1. General Check
Þ Check all wiring used in the Cabin and Locations are done in a neat manner so that the
wiring does not in any way prevent the proper functioning over working parts and is easily
accessible for maintenance
Þ Check at all locations and cabins wire entrance of adequate size, conveniently located for
ease of approach to terminals and other equipment so arranged as to protect the wires
from mechanical injury and wire entrance are plugged and sealed with suitable compound
after the wiring is completed
Þ Check Relay to Relay wiring on the same rack is as far as possible be direct without
intermediaries like tag blocks/terminals
Þ Check Identification Marker for Identifying the terminals and tags are provided at each
terminal to identify the circuits for which it is used
Þ Check Relay racks have sufficient capacity to take additional equipment to the extent of
15% of equipment provided to permit additions and alterations.
Þ Verify Charts showing the positions of relays on relay racks and contact arrangement of
relays indicating the spare and used contacts are prepared and kept in the cabin.
2.Indoor Signaling Cable
Indoor Signaling Cable is used for indoor wiring of signaling circuits.
Check following cables are normally being used for indoor signaling applications:
Ø 16/0.2 mm Wiring of Q series and Shelf type Relays
Ø 3/0.75 mm Wiring of shelf type Relays
Ø 1/1.4 mm Wiring of lever lock, Circuit Controller
Ø 7/1.4 mm Power supply – Battery room to Charger and Busbar
Ø 1/ 2.5 mm Wiring of Bootleg ( track Circuit)
Ø 40/0.6 &60/0.6 mm Rack to Rack wiring in metal to metal type Relays
Ø 24/1.0,40/1.0 & 60/1.0 mm Wiring of Control / Relay rack up to Cable termination
Rack for outdoor Circuit ( signal and Point)
Ø 1/0.6 mm Wiring of Tag block to Wiring of Tag block ( except signal and point)
Ø 1/1.0 mm Wiring of Tag block to Tag block ( Signal and Point)
Ø 36/0.3 mm Wiring of Track relays from MDF
Verify Busbar conductors are so chosen that voltage drop is not more than 0.5% of
busbar voltage between battery terminals & busbar in equipment room.
3. Marking and Labelling
Ø Check Conductor marking and labelling aredone by means of plasticferrules with embossed
letters. Alternatively, a chain of pre-embossed plastic ferrules used.
Ø Check Terminal numbers should be properly marked.
CHECK LIST FOR S & T INDOOR & OUTDOOR WIRING-REV-00
2 | P a g e
In case of any doubt or corrections please mail to : v.gopal21@gmail.com
4.Bunching & Lacing
ü Check All the inter-relay wirings and inter rack wiring are neatly bunched in a circular
shape
ü Check Black twine or plastic strip of suitable design are used for lacing of thewires.
5.Soldering Connections
Ø Verify Staff working in the installation and maintenance of S&T equipment are conversant
in use of soldering iron/gun for making good soldering joints.
Ø Ensure care is exercised to avoid dropping of solder particles and wire clipping on adjacent
terminals and apparatus.
Ø Ensure soldering irons of adequate wattage for the type of work done and the following
are on hand:
§ A small file for dressing the soldering tip.
§ A fire-proof pad for wiping the tip.
§ A mica sheet of adequate size or a suitable stand for soldering iron.
§ Electrical soldering irons is switched off when not in use over extended period.
Ø Verify while making a soldering joint, the surface thoroughly cleaned, fluxed andtinned.
Ø Ensure use of too much solder is avoided to prevent lumpy connections.
Ø Ensure soldering iron is not be held on the wire connection for too long to avoid damage to
insulation.
Ø Ensure Imperfect joints are the result of any one of the following causes, which should be
avoided:
• Soldering iron not sufficiently hot.
• Soldering iron held on the connection for sufficient time.
• Unclean terminal or wire
• A solder of improper composition or inferior fluxing agent.
• A newly soldered connection is not be disturbed till the solder has thoroughlycooled.
6.Wire Termination
Ø Ensure while terminating wires, care is taken to bend the wire in clock wisedirection.
Ø Ensure wire strippers used for the purpose of stripping off the wire insulation. Cutting-pliers
are not be used for this purpose.
Ø Check washers and check nuts are used whilst fastening.
Ø Ensure not more than two wires are terminated on one terminal
Ø Ensure multi-strand wires are terminated on terminal lugs and covered with insulation
sleeves.
Ø Ensure wires of cable are neatly terminated and properly bunched.
Ø Ensure connections from and between Secondary cells
