INTRODUCTION
TRISHULI NUWAKOT
GENERAL 0VERVIEW
Located at 70 km north-west of Kathmandu at Trishuli, Nuwakot
Constructed on Trishuli river
Installed capacity 21 MW in 1967 AD consisting of 7 units each of 3 MW
Upgraded to 24 MW in 1995 AD with 6 units each of 3.5 MW and
one unit of 3 MW
Developed By Government of India and Government of Nepal at a
Cost of INR 140 million
Head of station Baburaja Maharjan
SAILENT FEATURES
Maximum net head 51.4 m
Average annual flow 45.66 m^3/s
Length of Dam 139.6 m
Length of Waterway 4,792 m
Penstock 71.66 m & 2.3 m , 3Nos., steel
(length &dia.) 89 m & 1.5 m, 1Nos., steel
No. of Bridge 4
Catchment area 2600 sq km
Design generation 163 GWh annually
GENERATOR
Rated Output 3889 KVA
Rated Voltage 6.6 KV
Rated Frequency 50 Hz
Power factor 0.9
Power Transformer 5 MVA , 6.6/66 KV Single phase,6 Nos
Transmission Line 66 KV 27.6 km , Double circuit
66 KV 5 km ,Single circuit
TURBINE
Number and type 7, Francis
Rated Discharge 7.8 m^3/s
Rated Output 3620 kw
Rated Speed 500 rpm
CIVIL PART
WATER RETAINING STRUCTURE WITH SIDE
CHANNEL SPILLWAY
SIDE INTAKE
LIFT GATE WITH GEAR ROPE ELECTRIC DRIVE
TRAPEZOIDAL OPEN CHANNEL SYSTEM
OVERHEAD FLOW OVER RIVER
o Flow is diverse through residential area with two bridge type canal.
SETTLING BASIN (DECENDER)
oIt removes sediment load up to 0.2mm diameter.
oThe greater basin area & lower the through velocity the smaller the particles can settle down.
oOne traits for this case is being used as picnic spot area.
RESERVOIR
o We can notice problem of high silt.
FOREBAY
oEntry point for three penstock pipes
oStructure being lies on highway of headquarter
PENSTOCK PIPES
o Each 3 pipes serves for two units while last pipe feed single unit
MECHANICAL PART
TURBINE GENERATOR SETS
o Number of blades = 13 Inlet diameter = 1080 mm Throat diameter = 1100 mm
RUNNER
WICKET GATE
GOVERNER
SPIRAL CASING
INLET VALVE BY-PASS VALVE
DRAFT TUBE
TAILRACE
Here centered pipe is used to discharge leakage water (dewatering)
Initially tailrace discharge is mixed to trisuli itself
Now it is used for devighat power plant
ELECTRICAL PART
GENERATORS
parameter Unit 1-3 Unit 4-7
Original designer Rade koncar Fuji electric
Rated output 3500kw(+10% overload) 3500kw(+10% overload)
Rated capacity 3889 KVA 3889 KVA
Rated voltage 6.6KV 6.6KV
Stator connection 2Y 1Y
Rated current 340A 340A
Runaway speed 925 r.p.m 925 r.p.m
Stator winding resistance (per
phase)
0.10064 ohm @ 77°C 0.10064 ohm @ 77°C
Rotor winding resistance (per
phase)
0.1272 0.1159
Full load efficiency 96.79% 96.79%
SYNCHRONIZING PROCESS
Manual operation
Unit is connected to grid when its voltage and real power match system parameters
respectively
POWER FREQUENCY CONTROL
The regulator must designed to be insensitive to fast random
changes, otherwise the system will prone to hunting resulting in
excessive wear & tear of rotating machines & control
equipment.
EXCITATION SYSTEM
PLC or Human machine interface(HMI) is used to control excitation automatically and remotely.
STATIC EXCITATION SYSTEM
Field current:
At no = 157-164.7A @ 77V
At full load = 290-304.2A
At 110% rated load = 306-320A
PLC
Programmable Logic Controller is a user friendly, microprocessor specialized computer that
carries out control functions.
oMonitor crucial process parameters and
