Tools and techniques
for whole-enterprise architecture
Tom Graves, Tetradian
IQPC EA Summit, April 2021
Hi.
(yeah, I’ve been working in architectures
for maybe too many years now...?)
I’m Tom.
These days I’m best described as
a maker of tools for change...
also on the architecture of change,
linking strategy to execution
and back again, as needed...
Four themes for
whole-enterprise architecture…
1. About context and scope for EA
2. About fitness-for-purpose
3. About tools and fractality
4. About methods for whole-EA
Part 1:
A question of scope
The role of all architecture is
to ensure effectiveness
across the whole of the scope:
“Things work better when
they work together, on-purpose”
Over the years, the scope for
EA has expanded steadily from
IT-infrastructure to business-
architecture and beyond.
Let’s look at that history...
A bit of history: 1960s-1970s…
First usages of
the ‘architecture’
term in IT,
such as for the
IBM System/360
series
Image: Bundesarchiv, B 145 Bild-
F038812-0014 / Schaack, Lothar /
CC-BY-SA 3.0
A bit of history: 1980s…
IBM-PC etc
provide
standards
for hardware,
OS; also key
theory-elements
such as
Zachman’s
papers
Image: John Zachman via Wikipedia
A bit of history: 1990s…
Client-driven
demands for
improved IT-
effectiveness,
such as per US
Clinger-Cohen
Act
Image: CC-BY-SA MysteryBee via
Flickr
A bit of history: 2000s…
IT-architecture
now also covers
apps, data and
some aspects of
business, and is
lazily renamed
to ‘enterprise
architecture’
Image: Open Group
A bit of history: 2010s onward…
This ‘enterprise-
architecture’ now
aims to cover all
aspects of the
business and its
enterprise
Image: Alex Osterwalder et al
...yet we’ve been here before...
- let’s look at that history too...
Dowding System: 1940
The ‘Dowding
System’ for UK
air-defence – full
integration of
process, people,
information-flow,
feedback,
redundancy and
more
Ford’s ‘integrated factory’: 1910
Henry Ford’s
‘integrated
factory’, from
raw-materials to
full lifetime of
finished product
(and waste-
management
too)
US railroad systems: 1860
US railroads –
mapping
physical-layout,
people and their
responsibilities,
business-
structure and
more
Roman Empire: CE100
Full integration
of resource-
management,
security,
economics,
politics and
more, across the
entire Empire
Enterprise-architecture as
the architecture of the enterprise
- every aspect of the enterprise,
whatever that enterprise may be
Need ‘architecture of architectures’
that’s consistent across:
every type of enterprise,
every scope and scale,
every type of content and context,
every stage of implementation,
every part of the change-lifecycle
Part 2:
A question of fitness
Do our current tools and techniques
have fitness-for-purpose for:
every type of enterprise,
every scope and scale,
every type of content and context,
every stage of implementation,
every part of the change-lifecycle
Short-answer:
No.
The main reason for unfitness:
a persistent scope-error
mistaking the scope for
enterprise-wide IT
with the scope for
the enterprise itself
One of these is not like the others…
• Data-architecture is the architecture of data
• Security-architecture is the architecture of security
• Process-architecture is the architecture of processes
• Business-architecture is the architecture of business
• Enterprise-architecture is the architectural-analysis for
detail-design of IT-infrastructure in large organisations
“Enterprise architecture
is solely the architecture
for enterprise-wide IT” ?
- hmm…
CC-BY-ND-SA ores2k via Flickr
…gonna hafta think about this one…
CC-BY-ND alexsemenzato via Flickr
Enterprise-wide IT-architecture
is only one small subset
of whole-enterprise architecture
(and it’s actually the easy bit...)
Scope of
enterprise-
wide IT…
Scope of
whole-
enterprise
what we need… what we have…
utter confusion…
Content-before-context causes confusion...
confusion…
IT-specific
The scope and architecture for
enterprise-wide IT
is not the same as
the scope and architecture for
the enterprise itself…
- don’t mix them up!
Other reasons for poor fitness:
• Over-emphasis on ‘state’
• Over-emphasis on certainty
• Optimised for mass-sameness
• Optimised for single timescales
• Fragmentation into ‘walled-gardens’
In most classic
change-models,
we contrast
‘current state’
and ‘future state’
- yet in the real-
world there is no
‘state’ – there is
only change
Concern: Over-emphasis on ‘state’
Concern: Over-emphasis on certainty
(after Damien Newman)
Key information is lost
for use in the ‘messy’
part of the next loop
Tools over-focus
on the ‘certainty’
part of the process
Concern: Optimised for sameness
A quest for certainty:
analysis, algorithms,
identicality, efficiency,
business-rule
engines, executable
models, Six Sigma...
