SlideShare a Scribd company logo
1 of 28
Download to read offline
© Lean & Mean Consulting. All rights reserved. 2015
07/ 16
Visual Management
 Visual Controls
 Visual Displays
 Visual Metrics
World-Class Standards of Operational Excellence
2
Learning Objectives
1. Appreciate how Visual Management supports the Zero Injury
Safety Culture
2. Understand that Visual Management is an integral part of the
Continuous Improvement transformation
3. Become familiar with common visual tools such as Andon,
Red Tagging, MOS boards, Kanban, error-proofing, standard
work, OEE boards, etc.
4. Gain knowledge on how to apply visual tools to add structure
and stability to operations, reducing variation and increasing
efficiency
3
 Introduction
 5S - The foundation for a
visual workplace
 Types of visual
management
 Visual display
 Visual metrics
 Visual control
Contents
 Common visual tools
 Activity Boards
 MOS, OEE,
 Hourly attainment
 Standard work
 Kanban
1
Visual Controls / Visual Metrics / Visual Displays
Module. 07
5
What is Visual Management
 Visual Management enhances the smooth flow of information by using
visual and audio signals instead of texts or other written instructions
 Visual Management is the concept of making a workplace safe and more
effective by making the current condition of a workplace obvious at a
glance
 Visual Management includes a set of techniques that makes operation
standards visible so that people can follow them more easily
 These techniques expose waste so that it can be prevented and
eliminated
6
The name given to a whole range of activities for communicating
and controlling what needs to be done.
What is this?
Fundamentals of Gemba House
Visual Management
Visual Management
7
Fundamentals of Gemba House
Visual Management
Visual Management allows us to:
• See abnormal conditions as soon as they occur.
• Tell at a glance how we are doing.
8
• Safety & Health Information
• Identification of people, places and objects
• Procedures and methods of work
• Quality standards, instructions, results
• Status visibility
• Problem visibility
• Scheduling
• Communication
Types of Visual Management
9
Visual Controls
9
EVERYDAY
VISUAL CONTROLS
10
5 Disciplines for a Successful Visual
Management System
Disciplines Description
Project
identification
• Define implementation areas and establish current
conditions and baselines
Workplace organization • Implement 6S as a strong foundation
Visual display • Create a visual communication system providing the right
information in the right format at the point of need
Visual metrics • Quantify the path to targets for success
Visual control • Create an error-proofed environment to promote easy
adherence to standards
11
 5S workplace organization
can be enhanced by the use
of visual tools
 Visual tools help you to
monitor results and look for
things easily and quickly
Creating a Visual Workplace
Note: Visual management IS NOT decoration !
12
3 Types of Visual Management
• Label to make it perfectly clear where
things belong and what the procedures are
• Shadow boards, boundary samples
Visual Display
• Quantify the path to targets for success
• OEE Boards, MOS Boards, Attainment
Boards
Visual Metrics
• Create an error-proofed environment to
promote easy adherence to standards
• Poke Yoke, Red Rabbits
Visual Controls
13
Visual Displays
 Make it clear when something is out of place or
missing
 Labeling is mandatory to make it obvious where
things belong
 Labels are for everyone: those working in the area,
those that are new to the area, and those that might
need to know things about the area.
14
Examples of Visual Display
Floor markings
Bin labels for different components
Scheduling
Labels to identify documentation locations
Temporary work station or activity
15
 Andon refers to any visual display that
shows status information
 Andon is the Japanese word for paper
lantern
 Serves as warning system to signal and
identify problems in the process
What is an Andon?
16
Andon Examples
4 Function andon system
Warning sensors linked to andon
and/or audio device
Andon escalation process
17
Visual Metrics
 Allow everyone to “know the score” and they make out-of-
standard situations immediately obvious
 Enables everyone to ‘see’ how we’re performing
 Helps highlight problems, or variances from standard
 Encourages employee involvement and open discussions
 Facilitates the communication and identification of areas that
need improvement
18
• Gaps? Trends?What is
happening?
• Root causes?Why?
• Correct the problem –
implement containment
action?
• Prevent the problem –
permanent corrective action?
What needs to
be done?
• Who does what?
• Any support needed?
Who is going to
do it?
• Prioritization?
• Deadline?
• Milestones?
When is it going
to be done?
Example of Visual Metrics
Manufacturing Operating System (MOS)
Visual Metrics provide a mechanism to
take action…
19
 Create an error-proofed environment
 Promote easy adherence to standards
 Display goals and targets
 Are simple devices or visual standards to help prevent
mistakes
 Make it easy to find things
Visual Controls
20
Examples of Visual Control
E-stopLabeling of disposal bins Requirements
Lock out procedure Stop before proceeding
Shadow Board
21
 Error-proofing refers to
techniques that make it
impossible to make mistakes
 Also known as Poka Yoke
 Error-proofing helps people
and processes work right the
first time
Error-proofing
22
Error-Proofing Has Dual Focus
DefectsMistakesProcess
Prevention
Poka-Yoke that focuses here works
on mistake prevention or making
mistakes impossible.
Detection
Poka-Yoke that focuses here
works on mistake detection, or
making sure mistakes do not turn
into defects.
People and systems do make mistakes.
A portion of mistakes turn into defects.
Visual Controls / Visual Metrics / Visual Displays
Module. 07
24
What is an Activity Board?
 Activity board is a visual tool to guide teams to action
 It is a visual scorecard for the team’s progress toward
company, departmental and team visions and targets
 It keeps everyone’s attention on the project, using colors and
graphs to make information clear to everyone who sees it
 Is a focal point for team meetings, and a place for
management’s feedback and encouragement
Key TPM Tools
25
MOS Board OEE Board
Post the applicable schedule at each activity
board so it is clear:
• when the meetings occur
• who needs to be present
• what information will be reviewed
Examples of Activity Boards
26
Example of Hourly Attainment Board
HOURLY ATTAINMENT BOARD Line X
27
 Visual management is an essential part of a Lean
management system
 Visual management uses displays, metrics and controls
to help establish and maintain continuous flow
 Visual tools reinforce standards, and help people detect
abnormalities at a glance
 For visual management be effective and sustainable, it
has to be integrated and align with management
standard work - MOS, OEE, BP – the way we manage the
business
Summary
28© Lean & Mean Consulting. All rights reserved. 2016

