1. Check and verify the approved cable route plan
2. Check marking at site is done as per cable route plan
3. Check proper permission is obtained before the work commences
4. Check the excavation is done properly with 1 m depth and 0.35m width and trench is straight as far
as possible and steep angle is avoided
5. Check for minimum depth is not less than 300 mm with RCC pipes in Hard murrum
6. Check in rocky soil concreting is done for a depth of 150mm above the cable
7. Check the bottom of the trench is levelled and there should not be any sharp materials
8. Check 10 cm distance is maintained between signal and telecommunication cables
9. Check and ensure no earth is thrown on the ballast
10. Check 75 mm sand bed is provided in the trench above and below the cable
11. Check for good quality country bricks of size 220mmx100mmx60mm ( Check size as per contract)are
placed closely breadthwise without any gap
12. Check minimum distance between signalling cables and OHE mast or switching station earth is 1 m
and cable laid in concrete pipe/ heavy duty HDPE pipe/ split RCC pipe up to 300 m from either edge
of substation / if no protection given the distance is 5 m from station earth
13. Check depth of cable and distance from the OHE mast for 0.5 m depth 1.0 m distance if no protection
and 0.5 m if laid in concrete pipe/ heavy duty HDPE pipes/ Ducts up to 3 m on either side of mast. If
the depth is more than 0.5 m than the distance shall be 3 m.
14. Check cable coil pit size 1.0 mx1.0mx1.0m(depth) in rear of location boxes and 2.0mx2.0mx1.5m in
rear of relay rooms and cable huts. Also check bricks are placed without any gap above the coil and
refilled with earth and consolidated
15. Check In station yard cables are protected by laying in buried RCC duct/DWC HDPE pipe
16. Check cable trench is not less than 5.5 m from the centre of the nearest track on outside station
limits & In station limits, the trenches shall be at a distance of not less than 3 m from the centre of
the track, width of the trench being outside the 3 m distance.
17. Check trench crossing of cables through track / road is done at right angles
18. Check no cable trench crossing is made in between or inside point and crossing
19. Check RCC pipe 150 mm ID/DWC HDPE pipe 175 ID is used in road/track crossing and two numbers
of 2.0 m RCC/DWCHDPE pipe with collar provided in track crossing, similarly RCC pipe with collar
two numbers of 2.0 m for road crossing are provided.
20. Check when cable trench is on the platform sufficient depth and width to accommodate the
additional cables laid. Covering is done with slabs removed or broken or with new slabs or cement
mortar to restore it to original condition.
21. Check the depth and width of trench, quality of bricks, sand & cushion then allow the cable laying
22. Check the insulation resistance values and it should not be less than 500 Mega Ohm per KM at 20
Deg C
23. Check at least 6 to 8 m of cable (coil) provide at either end for main/tail and power cables
24. Check the signal cables are separated from power cables by row of brick (length wise approximately
five bricks per metre) in between them
25. Check order of cables place from nearest track first telecom, second signal, third power also check
No DoT cable or Electrical cable is laid on same trench
26. Check the signalling and power cables are laid close to the track and in block section the distance is
maximum 6 m
27. Check Cable markers made of 1:3:6 concrete as per approved drawing and fixed at an interval of 30
m throughout route, either side of track /road crossing and at diversions.
28. Check and enter the parameter verified such as depth, width distance, length etc in the register, DPR
and site diary
End of check sheet

More Related Content

What's hot

SUBSTATION-30-06-2016-LEVEL -2 BASEMENT
SUBSTATION-30-06-2016-LEVEL -2 BASEMENTSUBSTATION-30-06-2016-LEVEL -2 BASEMENT
SUBSTATION-30-06-2016-LEVEL -2 BASEMENTAtang Maphela
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
Alexander Decker
 
GRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
GRC Cable Trough & Elevated Channel - Rail Cable Protection & SupportGRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
GRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
Thorne & Derrick International
 
BR02 Proposed Foundation Plan
BR02 Proposed Foundation PlanBR02 Proposed Foundation Plan
BR02 Proposed Foundation Plansarah ralphs
 
MSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation GuideMSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation Guide
ibrahimnabil17
 
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Thorne & Derrick International
 
Item 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm DrainsItem 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm Drains
King Angco
 
S966 magnesium anode
S966 magnesium anodeS966 magnesium anode
S966 magnesium anode
Hedi Mohamed
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
Southampton Solent University
 
Pipeline construction management
Pipeline construction managementPipeline construction management
Pipeline construction management
Farraz Sarmento Salim
 
Intake and Pipes joining
Intake and Pipes joiningIntake and Pipes joining
Intake and Pipes joining
Lobsang Jampa
 
Ball mill liner
Ball mill linerBall mill liner
Ball mill liner
guo gaby
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
Stephen Nzima
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1David Dinsdale
 
Signature bridge pdf
Signature bridge pdfSignature bridge pdf
Signature bridge pdf
Bhismo Dev
 
RIW Cementjoint Datasheet
RIW Cementjoint DatasheetRIW Cementjoint Datasheet
RIW Cementjoint Datasheet
RIW Ltd
 
