Overview
 Introduction
 Single line diagram
 Classification of transformer
 Parts of transformer
 Cooling system
 Protection of Transformer
TRANSFORMER
 “Transformer is a static device which transform electric power of one circuit to
another circuit without changing its frequency.”
 Working Principle of transformer :
The working principle of transformer depends upon Faraday’s law of
electromagnetic induction. Actually mutual induction between two or more
winding is responsible for transformation action in an electrical transformer.
 Faraday’s laws of Electromagnetic Induction:
According to Faraday’s law,
“Rate of change of flux linkage with respect to
time is directly proportional to the induced EMF
in a conductor or coil".
Single line diagram
Types of Transformers used in
210MW unit
1) Generator Transformer 2) Station Transformer
3) Distribution Transformer 4) Unit auxiliary Transformer
5) Instrument Transformer 6) Rectifier Transformer
7) Neutral ground Transformer
8)Transformer used for general purposes and for different processes.
i ) Welding Transformer
ii ) Specially designed Transformer used for X ray, Radio,
Telecommunication, T.V., High frequency heating, and Industrial
heating for different processes.
Generator Transformer Rating
 MVA = 240 MVA
 Primary Side = 15.75 KV (d)
 Secondary Side = 400 KV (Y)
 Oil Qty = 43 KL
 Cooling = OFWF
 Vector Group = Yd11
 %Z = 11.90
Functions
 This is step up transformer of high voltage capacity.
 This is connected after the generator to step up voltage
from 15.75kv to 400kv.
 The main function of this transformer is to step up
voltage so as to reduce transmission losses, line drop
and increases Transmission efficiency .
Station Transformer Rating
 MVA = 40 MVA
 Primary Side = 220 KV (Y)
 Secondary Side = 6.6 KV (Y)
 Oil Qty = 30 KL
 Cooling = ONAF
 Vector Group = Yy0
 %Z = 11
Functions
 Transformer at the generating station is required for
starting of the generating units when they are either
newly constructed or taken of the bar for overhaul.
 These Power transformers are called station
transformer, which receives power from the grid and
feed power-to-power station distribution system.
Unit Auxiliary Transformer Rating
 MVA = 20 MVA
 Primary Side = 15.75KV (d)
 Secondary Side = 6.6 KV (Y)
 Oil Qty = 6.4 KL
 Cooling = ONAF
 Vector Group = Dy1
 %Z = 9.0
Functions
• The Purpose of Unit auxiliary Transformer is to feed power to generator
auxiliaries of that unit
• These transformers are connected to generators and are used as stepping
down transformers. The HV side transformer voltage corresponds to the
voltage of the generating unit and the LV side voltage is stepped down to
6.6KV
• Rated KVA of Unit Auxiliary Transformers is approximately 15% of the
generating rating
• Usually these transformers are outdoor transformers
• One Unit auxiliary transformer is present for every generating unit.
• A Rectiformer is a rectifier and
transformer designed and built as a
single entity for converting alternating
current into direct current.
• It is piece of power systems
equipment rather than an electronics
component.
• Rectiformers are used for supplying
power to different field of ESP
(electrostatic precipitator).
 For metering and protection to maintain instrument accuracy.
 For sensing H.T. side current at the secondary side
 Used in protection relay, trip coils and pilot wires.
 Used in current power measurement, temperature sensing etc.
Current Transformer (CT) Potential Transformer (PT)
Distribution transformer
 This is step down transformer connected according to
applications such as boiler ,turbine , station service
board.
 The main function of this transformer is to provide
convenient amount of power in the various boards.
NGT
 The subject of grounding covers the problems relating
to the conduction of electric current to the earth and
through the ground. The earth rarely serves as a part of
the return circuit, being used mainly for fixing the
potential of circuit neutrals.
 The ground connection improves service continuity
and protects lives and equipment.
(a) Arcing rounds are reduced or eliminated.
(b) The neutral grounding stabilises the neutral point.
(c) By employing resistance or reactance in earth connection, the earth fault current can
be controlled.
(d) The over voltage surge due to lightening are discharged to earth hence less damages
to the equipment. Useful amount of earth fault current is required to operate earth fault
relay.
(e) Improved service reliability due to limitation of arcing ground and prevention of
unnecessary tripping of circuit breakers.
(f) Life of eqipment, machines and installation is improved due to limitation of
voltages.
(g) Greater safety to personnel and equipment due to operation of fuses or relay on
earth fault and limitation of voltages. Hence it is economical to ground neutral point.
Advantages of Neutral Grounding
Transformer
Constructional Features
 Main Tank
 Laminated core
 Core winding
 Bushing
 Tap changer
 Conservator
 Breather
 Explosion vent / Pressure relief valve
 Cooling system is required for transformer to take away the heat generated in
transformer due to losses and maintaining insulation healthy.
 Cooling system of transformer is provided by considering design and KVA rating of
a transformer. Cooling system of transformer is as follows.
i. Air natural cooling system.
ii. Oil natural cooling system with or without radiator.
iii. Cooling of transformer improved by force airflow by blowers/Air blast by fans
iv. Oil forced natural cooling system (OFN): - circulation of oil by pump to radiator,
which has natural cooling.
v. OFB : Forced oil circulation of oil by pump to radiator, which has force, cooled by
air blower.
vi. OFW : Forced circulation of Oil through oil cooler and water-cooling is by water.
 Generally Oil temp is maintained in between 45 to 55 Dc. & Winding temp in
between 55to 80 °c.(depends upon insulation class)
Types of Cooling
ONAN ONAF
OFAF OFWF
Maintenance
 Transformer Oil Level Checking
 Breather condition monitoring
 Oil testing
 D. G. A.
 Oil Filtration
 Bushing Cleaning
 Drying Out (after 7 Yrs)
Transformers

