Pre-Survey
Location and Depth
Plowing Method
Trenching Method
Plowing vs. Trenching
FOC Unreel Procedure
Applicable Engineering Standards
for FOC-OSP Execution.
Placement methods for direct buried cable are essentially the
same as those used for placing direct buried copper cable.
However, it must be kept in mind that fiber cable is a high capacity
transmissionmedium which can have its transmission
characteristics degraded when subjected to excessive pulling
force, sharp bends, or crushing forces.
Fiber optic cables are more susceptible to performance
degradation due to tight bending than copper cables. The
minimum bend radius of each cable is relative to the cable
diameter. A general guide line is that a cable under tension should
not be exposed to a bend radius less than 20 times the cable
diameter and a cable with no tension not to be exposed to a bend
radius less than 10 times the cable diameter.
Standard FOC cable has maximum recommended pulling tension
of 600 lbs.
A pre-survey of the fiber cable
route is very important in
planning for a direct buried
optical fiber project. One of the
objectives of the pre-survey is
to determine where each reel of
fiber optic cable is to be placed.
The pre-survey will verify
construction methods, special
tools required, or possibly
require a revision of preliminary
splice location.
A good pre-survey and proper
planning will preclude reel ends
falling too close to roads,
creeks or any other undesirable
locations.
Buried fiber cable route locations
are selected by the Outside Plant
Engineering group.
When burying fiber optic cables
that must cross ditches, avoid
crossinglocations that might
interfere with natural drainage.
Also, avoid areas subject to
surface drainage that may result
in subsequent washing away of
soil and exposing of the fiber optic
cable.
Plowing refers to the insertion of
a cable into the ground through
a hollow plow blade or by pulling
the cable into the ground just
behind the plow blade.
When plowing method is to be
used for burying the optical fiber
cables, verify and ensure that
the route is pre-ripped before
plowing in the fiber optic cables,
so that obstacles can be
identified and removed or
necessary precautions taken
prior to the actual placement of
the cable.
Trenching is where a trench is dug,
the cable is placed into the trench,
and then the trench is backfilled.
Direct buried fiber optic cables shall be
placed with a minimum cover of:
1200 mm, when placed with no
additional protections.
760 mm to 1200 mm, when placed
inside polyethylene sub-duct.
250 mm to 760 mm, in rocks areas,
when placed inside concrete
encasedconduit.
Fiber optic cables shall not placed
with less than 250mm cover in any
situation.
IV. Plowing vs. Trench:
In general, the most desirable and
economical method of cable
placement in open area such as
desert area is plowing. Here there will
be fewer obstacles to impede the
progress of the plowing equipment.
Advantages of Plowing:
Speed of installation in open areas.
Less ground disturbance than may be
caused by trenching.
Disadvantages of Plowing:
Large size and high cost of
equipment.
Requires skilled equipment operators,
quality supervision, and equipment in
good condition.
Possibility of damaging cables or
under ground utilities.
In urban or sub-urban areas where
there can be many obstacles such as
underground utilities, side walk and
paved road crossings, trenching has
advantages.
Advantages of Trenching:
Lower cost of equipment.
Digging operation is separate from
cable placement.
Better depth control.
Less risk of damaging underground
utilities.
Provides the opportunity to place
conduit at the same time.
Disadvantages of Trenching:
Slower rate of cable placement than
with plow.
Not suitable for all soil, sands and
terrain conditions .
The “figure-eight” configuration should be used
to prevent kinking and twisting when the cable
must be unreeled. The “figure-eight” should be
approximately 4.5 to 9.0 meters in length. Each
loop should be approximately 1.5 meters to 4.5
meters in diameter.
PLOWING(typicaltrenchdimension)
When plowing in fiber optic cable a
warning orange terra tape is placed 12”
below the surface of the ground directly
above the cable. Both the cable and
the warning tape are normally plowed
in at the same time.
TRENCHING:
When trenching ensure an orange marker tape is placed flat in the trench above
all open trench for direct buried fiber optic cables. The marker tape is to be
placed approximately 300 mm below grade.
MARKERPOST
On the straight runs of buried
cable, marker posts shall be
placed no further than 100
meters apart. This clearly
indicate the route and to warn
the public and other workmen in
the presence of the buried cable.
CONT’N – APPLICABLE STANDARDS FOR FOC -OSP
FOC TESTING
End-to-end testing shall be
carriedout on all Outside
Plant fiber optic facilities
(define as the span of fiber
from the transmitter to
receiver) to document the
overall optical loss.
CONT’N – APPLICABLE STANDARDS FOR FOC -OSP
 All permanent pavement
and sidewalks must be
restoredto the satisfaction
of proper authorities.
 Verify that the surface at
grade level of the
excavated area is restored
to as good or better than
the original condition.
SATIP-T-624
CONT’N – APPLICABLE STANDARDS FOR FOC -OSP
SAIC-T-5408
“Quality is never an accident; it is always the result
of high intention”