More Related Content

What's hot

Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
Manufacturing Excellence - Visual Factory
Manufacturing Excellence - Visual FactoryManufacturing Excellence - Visual Factory
Manufacturing Excellence - Visual FactoryPatrick Françoisse
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvementAdrian Oprea
 
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
5s training slides_432
5s training slides_4325s training slides_432
5s training slides_432Mahesh Kumar
 
5 s and workplace productivity cet
5 s and workplace productivity cet5 s and workplace productivity cet
5 s and workplace productivity cetMarlon Grande
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can seeRenee Troughton
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAMDEEPAK SAHOO
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementationsudarshan jadwal
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 sZakir Husain
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleFrank-G. Adler
 
How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.Shara Cuyno
 
5 s in office environment
5 s in office environment5 s in office environment
5 s in office environmentchaqcs
 

What's hot (20)

Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Manufacturing Excellence - Visual Factory
Manufacturing Excellence - Visual FactoryManufacturing Excellence - Visual Factory
Manufacturing Excellence - Visual Factory
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
 
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
 
5s training slides_432
5s training slides_4325s training slides_432
5s training slides_432
 
5 s and workplace productivity cet
5 s and workplace productivity cet5 s and workplace productivity cet
5 s and workplace productivity cet
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can see
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
 
5S Complete Implementation Guide
5S Complete Implementation Guide 5S Complete Implementation Guide
5S Complete Implementation Guide
 
TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 
5s and kaizen
5s and kaizen5s and kaizen
5s and kaizen
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 
5 s
5 s5 s
5 s
 
Standard work
Standard workStandard work
Standard work
 
How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training Module
 
How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.
 
Autonomous maintenance preview
Autonomous maintenance previewAutonomous maintenance preview
Autonomous maintenance preview
 
5 s in office environment
5 s in office environment5 s in office environment
5 s in office environment
 

Viewers also liked

8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)Zeeshan Syed
 
Kaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_previewKaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_previewJaroslaw Gadek, MBA
 
Lean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introLean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introJaroslaw Gadek, MBA
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance DEEPAK SAHOO
 
PC&L: Production Control and Logistics
PC&L: Production Control and LogisticsPC&L: Production Control and Logistics
PC&L: Production Control and LogisticsJaroslaw Gadek, MBA
 