SAMENESS
(IT-systems do work
well here)
UNIQUENESS
(IT-systems don’t work
well here)
An acceptance of
uncertainty:
experiment, patterns,
probabilities, ‘design-
thinking’, unstructured
process, ‘human’...
certain uncertain
Concern: Optimised for single timescales
Like a forest, the
real-world has
many complex,
interleaving
timescales
Concern: Tools as ‘walled-gardens’
No connection
between tools –
causes fragmentation
Tools are scattered all
over the exploration-
space
• “Architecture is an exercise in truth”
- architecture is about structure
– (IT-architecture is often really good at this)
• “Architecture is an exercise in narrative”
- architecture is about story
– (IT-architecture is often really bad at this…)
We need balance between structure and story
‘Two points of view on architecture’
(adapted from Chapter 84, in Matthew Frederick, 101 Things I Learned In Architecture School, MIT Press, 2007
A quick recap:
What’s our current state of play?
Our sales-pitch to executives:
ensure and enhance effectiveness
across the enterprise as a whole,
adapting to and guiding change,
always ‘on-purpose’
Need effectiveness across the whole:
any form of local-optimisation is
Not A Good Idea…
(yet most current tools and methods for EA
are optimised only for specific domains
- mainly IT and ‘business-architecture’)
Our ‘architecture of architectures’
needs tools and methods that
work the same way everywhere
across a whole-enterprise scope
(and where everything links together
across the whole, always)
Yes, there’s
a lot to this
stuff about
‘whole-
enterprise’…
Don’t panic!
How to eat
an elephant?
…one bite
at a time!
For this too, it’s likewise
‘one bite at a time’
- yet each small bit linked into the whole,
each bit getting better at doing the work
Tools and methods must address:
• Any/all contexts, scopes, content etc
• Continual change, ‘statelessness’
• Certainty and uncertainty
• Mass-sameness and mass-uniqueness
• Any/all timescales, interleaving
• Integration across all ‘walled-gardens’
• Structure and story
Two questions to explore…
• What patterns, tools and guidelines
do we need for this work?
• What techniques and methods do we need,
to map each item of change, to do the right
things right, and learn from each action?
Part 3:
A question of tools
The core requirements again:
• tools able to address any type of
enterprise, any scope and scale, and
any content and context, stages of
implementation and change-lifecycle
• must help to link everything together
into a unified whole
An architects’ mantra:
“I don’t know” (but I know how to find out)
“It depends” (and I can find out what it depends on)
“Just enough detail” (not too little, not too much)
“Start anywhere” (everything’s connected!)
“Be honest, be kind” (everyone has their challenges)
Fractality is our friend…
Once we’ve
identified the
context, we can use
fractal-type ‘self-
similar’ patterns to
gather detail and
help connect across
the whole…
…tools that we can
use everywhere
Tools to help identify context:
• Visioning – identify the context-story,
values, guiding, principles, standards etc
• Layers – identify the core stakeholders
and required level or type of detail
Identifying context: Visioning
The vision or
story-descriptor
is the ultimate
anchor for
everything that
the enterprise is
and does – the
organisation then
links itself into
that story.
A three-part ‘story’ that makes sense to all enterprise-stakeholders
Elements of a vision-statement
Action (‘How’): what is being done to
or with or about the concern
Example: “Ideas worth spreading”
Qualifier (‘Why’): the emotive driver
for action on the concern
Example: “Ideas worth spreading”
Concern (‘What’): the focus of interest
to everyone in the shared-enterprise
Example: “Ideas worth spreading”
Visioning: Derive values, principles etc
Given the vision-
statement, we
can then derive
values and
principles that
can guide
decision-making
within the
organisation
Vision outlines the shared-story…
Principles devolve from values…
Value-propositions must align to
vision, values, principles…
Vision, role, mission, goal…
Values devolve from the vision…
Identifying context: Layers
Layers: Scope within the context
We can use a
layer-model to
identify which
parts of the
overall context
we will address
(Note that ‘classic’
EA will address only
a subset of these
layers)
Layers: Types of stakeholders
The layers that
we choose also
help us identify
the types of
stakeholders
that we will need
to work with and
consult
Fractal-checklist tools for content:
• Holomap – describe transactions,
interactions, dependencies, relationships
• SCORE – identify strategic options
• SCAN – model the complexity in context
• Service Canvas – describe services, service-
content and service-relationships
Identifying content: Holomap
The B(I)DAT-
stack used in
TOGAF etc is
just one context-
specific instance
of the more
generalised
pattern of the
Holomap
B(I)DAT-stack
Holomap
pattern
Holomap: Business-architecture
The Holomap
pattern also
shows why the
‘Business-
Architecture’
description in
TOGAF does not
work well for
business itself…
BIDAT-stack
Holomap
Business-
architecture
Holomap
Holomap: Both ‘outward’ and ‘inward’
The complete
Holomap pattern
also extends
downward,
fractally, into the
detail for
implementation
and action
Holomap: Organisation and enterprise
When the
‘service-in-focus’
for a Holomap is
the organisation
as a whole, the
pattern looks like
this…
Holomap: Implementation-detail
…where the
pattern for real-
world detail of
implementation
– for which the
BIDAT-pattern is
only one subset
– would look
more like this…
applications,
data etc
technology,
infrastructure,
agents etc
purpose,
guidance etc
scope of
BIDAT
Holomap: Adapt to context
It’s a checklist-
pattern, so we can
adapt it to more
complex contexts
such as a business’
IT-organisation…
IT-organisation
relationship-pattern
travel-ecommerce
relationship-pattern
…or a multi-partner
ecommerce
transaction-space
Holomap: Mapping responsibility
We can also merge
the Holomap with
other fractal-
compatible tools,
such as in linking
Holomap with RACI
to map the
organisation’s types
of responsibilities
with its stakeholders
Identifying content: SCORE
SCORE
(Strengths,
Challenges,
Options,
Responses,
Effectiveness)
provides a
consistent means
to explore
strategic choices
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0
International License (CC BY-SA 4.0).