More Related Content

What's hot

01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976Southern Railway
 
Power cable technology in cesc ltd
Power cable technology in cesc ltdPower cable technology in cesc ltd
Power cable technology in cesc ltdAritra Sarkar
 
Non stranded ropes
Non stranded ropesNon stranded ropes
Non stranded ropesem_vishal
 
Project on Cable and its classification
Project on Cable and its classificationProject on Cable and its classification
Project on Cable and its classificationSOMNATH DAS
 
250um loose tube vs. 900um tight buffered fiber
250um loose tube vs. 900um tight buffered fiber250um loose tube vs. 900um tight buffered fiber
250um loose tube vs. 900um tight buffered fiberAngelina Li
 
construction of underground cable
construction of underground cableconstruction of underground cable
construction of underground cableRajal Patel
 
Underground Cables
Underground Cables Underground Cables
Underground Cables Parth Pawar
 
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief ProcedureTechnical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedurepaperpublications3
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission lineFazlur Rahman
 
Presentation on cables
Presentation on cablesPresentation on cables
Presentation on cablesFaizanAli244
 
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...Thorne & Derrick International
 
Xlpe insulated power cable
Xlpe insulated power cableXlpe insulated power cable
Xlpe insulated power cable辉 李
 

What's hot (20)

01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
3m termination
3m termination3m termination
3m termination
 
Power cable technology in cesc ltd
Power cable technology in cesc ltdPower cable technology in cesc ltd
Power cable technology in cesc ltd
 
Non stranded ropes
Non stranded ropesNon stranded ropes
Non stranded ropes
 
Project on Cable and its classification
Project on Cable and its classificationProject on Cable and its classification
Project on Cable and its classification
 
250um loose tube vs. 900um tight buffered fiber
250um loose tube vs. 900um tight buffered fiber250um loose tube vs. 900um tight buffered fiber
250um loose tube vs. 900um tight buffered fiber
 
construction of underground cable
construction of underground cableconstruction of underground cable
construction of underground cable
 
Underground Cables
Underground Cables Underground Cables
Underground Cables
 
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief ProcedureTechnical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
 
Tempsens- cable and wires
Tempsens- cable and wiresTempsens- cable and wires
Tempsens- cable and wires
 
OFC
OFCOFC
OFC
 
Design and construction of underground cable transmission line
Design and construction of underground cable transmission lineDesign and construction of underground cable transmission line
Design and construction of underground cable transmission line
 
Presentation on cables
Presentation on cablesPresentation on cables
Presentation on cables
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Power cables
Power cablesPower cables
Power cables
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
400kV Undeground Cable Construction - Installation, Trenching & Jointing - Na...
 
