The document provides a 28-point checklist for laying signal and telecommunication cables in railways. It outlines steps to check the approved cable route plan, proper permissions, excavation depth and width, distance between cables, insulation resistance values, cable markers, and documentation of parameters verified during the cable laying process. Verification includes checking the excavation, cable placement, protection measures at road/track crossings, separation of cable types, and restoration of surfaces disturbed during installation. Proper documentation in registers and diaries is also included in the checklist.