To view a copy of this license, visit https://creativecommons.org/licenses/by-sa/4.0/
Tetradian www.tetradian.com
Project By Date
Versio
n
SCORE
strengths
Strengths / Services / Support
(existing capabilities and resources, potential for
synergies)
challenges
Challenges / Capabilities-needed
(‘weaknesses’ indicate needed capabilities and
resources)
options
Options / Opportunities and risks
(opportunity is also risk, risk is also opportunity)
responses
Responses / Returns / Rewards
(probable or emergent consequences of action or
inaction)
effectiveness
default: efficient, reliable, elegant,
appropriate, integrated
focus-question
SCORE: Provenance of choices
With SCORE, we
move around the
space, linking
ideas to feedback
and actions, and
building a trail of
provenance for
each choice along
the way
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0
International License (CC BY-SA 4.0).
To view a copy of this license, visit https://creativecommons.org/licenses/by-sa/4.0/
Tetradian www.tetradian.com
Project By Date
Versio
n
SCORE
strengths
Strengths / Services / Support
(existing capabilities and resources, potential for
synergies)
challenges
Challenges / Capabilities-needed
(‘weaknesses’ indicate needed capabilities and
resources)
options
Options / Opportunities and risks
(opportunity is also risk, risk is also opportunity)
responses
Responses / Returns / Rewards
(probable or emergent consequences of action or
inaction)
effectiveness
default: efficient, reliable, elegant,
appropriate, integrated
focus-question
Identifying content: SCAN
SCAN helps us to
map out types and
levels of uncertainty
before, during and
after the action at a
given ‘NOW’
SCAN: Resolve uncertainty
One use for SCAN
is to help identify
reducible-
uncertainty to
resolve before
action, versus
non-reducible
uncertainty that
can be resolved
only at run-time
reducible
uncertainty
non-reducible
uncertainty
purported
certainty
Identifying content: Service Canvas
A consistent,
symmetric, fully-
fractal way to
model every
type of activity in
the enterprise as
services and
their exchanges
support-
services
child-services
within the
service
(Note: Service Canvas is
also known as Enterprise
Canvas)
Service Canvas: Crosslink to Holomap
Support-services
in Service Canvas
link into different
parts of the
respective
Holomap and its
relationships:
transaction,
direct-interaction,
indirect-
interaction
Service Canvas: Crosslink with SCAN
Child-services
within each
Service Canvas
crosslink to the
‘before, during,
after’ of SCAN,
and other fractal
models such as
Service Cycle
‘before, during, after’ as in SCAN
Service Canvas: Service-content
Service Canvas
includes a
consistent way to
describe service-
content and
structure-
elements,
crosslinked to
context-layers
Reprise on core requirements:
• every type of enterprise, any scope and
scale, any content and context, stages of
implementation and change-lifecycle
• link everything together into a unified whole
• fractality is our friend in all of this
Part 4:
A question of method
Core requirements for method:
• works the same way everywhere
• work with every type of enterprise, any
scope, scale, content, context, stage
of implementation, change-lifecycle
• link everything into a unified whole
CAUTION:
current ‘EA’ methods will often:
• work well for only one type of context
• work well for only one type of enterprise,
scope, scale, content, context, stage of
implementation, or change-lifecycle
• create fragmented ‘walled-gardens’
Down to details for method...
• connect strategy to real-world action
• connect big-picture to fine-detail
• keep the whole in mind at all times
(Note: fractality is our friend for this
- the naturally recursive nature of tasks)
Rethinking tasks: Task…
On a Gantt-
chart, we would
show the task
just as a labelled
box…
Rethinking tasks: Action
Looking inside
the box, we’d
describe the
Action via a
work-instruction
– a set of mini-
tasks…
Rethinking tasks: Action and results
We’ll also need
to track the
outcomes of the
task: the records
of action, and
any variances,
incidents and
insights
arising…
Rethinking tasks: Plan and Action
Each task will
need its own
Plan, to resolve
uncertainties,
identify desired
outcomes and
records, and set
up for action…
Rethinking tasks: Context and Scope
We’ll need to
ensure that we
know the Scope
and Context for
the action – and
if we don’t know
what these are,
stop until we do
know them…
Rethinking tasks: Review and learn
The task is not
complete until
we’ve verified
benefits-realised,
identified the
lessons-learned,
and logged any
tasks-arising…
TOGAF does also follow this pattern…
The TOGAF ADM
(Architecture
Development
Method) does
sort-of follow
the same overall
pattern, if with
some parts
hardwired to an
IT-only focus
Context
Scope
Plan
Action
Review
what we have now… what we need for this…
…though it does need to be fully fractal
Dependencies drive the pattern...
