1 Explain the various phases of the project management life cycle.
A List and describe the various phases of the
project management life cycle.
10 (2 marks for each
phase)
10
2 List the steps involved in each process of project planning.
A  List the processes of project planning
 Write the steps involved in each process
of project planning
1
9( 3 marks for steps
under each process)
10
3 Write short notes on the following cost estimating tools and techniques:
a. Analogous estimating
b. Bottom-up estimating
c. Parametric estimating
d. Reserve analysis
A a. Analogous estimating
b. Bottom-up estimating
c. Parametric estimating
d. Reserve analysis
To answer short notes on the topics given above:
i. Outline the main points of the topic
10 (2.5 marks for
each)
Break up of 2.5
marks for each
topic/short note
1
10
FOR SOLVED ASSIGNMENTS VISIT
WWW.SMUSOLVEDASSIGNMENTS.COM OR
EMAIL- solvemyassignments@gmail.com
FOR SOLVED ASSIGNMENTS VISIT
WWW.SMUSOLVEDASSIGNMENTS.COM OR
EMAIL- solvemyassignments@gmail.com
ii. Analyse the topic
iii. Conclude with your opinion
1
0.5
4 Summarize quality control for project quality management.
A  Define quality control
 List the steps in quality control
 Explain the inputs, tools and
techniques and outcomes of quality
control
 Write the implications of quality
control for project quality
management
1
3
4
2
10
5 What is purchase cycle? Explain the key steps involved in the purchase cycle of a
project.
A 1. Define purchase cycle
2. List and describe the key steps involved
in the purchase cycle of a project
1.25
8.75(1.25 marks for
each step)
10
6 Explain the various elements of project control.
A List and describe the various elements of project
control.
10(2.5 marks for
each element)
10
*A-Answer
Note –Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme
***********

More Related Content

What's hot

SEM 4 PM SUMMER 2014 ASSIGNMENTS
SEM 4 PM SUMMER 2014 ASSIGNMENTSSEM 4 PM SUMMER 2014 ASSIGNMENTS
SEM 4 PM SUMMER 2014 ASSIGNMENTSsolved_assignments
 
Pm0011 – project planning and scheduling
Pm0011 – project planning and schedulingPm0011 – project planning and scheduling
Pm0011 – project planning and schedulingsmumbahelp
 
Pm0017 –project quality management
Pm0017 –project quality managementPm0017 –project quality management
Pm0017 –project quality managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales DirectorMy Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales DirectorElmo B. Joseph
 
Project Management In The Automotive Industry
Project Management In The Automotive IndustryProject Management In The Automotive Industry
Project Management In The Automotive IndustryGestion Projet Auto
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012 Skript
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4Highmark Health
 
SEM 3 OM SUMMER 2014 ASSIGNMENTS
SEM 3 OM SUMMER 2014 ASSIGNMENTSSEM 3 OM SUMMER 2014 ASSIGNMENTS
SEM 3 OM SUMMER 2014 ASSIGNMENTSsolved_assignments
 
Project management
Project managementProject management
Project managementChou Bảo
 
Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5Highmark Health
 

What's hot (20)

Pm0015
Pm0015Pm0015
Pm0015
 
Om0010
Om0010Om0010
Om0010
 
Bba501
Bba501Bba501
Bba501
 
Project manegement
Project manegementProject manegement
Project manegement
 
SEM 4 PM SUMMER 2014 ASSIGNMENTS
SEM 4 PM SUMMER 2014 ASSIGNMENTSSEM 4 PM SUMMER 2014 ASSIGNMENTS
SEM 4 PM SUMMER 2014 ASSIGNMENTS
 
Pm0018
Pm0018Pm0018
Pm0018
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
 
Pm0011 – project planning and scheduling
Pm0011 – project planning and schedulingPm0011 – project planning and scheduling
Pm0011 – project planning and scheduling
 