More Related Content

What's hot

Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
michaeljmack
 
Tap changer
Tap changerTap changer
Tap changer
vivek1292
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
Ang Sovann
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
SARAVANAN A
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformer
Raveendranath Macherla
 
Understanding transformer vector group
Understanding transformer vector groupUnderstanding transformer vector group
Understanding transformer vector group
Shyamkant Vasekar
 
CT design aspects - Nageswar-6
CT design aspects - Nageswar-6CT design aspects - Nageswar-6
CT design aspects - Nageswar-6Nageswar Rao
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
D Målîk
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
Bhushan Kumbhalkar
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
Siswoyo Edo
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
karikalan123
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
Kapil Singh
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
Sumeet Ratnawat
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
Molla Morshad
 
Faults on Power System
Faults on Power SystemFaults on Power System
Faults on Power System
Vinod Srivastava
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
Hemendra Kumar Rajput
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part I
Slides Hub
 
Esp rectifier transformer
Esp rectifier transformerEsp rectifier transformer
Esp rectifier transformer
Molla Morshad
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
H. Kheir
 

What's hot (20)

Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 
Tap changer
Tap changerTap changer
Tap changer
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformer
 
Understanding transformer vector group
Understanding transformer vector groupUnderstanding transformer vector group
Understanding transformer vector group
 
High Voltage
High VoltageHigh Voltage
High Voltage
 
CT design aspects - Nageswar-6
CT design aspects - Nageswar-6CT design aspects - Nageswar-6
CT design aspects - Nageswar-6
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
Faults on Power System
Faults on Power SystemFaults on Power System
Faults on Power System
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part I
 
Esp rectifier transformer
Esp rectifier transformerEsp rectifier transformer
Esp rectifier transformer
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
 

Viewers also liked

Transformer construction,types and working
Transformer construction,types and workingTransformer construction,types and working
Transformer construction,types and working
maharshi dayanand university rohtak
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
Sharukh Ansari
 
Transformer
TransformerTransformer
Transformer
Sandeep Kumar
 
Lecture 04 transformers
Lecture 04   transformersLecture 04   transformers
Lecture 04 transformersBibek Chouhan
 
Voltmeter & Transformers: Types and Applications.
Voltmeter & Transformers: Types and  Applications.Voltmeter & Transformers: Types and  Applications.
Voltmeter & Transformers: Types and Applications.
Diksha Prakash
 
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Lakhan Vadher
 
Transformer basic
Transformer basicTransformer basic
Transformer basic
BHAGWAN PRASAD
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PT
Chandan Singh
 
instrument transformer
instrument transformerinstrument transformer
instrument transformer
Nishant Kumar
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
Ritesh Verma
 
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Low
 
Current and Potential Transformers
Current and Potential TransformersCurrent and Potential Transformers
Current and Potential Transformers
Naveen Jakhar, I.T.S
 
Rapid metro gurgaon report
Rapid metro gurgaon report Rapid metro gurgaon report
Rapid metro gurgaon report
Gurudutt Bagha
 
Earth MAT design for Metro Station
Earth MAT design for Metro StationEarth MAT design for Metro Station
Earth MAT design for Metro Station
Subhendu Bikash Santra
 
Thermal Management of Transformers
Thermal Management of TransformersThermal Management of Transformers
Thermal Management of Transformers
ProSIM R & D Pvt. Ltd.
 