Ø Check inter connections between secondary cells, standard lead strips, supplied by the
manufacturer is used.
CHECK LIST FOR S & T INDOOR & OUTDOOR WIRING-REV-00
3 | P a g e
In case of any doubt or corrections please mail to : v.gopal21@gmail.com
Ø Verify flexible multi-strand copper cable PVC insulated single core of nominal Cross
Sectional area 10 Sq.mm. (7/1.4 mm.) is used for wiring between secondary cells to battery
chargers/terminal board. The ends are crimped with a copper ring conductor (eyelet) and
then terminated. However, the voltage drop between battery terminal and bus bar does
not exceed 0.5 V under full load condition.
7.The following colour code of wires are used:
Ensure
Ø Between Battery charger and Red for positive Batteries/ Terminal Board
& Black for negative
Ø Earth connections Grey
Ø AC side wiring - Blue for neutral and Yellow for phase.
8.Earth connections
v Ensure separate earth are provided for each block instrument at a station.
v Check the resistance of earth for signaling circuits does not exceed 10 ohms. If it is not
possible to reduce the earth resistance below 10 ohms additional earth may be provided in
parallel.
v Check Where more than one earth is used, the distance between earthing pipes is not less
than 3 metre. Conductor leading to these earthing is electrically insulated from each other
throughout and also from metallic structures connected to different earths.
9.Earthing Leads
Ø Check earth wires are protected against mechanical damage and possibility of corrosion
particularly at the point of connection of earth electrode.
Ø Verify the earthing lead is of mild steel flat of size 35mm x 6 mm. or copper wire of 29 sq.mm
cross-sectional area (19 strands of 1.4 mm dia). In case the conductor is buried
underground, it is protected from corrosion by an application of suitable anticorrosive paint
o bitumen or varnish. The length of the cable so treated is extend half a metre beyond the
buried length.
Ø Check the earthing lead is soldered or crimped on a lug which should be bolted to the earth
electrode.
10.Conventional Earthing
ü Verify In this type of arrangement, the earthing is achieved with the help of Earth
electrode (normally GI pipe) buried in the ground (earth pit).
ü Check the earth electrode is surrounded by filling material (Common salt and
Charcoal) and it is connected to the equipment with the help of GI or copper wire to
extend earth to the equipment.
ü Verify this type of earthing is normally provided for apparatus cases, signaling cables,
block instruments, conventional power supply equipment etc.
CHECK LIST FOR S & T INDOOR & OUTDOOR WIRING-REV-00
4 | P a g e
In case of any doubt or corrections please mail to : v.gopal21@gmail.com
11.Earthing & Surge protection for S&T installation
Effective or Maintenance-free earthing
Ø Check this type of earthing is provided with earth electrode of a highly conductive,
corrosion-resistant material with low soil resistivity earth enhancement compound
around it.
Ø Verify this arrangement eliminates the drawbacks of conventional earthing such as
corrosion of electrode and high and fluctuating earth resistance.
Ø Check maintenance free earthing is provided for signaling and telecom equipment
with solid state components requiring low earth resistance of the order of 1 Ohm such
as Integrated Power Supply, Digital Axle Counter, Data Logger, Electronic Interlocking
etc.
12.Check Measured Earth resistance value is not more the specified value below
1. Telegraph and Block Instrument using earth return circuit 10 Ω
2. Earths for surge arrestors/ lightening dischargers 10 Ω
3. Earthing of Signaling equipment 10 Ω
4. Earthing of signaling cable screen in AC electrified areas 10 Ω
5. Earthing of Telephone Exchange 5 Ω
6. Earthing of aluminum sheathed telecom cable in AC electrified area 1Ω
7. Earthing of equipment in VF repeater stations and cable huts 5 Ω
8. Axle counter cable screened in AC electrified area 1 Ω
9. Electronic Interlocking installation 1 Ω
10. Integrated Power Supply System & its individual modules 2 Ω
11. Digital Axle Counter EJB and its apparatus case connected to same earth All cable
armours connected to same earth 1 Ω
12. Reset box of Digital Axle Counter connected to earth (indoor) near SM Room 1Ω
13. Tools for Wiring
Ø Stripper and cutter suitable for wires 0.6 sq.mm to 1.5 sq.mm. and 2.5sq.mm.
Ø Crimping tool.
Ø Soldering iron or Soldering Gun of suitable wattage.
Ø Socket set consisting of 19 sockets and other accessories for maintenance of point
machine.
Ø Socket driver tester set.
Ø Screw driver set
Safety and Quality First
**************