Under ground Cables
Under ground Cables Under ground Cables
Under ground Cables
 
Ug cables
Ug cablesUg cables
Ug cables
 
Xlpe insulated power cable
Xlpe insulated power cableXlpe insulated power cable
Xlpe insulated power cable
 

Viewers also liked

Parameter check list for tch drop in huawei system 2 - blogs - telecom source
Parameter check list for tch drop in huawei system 2 - blogs - telecom sourceParameter check list for tch drop in huawei system 2 - blogs - telecom source
Parameter check list for tch drop in huawei system 2 - blogs - telecom sourceEfosa Aigbe
 
Sirens Song - Chinese
Sirens Song - ChineseSirens Song - Chinese
Sirens Song - ChineseSharon Gal Or
 
Desarrollo organizacional clima cultura y cambios
Desarrollo organizacional clima cultura y cambiosDesarrollo organizacional clima cultura y cambios
Desarrollo organizacional clima cultura y cambiosmixrreiky delgado
 
Invu- Mind the Gap - POP and Invoice Processing - Accountex2016
Invu- Mind the Gap - POP and Invoice Processing - Accountex2016Invu- Mind the Gap - POP and Invoice Processing - Accountex2016
Invu- Mind the Gap - POP and Invoice Processing - Accountex2016Invu Services
 
Why Germany - Mackwins Education
Why Germany - Mackwins EducationWhy Germany - Mackwins Education
Why Germany - Mackwins EducationAzmat Lohani
 
小中学生のスマートフォン夜間使用禁止を
小中学生のスマートフォン夜間使用禁止を小中学生のスマートフォン夜間使用禁止を
小中学生のスマートフォン夜間使用禁止を113223
 
N c22 jesús nos enseña a vencer el mal
N c22 jesús nos enseña a vencer el malN c22 jesús nos enseña a vencer el mal
N c22 jesús nos enseña a vencer el malmangostafeliz
 
The 2nd happy banana quest - Taiwan 2016
The 2nd happy banana quest - Taiwan 2016The 2nd happy banana quest - Taiwan 2016
The 2nd happy banana quest - Taiwan 2016Sharon Gal Or
 
Nuevos retos tecnológicos para los profesionales de RRHH
Nuevos retos tecnológicos para los profesionales de RRHHNuevos retos tecnológicos para los profesionales de RRHH
Nuevos retos tecnológicos para los profesionales de RRHHEmilio Márquez Espino
 
Communication interne : Vers une culture numerique
Communication interne : Vers une culture numeriqueCommunication interne : Vers une culture numerique
Communication interne : Vers une culture numeriqueConseils Atelya
 
Pedagogia del Oprimido Freire
Pedagogia del Oprimido FreirePedagogia del Oprimido Freire
Pedagogia del Oprimido FreireBeto Vera
 
Estrategias de servicio al cliente
Estrategias de servicio al clienteEstrategias de servicio al cliente
Estrategias de servicio al clienteMoises Cielak
 
Event Report - Acumatica Summit 2017
Event Report - Acumatica Summit 2017Event Report - Acumatica Summit 2017
Event Report - Acumatica Summit 2017Holger Mueller
 
Telecommunication basics
Telecommunication basicsTelecommunication basics
Telecommunication basicsYoohyun Kim
 

Viewers also liked (15)

Parameter check list for tch drop in huawei system 2 - blogs - telecom source
Parameter check list for tch drop in huawei system 2 - blogs - telecom sourceParameter check list for tch drop in huawei system 2 - blogs - telecom source
Parameter check list for tch drop in huawei system 2 - blogs - telecom source
 
Sirens Song - Chinese
Sirens Song - ChineseSirens Song - Chinese
Sirens Song - Chinese
 
Desarrollo organizacional clima cultura y cambios
Desarrollo organizacional clima cultura y cambiosDesarrollo organizacional clima cultura y cambios
Desarrollo organizacional clima cultura y cambios
 
Invu- Mind the Gap - POP and Invoice Processing - Accountex2016
Invu- Mind the Gap - POP and Invoice Processing - Accountex2016Invu- Mind the Gap - POP and Invoice Processing - Accountex2016
Invu- Mind the Gap - POP and Invoice Processing - Accountex2016
 