• learning depends on info from action
• action depends on plan and preparation
• planning depends on awareness of scope
• scope for action depends on context
• successful outcomes depend on
doing the right things right,
and improving every time
“Do all of this
for the whole enterprise?
- that’s impossibly huge!”
Actually, no, it’s not that hard,
if we remember that one simple trick…
How to eat
an elephant?
…one bite
at a time!
(But remember
that it’s always a
whole elephant…)
Maturity-Model shows where to bite next…
All we have to do is
keep going, keep going,
one step at a time
- then fractality, consistent tools
and consistent methods
will do the rest for us
(mostly, anyway…)
Change-mapping provides a
consistent method to do this:
• guide and keep track of change-tasks,
and their provenance and outcomes
• keep track of all interdependencies
within and between change-tasks, and
guide use and re-use of task-outcomes
We hide the complexity via
separation of concerns and
separation of roles:
• roles such as Explorer, Pathfinder and
Reporter tackle the tasks for the context of
each mission and its underlying issue
• roles such as Librarian, Coordinator and
Architect tackle connection across all tasks
Think of it as like
the departments
in a factory…
1. Context
2. Scope
3. Plan
4. Action
5. Review
…an iterative,
recursive cycle
of change…
…everything
shared in the
centre and its
repository
Context-neutral tools and methods
as used in Change-mapping
connect everything, consistently,
across every part of the enterprise
- and keep it simple enough for
everyone to use, everywhere
Keep it simple with a folder metaphor
Missions act as
containers for each
set of tasks and
their sub-tasks
(tasks and their folders
may be nested to any
depth that we need)
A core concept:
everything is a plug-in tool
(even the method itself is just another plug-in tool…)
Use fractality, dependencies, layering
to link big-picture, context-neutral tools
to all those context-specific tools
that we need for detailed design
Use any tool as a plug-in
Every use of a tool is a ‘mini-task’ in its own right,
following the same pattern, invoked in the same way,
with its results stored in the respective folder
Change-mapping is already
proven in practice, using paper
forms and physical folders
- what’s needed next is the right software
toolset, such as an expanded Gantt-chart
with fully-fractal task-nesting, task-linking,
plug-in tools and central repository
(any developer interested in this, please get in touch with us!)
Books on Change-mapping
Published March 2020 Published March 2021 (to be published early 2022)
Wrapping up...
As enterprise-architects, we can
address a whole-enterprise scope
- any type of enterprise, at any scale,
any context, any type of content, whatever
Let’s do this!
- and link everything together, consistently,
in any way that we need
Three takeaways:
1.The purpose of EA is enterprise effectiveness
2.EA must be able to extend to whole-enterprise
3.Tools and methods to do this do already exist
(so let’s use them, make them easier to use)
Conversations on this need to happen
– let’s make them happen!
Thank you!
Further information (page 1 of 5)
• (Slide 04) Post-series 'Towards a whole-enterprise architecture standard': summary at
http://weblog.tetradian.com/2016/06/06/towards-a-whole-enterprise-architecture-standard-
summary/
• (Slide 06) Enterprise-effectiveness: post 'A tagline for enterprise effectiveness',
http://weblog.tetradian.com/2015/06/02/tagline-for-enterprise-effectiveness/
• (Slide 14) Wikipedia on Dowding system: 'Dowding system',
https://en.wikipedia.org/wiki/Dowding_system
• (Slide 23) IT-centrism: 'IT-centrism and real-world enterprise-architecture',
http://weblog.tetradian.com/2014/03/24/it-centrism-and-real-world-ea/
• (Slide 31) Confusion from the 'BDAT-stack': 'On business-architecture and enterprise-architecture',
http://weblog.tetradian.com/2017/07/03/on-ba-and-ea/
• (Slide 32) Consequences of IT-centrism: 'How IT-centrism creeps into enterprise-architecture',
http://weblog.tetradian.com/2012/01/30/how-it-centrism-creeps-into-ea/
• (Slide 34) Over-emphasis on 'state': 'The no-plan plan: Architecture dynamics',
http://weblog.tetradian.com/2011/10/21/the-no-plan-plan-architecture-dynamics/’
Further information (page 2 of 5)
• (Slide 36) Slidedeck 'Same and different: architectures for mass-uniqueness',
https://www.slideshare.net/tetradian/same-and-different-architectures-for-massuniqueness
• (Slide 35) Post 'Documenting the Not-known',
http://weblog.tetradian.com/2018/05/06/documenting-the-not-known/
• (Slide 36) Post 'Scalability and uniqueness', http://weblog.tetradian.com/2013/04/24/scalability-
