band is reduced once again into “cold rolled steel.” A protective coating of zinc is then added through the galvanization process. The final product is called a “coil.”
  • 6. 6 4. To convert coils into cold-formed steel framing members, they are first slit into widths that match the intended dimensions of the final product. 5. The slit coils of cold-formed steel are formed into C-sections and other shapes usually by roll forming the steel through a series of dies. Penetrations for plumbing and electrical runs are also punched at pre-determined locations, helping reduce installation times. No heat is required to form the shapes and thus the name cold-formed steel.
  • 7. 7 6. The cold-formed steel framing materials are then either used to build wall and floor panels, and roof trusses, or delivered to the job site in bundles.
  • 8. 8 Composite floor slab Composite slabs comprise reinforced concrete cast on top of profiled steel decking. This acts as formwork during construction and external reinforcement at the final stage. The decking can be either re-entrant or trapezoidal. Trapezoidal decking may be over 200 mm deep which known as deep decking. Additional reinforcing bars may be placed in the decking troughs, particularly for deep decking. They are sometimes required in shallow decking when heavy loads are combined with high periods of fire resistance. Trapezoidal decking Re-entrant decking Re-entrant or trapezoidal decking of 50 to 60 mm depth can span around 3 m unpropped, 80 mm deep trapezoidal profiles can span up to around 4.5 m unpropped, and deep decking can achieve around 6 m. Overall slab depths range from 130 mm upwards.
  • 9. 9 Installation of Composite Slab 1. Installation of decking First, the contractor will place metal decking on the structural steel at predetermined points in the erection sequences. Powder actuated tools can be used as an alternative of welding to attach metal decking to the structural steel. A nail-like fastener is driven through the metal deck into the steel beam. 2. Shear connectors Installing shear connector to create a strong bond between the steel beam and the concrete floor slab which is poured on top of the metal decking. The tip of the shear connector may be placed in a ceramic ferrule to retain the weld during the welding process. The ferrules are removed before the concrete is poured. 3. Installation of concrete Lastly, after the decking has been installed, concrete contractor will cast the concrete, usually by pumping method on top of the composite metal decking, shear connectors, and welded wire fabric or rebar grid.
  • 10. 10 Advantages of cold form structures  Strength Steel has the highest strength to weight ratio of any building material. The strength of cold-formed steel provides architects with greater flexibility.  Durable Steel can last hundreds of years without any deterioration due to the fact that steel is inorganic, and thus impervious to termites and rot. A protective layer is used to provide high resistance to corrosion.  Non-combustible Steel will not contribute to the spread of a fire. Because of this, cold-formed steel projects can easily be designed to meet code fire rating requirements. This gives lower costs and broader coverage for many types of construction insurance.  Sustainable Steel is the only building material that is infinitely recyclable. As a recognized green building material, cold-formed steel framing projects can earn credits for green building ratings such as LEED.  Cost-effective By helping to minimize the risk, the use of cold-formed steel results in lower insurance costs for builders and owners. The cold-formed steel construction methods allowing builders to complete the projects months faster than with other framing materials due to shorter construction cycles,  Lightweight Cold-formed steel are usually lightweight, making it easy to transport and erect
  • 11. 11 Disadvantages of cold-form structure  Low fire resistance Even though light gauge steel won’t burn, it can still lose strength in a fire.  Unit price Cold rolling process is expensive compare to hot-rolled system due to the equipment and labour cost in production.  Careful requirement Careful treatment is required when assembling as it can caused buckling as cold-formed steel is not as strong in physical structure compare to hot-rolled steel.  Difficult connecting Due to the thinness of cold-form steel, connecting steel section must be done in caution, especially for welded joints.  Thermal and sound insulation It has low thermal and sound insulation. Steel also transmit sound more readily than wood therefore installing internal soundproofing may be required.  Rusting Steel is subject to rusting due to moisture or water.
  • 12. 12 Advantages of composite slab  Versatility Composite slab can be adapted to many practical cases and a multitude of solutions.  Resistance weight ratio Have a great resistance with less weight, thus enabling a global reduction of the structure’s weight. The minimum slab edge measures is only 12 cm.  Quick installation The time taken for installation is shorter than timber flooring. The absence of props means that more than one floor can be concreted at the same time, thus reducing construction time per floor.  Cost reduction Cost reduction in both in terms of labour costs and material cost as there is no need for props, and less concrete is used.  Safe The concrete slab is being poured progress is not hindered in other areas e.g. the floors above.  Strength Steel decking provides flexible reinforcement, combined with the comprehensive strength of the concrete, for an all-round stronger slab.  Easy on site handling Steel decking is transported to site in pre-cut lengths, and in pre-packaged bundles.
  • 13. 13 Disadvantages of composite slab  Brittle Composite is more brittle than wrought metal thus it is easily damaged.  Crack The biggest problem for composite slab is cracking.  Temperature sensitive Can cause expands and contracts with temperature change  Might cause overloading During placement on concrete, care should be taken to avoid overloading the decking or supporting structural member.  Replacement Damaged or faded material must be replaced, and it is a soft material that wears easily.