Leveling production sap-support_intro
Leveling production sap-support_introLeveling production sap-support_intro
Leveling production sap-support_introJaroslaw Gadek, MBA
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools 博行 門眞
 
Autonomous Maintenance Presentation
Autonomous Maintenance PresentationAutonomous Maintenance Presentation
Autonomous Maintenance PresentationAbdul Rehman Ghauri
 

Viewers also liked (20)

5S & Safety
5S & Safety5S & Safety
5S & Safety
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
Tpm preview
Tpm previewTpm preview
Tpm preview
 
Kaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_previewKaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_preview
 
Lean leadership preview
Lean leadership previewLean leadership preview
Lean leadership preview
 
VSM Lean Value Stream intro
VSM Lean Value Stream introVSM Lean Value Stream intro
VSM Lean Value Stream intro
 
Problem solving preview
Problem solving previewProblem solving preview
Problem solving preview
 
Lean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introLean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_intro
 
Smed simulation game_intro
Smed simulation game_introSmed simulation game_intro
Smed simulation game_intro
 
Visual Factory
Visual FactoryVisual Factory
Visual Factory
 
Kanban pull flow_intro
Kanban pull flow_introKanban pull flow_intro
Kanban pull flow_intro
 
Standard operations preview
Standard operations previewStandard operations preview
Standard operations preview
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
PC&L: Production Control and Logistics
PC&L: Production Control and LogisticsPC&L: Production Control and Logistics
PC&L: Production Control and Logistics
 
Leveling production sap-support_intro
Leveling production sap-support_introLeveling production sap-support_intro
Leveling production sap-support_intro
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
5 S Sample
5 S Sample5 S Sample
5 S Sample
 
Autonomous Maintenance Presentation
Autonomous Maintenance PresentationAutonomous Maintenance Presentation
Autonomous Maintenance Presentation
 
SMED Training
SMED Training SMED Training
SMED Training
 

Similar to Visual controls &_management_preview

VISUAL CONTROLS - Mieruka
VISUAL CONTROLS - MierukaVISUAL CONTROLS - Mieruka
VISUAL CONTROLS - Mierukaadcom2015
 
Value Summary 2.0 Overview
Value Summary 2.0 OverviewValue Summary 2.0 Overview
Value Summary 2.0 Overviewbpatterson888
 
Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015
Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015 Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015
Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015 CA CISA Jayjit Biswas
 
Driving Continuous Improvement with Standard Work and SOPs
Driving Continuous Improvement with Standard Work and SOPsDriving Continuous Improvement with Standard Work and SOPs
Driving Continuous Improvement with Standard Work and SOPsCIToolkit
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdfPrabagaraneRamachand1
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdfPrabagaraneRamachand1
 
The Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemThe Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemCIToolkit
 
OE 4.0 and the Autonomous Plant
OE 4.0 and the Autonomous PlantOE 4.0 and the Autonomous Plant
OE 4.0 and the Autonomous PlantYokogawa1
 
Creating Intelligent SOPs with VKS - Using the DMAIC Approach
Creating Intelligent SOPs with VKS - Using the DMAIC ApproachCreating Intelligent SOPs with VKS - Using the DMAIC Approach
Creating Intelligent SOPs with VKS - Using the DMAIC ApproachVKS - Visual Knowledge Share
 
GRCSG2014_Kumar_Lessons for ensuring_F2E [Compatibility Mode]
GRCSG2014_Kumar_Lessons for ensuring_F2E [Compatibility Mode]GRCSG2014_Kumar_Lessons for ensuring_F2E [Compatibility Mode]
GRCSG2014_Kumar_Lessons for ensuring_F2E [Compatibility Mode]Barun Kumar
 
5S present.pptx
5S present.pptx5S present.pptx
5S present.pptxSemra D.
 