Increasing Transformer Reliability by Smart Bushing
Increasing Transformer Reliability by Smart BushingIncreasing Transformer Reliability by Smart Bushing
Increasing Transformer Reliability by Smart Bushing
ProSIM R & D Pvt. Ltd.
 
Physics investigatory project on transformers by vishesh
Physics investigatory project on transformers by visheshPhysics investigatory project on transformers by vishesh
Physics investigatory project on transformers by vishesh
Vishesh Srivastava
 

Viewers also liked (20)

Transformer construction,types and working
Transformer construction,types and workingTransformer construction,types and working
Transformer construction,types and working
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
 
Transformer
TransformerTransformer
Transformer
 
Transformer
TransformerTransformer
Transformer
 
Lecture 04 transformers
Lecture 04   transformersLecture 04   transformers
Lecture 04 transformers
 
Voltmeter & Transformers: Types and Applications.
Voltmeter & Transformers: Types and  Applications.Voltmeter & Transformers: Types and  Applications.
Voltmeter & Transformers: Types and Applications.
 
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
 
Transformer basic
Transformer basicTransformer basic
Transformer basic
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PT
 
Chapter 7 transformers
Chapter 7 transformersChapter 7 transformers
Chapter 7 transformers
 
instrument transformer
instrument transformerinstrument transformer
instrument transformer
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015
 
Current and Potential Transformers
Current and Potential TransformersCurrent and Potential Transformers
Current and Potential Transformers
 
Rapid metro gurgaon report
Rapid metro gurgaon report Rapid metro gurgaon report
Rapid metro gurgaon report
 
Earth MAT design for Metro Station
Earth MAT design for Metro StationEarth MAT design for Metro Station
Earth MAT design for Metro Station
 
Thermal Management of Transformers
Thermal Management of TransformersThermal Management of Transformers
Thermal Management of Transformers
 
Increasing Transformer Reliability by Smart Bushing
Increasing Transformer Reliability by Smart BushingIncreasing Transformer Reliability by Smart Bushing
Increasing Transformer Reliability by Smart Bushing
 
Calderas saunier duval
Calderas saunier duvalCalderas saunier duval
Calderas saunier duval
 
Physics investigatory project on transformers by vishesh
Physics investigatory project on transformers by visheshPhysics investigatory project on transformers by vishesh
Physics investigatory project on transformers by vishesh
 

Similar to Transformers

Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
Sagnik Saha
 
various types of transformers.
various types of transformers.various types of transformers.
various types of transformers.
ITM universe , vadodara
 
Industrial training report format
Industrial training report formatIndustrial training report format
Industrial training report format
Ashu0711
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
shovandey07
 
Power electronics and its applications.pptx
Power electronics and its applications.pptxPower electronics and its applications.pptx
Power electronics and its applications.pptx
SHIVANICHAUUHAN1
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
99sunilkumar
 
牵引变流器(CI).ppt
牵引变流器(CI).ppt牵引变流器(CI).ppt
牵引变流器(CI).ppt
Najihah Ab.
 
Kanti Thermal Power Station
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Station
neeraj prasad
 
Electric-Traction-Railways.ppt
Electric-Traction-Railways.pptElectric-Traction-Railways.ppt
Electric-Traction-Railways.ppt
ssuserf805c8
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar
Devendra khairiya
 
Substation
Substation Substation
A survey on Single Phase to Three Phase Cyclo-Converter fed Induction Motor
A survey on Single Phase to Three Phase Cyclo-Converter fed Induction MotorA survey on Single Phase to Three Phase Cyclo-Converter fed Induction Motor
A survey on Single Phase to Three Phase Cyclo-Converter fed Induction Motor
IJSRD
 
lift ppt
lift pptlift ppt
lift ppt
smartraja1991
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
uppcl training in moradabad report
uppcl training in moradabad reportuppcl training in moradabad report
uppcl training in moradabad report
MONU KUMAR
 