adjust process operations accordingly.
oCan be programmed, controlled and
operated by a person unskilled in operating
computers.
oPLCs are used in the substation to manage
transformers, voltage regulation, automatic
transfer schemes, custom/automatic reclosing
schemes, automatic service restoration,
remote control, system diagnostics
maintenance
SWITCHING PANELS
o Double for double bus bar system.
INDOOR HV VCB
CONTROL SYSTEM
CONTROL ROOM
oEach unit have its own control set.
oAt least one technical must be here to monitor whether generation and other operation is
within limit.
TRANSFORMER CONTROL & RELAY PANEL
GENERATOR PROTECTION PANEL
DATE U1 U2 U3 U4 U5 U6 U7 TOTAL(
MW)
8/21 3 2.5 3 1 3 3 3 18.5
8/22 3 3 3 1 3 3 3 19
8/23 2 3 3 1 3 3 3 18
8/24 3 2 3 1 3 3 3 18
8/25 3 2 3 1 3 3 3 18
GENERATION DATA OF 8/21 TO 8/25
STATION ANNUNCIATOR PANEL
o It indicates which of several electric circuits has been activated.
RECORDER PANELS
TRANSDUCER PANELS
BATTERY ROOM
oThe control panels and relays require DC supply of 220V.
oNi-Cd batteries are used due to their advantages like low maintenance , longer life
(15-25 years).
oEach cell is of 2V and 6Ah capacity.
o55 cell is connected to 110V charging system.
oNormally charging panel delivers load & give trickle charging to Battery bank
oworks on Auto and Manual mode.
FIRE PROTECTION
o A new fire detection and protection system was installed with complete Halogen gas fire,
portable fire extinguishers and fire hose reels and fire hydrants for total protection of power
house.
SWITCHYARD
oJunction of four areas network
oBalaju-1 and balaju-2 by double circuit transmission line (27.6Km)
oChilime and devighat (5Km) by single circuit
oAlso distribute power to local area
SUBSTATION
SINGLE LINE DIAGRAM
TRANSFORMERS
oSix single phase power transformers of rating 5 MVA 6.6/66 kv
oOne 3 phase distribution transformer of rating 10 MVA 6.6/11 kv for local distribution
COOLING AND FIRE EXTINGUSHER
oCooling pipe are run along all transformers
oOperate when transformer are overloaded or any abnormal conditions
INSTRUMENTATION TRANSFORMERS
66 kv CT 66 kv PT
SF6 CIRCUIT BREAKER
BUS COUPLER
o Coupling is done when one bus bar fails which removes interruption to feeder.
SURGE PROTECTION
LIGHTNING PROTECTOR ROD GAP ARRESTER
CONCLUSION
SPECIAL FEATURES
• One of the oldest HPP but still operating well
• Lies on headquarter of Nuwakot
• More number of units making it more efficient
• 3 single phase transformers combine to make three phase has its
own advantage
• Tailrace utilize for another HPP
PROBLEMS
• Small area of the settling basin so the sand does not settle properly in the basin.
• Problem in diversion system and intake construction.
• There is no SCADA system in use.
• The amount of silt accumulated in the reservoir is excess.
• Weir and tear on the runner due to silt.
• Manual synchronizing and Governing system.
• The settling basin should be upgraded.
• The direction of the flow of water should be managed at diversion weir.
• The SCADA system should be maintained as soon as possible.
• The number of instrument to clean silt should be increased.
• Governing and overall system should be upgraded to digital.
RECOMMENDATIONS
• www.nea.org.np
• www.google.com
• Handbook of
Trishuli hydropower
Project
• Trishuli Upgrading
File
REFERENCES