More Related Content

What's hot

11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...
Thorne & Derrick International
 
S966 magnesium anode
S966 magnesium anodeS966 magnesium anode
S966 magnesium anode
Hedi Mohamed
 
BTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and AcceptanceBTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and Acceptance
ibrahimnabil17
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
Thorne & Derrick International
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Thorne & Derrick International
 
BR02 Proposed Foundation Plan
BR02 Proposed Foundation PlanBR02 Proposed Foundation Plan
BR02 Proposed Foundation Plansarah ralphs
 
Pfisterer Rail - Connectors, Clamps, Compensating Devices, Insulators & Elect...
Pfisterer Rail - Connectors, Clamps, Compensating Devices, Insulators & Elect...Pfisterer Rail - Connectors, Clamps, Compensating Devices, Insulators & Elect...
Pfisterer Rail - Connectors, Clamps, Compensating Devices, Insulators & Elect...
Thorne & Derrick International
 
Power System Reserves for Installation, Preventative Maintenance and Acceptance
Power System Reserves for Installation, Preventative Maintenance and AcceptancePower System Reserves for Installation, Preventative Maintenance and Acceptance
Power System Reserves for Installation, Preventative Maintenance and Acceptance
ibrahimnabil17
 
RAYCHEM SAUDI ARABIA LTD. (TYCO ELECTRONICS) Raychem terminations for polymer...
RAYCHEM SAUDI ARABIA LTD. (TYCO ELECTRONICS) Raychem terminations for polymer...RAYCHEM SAUDI ARABIA LTD. (TYCO ELECTRONICS) Raychem terminations for polymer...
RAYCHEM SAUDI ARABIA LTD. (TYCO ELECTRONICS) Raychem terminations for polymer...
AKBAR TRADING
 
How To Determine MV-Connex Cable Connectors
How To Determine MV-Connex Cable ConnectorsHow To Determine MV-Connex Cable Connectors
How To Determine MV-Connex Cable Connectors
Thorne & Derrick International
 
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
AKBAR TRADING
 
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
AKBAR TRADING
 
GRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
GRC Cable Trough & Elevated Channel - Rail Cable Protection & SupportGRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
GRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
Thorne & Derrick International
 
Marechal Distribution Boxes - Marechal Express Boxes, Marechal Express Fire B...
Marechal Distribution Boxes - Marechal Express Boxes, Marechal Express Fire B...Marechal Distribution Boxes - Marechal Express Boxes, Marechal Express Fire B...
Marechal Distribution Boxes - Marechal Express Boxes, Marechal Express Fire B...
Thorne & Derrick International
 
Elastimold Loadbreak Elbows 200Amp - Elastimold 166LR
Elastimold Loadbreak Elbows 200Amp - Elastimold 166LRElastimold Loadbreak Elbows 200Amp - Elastimold 166LR
Elastimold Loadbreak Elbows 200Amp - Elastimold 166LR
Thorne & Derrick International
 
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Thorne & Derrick International
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
Thorne & Derrick International
 
Pipeline construction management
Pipeline construction managementPipeline construction management
Pipeline construction management
Farraz Sarmento Salim
 
Etc spark tester
Etc spark testerEtc spark tester
Etc spark tester
Fakhruddin Gandhi
 
An Essential Information About Brass Cable Gland
An Essential Information About Brass Cable GlandAn Essential Information About Brass Cable Gland
An Essential Information About Brass Cable Gland
Vmibrass Fittings
 

What's hot (20)

11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XC11 3 Core 95-240sqmm 11k...
 