Intelligent Process Management
Intelligent Process ManagementIntelligent Process Management
Intelligent Process ManagementDafna Levy
 
Mastering the Huddle Office of Lean Transformation
Mastering the Huddle Office of Lean TransformationMastering the Huddle Office of Lean Transformation
Mastering the Huddle Office of Lean TransformationAmanda Gilmore
 

Similar to Visual controls &_management_preview (20)

VISUAL CONTROLS - Mieruka
VISUAL CONTROLS - MierukaVISUAL CONTROLS - Mieruka
VISUAL CONTROLS - Mieruka
 
Value Summary 2.0 Overview
Value Summary 2.0 OverviewValue Summary 2.0 Overview
Value Summary 2.0 Overview
 
Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015
Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015 Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015
Segregation of duties in SAP @ ISACA Pune presentation on 18.4.2015
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Core Lean Tools
Core Lean ToolsCore Lean Tools
Core Lean Tools
 
5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
 
Visual control
Visual controlVisual control
Visual control
 
Establishing a Visual Workplace with 5S and Lean (2).pdf
Establishing a Visual Workplace with 5S and Lean (2).pdfEstablishing a Visual Workplace with 5S and Lean (2).pdf
Establishing a Visual Workplace with 5S and Lean (2).pdf
 
Driving Continuous Improvement with Standard Work and SOPs
Driving Continuous Improvement with Standard Work and SOPsDriving Continuous Improvement with Standard Work and SOPs
Driving Continuous Improvement with Standard Work and SOPs
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
 
The Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemThe Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management System
 
Mtug dev ops
Mtug   dev opsMtug   dev ops
Mtug dev ops
 
OE 4.0 and the Autonomous Plant
OE 4.0 and the Autonomous PlantOE 4.0 and the Autonomous Plant
OE 4.0 and the Autonomous Plant
 
Creating Intelligent SOPs with VKS - Using the DMAIC Approach
Creating Intelligent SOPs with VKS - Using the DMAIC ApproachCreating Intelligent SOPs with VKS - Using the DMAIC Approach
Creating Intelligent SOPs with VKS - Using the DMAIC Approach
 
GRCSG2014_Kumar_Lessons for ensuring_F2E [Compatibility Mode]
GRCSG2014_Kumar_Lessons for ensuring_F2E [Compatibility Mode]GRCSG2014_Kumar_Lessons for ensuring_F2E [Compatibility Mode]
GRCSG2014_Kumar_Lessons for ensuring_F2E [Compatibility Mode]
 
20200212 marzia arico sd ss horrors and heroes issip speaker series feb 12
20200212 marzia arico sd ss horrors and heroes issip speaker series feb 1220200212 marzia arico sd ss horrors and heroes issip speaker series feb 12
20200212 marzia arico sd ss horrors and heroes issip speaker series feb 12
 
5S present.pptx
5S present.pptx5S present.pptx
5S present.pptx
 
Intelligent Process Management
Intelligent Process ManagementIntelligent Process Management
Intelligent Process Management
 
Mastering the Huddle Office of Lean Transformation
Mastering the Huddle Office of Lean TransformationMastering the Huddle Office of Lean Transformation
Mastering the Huddle Office of Lean Transformation
 

Recently uploaded

꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
办理(PITT毕业证书)美国匹兹堡大学毕业证成绩单原版一比一
办理(PITT毕业证书)美国匹兹堡大学毕业证成绩单原版一比一办理(PITT毕业证书)美国匹兹堡大学毕业证成绩单原版一比一
办理(PITT毕业证书)美国匹兹堡大学毕业证成绩单原版一比一F La
 
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一fhhkjh
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERunosafeads
 
VDA 6.3 Process Approach in Automotive Industries
VDA 6.3 Process Approach in Automotive IndustriesVDA 6.3 Process Approach in Automotive Industries
VDA 6.3 Process Approach in Automotive IndustriesKannanDN
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607dollysharma2066
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样whjjkkk
 
Call Girls in Karachi | +923081633338 | Karachi Call Girls
Call Girls in Karachi  | +923081633338 | Karachi Call GirlsCall Girls in Karachi  | +923081633338 | Karachi Call Girls
Call Girls in Karachi | +923081633338 | Karachi Call GirlsAyesha Khan
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样gfghbihg
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一ga6c6bdl
 
Digamma / CertiCon Company Presentation
Digamma / CertiCon Company  PresentationDigamma / CertiCon Company  Presentation
Digamma / CertiCon Company PresentationMihajloManjak
 
Independent Andheri Call Girls 9833363713
Independent Andheri Call Girls 9833363713Independent Andheri Call Girls 9833363713
Independent Andheri Call Girls 9833363713Komal Khan
 
907MTAMount Coventry University Bachelor's Diploma in Engineering
907MTAMount Coventry University Bachelor's Diploma in Engineering907MTAMount Coventry University Bachelor's Diploma in Engineering
907MTAMount Coventry University Bachelor's Diploma in EngineeringFi sss
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxDineshKumar4165
 