Pm0017 –project quality management
Pm0017 –project quality managementPm0017 –project quality management
Pm0017 –project quality management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales DirectorMy Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
My Singer Self Appraisal by Mr Muraliy Prakash, EX - Sales Director
 
Project Management In The Automotive Industry
Project Management In The Automotive IndustryProject Management In The Automotive Industry
Project Management In The Automotive Industry
 
Quality unit 2012
Quality unit 2012 Quality unit 2012
Quality unit 2012
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4
 
Mba semester 2 mb0044
Mba semester 2 mb0044Mba semester 2 mb0044
Mba semester 2 mb0044
 
SEM 3 OM SUMMER 2014 ASSIGNMENTS
SEM 3 OM SUMMER 2014 ASSIGNMENTSSEM 3 OM SUMMER 2014 ASSIGNMENTS
SEM 3 OM SUMMER 2014 ASSIGNMENTS
 
Project management
Project managementProject management
Project management
 
Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 

Viewers also liked

Mba ii hrm u-2.5 orientation
Mba ii hrm u-2.5 orientationMba ii hrm u-2.5 orientation
Mba ii hrm u-2.5 orientationRai University
 
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTSSMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTSsolved_assignments
 
Merger of hutch to vodaf one.pptx
Merger of hutch to vodaf one.pptxMerger of hutch to vodaf one.pptx
Merger of hutch to vodaf one.pptxMj Payal
 
Equity research & portfolio investment in indian financial market telecom se...
Equity research & portfolio investment in indian financial market  telecom se...Equity research & portfolio investment in indian financial market  telecom se...
Equity research & portfolio investment in indian financial market telecom se...Amit Bansal
 
Human resource management need of the time
Human resource management   need of the timeHuman resource management   need of the time
Human resource management need of the timejitharadharmesh
 
CORPORATE LEVEL STRATEGY - TAKEOVER STRATEGY
CORPORATE LEVEL STRATEGY - TAKEOVER STRATEGYCORPORATE LEVEL STRATEGY - TAKEOVER STRATEGY
CORPORATE LEVEL STRATEGY - TAKEOVER STRATEGYSoumeet Sarkar
 
Merger & Acquisitions: Hutch Is Now Vodafone
Merger & Acquisitions: Hutch Is Now Vodafone Merger & Acquisitions: Hutch Is Now Vodafone
Merger & Acquisitions: Hutch Is Now Vodafone Sandeep Patel
 
Telenor Group company presentation Q4-2013
Telenor Group company presentation Q4-2013Telenor Group company presentation Q4-2013
Telenor Group company presentation Q4-2013Telenor_Group
 
Final Year Project Report Of Pgdm 6th Trimester
Final Year Project Report Of Pgdm 6th TrimesterFinal Year Project Report Of Pgdm 6th Trimester
Final Year Project Report Of Pgdm 6th Trimestertowardsgoal
 
MERGER AND ACQUISITION OF BANKS
MERGER AND ACQUISITION OF BANKS MERGER AND ACQUISITION OF BANKS
MERGER AND ACQUISITION OF BANKS Sardaar Saab
 
Working Capital Management in Bajaj Allianz Life Insurance
Working Capital Management in Bajaj Allianz Life InsuranceWorking Capital Management in Bajaj Allianz Life Insurance
Working Capital Management in Bajaj Allianz Life InsuranceSuresh kumar
 
bajaj allianz life insurance
bajaj allianz life insurancebajaj allianz life insurance
bajaj allianz life insuranceRahul Agrawal
 
Finance projects topics
Finance projects topicsFinance projects topics
Finance projects topicsBabasab Patil
 

Viewers also liked (20)

Mba ii hrm u-2.5 orientation
Mba ii hrm u-2.5 orientationMba ii hrm u-2.5 orientation
Mba ii hrm u-2.5 orientation
 
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTSSMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
 