Camarón
CamarónCamarón
Camarón
 
Why Germany - Mackwins Education
Why Germany - Mackwins EducationWhy Germany - Mackwins Education
Why Germany - Mackwins Education
 
小中学生のスマートフォン夜間使用禁止を
小中学生のスマートフォン夜間使用禁止を小中学生のスマートフォン夜間使用禁止を
小中学生のスマートフォン夜間使用禁止を
 
N c22 jesús nos enseña a vencer el mal
N c22 jesús nos enseña a vencer el malN c22 jesús nos enseña a vencer el mal
N c22 jesús nos enseña a vencer el mal
 
The 2nd happy banana quest - Taiwan 2016
The 2nd happy banana quest - Taiwan 2016The 2nd happy banana quest - Taiwan 2016
The 2nd happy banana quest - Taiwan 2016
 
Nuevos retos tecnológicos para los profesionales de RRHH
Nuevos retos tecnológicos para los profesionales de RRHHNuevos retos tecnológicos para los profesionales de RRHH
Nuevos retos tecnológicos para los profesionales de RRHH
 
Communication interne : Vers une culture numerique
Communication interne : Vers une culture numeriqueCommunication interne : Vers une culture numerique
Communication interne : Vers une culture numerique
 
Pedagogia del Oprimido Freire
Pedagogia del Oprimido FreirePedagogia del Oprimido Freire
Pedagogia del Oprimido Freire
 
Estrategias de servicio al cliente
Estrategias de servicio al clienteEstrategias de servicio al cliente
Estrategias de servicio al cliente
 
Event Report - Acumatica Summit 2017
Event Report - Acumatica Summit 2017Event Report - Acumatica Summit 2017
Event Report - Acumatica Summit 2017
 
Telecommunication basics
Telecommunication basicsTelecommunication basics
Telecommunication basics
 

Similar to Buried Instln Pract for FOC Technical Presentation

OFCPulling
OFCPullingOFCPulling
OFCPullingBala V
 
OFC Puling
OFC PulingOFC Puling
OFC PulingBala V
 
Approach cable installation
Approach cable installationApproach cable installation
Approach cable installationMayank Porwal
 
Whether to go for underground or aerial deployment
Whether to go for underground or aerial deploymentWhether to go for underground or aerial deployment
Whether to go for underground or aerial deploymentAngelina Li
 
Overhead Fiber Optic Cable Installation Method and Requirement
Overhead Fiber Optic Cable Installation Method and RequirementOverhead Fiber Optic Cable Installation Method and Requirement
Overhead Fiber Optic Cable Installation Method and RequirementSun Telecom
 
Laying of Underground Cables.pptx
Laying of Underground Cables.pptxLaying of Underground Cables.pptx
Laying of Underground Cables.pptxDrAkankshaSharma4
 
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1Thorne & Derrick International
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguidebui thequan
 
OFC Trenching
OFC TrenchingOFC Trenching
OFC TrenchingBala V
 
Dish4You System Grounding
Dish4You System GroundingDish4You System Grounding
Dish4You System Groundingspicherheidi
 
Fiber optic cables
Fiber optic cablesFiber optic cables
Fiber optic cablesRavi Yasas
 
Loose tube vs. tight-buffered fiber optic cable
Loose tube vs. tight-buffered fiber optic cableLoose tube vs. tight-buffered fiber optic cable
Loose tube vs. tight-buffered fiber optic cableTeresa Huang
 
Nexans Euromold 151SP Screened Separable Straight Connector
Nexans Euromold 151SP Screened Separable Straight ConnectorNexans Euromold 151SP Screened Separable Straight Connector
Nexans Euromold 151SP Screened Separable Straight ConnectorThorne & Derrick International
 
Everything You Need to Know About Underwater Submarine Fiber Optic cable
Everything You Need to Know About Underwater Submarine Fiber Optic cableEverything You Need to Know About Underwater Submarine Fiber Optic cable
Everything You Need to Know About Underwater Submarine Fiber Optic cableSun Telecom
 