and-uniqueness/
• (Slide 37) Post 'More on backbone and edge', http://weblog.tetradian.com/2013/05/04/more-on-
backbone-and-edge/
• (Slide 37) Slidedeck 'Backbone and edge: Architecting the balance between continuity and
change', https://www.slideshare.net/tetradian/backbone-and-edge-architecting-the-balance-
between-continuity-and-change
• (Slide 38) Tools as walled-gardens: slidedeck 'Disintegrated enterprise-architecture?',
https://www.slideshare.net/tetradian/disintegrated-enterprisearchitecture
• (Slide 38) Post 'Toolsets, pinball and un-dotting the joins',
http://weblog.tetradian.com/2015/01/16/toolsets-pinball-and-undotting-joins/
Further information (page 3 of 5)
• (Slide 39) Slidedeck 'The enterprise is the story', https://www.slideshare.net/tetradian/the-
enterprise-is-the-story-54141263
• (Slide 44) Slidedeck 'Whole-enterprise architecture',
https://www.slideshare.net/tetradian/wholeenterprise-architecture
• (Slide 48) Post 'Towards a whole-enterprise architecture standard – 3: Method',
http://weblog.tetradian.com/2016/04/27/towards-a-whole-enterprise-architecture-standard-3-
method/
• (Slide 48) Post 'Towards a whole-enterprise architecture standard – 4: Content',
http://weblog.tetradian.com/2016/05/01/towards-a-whole-enterprise-architecture-standard-4-
content/
• (Slide 52) Post 'An enterprise-architects' mantra', http://weblog.tetradian.com/2014/04/18/an-ea-
mantra/
• (Slide 54) Video 'Introduction to visioning', https://youtu.be/z0ybs2VOI-M
• (Slide 56) Post 'Services and Enterprise Canvas review - 4: Layers',
http://weblog.tetradian.com/2014/10/24/services-and-ecanvas-review-4-layers/
Further information (page 4 of 5)
• (Slide 61) Video 'Introduction to Holomap stakeholder-mapping', https://youtu.be/dZWFYbGcVgQ
• (Slide 68) Slidedeck 'What's the SCORE?', https://www.slideshare.net/tetradian/whats-the-score-
how-to-make-sense-of-a-business-change
• (Slide 68) Video 'Introduction to SCORE', https://youtu.be/SdkhYl7ae0M
• (Slide 70) Video 'Introduction to SCAN complexity-map', https://youtu.be/qvgBIXItVYw
• (Slide 72) Video 'Introduction to Enterprise Canvas core', https://youtu.be/vcaeDwPtsJY
• (Slide 72) Video 'Introduction to Enterprise Canvas support-services',
https://youtu.be/1XscaHoNVTs
• (Slide 72) Post-series ''"Services and Enterprise Canvas review': summary at
http://weblog.tetradian.com/2014/10/29/services-and-ecanvas-review-summary/
• (Slide 75) Post 'Services and Enterprise Canvas review – 5: Service-content',
http://weblog.tetradian.com/2014/10/27/services-and-ecanvas-review-5-service-content/
• (Slide 81) Post 'Architecture basics: The structure of a task',
http://weblog.tetradian.com/2021/03/26/architecture-basics-the-structure-of-a-task/
Further information (page 5 of 5)
• (Slide 92) Slidedeck 'Stepping-stones of enterprise-architecture',
https://www.slideshare.net/tetradian/steppingstones-of-enterprisearchitecture-process-and-
practice-in-the-real-enterprise
• (Slide 94) Video 'Introduction to Change-mapping', https://youtu.be/uey79fSYSNM
• (Slide 102) Change-mapping Books website: http://weblog.tetradian.com/2021/03/26/architecture-
basics-the-structure-of-a-task/
Tools and techniques for whole-enterprise architecture

Tools and techniques for whole-enterprise architecture

  • 1.
    Tools and techniques forwhole-enterprise architecture Tom Graves, Tetradian IQPC EA Summit, April 2021
  • 2.
    Hi. (yeah, I’ve beenworking in architectures for maybe too many years now...?) I’m Tom.
  • 3.
    These days I’mbest described as a maker of tools for change... also on the architecture of change, linking strategy to execution and back again, as needed...
  • 4.
    Four themes for whole-enterprisearchitecture… 1. About context and scope for EA 2. About fitness-for-purpose 3. About tools and fractality 4. About methods for whole-EA
  • 5.
  • 6.
    The role ofall architecture is to ensure effectiveness across the whole of the scope: “Things work better when they work together, on-purpose”
  • 7.
    Over the years,the scope for EA has expanded steadily from IT-infrastructure to business- architecture and beyond. Let’s look at that history...
  • 8.
    A bit ofhistory: 1960s-1970s… First usages of the ‘architecture’ term in IT, such as for the IBM System/360 series Image: Bundesarchiv, B 145 Bild- F038812-0014 / Schaack, Lothar / CC-BY-SA 3.0
  • 9.
    A bit ofhistory: 1980s… IBM-PC etc provide standards for hardware, OS; also key theory-elements such as Zachman’s papers Image: John Zachman via Wikipedia
  • 10.
    A bit ofhistory: 1990s… Client-driven demands for improved IT- effectiveness, such as per US Clinger-Cohen Act Image: CC-BY-SA MysteryBee via Flickr
  • 11.