S966 magnesium anode
S966 magnesium anodeS966 magnesium anode
S966 magnesium anode
 
BTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and AcceptanceBTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and Acceptance
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
 
BR02 Proposed Foundation Plan
BR02 Proposed Foundation PlanBR02 Proposed Foundation Plan
BR02 Proposed Foundation Plan
 
Pfisterer Rail - Connectors, Clamps, Compensating Devices, Insulators & Elect...
Pfisterer Rail - Connectors, Clamps, Compensating Devices, Insulators & Elect...Pfisterer Rail - Connectors, Clamps, Compensating Devices, Insulators & Elect...
Pfisterer Rail - Connectors, Clamps, Compensating Devices, Insulators & Elect...
 
Power System Reserves for Installation, Preventative Maintenance and Acceptance
Power System Reserves for Installation, Preventative Maintenance and AcceptancePower System Reserves for Installation, Preventative Maintenance and Acceptance
Power System Reserves for Installation, Preventative Maintenance and Acceptance
 
RAYCHEM SAUDI ARABIA LTD. (TYCO ELECTRONICS) Raychem terminations for polymer...
RAYCHEM SAUDI ARABIA LTD. (TYCO ELECTRONICS) Raychem terminations for polymer...RAYCHEM SAUDI ARABIA LTD. (TYCO ELECTRONICS) Raychem terminations for polymer...
RAYCHEM SAUDI ARABIA LTD. (TYCO ELECTRONICS) Raychem terminations for polymer...
 
How To Determine MV-Connex Cable Connectors
How To Determine MV-Connex Cable ConnectorsHow To Determine MV-Connex Cable Connectors
How To Determine MV-Connex Cable Connectors
 
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
 
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
EPP-0843-10/11 RAYCHEM JOINT KIT | AKBAR TRADING EST. SAUDI ARABIA|
 
GRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
GRC Cable Trough & Elevated Channel - Rail Cable Protection & SupportGRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
GRC Cable Trough & Elevated Channel - Rail Cable Protection & Support
 
Marechal Distribution Boxes - Marechal Express Boxes, Marechal Express Fire B...
Marechal Distribution Boxes - Marechal Express Boxes, Marechal Express Fire B...Marechal Distribution Boxes - Marechal Express Boxes, Marechal Express Fire B...
Marechal Distribution Boxes - Marechal Express Boxes, Marechal Express Fire B...
 
Elastimold Loadbreak Elbows 200Amp - Elastimold 166LR
Elastimold Loadbreak Elbows 200Amp - Elastimold 166LRElastimold Loadbreak Elbows 200Amp - Elastimold 166LR
Elastimold Loadbreak Elbows 200Amp - Elastimold 166LR
 
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
Captrad Cable Systems - GRP Cable Tray, GRP Cable Troughs, Recycled Plastic C...
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
Pipeline construction management
Pipeline construction managementPipeline construction management
Pipeline construction management
 
Etc spark tester
Etc spark testerEtc spark tester
Etc spark tester
 
An Essential Information About Brass Cable Gland
An Essential Information About Brass Cable GlandAn Essential Information About Brass Cable Gland
An Essential Information About Brass Cable Gland
 

Similar to VG Railway S & T wiring check list rev 00

Residential wiring PPT.pptx
Residential wiring PPT.pptxResidential wiring PPT.pptx
Residential wiring PPT.pptx
vlkumashankardeekshi th
 
KL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfKL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdf
SysteDesig
 
Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom
123sudha
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
ssuser8298f2
 
Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptx
mebremezgebe
 
Training for Electrical Harness Equipment and Their Usage by Derya Milner
Training for Electrical Harness Equipment and Their Usage by Derya MilnerTraining for Electrical Harness Equipment and Their Usage by Derya Milner
Training for Electrical Harness Equipment and Their Usage by Derya Milner
Derya_Durmus
 
The Elektro Tipp - Terminal Connection
The Elektro Tipp - Terminal ConnectionThe Elektro Tipp - Terminal Connection
The Elektro Tipp - Terminal Connection
Hensel Electric India Private Limited
 
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
Thorne & Derrick International
 
Busbar Presentation2.pdf
Busbar Presentation2.pdfBusbar Presentation2.pdf
Busbar Presentation2.pdf
NooruddinKhan22
 