More Related Content

What's hot

Ac distribution system
Ac distribution systemAc distribution system
Ac distribution system
Daffodil International University
 
MECHANICAL BELTS
MECHANICAL BELTSMECHANICAL BELTS
MECHANICAL BELTS
GANESH GANESH
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
Sachin Singh
 
Air brake system in indian railways
Air brake system in indian railwaysAir brake system in indian railways
Air brake system in indian railways
Ramkumar Niluroutu
 
hydraulic and pneumatic Valves
hydraulic and pneumatic Valveshydraulic and pneumatic Valves
hydraulic and pneumatic Valves
Sam Aero
 
Hydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant Auxaleries
Mahajan Saurabh
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
ManishKushwaha97
 
Revised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfRevised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdf
majjisatish
 
11.track junctions and layouts
11.track junctions and layouts11.track junctions and layouts
11.track junctions and layouts
Mani Vel
 
Electrical Transmission Tower: Types, Design and Parts
Electrical Transmission Tower: Types, Design and  PartsElectrical Transmission Tower: Types, Design and  Parts
Electrical Transmission Tower: Types, Design and Parts
Dr.Raja R
 
power grid design
power grid designpower grid design
power grid designsusanta das
 
Rail Joints.pdf
Rail Joints.pdfRail Joints.pdf
Rail Joints.pdf
TVijayaGowri
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
SURESH GOPAL
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
anand prasad
 
Internship report
Internship report Internship report
Internship report
Niteesh Shanbog
 
Design of hydraulic system
Design of hydraulic systemDesign of hydraulic system
Design of hydraulic system
Rajesh Kannan
 
Pneumatic circuits
Pneumatic circuitsPneumatic circuits
Pneumatic circuits
RAHUL THAKER
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
Kanahiya Lal
 
Stepper motor
Stepper motorStepper motor
Stepper motor
Anurag Chaudhary
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
Malyar Talash
 

What's hot (20)

Ac distribution system
Ac distribution systemAc distribution system
Ac distribution system
 
MECHANICAL BELTS
MECHANICAL BELTSMECHANICAL BELTS
MECHANICAL BELTS
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
Air brake system in indian railways
Air brake system in indian railwaysAir brake system in indian railways
Air brake system in indian railways
 
hydraulic and pneumatic Valves
hydraulic and pneumatic Valveshydraulic and pneumatic Valves
hydraulic and pneumatic Valves
 
Hydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant Auxaleries
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Revised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfRevised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdf
 
11.track junctions and layouts
11.track junctions and layouts11.track junctions and layouts
11.track junctions and layouts
 
Electrical Transmission Tower: Types, Design and Parts
Electrical Transmission Tower: Types, Design and  PartsElectrical Transmission Tower: Types, Design and  Parts
Electrical Transmission Tower: Types, Design and Parts
 
power grid design
power grid designpower grid design
power grid design
 
Rail Joints.pdf
Rail Joints.pdfRail Joints.pdf
Rail Joints.pdf
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
Internship report
Internship report Internship report
Internship report
 
Design of hydraulic system
Design of hydraulic systemDesign of hydraulic system
Design of hydraulic system
 
Pneumatic circuits
Pneumatic circuitsPneumatic circuits
Pneumatic circuits
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
Stepper motor
Stepper motorStepper motor
Stepper motor
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 

Similar to Trishuli hydro power plant 3 day educational visit

trisuli hydropower nepal
trisuli hydropower nepaltrisuli hydropower nepal
trisuli hydropower nepal
surendra purbey
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
ssuser1b3e431
 
Ashwani
AshwaniAshwani
Ashwani
ashwani kumar
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station
Bikash Gyawali
 
Kotmale power station
Kotmale power stationKotmale power station
Kotmale power station
Rasitha Romesha
 
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan) 2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
Ministry of New & Renewable Energy, Govt of India
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 
400kv-Substation-Training-report-Unnao-India.ppt
400kv-Substation-Training-report-Unnao-India.ppt400kv-Substation-Training-report-Unnao-India.ppt
400kv-Substation-Training-report-Unnao-India.ppt
MarcWorld
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
AkshaiSai2
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITY
Rohitashav Goyal
 
Ajay binay institute of technology,/ondvc
Ajay binay institute                                  of technology,/ondvcAjay binay institute                                  of technology,/ondvc
Ajay binay institute of technology,/ondvc
Mukesh Kumar
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
Saumyadip Moitra
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
Shadab Khan
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
Devesh54
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
Ashutosh Srivastava
 
SUMMER TRAINING @CHIBRO BY AAKASH
SUMMER TRAINING @CHIBRO BY AAKASH SUMMER TRAINING @CHIBRO BY AAKASH
SUMMER TRAINING @CHIBRO BY AAKASH
THDC IHET
 
POWER CAR.pptx
POWER CAR.pptxPOWER CAR.pptx
POWER CAR.pptx
AnkitKumar339958
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
sahid raja khan
 
the substation components study
the substation components study the substation components study
the substation components study
Krishnaveni Reddy
 