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 HybridHyundai Motor Group
 
Dubai Call Girls Services Call 09900000000
Dubai Call Girls Services Call 09900000000Dubai Call Girls Services Call 09900000000
Dubai Call Girls Services Call 09900000000Komal Khan
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样umasea
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Roomdivyansh0kumar0
 
BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024AHOhOops1
 

Recently uploaded (20)

꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
办理(PITT毕业证书)美国匹兹堡大学毕业证成绩单原版一比一
办理(PITT毕业证书)美国匹兹堡大学毕业证成绩单原版一比一办理(PITT毕业证书)美国匹兹堡大学毕业证成绩单原版一比一
办理(PITT毕业证书)美国匹兹堡大学毕业证成绩单原版一比一
 
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
 
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHERUNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
UNOSAFE ELEVATOR PRIVATE LTD BANGALORE BROUCHER
 
VDA 6.3 Process Approach in Automotive Industries
VDA 6.3 Process Approach in Automotive IndustriesVDA 6.3 Process Approach in Automotive Industries
VDA 6.3 Process Approach in Automotive Industries
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
 
Call Girls in Karachi | +923081633338 | Karachi Call Girls
Call Girls in Karachi  | +923081633338 | Karachi Call GirlsCall Girls in Karachi  | +923081633338 | Karachi Call Girls
Call Girls in Karachi | +923081633338 | Karachi Call Girls
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
 
Digamma / CertiCon Company Presentation
Digamma / CertiCon Company  PresentationDigamma / CertiCon Company  Presentation
Digamma / CertiCon Company Presentation
 
Independent Andheri Call Girls 9833363713
Independent Andheri Call Girls 9833363713Independent Andheri Call Girls 9833363713
Independent Andheri Call Girls 9833363713
 
907MTAMount Coventry University Bachelor's Diploma in Engineering
907MTAMount Coventry University Bachelor's Diploma in Engineering907MTAMount Coventry University Bachelor's Diploma in Engineering
907MTAMount Coventry University Bachelor's Diploma in Engineering
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
 
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
2024 WRC Hyundai World Rally Team’s i20 N Rally1 Hybrid
 
Dubai Call Girls Services Call 09900000000
Dubai Call Girls Services Call 09900000000Dubai Call Girls Services Call 09900000000
Dubai Call Girls Services Call 09900000000
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
 
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Servicesauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
 
BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024BLUE VEHICLES the kids picture show 2024
BLUE VEHICLES the kids picture show 2024
 

