Completions / Workovers
Completions / Workovers
• Production Improvement
1. Improvement in ESP run life
• Operational needs
– Operational process
• Detailed Procedures
• Best Practices – Shared by bu’s and contractors
• Lessons Learned - Shared by bu’s and contractors
• Contractors become more proactive – fill in the gap ( but
they have to be experienced and qualified to do it while
we train.
.
– Team Development
• Contractors
• Field shop – job preparation
• Redress facilities
• TNK-bp engineering staff
• TNK-bp operations team and support
– People
• Sufficient number and Competent Supervisors
• Well defined roles and responsibilities
• What if we can’t get enough competent Supervisors?
Use experienced contractors – they have to
proactive.
Completions / Workovers
Completions & Workovers
– Job Planning
– ????
– Logistics
• Right Vehicle for the job
• Proper transport container for the part
• Vehicle Preparedness
– Quality Assurance and Quality Control
• Equipment re-build or re-dress as per manufacture guidelines
• Manufacturing quality paln
• Field shop / redress center Quality Plans
• Rig site quality Plan
• Detailed Job procedures
Completions / Workovers
• Mechanical needs for Improvement in ESP run
life
– Cable Clamps
– Proper rated cables and equipment in the well
– Wellbore clean out after Frac
» Viscous pills to kill formations and control losses
» W/O rig w/ work string – high rates / reverse
circulation to wash sand out
» Washdown screens
– Fluid Loss during ESP change outs
» Viscous pills to control losses
» Filtration of completion fluids
» Mechanical barriers – downhole shutoff
– Solids or fines control
» Screen below packer
» Different types of screen
» Low cost sand control
– Dual ESP’s or ESP and Jet Pump combination
Water Control
Water Control
Problem: Water Coning
Possible Solution: Cement Off Lower Perfs
Water Control
Problem: High Perm Streaks
Possible Solution: 1)Treat with Perm Modifier Chemical,
2) Manage water
injection
Completions / Workovers
2. Water Control
• ????Squeeze off formations
• Chemical to change the reservoir permibility
– Bright Water – bp Technology
– ?? Halliburton and Schlumberger and others
• Downhole sink completion method - (this method produces the
water from below the WOC to reduce the coning effect near the
wellbore, allowing for great effects from the waterflood).
• Service company – chemical treatments
• Easywell constrictors
• Logging and traciers to see where the water is coming from
• Balancing water injection
3. Scale and Corrosion
• Continuous Chemical injection
– Down annulus
– Down tubing
• Batch inhibitor treatment - Pump a large volume of inhibitor
into the annulus perodically
• QA/QC
– Inhibitor testing on oil & water for emulsions
– Inhibitor testing on the pump and cable elastomers

workover presentation (1)

  • 1.
  • 2.
    Completions / Workovers •Production Improvement 1. Improvement in ESP run life • Operational needs – Operational process • Detailed Procedures • Best Practices – Shared by bu’s and contractors • Lessons Learned - Shared by bu’s and contractors • Contractors become more proactive – fill in the gap ( but they have to be experienced and qualified to do it while we train. .
  • 3.
    – Team Development •Contractors • Field shop – job preparation • Redress facilities • TNK-bp engineering staff • TNK-bp operations team and support – People • Sufficient number and Competent Supervisors • Well defined roles and responsibilities • What if we can’t get enough competent Supervisors? Use experienced contractors – they have to proactive. Completions / Workovers
  • 4.
    Completions & Workovers –Job Planning – ???? – Logistics • Right Vehicle for the job • Proper transport container for the part • Vehicle Preparedness – Quality Assurance and Quality Control • Equipment re-build or re-dress as per manufacture guidelines • Manufacturing quality paln • Field shop / redress center Quality Plans • Rig site quality Plan • Detailed Job procedures
  • 5.
    Completions / Workovers •Mechanical needs for Improvement in ESP run life – Cable Clamps – Proper rated cables and equipment in the well – Wellbore clean out after Frac » Viscous pills to kill formations and control losses » W/O rig w/ work string – high rates / reverse circulation to wash sand out » Washdown screens
  • 6.
    – Fluid Lossduring ESP change outs » Viscous pills to control losses » Filtration of completion fluids » Mechanical barriers – downhole shutoff – Solids or fines control » Screen below packer » Different types of screen » Low cost sand control – Dual ESP’s or ESP and Jet Pump combination
  • 7.
  • 8.
    Water Control Problem: WaterConing Possible Solution: Cement Off Lower Perfs
  • 9.
    Water Control Problem: HighPerm Streaks Possible Solution: 1)Treat with Perm Modifier Chemical, 2) Manage water injection
  • 10.
    Completions / Workovers 2.Water Control • ????Squeeze off formations • Chemical to change the reservoir permibility – Bright Water – bp Technology – ?? Halliburton and Schlumberger and others • Downhole sink completion method - (this method produces the water from below the WOC to reduce the coning effect near the wellbore, allowing for great effects from the waterflood). • Service company – chemical treatments • Easywell constrictors • Logging and traciers to see where the water is coming from • Balancing water injection
  • 11.
    3. Scale andCorrosion • Continuous Chemical injection – Down annulus – Down tubing • Batch inhibitor treatment - Pump a large volume of inhibitor into the annulus perodically • QA/QC – Inhibitor testing on oil & water for emulsions – Inhibitor testing on the pump and cable elastomers