Technician Training: Wiring Basics
Technician Training: Wiring BasicsTechnician Training: Wiring Basics
Technician Training: Wiring Basics
Earthsafe Systems, Inc.
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
Engr Numan Sarwar
 
Electrical Wiring
Electrical WiringElectrical Wiring
Electrical Wiring
Ali Warraich
 
Perfiles
PerfilesPerfiles
1603175957466-TELECOM CABLES .pdf
1603175957466-TELECOM   CABLES .pdf1603175957466-TELECOM   CABLES .pdf
1603175957466-TELECOM CABLES .pdf
IlaiyarajaS1
 
Electrical Services & Cast Iron Earthing Pipe By Vaidehi E. Link, Maharashtra
Electrical Services & Cast Iron Earthing Pipe By Vaidehi E. Link, MaharashtraElectrical Services & Cast Iron Earthing Pipe By Vaidehi E. Link, Maharashtra
Electrical Services & Cast Iron Earthing Pipe By Vaidehi E. Link, Maharashtra
IndiaMART InterMESH Limited
 
Instalaciones avionicas
Instalaciones avionicasInstalaciones avionicas
Instalaciones avionicas
Oscar Hermosa Garces
 
WIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptxWIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptx
JayveeVillar3
 
report on electrical wiring
report on electrical wiringreport on electrical wiring
report on electrical wiring
Abhidada123
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specification
Sajeewa Lakmal
 

Similar to VG Railway S & T wiring check list rev 00 (20)

Residential wiring PPT.pptx
Residential wiring PPT.pptxResidential wiring PPT.pptx
Residential wiring PPT.pptx
 
KL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfKL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdf
 
Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
 
Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptx
 
Training for Electrical Harness Equipment and Their Usage by Derya Milner
Training for Electrical Harness Equipment and Their Usage by Derya MilnerTraining for Electrical Harness Equipment and Their Usage by Derya Milner
Training for Electrical Harness Equipment and Their Usage by Derya Milner
 
The Elektro Tipp - Terminal Connection
The Elektro Tipp - Terminal ConnectionThe Elektro Tipp - Terminal Connection
The Elektro Tipp - Terminal Connection
 
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
 
Busbar Presentation2.pdf
Busbar Presentation2.pdfBusbar Presentation2.pdf
Busbar Presentation2.pdf
 
Technician Training: Wiring Basics
Technician Training: Wiring BasicsTechnician Training: Wiring Basics
Technician Training: Wiring Basics
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
 
Electrical Wiring
Electrical WiringElectrical Wiring
Electrical Wiring
 
Perfiles
PerfilesPerfiles
Perfiles
 
Safety for wiring methods
Safety for wiring methodsSafety for wiring methods
Safety for wiring methods
 
1603175957466-TELECOM CABLES .pdf
1603175957466-TELECOM   CABLES .pdf1603175957466-TELECOM   CABLES .pdf
1603175957466-TELECOM CABLES .pdf
 
Electrical Services & Cast Iron Earthing Pipe By Vaidehi E. Link, Maharashtra
Electrical Services & Cast Iron Earthing Pipe By Vaidehi E. Link, MaharashtraElectrical Services & Cast Iron Earthing Pipe By Vaidehi E. Link, Maharashtra
Electrical Services & Cast Iron Earthing Pipe By Vaidehi E. Link, Maharashtra
 
Instalaciones avionicas
Instalaciones avionicasInstalaciones avionicas
Instalaciones avionicas
 
WIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptxWIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptx
 
report on electrical wiring
report on electrical wiringreport on electrical wiring
report on electrical wiring
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specification
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 