CMC Ltd. CJET
CMC Ltd. CJETCMC Ltd. CJET
CMC Ltd. CJET
 
TIMSR
TIMSRTIMSR
TIMSR
 
Hdfc001
Hdfc001Hdfc001
Hdfc001
 
Merger of hutch to vodaf one.pptx
Merger of hutch to vodaf one.pptxMerger of hutch to vodaf one.pptx
Merger of hutch to vodaf one.pptx
 
Merger and analysis ppt
Merger and analysis pptMerger and analysis ppt
Merger and analysis ppt
 
Tata mo.final
Tata mo.finalTata mo.final
Tata mo.final
 
Equity research & portfolio investment in indian financial market telecom se...
Equity research & portfolio investment in indian financial market  telecom se...Equity research & portfolio investment in indian financial market  telecom se...
Equity research & portfolio investment in indian financial market telecom se...
 
Human resource management need of the time
Human resource management   need of the timeHuman resource management   need of the time
Human resource management need of the time
 
CORPORATE LEVEL STRATEGY - TAKEOVER STRATEGY
CORPORATE LEVEL STRATEGY - TAKEOVER STRATEGYCORPORATE LEVEL STRATEGY - TAKEOVER STRATEGY
CORPORATE LEVEL STRATEGY - TAKEOVER STRATEGY
 
Merger & Acquisitions: Hutch Is Now Vodafone
Merger & Acquisitions: Hutch Is Now Vodafone Merger & Acquisitions: Hutch Is Now Vodafone
Merger & Acquisitions: Hutch Is Now Vodafone
 
Telenor Group company presentation Q4-2013
Telenor Group company presentation Q4-2013Telenor Group company presentation Q4-2013
Telenor Group company presentation Q4-2013
 
Final Year Project Report Of Pgdm 6th Trimester
Final Year Project Report Of Pgdm 6th TrimesterFinal Year Project Report Of Pgdm 6th Trimester
Final Year Project Report Of Pgdm 6th Trimester
 
Dividend policies-financial mgt
Dividend policies-financial mgtDividend policies-financial mgt
Dividend policies-financial mgt
 
MERGER AND ACQUISITION OF BANKS
MERGER AND ACQUISITION OF BANKS MERGER AND ACQUISITION OF BANKS
MERGER AND ACQUISITION OF BANKS
 
Working Capital Management in Bajaj Allianz Life Insurance
Working Capital Management in Bajaj Allianz Life InsuranceWorking Capital Management in Bajaj Allianz Life Insurance
Working Capital Management in Bajaj Allianz Life Insurance
 
Flipkart
FlipkartFlipkart
Flipkart
 
bajaj allianz life insurance
bajaj allianz life insurancebajaj allianz life insurance
bajaj allianz life insurance
 
Finance projects topics
Finance projects topicsFinance projects topics
Finance projects topics
 

Similar to MB0049 Sem 2 MBA Summer 2015 Assignments

Similar to MB0049 Sem 2 MBA Summer 2015 Assignments (20)

Smu Mba Sem 2 Assignments
Smu Mba Sem 2 AssignmentsSmu Mba Sem 2 Assignments
Smu Mba Sem 2 Assignments
 
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTSSMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
 
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTSSMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
SMU MBA SEM 2 SPRING 2015 SOLVED ASSIGNMENTS
 
Om0016
Om0016Om0016
Om0016
 
Om0013
Om0013Om0013
Om0013
 
Pm0010 – introduction to project management
Pm0010 – introduction to project managementPm0010 – introduction to project management
Pm0010 – introduction to project management
 
Mb0049
Mb0049Mb0049
Mb0049
 
Mb0044
Mb0044Mb0044
Mb0044
 
Pm0017
Pm0017Pm0017
Pm0017
 
Mb0049
Mb0049Mb0049
Mb0049
 
Mba semester 2 mb0049
Mba semester 2 mb0049Mba semester 2 mb0049
Mba semester 2 mb0049
 