    A bit ofhistory: 2000s… IT-architecture now also covers apps, data and some aspects of business, and is lazily renamed to ‘enterprise architecture’ Image: Open Group
  • 12.
    A bit ofhistory: 2010s onward… This ‘enterprise- architecture’ now aims to cover all aspects of the business and its enterprise Image: Alex Osterwalder et al
  • 13.
    ...yet we’ve beenhere before... - let’s look at that history too...
  • 14.
    Dowding System: 1940 The‘Dowding System’ for UK air-defence – full integration of process, people, information-flow, feedback, redundancy and more
  • 15.
    Ford’s ‘integrated factory’:1910 Henry Ford’s ‘integrated factory’, from raw-materials to full lifetime of finished product (and waste- management too)
  • 16.
    US railroad systems:1860 US railroads – mapping physical-layout, people and their responsibilities, business- structure and more
  • 17.
    Roman Empire: CE100 Fullintegration of resource- management, security, economics, politics and more, across the entire Empire
  • 18.
    Enterprise-architecture as the architectureof the enterprise - every aspect of the enterprise, whatever that enterprise may be
  • 19.
    Need ‘architecture ofarchitectures’ that’s consistent across: every type of enterprise, every scope and scale, every type of content and context, every stage of implementation, every part of the change-lifecycle
  • 20.
  • 21.
    Do our currenttools and techniques have fitness-for-purpose for: every type of enterprise, every scope and scale, every type of content and context, every stage of implementation, every part of the change-lifecycle
  • 22.
  • 23.
    The main reasonfor unfitness: a persistent scope-error mistaking the scope for enterprise-wide IT with the scope for the enterprise itself
  • 24.
    One of theseis not like the others… • Data-architecture is the architecture of data • Security-architecture is the architecture of security • Process-architecture is the architecture of processes • Business-architecture is the architecture of business • Enterprise-architecture is the architectural-analysis for detail-design of IT-infrastructure in large organisations
  • 25.
    “Enterprise architecture is solelythe architecture for enterprise-wide IT” ? - hmm… CC-BY-ND-SA ores2k via Flickr
  • 26.
    …gonna hafta thinkabout this one… CC-BY-ND alexsemenzato via Flickr
  • 27.
    Enterprise-wide IT-architecture is onlyone small subset of whole-enterprise architecture (and it’s actually the easy bit...)
  • 28.
  • 29.
  • 30.
    what we need…what we have…
  • 31.
    utter confusion… Content-before-context causesconfusion... confusion… IT-specific
  • 32.
    The scope andarchitecture for enterprise-wide IT is not the same as the scope and architecture for the enterprise itself… - don’t mix them up!
  • 33.
    Other reasons forpoor fitness: • Over-emphasis on ‘state’ • Over-emphasis on certainty • Optimised for mass-sameness • Optimised for single timescales • Fragmentation into ‘walled-gardens’
  • 34.
    In most classic change-models, wecontrast ‘current state’ and ‘future state’ - yet in the real- world there is no ‘state’ – there is only change Concern: Over-emphasis on ‘state’
  • 35.
    Concern: Over-emphasis oncertainty (after Damien Newman) Key information is lost for use in the ‘messy’ part of the next loop Tools over-focus on the ‘certainty’ part of the process
  • 36.
    Concern: Optimised forsameness A quest for certainty: analysis, algorithms, identicality, efficiency, business-rule engines, executable models, Six Sigma... SAMENESS (IT-systems do work well here) UNIQUENESS (IT-systems don’t work well here) An acceptance of uncertainty: experiment, patterns, probabilities, ‘design- thinking’, unstructured process, ‘human’... certain uncertain
  • 37.
    Concern: Optimised forsingle timescales Like a forest, the real-world has many complex, interleaving timescales
  • 38.
    Concern: Tools as‘walled-gardens’ No connection between tools – causes fragmentation Tools are scattered all over the exploration- space
  • 39.
    • “Architecture isan exercise in truth” - architecture is about structure – (IT-architecture is often really good at this) • “Architecture is an exercise in narrative” - architecture is about story – (IT-architecture is often really bad at this…) We need balance between structure and story ‘Two points of view on architecture’ (adapted from Chapter 84, in Matthew Frederick, 101 Things I Learned In Architecture School, MIT Press, 2007
  • 40.
    A quick recap: What’sour current state of play?
  • 41.
    Our sales-pitch toexecutives: ensure and enhance effectiveness across the enterprise as a whole, adapting to and guiding change, always ‘on-purpose’
  • 42.
    Need effectiveness acrossthe whole: any form of local-optimisation is Not A Good Idea… (yet most current tools and methods for EA are optimised only for specific domains - mainly IT and ‘business-architecture’)
  • 43.
    Our ‘architecture ofarchitectures’ needs tools and methods that work the same way everywhere across a whole-enterprise scope (and where everything links together across the whole, always)
  • 44.
    Yes, there’s a lotto this stuff about ‘whole- enterprise’…
  • 45.
  • 46.
    How to eat anelephant? …one bite at a time!
  • 47.
    For this too,it’s likewise ‘one bite at a time’ - yet each small bit linked into the whole, each bit getting better at doing the work
  • 48.