VG Railway S & T wiring check list rev 00

  • 1. CHECK LIST FOR S & T INDOOR & OUTDOOR WIRING-REV-00 1 | P a g e In case of any doubt or corrections please mail to : v.gopal21@gmail.com 1. General Check Þ Check all wiring used in the Cabin and Locations are done in a neat manner so that the wiring does not in any way prevent the proper functioning over working parts and is easily accessible for maintenance Þ Check at all locations and cabins wire entrance of adequate size, conveniently located for ease of approach to terminals and other equipment so arranged as to protect the wires from mechanical injury and wire entrance are plugged and sealed with suitable compound after the wiring is completed Þ Check Relay to Relay wiring on the same rack is as far as possible be direct without intermediaries like tag blocks/terminals Þ Check Identification Marker for Identifying the terminals and tags are provided at each terminal to identify the circuits for which it is used Þ Check Relay racks have sufficient capacity to take additional equipment to the extent of 15% of equipment provided to permit additions and alterations. Þ Verify Charts showing the positions of relays on relay racks and contact arrangement of relays indicating the spare and used contacts are prepared and kept in the cabin. 2.Indoor Signaling Cable Indoor Signaling Cable is used for indoor wiring of signaling circuits. Check following cables are normally being used for indoor signaling applications: Ø 16/0.2 mm Wiring of Q series and Shelf type Relays Ø 3/0.75 mm Wiring of shelf type Relays Ø 1/1.4 mm Wiring of lever lock, Circuit Controller Ø 7/1.4 mm Power supply – Battery room to Charger and Busbar Ø 1/ 2.5 mm Wiring of Bootleg ( track Circuit) Ø 40/0.6 &60/0.6 mm Rack to Rack wiring in metal to metal type Relays Ø 24/1.0,40/1.0 & 60/1.0 mm Wiring of Control / Relay rack up to Cable termination Rack for outdoor Circuit ( signal and Point) Ø 1/0.6 mm Wiring of Tag block to Wiring of Tag block ( except signal and point) Ø 1/1.0 mm Wiring of Tag block to Tag block ( Signal and Point) Ø 36/0.3 mm Wiring of Track relays from MDF Verify Busbar conductors are so chosen that voltage drop is not more than 0.5% of busbar voltage between battery terminals & busbar in equipment room. 3. Marking and Labelling Ø Check Conductor marking and labelling aredone by means of plasticferrules with embossed letters. Alternatively, a chain of pre-embossed plastic ferrules used. Ø Check Terminal numbers should be properly marked.
  • 2. CHECK LIST FOR S & T INDOOR & OUTDOOR WIRING-REV-00 2 | P a g e In case of any doubt or corrections please mail to : v.gopal21@gmail.com 4.Bunching & Lacing ü Check All the inter-relay wirings and inter rack wiring are neatly bunched in a circular shape ü Check Black twine or plastic strip of suitable design are used for lacing of thewires. 5.Soldering Connections Ø Verify Staff working in the installation and maintenance of S&T equipment are conversant in use of soldering iron/gun for making good soldering joints. Ø Ensure care is exercised to avoid dropping of solder particles and wire clipping on adjacent terminals and apparatus. Ø Ensure soldering irons of adequate wattage for the type of work done and the following are on hand: § A small file for dressing the soldering tip. § A fire-proof pad for wiping the tip. § A mica sheet of adequate size or a suitable stand for soldering iron. § Electrical soldering irons is switched off when not in use over extended period. Ø Verify while making a soldering joint, the surface thoroughly cleaned, fluxed andtinned. Ø Ensure use of too much solder is avoided to prevent lumpy connections. Ø Ensure soldering iron is not be held on the wire connection for too long to avoid damage to insulation. Ø Ensure Imperfect joints are the result of any one of the following causes, which should be avoided: • Soldering iron not sufficiently hot. • Soldering iron held on the connection for sufficient time. • Unclean terminal or wire • A solder of improper composition or inferior fluxing agent. • A newly soldered connection is not be disturbed till the solder has thoroughlycooled. 6.Wire Termination Ø Ensure while terminating wires, care is taken to bend the wire in clock wisedirection. Ø Ensure wire strippers used for the purpose of stripping off the wire insulation. Cutting-pliers are not be used for this purpose. Ø Check washers and check nuts are used whilst fastening. Ø Ensure not more than two wires are terminated on one terminal Ø Ensure multi-strand wires are terminated on terminal lugs and covered with insulation sleeves. Ø Ensure wires of cable are neatly terminated and properly bunched. Ø Ensure connections from and between Secondary cells Ø Check inter connections between secondary cells, standard lead strips, supplied by the manufacturer is used.