Smu mba sem 4 pm summer 2016 assignments
Smu mba sem 4 pm summer 2016 assignmentsSmu mba sem 4 pm summer 2016 assignments
Smu mba sem 4 pm summer 2016 assignments
 
Om0016
Om0016Om0016
Om0016
 
Smu mba sem 4 pm spring 2017 assignments
Smu mba sem 4 pm spring 2017 assignmentsSmu mba sem 4 pm spring 2017 assignments
Smu mba sem 4 pm spring 2017 assignments
 
Smu mba sem 2 summer 2017 assignments
Smu mba sem 2 summer 2017 assignmentsSmu mba sem 2 summer 2017 assignments
Smu mba sem 2 summer 2017 assignments
 
Smu mba sem 2 spring 2017 assignments
Smu mba sem 2 spring 2017 assignmentsSmu mba sem 2 spring 2017 assignments
Smu mba sem 2 spring 2017 assignments
 
Smu bba sem 6 spring 2016 assignments
Smu bba sem 6 spring 2016 assignmentsSmu bba sem 6 spring 2016 assignments
Smu bba sem 6 spring 2016 assignments
 
Qm0015
Qm0015Qm0015
Qm0015
 
Project managment (pm) solved assignments summer 2015
Project managment  (pm) solved assignments summer 2015Project managment  (pm) solved assignments summer 2015
Project managment (pm) solved assignments summer 2015
 
SMU mba sem 4 om fall 2014 assignments
SMU mba sem 4 om fall 2014 assignmentsSMU mba sem 4 om fall 2014 assignments
SMU mba sem 4 om fall 2014 assignments
 

Recently uploaded

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 

Recently uploaded (20)

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 

MB0049 Sem 2 MBA Summer 2015 Assignments

  • 1. ASSIGNMENT DRIVE SUMMER 2015 PROGRAM MBA/ MBADS/ MBAFLEX/ MBAHCSN3/ PGDBAN2 SEMESTER II SUBJECT CODE & NAME MB 0049 - PROJECT MANAGEMENT BK ID B1632 CREDIT AND MARKS 4 CREDITS , 60 MARKS Q.No Criteria Marks Total Marks 1 Explain the various phases of the project management life cycle. A List and describe the various phases of the project management life cycle. 10 (2 marks for each phase) 10 2 List the steps involved in each process of project planning. A  List the processes of project planning  Write the steps involved in each process of project planning 1 9( 3 marks for steps under each process) 10 3 Write short notes on the following cost estimating tools and techniques: a. Analogous estimating b. Bottom-up estimating c. Parametric estimating d. Reserve analysis A a. Analogous estimating b. Bottom-up estimating c. Parametric estimating d. Reserve analysis To answer short notes on the topics given above: i. Outline the main points of the topic 10 (2.5 marks for each) Break up of 2.5 marks for each topic/short note 1 10 FOR SOLVED ASSIGNMENTS VISIT WWW.SMUSOLVEDASSIGNMENTS.COM OR EMAIL- solvemyassignments@gmail.com FOR SOLVED ASSIGNMENTS VISIT WWW.SMUSOLVEDASSIGNMENTS.COM OR EMAIL- solvemyassignments@gmail.com
  • 2. ii. Analyse the topic iii. Conclude with your opinion 1 0.5 4 Summarize quality control for project quality management. A  Define quality control  List the steps in quality control  Explain the inputs, tools and techniques and outcomes of quality control  Write the implications of quality control for project quality management 1 3 4 2 10 5 What is purchase cycle? Explain the key steps involved in the purchase cycle of a project. A 1. Define purchase cycle 2. List and describe the key steps involved in the purchase cycle of a project 1.25 8.75(1.25 marks for each step) 10 6 Explain the various elements of project control. A List and describe the various elements of project control. 10(2.5 marks for each element) 10 *A-Answer Note –Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme ***********