Pulse Density Modulation Based Series Resonant Inverter Fed Induction Heater ...
Pulse Density Modulation Based Series Resonant Inverter Fed Induction Heater ...Pulse Density Modulation Based Series Resonant Inverter Fed Induction Heater ...
Pulse Density Modulation Based Series Resonant Inverter Fed Induction Heater ...
International Journal of Power Electronics and Drive Systems
 
Substations
Substations Substations
Substations
Engr Muhammad Imran
 
National Hydro Power Plant collage PPT 1.pptx
National  Hydro Power Plant  collage PPT  1.pptxNational  Hydro Power Plant  collage PPT  1.pptx
National Hydro Power Plant collage PPT 1.pptx
rupasharma39
 

Similar to Transformers (20)

Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
 
various types of transformers.
various types of transformers.various types of transformers.
various types of transformers.
 
ntpc
ntpcntpc
ntpc
 
Industrial training report format
Industrial training report formatIndustrial training report format
Industrial training report format
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
 
Power electronics and its applications.pptx
Power electronics and its applications.pptxPower electronics and its applications.pptx
Power electronics and its applications.pptx
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
牵引变流器(CI).ppt
牵引变流器(CI).ppt牵引变流器(CI).ppt
牵引变流器(CI).ppt
 
Kanti Thermal Power Station
Kanti Thermal Power StationKanti Thermal Power Station
Kanti Thermal Power Station
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
Electric-Traction-Railways.ppt
Electric-Traction-Railways.pptElectric-Traction-Railways.ppt
Electric-Traction-Railways.ppt
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar
 
Substation
Substation Substation
Substation
 
A survey on Single Phase to Three Phase Cyclo-Converter fed Induction Motor
A survey on Single Phase to Three Phase Cyclo-Converter fed Induction MotorA survey on Single Phase to Three Phase Cyclo-Converter fed Induction Motor
A survey on Single Phase to Three Phase Cyclo-Converter fed Induction Motor
 
lift ppt
lift pptlift ppt
lift ppt
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
uppcl training in moradabad report
uppcl training in moradabad reportuppcl training in moradabad report
uppcl training in moradabad report
 
Pulse Density Modulation Based Series Resonant Inverter Fed Induction Heater ...
Pulse Density Modulation Based Series Resonant Inverter Fed Induction Heater ...Pulse Density Modulation Based Series Resonant Inverter Fed Induction Heater ...
Pulse Density Modulation Based Series Resonant Inverter Fed Induction Heater ...
 
Substations
Substations Substations
Substations
 
National Hydro Power Plant collage PPT 1.pptx
National  Hydro Power Plant  collage PPT  1.pptxNational  Hydro Power Plant  collage PPT  1.pptx
National Hydro Power Plant collage PPT 1.pptx
 

Recently uploaded

Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
daothibichhang1
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 

Recently uploaded (20)

Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 

Transformers

  • 1. A SEMINAR ON “Different Types Of Transformers Used For 210MW Unit Thermal Power Plant” PRESENTED BY : VAIBHAV BHOPE PRITAM BIJWAL SUMIT VINCHURKAR SANTOSH VIJEKAR NIKHIL WANDHARE NIKHIL SHRIWAS AKASH SHEGOKAR CHETAN ANGARWAR VIKASH SINGH AKSHAY SAHARE
  • 2. Overview  Introduction  Single line diagram  Classification of transformer  Parts of transformer  Cooling system  Protection of Transformer
  • 3. TRANSFORMER  “Transformer is a static device which transform electric power of one circuit to another circuit without changing its frequency.”  Working Principle of transformer : The working principle of transformer depends upon Faraday’s law of electromagnetic induction. Actually mutual induction between two or more winding is responsible for transformation action in an electrical transformer.  Faraday’s laws of Electromagnetic Induction: According to Faraday’s law, “Rate of change of flux linkage with respect to time is directly proportional to the induced EMF in a conductor or coil".
  • 5. Types of Transformers used in 210MW unit 1) Generator Transformer 2) Station Transformer 3) Distribution Transformer 4) Unit auxiliary Transformer 5) Instrument Transformer 6) Rectifier Transformer 7) Neutral ground Transformer 8)Transformer used for general purposes and for different processes. i ) Welding Transformer ii ) Specially designed Transformer used for X ray, Radio, Telecommunication, T.V., High frequency heating, and Industrial heating for different processes.
  • 6.
  • 7. Generator Transformer Rating  MVA = 240 MVA  Primary Side = 15.75 KV (d)  Secondary Side = 400 KV (Y)  Oil Qty = 43 KL  Cooling = OFWF  Vector Group = Yd11  %Z = 11.90
  • 8. Functions  This is step up transformer of high voltage capacity.  This is connected after the generator to step up voltage from 15.75kv to 400kv.  The main function of this transformer is to step up voltage so as to reduce transmission losses, line drop and increases Transmission efficiency .
  • 9.
  • 10. Station Transformer Rating  MVA = 40 MVA  Primary Side = 220 KV (Y)  Secondary Side = 6.6 KV (Y)  Oil Qty = 30 KL  Cooling = ONAF  Vector Group = Yy0  %Z = 11
  • 11. Functions  Transformer at the generating station is required for starting of the generating units when they are either newly constructed or taken of the bar for overhaul.  These Power transformers are called station transformer, which receives power from the grid and feed power-to-power station distribution system.
  • 12.
  • 13. Unit Auxiliary Transformer Rating  MVA = 20 MVA  Primary Side = 15.75KV (d)  Secondary Side = 6.6 KV (Y)  Oil Qty = 6.4 KL  Cooling = ONAF  Vector Group = Dy1  %Z = 9.0
  • 14. Functions • The Purpose of Unit auxiliary Transformer is to feed power to generator auxiliaries of that unit • These transformers are connected to generators and are used as stepping down transformers. The HV side transformer voltage corresponds to the voltage of the generating unit and the LV side voltage is stepped down to 6.6KV • Rated KVA of Unit Auxiliary Transformers is approximately 15% of the generating rating • Usually these transformers are outdoor transformers • One Unit auxiliary transformer is present for every generating unit.
  • 15. • A Rectiformer is a rectifier and transformer designed and built as a single entity for converting alternating current into direct current. • It is piece of power systems equipment rather than an electronics component. • Rectiformers are used for supplying power to different field of ESP (electrostatic precipitator).
  • 16.  For metering and protection to maintain instrument accuracy.  For sensing H.T. side current at the secondary side  Used in protection relay, trip coils and pilot wires.  Used in current power measurement, temperature sensing etc. Current Transformer (CT) Potential Transformer (PT)
  • 17.
  • 18.
  • 19.
  • 20. Distribution transformer  This is step down transformer connected according to applications such as boiler ,turbine , station service board.  The main function of this transformer is to provide convenient amount of power in the various boards.
  • 21.
  • 22. NGT  The subject of grounding covers the problems relating to the conduction of electric current to the earth and through the ground. The earth rarely serves as a part of the return circuit, being used mainly for fixing the potential of circuit neutrals.  The ground connection improves service continuity and protects lives and equipment.
  • 23. (a) Arcing rounds are reduced or eliminated. (b) The neutral grounding stabilises the neutral point. (c) By employing resistance or reactance in earth connection, the earth fault current can be controlled. (d) The over voltage surge due to lightening are discharged to earth hence less damages to the equipment. Useful amount of earth fault current is required to operate earth fault relay. (e) Improved service reliability due to limitation of arcing ground and prevention of unnecessary tripping of circuit breakers. (f) Life of eqipment, machines and installation is improved due to limitation of voltages. (g) Greater safety to personnel and equipment due to operation of fuses or relay on earth fault and limitation of voltages. Hence it is economical to ground neutral point. Advantages of Neutral Grounding Transformer
  • 24. Constructional Features  Main Tank  Laminated core  Core winding  Bushing  Tap changer  Conservator  Breather  Explosion vent / Pressure relief valve
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.  Cooling system is required for transformer to take away the heat generated in transformer due to losses and maintaining insulation healthy.  Cooling system of transformer is provided by considering design and KVA rating of a transformer. Cooling system of transformer is as follows. i. Air natural cooling system. ii. Oil natural cooling system with or without radiator. iii. Cooling of transformer improved by force airflow by blowers/Air blast by fans iv. Oil forced natural cooling system (OFN): - circulation of oil by pump to radiator, which has natural cooling. v. OFB : Forced oil circulation of oil by pump to radiator, which has force, cooled by air blower. vi. OFW : Forced circulation of Oil through oil cooler and water-cooling is by water.  Generally Oil temp is maintained in between 45 to 55 Dc. & Winding temp in between 55to 80 °c.(depends upon insulation class)
  • 37. Maintenance  Transformer Oil Level Checking  Breather condition monitoring  Oil testing  D. G. A.  Oil Filtration  Bushing Cleaning  Drying Out (after 7 Yrs)