  • 3. CHECK LIST FOR S & T INDOOR & OUTDOOR WIRING-REV-00 3 | P a g e In case of any doubt or corrections please mail to : v.gopal21@gmail.com Ø Verify flexible multi-strand copper cable PVC insulated single core of nominal Cross Sectional area 10 Sq.mm. (7/1.4 mm.) is used for wiring between secondary cells to battery chargers/terminal board. The ends are crimped with a copper ring conductor (eyelet) and then terminated. However, the voltage drop between battery terminal and bus bar does not exceed 0.5 V under full load condition. 7.The following colour code of wires are used: Ensure Ø Between Battery charger and Red for positive Batteries/ Terminal Board & Black for negative Ø Earth connections Grey Ø AC side wiring - Blue for neutral and Yellow for phase. 8.Earth connections v Ensure separate earth are provided for each block instrument at a station. v Check the resistance of earth for signaling circuits does not exceed 10 ohms. If it is not possible to reduce the earth resistance below 10 ohms additional earth may be provided in parallel. v Check Where more than one earth is used, the distance between earthing pipes is not less than 3 metre. Conductor leading to these earthing is electrically insulated from each other throughout and also from metallic structures connected to different earths. 9.Earthing Leads Ø Check earth wires are protected against mechanical damage and possibility of corrosion particularly at the point of connection of earth electrode. Ø Verify the earthing lead is of mild steel flat of size 35mm x 6 mm. or copper wire of 29 sq.mm cross-sectional area (19 strands of 1.4 mm dia). In case the conductor is buried underground, it is protected from corrosion by an application of suitable anticorrosive paint o bitumen or varnish. The length of the cable so treated is extend half a metre beyond the buried length. Ø Check the earthing lead is soldered or crimped on a lug which should be bolted to the earth electrode. 10.Conventional Earthing ü Verify In this type of arrangement, the earthing is achieved with the help of Earth electrode (normally GI pipe) buried in the ground (earth pit). ü Check the earth electrode is surrounded by filling material (Common salt and Charcoal) and it is connected to the equipment with the help of GI or copper wire to extend earth to the equipment. ü Verify this type of earthing is normally provided for apparatus cases, signaling cables, block instruments, conventional power supply equipment etc.
  • 4. CHECK LIST FOR S & T INDOOR & OUTDOOR WIRING-REV-00 4 | P a g e In case of any doubt or corrections please mail to : v.gopal21@gmail.com 11.Earthing & Surge protection for S&T installation Effective or Maintenance-free earthing Ø Check this type of earthing is provided with earth electrode of a highly conductive, corrosion-resistant material with low soil resistivity earth enhancement compound around it. Ø Verify this arrangement eliminates the drawbacks of conventional earthing such as corrosion of electrode and high and fluctuating earth resistance. Ø Check maintenance free earthing is provided for signaling and telecom equipment with solid state components requiring low earth resistance of the order of 1 Ohm such as Integrated Power Supply, Digital Axle Counter, Data Logger, Electronic Interlocking etc. 12.Check Measured Earth resistance value is not more the specified value below 1. Telegraph and Block Instrument using earth return circuit 10 Ω 2. Earths for surge arrestors/ lightening dischargers 10 Ω 3. Earthing of Signaling equipment 10 Ω 4. Earthing of signaling cable screen in AC electrified areas 10 Ω 5. Earthing of Telephone Exchange 5 Ω 6. Earthing of aluminum sheathed telecom cable in AC electrified area 1Ω 7. Earthing of equipment in VF repeater stations and cable huts 5 Ω 8. Axle counter cable screened in AC electrified area 1 Ω 9. Electronic Interlocking installation 1 Ω 10. Integrated Power Supply System & its individual modules 2 Ω 11. Digital Axle Counter EJB and its apparatus case connected to same earth All cable armours connected to same earth 1 Ω 12. Reset box of Digital Axle Counter connected to earth (indoor) near SM Room 1Ω 13. Tools for Wiring Ø Stripper and cutter suitable for wires 0.6 sq.mm to 1.5 sq.mm. and 2.5sq.mm. Ø Crimping tool. Ø Soldering iron or Soldering Gun of suitable wattage. Ø Socket set consisting of 19 sockets and other accessories for maintenance of point machine. Ø Socket driver tester set. Ø Screw driver set Safety and Quality First **************