05.chapter iii
05.chapter iii05.chapter iii
05.chapter iiiGTVT
 
Etc spark tester
Etc spark testerEtc spark tester
Etc spark tester
Fakhruddin Gandhi
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
Arissa Loh
 

What's hot (20)

SUBSTATION-30-06-2016-LEVEL -2 BASEMENT
SUBSTATION-30-06-2016-LEVEL -2 BASEMENTSUBSTATION-30-06-2016-LEVEL -2 BASEMENT
SUBSTATION-30-06-2016-LEVEL -2 BASEMENT
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 
GRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
GRC Cable Trough & Elevated Channel - Rail Cable Protection & SupportGRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
GRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
 
BR02 Proposed Foundation Plan
BR02 Proposed Foundation PlanBR02 Proposed Foundation Plan
BR02 Proposed Foundation Plan
 
MSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation GuideMSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation Guide
 
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
 
Item 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm DrainsItem 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm Drains
 
S966 magnesium anode
S966 magnesium anodeS966 magnesium anode
S966 magnesium anode
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
 
Pipeline construction management
Pipeline construction managementPipeline construction management
Pipeline construction management
 
Intake and Pipes joining
Intake and Pipes joiningIntake and Pipes joining
Intake and Pipes joining
 
Ball mill liner
Ball mill linerBall mill liner
Ball mill liner
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
Signature bridge pdf
Signature bridge pdfSignature bridge pdf
Signature bridge pdf
 
RIW Cementjoint Datasheet
RIW Cementjoint DatasheetRIW Cementjoint Datasheet
RIW Cementjoint Datasheet
 
05.chapter iii
05.chapter iii05.chapter iii
05.chapter iii
 
precast manholes
precast manholesprecast manholes
precast manholes
 
Etc spark tester
Etc spark testerEtc spark tester
Etc spark tester
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 

Similar to VG check list for S & T cable laying

Yard and Rack Area Piping.pdf
Yard and Rack Area Piping.pdfYard and Rack Area Piping.pdf
Yard and Rack Area Piping.pdf
NoorulK
 
electrical regulation ppt 0123321123333333
electrical regulation ppt 0123321123333333electrical regulation ppt 0123321123333333
electrical regulation ppt 0123321123333333
FranklinCaleJr1
 
METHOD OF WIRINGS.pdf
METHOD OF WIRINGS.pdfMETHOD OF WIRINGS.pdf
METHOD OF WIRINGS.pdf
DonaldBohol1
 
electrical cable crossing.pdf
electrical cable crossing.pdfelectrical cable crossing.pdf
electrical cable crossing.pdf
ssuser01e374
 
Steel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industrySteel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industry
Akshay Toraskar
 
Installing a shallow horizontal CP groundbed in West Georgia
Installing a shallow horizontal CP groundbed in West GeorgiaInstalling a shallow horizontal CP groundbed in West Georgia
Installing a shallow horizontal CP groundbed in West Georgia
Alberto Del Moro
 
Power system earthing
Power system earthingPower system earthing
Power system earthing
Nisarg Amin
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
Southern Railway
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
Pravin Gaurav
 
Tunneling
Tunneling Tunneling
Tunneling
ila vamsi krishna
 
Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
FAISAL ANSARI
 
Laying of Underground Cables in INSTALLATION AND MAINTENANCE OF ELECTRICAL EQ...
Laying of Underground Cables in INSTALLATION AND MAINTENANCE OF ELECTRICAL EQ...Laying of Underground Cables in INSTALLATION AND MAINTENANCE OF ELECTRICAL EQ...
Laying of Underground Cables in INSTALLATION AND MAINTENANCE OF ELECTRICAL EQ...
AkankshaSharma570781
 
Laying of Underground Cables.pptx
Laying of Underground Cables.pptxLaying of Underground Cables.pptx
Laying of Underground Cables.pptx
DrAkankshaSharma4
 
A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...
nasina balasubrahmayam
 
Buried Instln Pract for FOC Technical Presentation
Buried Instln Pract for FOC Technical PresentationBuried Instln Pract for FOC Technical Presentation
Buried Instln Pract for FOC Technical PresentationKamran Bashir
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
PrateekVerma111
 
Electrical services
Electrical servicesElectrical services
Electrical services
Piyush Purshottam Lalwani
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
ssuser480182
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
Amit Kumar
 

Similar to VG check list for S & T cable laying (20)

Yard and Rack Area Piping.pdf
Yard and Rack Area Piping.pdfYard and Rack Area Piping.pdf
Yard and Rack Area Piping.pdf
 
electrical regulation ppt 0123321123333333
electrical regulation ppt 0123321123333333electrical regulation ppt 0123321123333333
electrical regulation ppt 0123321123333333
 
METHOD OF WIRINGS.pdf
METHOD OF WIRINGS.pdfMETHOD OF WIRINGS.pdf
METHOD OF WIRINGS.pdf
 
electrical cable crossing.pdf
electrical cable crossing.pdfelectrical cable crossing.pdf
electrical cable crossing.pdf
 