EC8072 UNIT IV.pptx
EC8072 UNIT IV.pptxEC8072 UNIT IV.pptx
EC8072 UNIT IV.pptxponni2
 
Coaxial cable and its types
Coaxial cable and its typesCoaxial cable and its types
Coaxial cable and its typesAdeel Khurram
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 CablesThorne & Derrick International
 
Benefits of earth grounding cable reels.pptx
Benefits of earth grounding cable reels.pptxBenefits of earth grounding cable reels.pptx
Benefits of earth grounding cable reels.pptxAtex Winget
 

Similar to Buried Instln Pract for FOC Technical Presentation (20)

OFCPulling
OFCPullingOFCPulling
OFCPulling
 
OFC Puling
OFC PulingOFC Puling
OFC Puling
 
Approach cable installation
Approach cable installationApproach cable installation
Approach cable installation
 
Whether to go for underground or aerial deployment
Whether to go for underground or aerial deploymentWhether to go for underground or aerial deployment
Whether to go for underground or aerial deployment
 
Overhead Fiber Optic Cable Installation Method and Requirement
Overhead Fiber Optic Cable Installation Method and RequirementOverhead Fiber Optic Cable Installation Method and Requirement
Overhead Fiber Optic Cable Installation Method and Requirement
 
Laying of Underground Cables.pptx
Laying of Underground Cables.pptxLaying of Underground Cables.pptx
Laying of Underground Cables.pptx
 
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguide
 
OFC Trenching
OFC TrenchingOFC Trenching
OFC Trenching
 
cables.pptx
cables.pptxcables.pptx
cables.pptx
 
Dish4You System Grounding
Dish4You System GroundingDish4You System Grounding
Dish4You System Grounding
 
Fiber optic cables
Fiber optic cablesFiber optic cables
Fiber optic cables
 
Loose tube vs. tight-buffered fiber optic cable
Loose tube vs. tight-buffered fiber optic cableLoose tube vs. tight-buffered fiber optic cable
Loose tube vs. tight-buffered fiber optic cable
 
Nexans Euromold 151SP Screened Separable Straight Connector
Nexans Euromold 151SP Screened Separable Straight ConnectorNexans Euromold 151SP Screened Separable Straight Connector
Nexans Euromold 151SP Screened Separable Straight Connector
 
Everything You Need to Know About Underwater Submarine Fiber Optic cable
Everything You Need to Know About Underwater Submarine Fiber Optic cableEverything You Need to Know About Underwater Submarine Fiber Optic cable
Everything You Need to Know About Underwater Submarine Fiber Optic cable
 
2012 offshore wind cables
2012 offshore wind cables2012 offshore wind cables
2012 offshore wind cables
 
EC8072 UNIT IV.pptx
EC8072 UNIT IV.pptxEC8072 UNIT IV.pptx
EC8072 UNIT IV.pptx
 
Coaxial cable and its types
Coaxial cable and its typesCoaxial cable and its types
Coaxial cable and its types
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
 
Benefits of earth grounding cable reels.pptx
Benefits of earth grounding cable reels.pptxBenefits of earth grounding cable reels.pptx
Benefits of earth grounding cable reels.pptx
 