Visual controls &_management_preview

  • 1. © Lean & Mean Consulting. All rights reserved. 2015 07/ 16 Visual Management  Visual Controls  Visual Displays  Visual Metrics World-Class Standards of Operational Excellence
  • 2. 2 Learning Objectives 1. Appreciate how Visual Management supports the Zero Injury Safety Culture 2. Understand that Visual Management is an integral part of the Continuous Improvement transformation 3. Become familiar with common visual tools such as Andon, Red Tagging, MOS boards, Kanban, error-proofing, standard work, OEE boards, etc. 4. Gain knowledge on how to apply visual tools to add structure and stability to operations, reducing variation and increasing efficiency
  • 3. 3  Introduction  5S - The foundation for a visual workplace  Types of visual management  Visual display  Visual metrics  Visual control Contents  Common visual tools  Activity Boards  MOS, OEE,  Hourly attainment  Standard work  Kanban
  • 4. 1 Visual Controls / Visual Metrics / Visual Displays Module. 07
  • 5. 5 What is Visual Management  Visual Management enhances the smooth flow of information by using visual and audio signals instead of texts or other written instructions  Visual Management is the concept of making a workplace safe and more effective by making the current condition of a workplace obvious at a glance  Visual Management includes a set of techniques that makes operation standards visible so that people can follow them more easily  These techniques expose waste so that it can be prevented and eliminated
  • 6. 6 The name given to a whole range of activities for communicating and controlling what needs to be done. What is this? Fundamentals of Gemba House Visual Management Visual Management
  • 7. 7 Fundamentals of Gemba House Visual Management Visual Management allows us to: • See abnormal conditions as soon as they occur. • Tell at a glance how we are doing.
  • 8. 8 • Safety & Health Information • Identification of people, places and objects • Procedures and methods of work • Quality standards, instructions, results • Status visibility • Problem visibility • Scheduling • Communication Types of Visual Management
  • 10. 10 5 Disciplines for a Successful Visual Management System Disciplines Description Project identification • Define implementation areas and establish current conditions and baselines Workplace organization • Implement 6S as a strong foundation Visual display • Create a visual communication system providing the right information in the right format at the point of need Visual metrics • Quantify the path to targets for success Visual control • Create an error-proofed environment to promote easy adherence to standards
  • 11. 11  5S workplace organization can be enhanced by the use of visual tools  Visual tools help you to monitor results and look for things easily and quickly Creating a Visual Workplace Note: Visual management IS NOT decoration !
  • 12. 12 3 Types of Visual Management • Label to make it perfectly clear where things belong and what the procedures are • Shadow boards, boundary samples Visual Display • Quantify the path to targets for success • OEE Boards, MOS Boards, Attainment Boards Visual Metrics • Create an error-proofed environment to promote easy adherence to standards • Poke Yoke, Red Rabbits Visual Controls
  • 13. 13 Visual Displays  Make it clear when something is out of place or missing  Labeling is mandatory to make it obvious where things belong  Labels are for everyone: those working in the area, those that are new to the area, and those that might need to know things about the area.
  • 14. 14 Examples of Visual Display Floor markings Bin labels for different components Scheduling Labels to identify documentation locations Temporary work station or activity
  • 15. 15  Andon refers to any visual display that shows status information  Andon is the Japanese word for paper lantern  Serves as warning system to signal and identify problems in the process What is an Andon?
  • 16. 16 Andon Examples 4 Function andon system Warning sensors linked to andon and/or audio device Andon escalation process
  • 17. 17 Visual Metrics  Allow everyone to “know the score” and they make out-of- standard situations immediately obvious  Enables everyone to ‘see’ how we’re performing  Helps highlight problems, or variances from standard  Encourages employee involvement and open discussions  Facilitates the communication and identification of areas that need improvement
  • 18. 18 • Gaps? Trends?What is happening? • Root causes?Why? • Correct the problem – implement containment action? • Prevent the problem – permanent corrective action? What needs to be done? • Who does what? • Any support needed? Who is going to do it? • Prioritization? • Deadline? • Milestones? When is it going to be done? Example of Visual Metrics Manufacturing Operating System (MOS) Visual Metrics provide a mechanism to take action…
  • 19. 19  Create an error-proofed environment  Promote easy adherence to standards  Display goals and targets  Are simple devices or visual standards to help prevent mistakes  Make it easy to find things Visual Controls
  • 20. 20 Examples of Visual Control E-stopLabeling of disposal bins Requirements Lock out procedure Stop before proceeding Shadow Board
  • 21. 21  Error-proofing refers to techniques that make it impossible to make mistakes  Also known as Poka Yoke  Error-proofing helps people and processes work right the first time Error-proofing
  • 22. 22 Error-Proofing Has Dual Focus DefectsMistakesProcess Prevention Poka-Yoke that focuses here works on mistake prevention or making mistakes impossible. Detection Poka-Yoke that focuses here works on mistake detection, or making sure mistakes do not turn into defects. People and systems do make mistakes. A portion of mistakes turn into defects.
  • 23. Visual Controls / Visual Metrics / Visual Displays Module. 07
  • 24. 24 What is an Activity Board?  Activity board is a visual tool to guide teams to action  It is a visual scorecard for the team’s progress toward company, departmental and team visions and targets  It keeps everyone’s attention on the project, using colors and graphs to make information clear to everyone who sees it  Is a focal point for team meetings, and a place for management’s feedback and encouragement Key TPM Tools
  • 25. 25 MOS Board OEE Board Post the applicable schedule at each activity board so it is clear: • when the meetings occur • who needs to be present • what information will be reviewed Examples of Activity Boards
  • 26. 26 Example of Hourly Attainment Board HOURLY ATTAINMENT BOARD Line X
  • 27. 27  Visual management is an essential part of a Lean management system  Visual management uses displays, metrics and controls to help establish and maintain continuous flow  Visual tools reinforce standards, and help people detect abnormalities at a glance  For visual management be effective and sustainable, it has to be integrated and align with management standard work - MOS, OEE, BP – the way we manage the business Summary
  • 28. 28© Lean & Mean Consulting. All rights reserved. 2016