Steel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industrySteel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industry
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
Installing a shallow horizontal CP groundbed in West Georgia
Installing a shallow horizontal CP groundbed in West GeorgiaInstalling a shallow horizontal CP groundbed in West Georgia
Installing a shallow horizontal CP groundbed in West Georgia
 
Power system earthing
Power system earthingPower system earthing
Power system earthing
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
Tunneling
Tunneling Tunneling
Tunneling
 
Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
 
Laying of Underground Cables in INSTALLATION AND MAINTENANCE OF ELECTRICAL EQ...
Laying of Underground Cables in INSTALLATION AND MAINTENANCE OF ELECTRICAL EQ...Laying of Underground Cables in INSTALLATION AND MAINTENANCE OF ELECTRICAL EQ...
Laying of Underground Cables in INSTALLATION AND MAINTENANCE OF ELECTRICAL EQ...
 
Laying of Underground Cables.pptx
Laying of Underground Cables.pptxLaying of Underground Cables.pptx
Laying of Underground Cables.pptx
 
A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...A model support plan for underground coal mines , under regulation 123 of the...
A model support plan for underground coal mines , under regulation 123 of the...
 
Buried Instln Pract for FOC Technical Presentation
Buried Instln Pract for FOC Technical PresentationBuried Instln Pract for FOC Technical Presentation
Buried Instln Pract for FOC Technical Presentation
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
 
Electrical services
Electrical servicesElectrical services
Electrical services
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 

VG check list for S & T cable laying

  • 1. CHECK LIST FOR S & T CABLE LAYING IN RAILWAYS REV-00 1 | P a g e In case of any doubt or corrections please mail to : v.gopal21@gmail.com 1. Check and verify the approved cable route plan 2. Check marking at site is done as per cable route plan 3. Check proper permission is obtained before the work commences 4. Check the excavation is done properly with 1 m depth and 0.35m width and trench is straight as far as possible and steep angle is avoided 5. Check for minimum depth is not less than 300 mm with RCC pipes in Hard murrum 6. Check in rocky soil concreting is done for a depth of 150mm above the cable 7. Check the bottom of the trench is levelled and there should not be any sharp materials 8. Check 10 cm distance is maintained between signal and telecommunication cables 9. Check and ensure no earth is thrown on the ballast 10. Check 75 mm sand bed is provided in the trench above and below the cable 11. Check for good quality country bricks of size 220mmx100mmx60mm ( Check size as per contract)are placed closely breadthwise without any gap 12. Check minimum distance between signalling cables and OHE mast or switching station earth is 1 m and cable laid in concrete pipe/ heavy duty HDPE pipe/ split RCC pipe up to 300 m from either edge of substation / if no protection given the distance is 5 m from station earth 13. Check depth of cable and distance from the OHE mast for 0.5 m depth 1.0 m distance if no protection and 0.5 m if laid in concrete pipe/ heavy duty HDPE pipes/ Ducts up to 3 m on either side of mast. If the depth is more than 0.5 m than the distance shall be 3 m. 14. Check cable coil pit size 1.0 mx1.0mx1.0m(depth) in rear of location boxes and 2.0mx2.0mx1.5m in rear of relay rooms and cable huts. Also check bricks are placed without any gap above the coil and refilled with earth and consolidated 15. Check In station yard cables are protected by laying in buried RCC duct/DWC HDPE pipe 16. Check cable trench is not less than 5.5 m from the centre of the nearest track on outside station limits & In station limits, the trenches shall be at a distance of not less than 3 m from the centre of the track, width of the trench being outside the 3 m distance. 17. Check trench crossing of cables through track / road is done at right angles 18. Check no cable trench crossing is made in between or inside point and crossing 19. Check RCC pipe 150 mm ID/DWC HDPE pipe 175 ID is used in road/track crossing and two numbers of 2.0 m RCC/DWCHDPE pipe with collar provided in track crossing, similarly RCC pipe with collar two numbers of 2.0 m for road crossing are provided. 20. Check when cable trench is on the platform sufficient depth and width to accommodate the additional cables laid. Covering is done with slabs removed or broken or with new slabs or cement mortar to restore it to original condition. 21. Check the depth and width of trench, quality of bricks, sand & cushion then allow the cable laying 22. Check the insulation resistance values and it should not be less than 500 Mega Ohm per KM at 20 Deg C 23. Check at least 6 to 8 m of cable (coil) provide at either end for main/tail and power cables 24. Check the signal cables are separated from power cables by row of brick (length wise approximately five bricks per metre) in between them 25. Check order of cables place from nearest track first telecom, second signal, third power also check No DoT cable or Electrical cable is laid on same trench 26. Check the signalling and power cables are laid close to the track and in block section the distance is maximum 6 m 27. Check Cable markers made of 1:3:6 concrete as per approved drawing and fixed at an interval of 30 m throughout route, either side of track /road crossing and at diversions. 28. Check and enter the parameter verified such as depth, width distance, length etc in the register, DPR and site diary End of check sheet