Buried Instln Pract for FOC Technical Presentation

  • 2. General-(Placement Methodology) Pre-Survey Location and Depth Plowing Method Trenching Method Plowing vs. Trenching FOC Unreel Procedure Applicable Engineering Standards for FOC-OSP Execution.
  • 3. Placement methods for direct buried cable are essentially the same as those used for placing direct buried copper cable. However, it must be kept in mind that fiber cable is a high capacity transmissionmedium which can have its transmission characteristics degraded when subjected to excessive pulling force, sharp bends, or crushing forces. Fiber optic cables are more susceptible to performance degradation due to tight bending than copper cables. The minimum bend radius of each cable is relative to the cable diameter. A general guide line is that a cable under tension should not be exposed to a bend radius less than 20 times the cable diameter and a cable with no tension not to be exposed to a bend radius less than 10 times the cable diameter. Standard FOC cable has maximum recommended pulling tension of 600 lbs.
  • 4. A pre-survey of the fiber cable route is very important in planning for a direct buried optical fiber project. One of the objectives of the pre-survey is to determine where each reel of fiber optic cable is to be placed. The pre-survey will verify construction methods, special tools required, or possibly require a revision of preliminary splice location. A good pre-survey and proper planning will preclude reel ends falling too close to roads, creeks or any other undesirable locations.
  • 5. Buried fiber cable route locations are selected by the Outside Plant Engineering group. When burying fiber optic cables that must cross ditches, avoid crossinglocations that might interfere with natural drainage. Also, avoid areas subject to surface drainage that may result in subsequent washing away of soil and exposing of the fiber optic cable.
  • 6. Plowing refers to the insertion of a cable into the ground through a hollow plow blade or by pulling the cable into the ground just behind the plow blade. When plowing method is to be used for burying the optical fiber cables, verify and ensure that the route is pre-ripped before plowing in the fiber optic cables, so that obstacles can be identified and removed or necessary precautions taken prior to the actual placement of the cable.
  • 7. Trenching is where a trench is dug, the cable is placed into the trench, and then the trench is backfilled. Direct buried fiber optic cables shall be placed with a minimum cover of: 1200 mm, when placed with no additional protections. 760 mm to 1200 mm, when placed inside polyethylene sub-duct. 250 mm to 760 mm, in rocks areas, when placed inside concrete encasedconduit. Fiber optic cables shall not placed with less than 250mm cover in any situation.
  • 8. IV. Plowing vs. Trench: In general, the most desirable and economical method of cable placement in open area such as desert area is plowing. Here there will be fewer obstacles to impede the progress of the plowing equipment. Advantages of Plowing: Speed of installation in open areas. Less ground disturbance than may be caused by trenching. Disadvantages of Plowing: Large size and high cost of equipment. Requires skilled equipment operators, quality supervision, and equipment in good condition. Possibility of damaging cables or under ground utilities.
  • 9. In urban or sub-urban areas where there can be many obstacles such as underground utilities, side walk and paved road crossings, trenching has advantages. Advantages of Trenching: Lower cost of equipment. Digging operation is separate from cable placement. Better depth control. Less risk of damaging underground utilities. Provides the opportunity to place conduit at the same time. Disadvantages of Trenching: Slower rate of cable placement than with plow. Not suitable for all soil, sands and terrain conditions .
  • 10. The “figure-eight” configuration should be used to prevent kinking and twisting when the cable must be unreeled. The “figure-eight” should be approximately 4.5 to 9.0 meters in length. Each loop should be approximately 1.5 meters to 4.5 meters in diameter.
  • 11. PLOWING(typicaltrenchdimension) When plowing in fiber optic cable a warning orange terra tape is placed 12” below the surface of the ground directly above the cable. Both the cable and the warning tape are normally plowed in at the same time.
  • 12. TRENCHING: When trenching ensure an orange marker tape is placed flat in the trench above all open trench for direct buried fiber optic cables. The marker tape is to be placed approximately 300 mm below grade.
  • 13. MARKERPOST On the straight runs of buried cable, marker posts shall be placed no further than 100 meters apart. This clearly indicate the route and to warn the public and other workmen in the presence of the buried cable.
  • 14. CONT’N – APPLICABLE STANDARDS FOR FOC -OSP FOC TESTING End-to-end testing shall be carriedout on all Outside Plant fiber optic facilities (define as the span of fiber from the transmitter to receiver) to document the overall optical loss.
  • 15. CONT’N – APPLICABLE STANDARDS FOR FOC -OSP  All permanent pavement and sidewalks must be restoredto the satisfaction of proper authorities.  Verify that the surface at grade level of the excavated area is restored to as good or better than the original condition.
  • 16. SATIP-T-624 CONT’N – APPLICABLE STANDARDS FOR FOC -OSP SAIC-T-5408
  • 17. “Quality is never an accident; it is always the result of high intention”