    Tools and methodsmust address: • Any/all contexts, scopes, content etc • Continual change, ‘statelessness’ • Certainty and uncertainty • Mass-sameness and mass-uniqueness • Any/all timescales, interleaving • Integration across all ‘walled-gardens’ • Structure and story
  • 49.
    Two questions toexplore… • What patterns, tools and guidelines do we need for this work? • What techniques and methods do we need, to map each item of change, to do the right things right, and learn from each action?
  • 50.
  • 51.
    The core requirementsagain: • tools able to address any type of enterprise, any scope and scale, and any content and context, stages of implementation and change-lifecycle • must help to link everything together into a unified whole
  • 52.
    An architects’ mantra: “Idon’t know” (but I know how to find out) “It depends” (and I can find out what it depends on) “Just enough detail” (not too little, not too much) “Start anywhere” (everything’s connected!) “Be honest, be kind” (everyone has their challenges)
  • 53.
    Fractality is ourfriend… Once we’ve identified the context, we can use fractal-type ‘self- similar’ patterns to gather detail and help connect across the whole… …tools that we can use everywhere
  • 54.
    Tools to helpidentify context: • Visioning – identify the context-story, values, guiding, principles, standards etc • Layers – identify the core stakeholders and required level or type of detail
  • 55.
    Identifying context: Visioning Thevision or story-descriptor is the ultimate anchor for everything that the enterprise is and does – the organisation then links itself into that story. A three-part ‘story’ that makes sense to all enterprise-stakeholders Elements of a vision-statement Action (‘How’): what is being done to or with or about the concern Example: “Ideas worth spreading” Qualifier (‘Why’): the emotive driver for action on the concern Example: “Ideas worth spreading” Concern (‘What’): the focus of interest to everyone in the shared-enterprise Example: “Ideas worth spreading”
  • 56.
    Visioning: Derive values,principles etc Given the vision- statement, we can then derive values and principles that can guide decision-making within the organisation Vision outlines the shared-story… Principles devolve from values… Value-propositions must align to vision, values, principles… Vision, role, mission, goal… Values devolve from the vision…
  • 57.
  • 58.
    Layers: Scope withinthe context We can use a layer-model to identify which parts of the overall context we will address (Note that ‘classic’ EA will address only a subset of these layers)
  • 59.
    Layers: Types ofstakeholders The layers that we choose also help us identify the types of stakeholders that we will need to work with and consult
  • 60.
    Fractal-checklist tools forcontent: • Holomap – describe transactions, interactions, dependencies, relationships • SCORE – identify strategic options • SCAN – model the complexity in context • Service Canvas – describe services, service- content and service-relationships
  • 61.
    Identifying content: Holomap TheB(I)DAT- stack used in TOGAF etc is just one context- specific instance of the more generalised pattern of the Holomap B(I)DAT-stack Holomap pattern
  • 62.
    Holomap: Business-architecture The Holomap patternalso shows why the ‘Business- Architecture’ description in TOGAF does not work well for business itself… BIDAT-stack Holomap Business- architecture Holomap
  • 63.
    Holomap: Both ‘outward’and ‘inward’ The complete Holomap pattern also extends downward, fractally, into the detail for implementation and action
  • 64.
    Holomap: Organisation andenterprise When the ‘service-in-focus’ for a Holomap is the organisation as a whole, the pattern looks like this…
  • 65.
    Holomap: Implementation-detail …where the patternfor real- world detail of implementation – for which the BIDAT-pattern is only one subset – would look more like this… applications, data etc technology, infrastructure, agents etc purpose, guidance etc scope of BIDAT
  • 66.
    Holomap: Adapt tocontext It’s a checklist- pattern, so we can adapt it to more complex contexts such as a business’ IT-organisation… IT-organisation relationship-pattern travel-ecommerce relationship-pattern …or a multi-partner ecommerce transaction-space
  • 67.
    Holomap: Mapping responsibility Wecan also merge the Holomap with other fractal- compatible tools, such as in linking Holomap with RACI to map the organisation’s types of responsibilities with its stakeholders
  • 68.
    Identifying content: SCORE SCORE (Strengths, Challenges, Options, Responses, Effectiveness) providesa consistent means to explore strategic choices This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 International License (CC BY-SA 4.0). To view a copy of this license, visit https://creativecommons.org/licenses/by-sa/4.0/ Tetradian www.tetradian.com Project By Date Versio n SCORE strengths Strengths / Services / Support (existing capabilities and resources, potential for synergies) challenges Challenges / Capabilities-needed (‘weaknesses’ indicate needed capabilities and resources) options Options / Opportunities and risks (opportunity is also risk, risk is also opportunity) responses Responses / Returns / Rewards (probable or emergent consequences of action or inaction) effectiveness default: efficient, reliable, elegant, appropriate, integrated focus-question
  • 69.