Similar to Trishuli hydro power plant 3 day educational visit (20)

trisuli hydropower nepal
trisuli hydropower nepaltrisuli hydropower nepal
trisuli hydropower nepal
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
 
Ashwani
AshwaniAshwani
Ashwani
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station
 
Kotmale power station
Kotmale power stationKotmale power station
Kotmale power station
 
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan) 2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
400kv-Substation-Training-report-Unnao-India.ppt
400kv-Substation-Training-report-Unnao-India.ppt400kv-Substation-Training-report-Unnao-India.ppt
400kv-Substation-Training-report-Unnao-India.ppt
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITY
 
Ajay binay institute of technology,/ondvc
Ajay binay institute                                  of technology,/ondvcAjay binay institute                                  of technology,/ondvc
Ajay binay institute of technology,/ondvc
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
SUMMER TRAINING @CHIBRO BY AAKASH
SUMMER TRAINING @CHIBRO BY AAKASH SUMMER TRAINING @CHIBRO BY AAKASH
SUMMER TRAINING @CHIBRO BY AAKASH
 
POWER CAR.pptx
POWER CAR.pptxPOWER CAR.pptx
POWER CAR.pptx
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
the substation components study
the substation components study the substation components study
the substation components study
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 

Recently uploaded

space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 

Trishuli hydro power plant 3 day educational visit

  • 1. TRISHULI HYDROPOWER VISIT Presented by: Baikuntha Poudel(070/BEL/208) Ishwor Singh(070/BEL/219) Kishor Ghimire(070/BEL/222) Khagraj Subedi(070/BEL/221) Ramesh Adhikari(070/BEL/233) Suman Sharma(070/BEL/242) Sunil K.C.(070/BEL/243)
  • 4. GENERAL 0VERVIEW Located at 70 km north-west of Kathmandu at Trishuli, Nuwakot Constructed on Trishuli river Installed capacity 21 MW in 1967 AD consisting of 7 units each of 3 MW Upgraded to 24 MW in 1995 AD with 6 units each of 3.5 MW and one unit of 3 MW Developed By Government of India and Government of Nepal at a Cost of INR 140 million Head of station Baburaja Maharjan
  • 5. SAILENT FEATURES Maximum net head 51.4 m Average annual flow 45.66 m^3/s Length of Dam 139.6 m Length of Waterway 4,792 m Penstock 71.66 m & 2.3 m , 3Nos., steel (length &dia.) 89 m & 1.5 m, 1Nos., steel No. of Bridge 4 Catchment area 2600 sq km Design generation 163 GWh annually
  • 6. GENERATOR Rated Output 3889 KVA Rated Voltage 6.6 KV Rated Frequency 50 Hz Power factor 0.9 Power Transformer 5 MVA , 6.6/66 KV Single phase,6 Nos Transmission Line 66 KV 27.6 km , Double circuit 66 KV 5 km ,Single circuit TURBINE Number and type 7, Francis Rated Discharge 7.8 m^3/s Rated Output 3620 kw Rated Speed 500 rpm
  • 8. WATER RETAINING STRUCTURE WITH SIDE CHANNEL SPILLWAY
  • 10. LIFT GATE WITH GEAR ROPE ELECTRIC DRIVE
  • 12. OVERHEAD FLOW OVER RIVER o Flow is diverse through residential area with two bridge type canal.
  • 13. SETTLING BASIN (DECENDER) oIt removes sediment load up to 0.2mm diameter. oThe greater basin area & lower the through velocity the smaller the particles can settle down. oOne traits for this case is being used as picnic spot area.
  • 14. RESERVOIR o We can notice problem of high silt.
  • 15. FOREBAY oEntry point for three penstock pipes oStructure being lies on highway of headquarter
  • 16. PENSTOCK PIPES o Each 3 pipes serves for two units while last pipe feed single unit
  • 19. o Number of blades = 13 Inlet diameter = 1080 mm Throat diameter = 1100 mm RUNNER
  • 25. TAILRACE Here centered pipe is used to discharge leakage water (dewatering) Initially tailrace discharge is mixed to trisuli itself Now it is used for devighat power plant
  • 27. GENERATORS parameter Unit 1-3 Unit 4-7 Original designer Rade koncar Fuji electric Rated output 3500kw(+10% overload) 3500kw(+10% overload) Rated capacity 3889 KVA 3889 KVA Rated voltage 6.6KV 6.6KV Stator connection 2Y 1Y Rated current 340A 340A Runaway speed 925 r.p.m 925 r.p.m Stator winding resistance (per phase) 0.10064 ohm @ 77°C 0.10064 ohm @ 77°C Rotor winding resistance (per phase) 0.1272 0.1159 Full load efficiency 96.79% 96.79%