  • 14. 14 CASE STUDY Embassy Suites ,Columbus, OH Background Building: Embassy Suites Location: Columbus Ohio Size: 135000 square foot Capacity: 224 guest rooms, 7 storey Completion: 2009 Designteam Project architect: Bird Houk Collaboration Project Engineer: Jezerinca Geers General contractor: Brackett Builder
  • 15. 15 CFS Use at Embassy Suites Cold form steel(CFS) framing was used for interior and exterior load-bearing and non load- bearing walls, and floor and roof joists. A very small amount of structural steel was used within the top six floors of the cold-form steel portion of the structure. The podium level was constructed of a 3 1/2” concrete over 3” deep composite metal deck on top of structural steel. In order to provide the fire-resistance necessary in a residential building of this type, the floors and flat roof are constructed with the Trade-Ready joist system supporting metal deck. The Trade- Ready system is a proprietary system that allows for ease of utility installation through pre- fabricated holes in the joists. Cost Vs Competition The general contractor initially estimated the cost of hotel buildings of this type to evaluate the differences between steel and concrete. They determined that steel beats the competition by a wide margin. The contractor estimates that the cost savings of CFS compared to concrete is at least $10/SF of floor area. For the Embassy Suites, this would equate to approximately $1,350,000 for the 135,000 square foot of floor area framed with CFS. Construction Cycle Time For hotel owners, timing is extremely important. The time from groundbreaking to finish was 13 months. The CFS framing was complete in 96 days. According to Hoying, “ the panelised Worthington Integrated Building Systemschedule is very dependable and predictable. Panelized steel systems obviously do not experience weather delays during cold weather was you would see with concrete, block, and precast planks.” Because there is no concrete shoring to get in the way, mechanical and electrical trades can get started quicker with their rough-in work.
  • 16. 16
  • 17. 17 Case Study II Background Building: Poly Canyon Village Student Housing Location: San Luis Obispo, California Size: 1,400,000 square foot Year completed: 2009 Contract value: $250,000,000 Certification: LEED Gold Designteam Client: California Polytechnic State University Architect: Niles Bolton Associates CFS Use At Poly Canyon Village CFS for this project was used for the wall framing exclusively relying on four-inch studs ranging from 33 to 78 mil thickness. The thicker 68 mil studs were used at the ground floor and the stud thickness decreased as additional floors were added. Floor framing was accomplished with Dietrich TradeReady CFS floor joins with 9/16-inch shallow metal decking, and USG Levelrock was poured one inch over the top of the decking for the subfloor. Roof framing consisted of steel trusses fabricated by Pacific Coast Truss Fabricator, a CEMCO Company. Fire-treated structural plywood was used on the roof.
  • 18. 18 Tegan Sullivan of Clark Design/Build, who has served as the captain for the team, confirmed the LEED certification requirement is one of the main reasons steel framing was selected. Cold- formed steel and the panaelization process was attractive because of the off-site plant. In addition to qualifying for LEED credit because of steel’s recycled content, the project also earned LEED points because the manufacturing plant was located within 500 miles of the job site. The project achieved a LEED Gold Certification from the U.S. Green Building Council. Construction Cycle Time ( Schedule ) The construction was completed in six months less time using CFS framing compared to the schedule for a concrete structural frame. The entire project could have been turned over a year early but the lead time for some of the logistics like furnishings, retail build-out and training of facility managers was not enough to advertise and lease the rooms. The flexibility to pre-fabricate panels off-site definitely contributed to the project’s success, and the speed at which the steel framing installer, KHS&S of California, was able to install the structures on site allowed for all the subcontractors to be productive. The efficiencies gained through pre-fabrication made it possible to start several components in several places at the same time, which significantly cut down on any potential downtime for workers and subcontractors.” The use of new techniques using steel helps reduce costs of the overall project and makes project like Poly Canyon Village more marketable since steel is a stable, engineered material with consistent properties. On completion inmate 2009, Poly Canyon Village is an impressive apartment development for Cal Poly students with amenities including a swimming pool, community center and a central retail plaza.
  • 19. 19 Reference: Emma Goodgion(2016). How Cold-Formed Steel is Made. Retrieved from 1 December 2017 from https://sfia.memberclicks.net/how-cold-formed-steel-is-made Composite construction. Retrieved from 1 December 1, 2017 from https://www.steelconstruction.info/Composite_construction Composite construction. Retrieved from 1 December 2017 from http://www.enme.umd.edu/~ccfu/ref/CompConstCamber1_Fu.pdf Advantages of Composite Slabs. Retrieved from 1 December 2017 from https://www.incoperfil.com/advantages-cms-1-51-189/ Metal deck(2017).The Advantages of Steel Decking. Retrieved from 1 December 2017 from https://www.raisedfloor.co.uk/the-advantages-of-steel-decking/ Bill Hutchison(2007).Advantages-and-6-disadvantages-of-composite-decking. Retrieved from 1 December 2017 from http://www.renovateaustralia.com/2007/03/03/6-advantages-and-6- disadvantages-of-composite-decking/ Emma Goodgion(2016). Advantages of Cold-Formed Steel Framing. Retrieved from 1 December 2017 from http://www.cfsteel.org/advantages-of-cold-formed-steel-framing Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar(2015). Design of Steel Structures. Retrieved from 1 December 2017 from http://nptel.ac.in/courses/105106113/5_cold_form_steel/2_advantages.pdf Steel framing alliance(2016). The Embassy suites is a seven story hotel built by Brackett Builder of Troy, Ohio. Retrieved from 1 December 2017 from http://www.steelframing.org/PDF/cycletime/EmbassySuites.PDF Steel framing alliance(2016). Park 4200 is a six story apartment project built over a three story parking garage. Retrieved from 1 December 2017 from http://www.steelframing.org/PDF/cycletime/PolyCanyonVillage-FINAL-1.pdf