  • 28. SYNCHRONIZING PROCESS Manual operation Unit is connected to grid when its voltage and real power match system parameters respectively
  • 29. POWER FREQUENCY CONTROL The regulator must designed to be insensitive to fast random changes, otherwise the system will prone to hunting resulting in excessive wear & tear of rotating machines & control equipment.
  • 30. EXCITATION SYSTEM PLC or Human machine interface(HMI) is used to control excitation automatically and remotely.
  • 31. STATIC EXCITATION SYSTEM Field current: At no = 157-164.7A @ 77V At full load = 290-304.2A At 110% rated load = 306-320A
  • 32. PLC Programmable Logic Controller is a user friendly, microprocessor specialized computer that carries out control functions. oMonitor crucial process parameters and adjust process operations accordingly. oCan be programmed, controlled and operated by a person unskilled in operating computers. oPLCs are used in the substation to manage transformers, voltage regulation, automatic transfer schemes, custom/automatic reclosing schemes, automatic service restoration, remote control, system diagnostics maintenance
  • 33. SWITCHING PANELS o Double for double bus bar system.
  • 36. CONTROL ROOM oEach unit have its own control set. oAt least one technical must be here to monitor whether generation and other operation is within limit.
  • 37. TRANSFORMER CONTROL & RELAY PANEL
  • 39. DATE U1 U2 U3 U4 U5 U6 U7 TOTAL( MW) 8/21 3 2.5 3 1 3 3 3 18.5 8/22 3 3 3 1 3 3 3 19 8/23 2 3 3 1 3 3 3 18 8/24 3 2 3 1 3 3 3 18 8/25 3 2 3 1 3 3 3 18 GENERATION DATA OF 8/21 TO 8/25
  • 40. STATION ANNUNCIATOR PANEL o It indicates which of several electric circuits has been activated.
  • 43. BATTERY ROOM oThe control panels and relays require DC supply of 220V. oNi-Cd batteries are used due to their advantages like low maintenance , longer life (15-25 years). oEach cell is of 2V and 6Ah capacity. o55 cell is connected to 110V charging system. oNormally charging panel delivers load & give trickle charging to Battery bank oworks on Auto and Manual mode.
  • 44. FIRE PROTECTION o A new fire detection and protection system was installed with complete Halogen gas fire, portable fire extinguishers and fire hose reels and fire hydrants for total protection of power house.
  • 46. oJunction of four areas network oBalaju-1 and balaju-2 by double circuit transmission line (27.6Km) oChilime and devighat (5Km) by single circuit oAlso distribute power to local area SUBSTATION
  • 48. TRANSFORMERS oSix single phase power transformers of rating 5 MVA 6.6/66 kv oOne 3 phase distribution transformer of rating 10 MVA 6.6/11 kv for local distribution
  • 49. COOLING AND FIRE EXTINGUSHER oCooling pipe are run along all transformers oOperate when transformer are overloaded or any abnormal conditions
  • 52. BUS COUPLER o Coupling is done when one bus bar fails which removes interruption to feeder.
  • 55. SPECIAL FEATURES • One of the oldest HPP but still operating well • Lies on headquarter of Nuwakot • More number of units making it more efficient • 3 single phase transformers combine to make three phase has its own advantage • Tailrace utilize for another HPP
  • 56. PROBLEMS • Small area of the settling basin so the sand does not settle properly in the basin. • Problem in diversion system and intake construction. • There is no SCADA system in use. • The amount of silt accumulated in the reservoir is excess. • Weir and tear on the runner due to silt. • Manual synchronizing and Governing system. • The settling basin should be upgraded. • The direction of the flow of water should be managed at diversion weir. • The SCADA system should be maintained as soon as possible. • The number of instrument to clean silt should be increased. • Governing and overall system should be upgraded to digital. RECOMMENDATIONS
  • 57.