    SCORE: Provenance ofchoices With SCORE, we move around the space, linking ideas to feedback and actions, and building a trail of provenance for each choice along the way This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 International License (CC BY-SA 4.0). To view a copy of this license, visit https://creativecommons.org/licenses/by-sa/4.0/ Tetradian www.tetradian.com Project By Date Versio n SCORE strengths Strengths / Services / Support (existing capabilities and resources, potential for synergies) challenges Challenges / Capabilities-needed (‘weaknesses’ indicate needed capabilities and resources) options Options / Opportunities and risks (opportunity is also risk, risk is also opportunity) responses Responses / Returns / Rewards (probable or emergent consequences of action or inaction) effectiveness default: efficient, reliable, elegant, appropriate, integrated focus-question
  • 70.
    Identifying content: SCAN SCANhelps us to map out types and levels of uncertainty before, during and after the action at a given ‘NOW’
  • 71.
    SCAN: Resolve uncertainty Oneuse for SCAN is to help identify reducible- uncertainty to resolve before action, versus non-reducible uncertainty that can be resolved only at run-time reducible uncertainty non-reducible uncertainty purported certainty
  • 72.
    Identifying content: ServiceCanvas A consistent, symmetric, fully- fractal way to model every type of activity in the enterprise as services and their exchanges support- services child-services within the service (Note: Service Canvas is also known as Enterprise Canvas)
  • 73.
    Service Canvas: Crosslinkto Holomap Support-services in Service Canvas link into different parts of the respective Holomap and its relationships: transaction, direct-interaction, indirect- interaction
  • 74.
    Service Canvas: Crosslinkwith SCAN Child-services within each Service Canvas crosslink to the ‘before, during, after’ of SCAN, and other fractal models such as Service Cycle ‘before, during, after’ as in SCAN
  • 75.
    Service Canvas: Service-content ServiceCanvas includes a consistent way to describe service- content and structure- elements, crosslinked to context-layers
  • 76.
    Reprise on corerequirements: • every type of enterprise, any scope and scale, any content and context, stages of implementation and change-lifecycle • link everything together into a unified whole • fractality is our friend in all of this
  • 77.
  • 78.
    Core requirements formethod: • works the same way everywhere • work with every type of enterprise, any scope, scale, content, context, stage of implementation, change-lifecycle • link everything into a unified whole
  • 79.
    CAUTION: current ‘EA’ methodswill often: • work well for only one type of context • work well for only one type of enterprise, scope, scale, content, context, stage of implementation, or change-lifecycle • create fragmented ‘walled-gardens’
  • 80.
    Down to detailsfor method... • connect strategy to real-world action • connect big-picture to fine-detail • keep the whole in mind at all times (Note: fractality is our friend for this - the naturally recursive nature of tasks)
  • 81.
    Rethinking tasks: Task… Ona Gantt- chart, we would show the task just as a labelled box…
  • 82.
    Rethinking tasks: Action Lookinginside the box, we’d describe the Action via a work-instruction – a set of mini- tasks…
  • 83.
    Rethinking tasks: Actionand results We’ll also need to track the outcomes of the task: the records of action, and any variances, incidents and insights arising…
  • 84.
    Rethinking tasks: Planand Action Each task will need its own Plan, to resolve uncertainties, identify desired outcomes and records, and set up for action…
  • 85.
    Rethinking tasks: Contextand Scope We’ll need to ensure that we know the Scope and Context for the action – and if we don’t know what these are, stop until we do know them…
  • 86.
    Rethinking tasks: Reviewand learn The task is not complete until we’ve verified benefits-realised, identified the lessons-learned, and logged any tasks-arising…
  • 87.
    TOGAF does alsofollow this pattern… The TOGAF ADM (Architecture Development Method) does sort-of follow the same overall pattern, if with some parts hardwired to an IT-only focus Context Scope Plan Action Review
  • 88.
    what we havenow… what we need for this… …though it does need to be fully fractal
  • 89.
    Dependencies drive thepattern... • learning depends on info from action • action depends on plan and preparation • planning depends on awareness of scope • scope for action depends on context • successful outcomes depend on doing the right things right, and improving every time
  • 90.
    “Do all ofthis for the whole enterprise? - that’s impossibly huge!” Actually, no, it’s not that hard, if we remember that one simple trick…
  • 91.
    How to eat anelephant? …one bite at a time! (But remember that it’s always a whole elephant…)
  • 92.
  • 93.
    All we haveto do is keep going, keep going, one step at a time - then fractality, consistent tools and consistent methods will do the rest for us (mostly, anyway…)
  • 94.
    Change-mapping provides a consistentmethod to do this: • guide and keep track of change-tasks, and their provenance and outcomes • keep track of all interdependencies within and between change-tasks, and guide use and re-use of task-outcomes
  • 95.
    We hide thecomplexity via separation of concerns and separation of roles: • roles such as Explorer, Pathfinder and Reporter tackle the tasks for the context of each mission and its underlying issue • roles such as Librarian, Coordinator and Architect tackle connection across all tasks
  • 96.
    Think of itas like the departments in a factory… 1. Context 2. Scope 3. Plan 4. Action 5. Review …an iterative, recursive cycle of change… …everything shared in the centre and its repository
  • 97.
    Context-neutral tools andmethods as used in Change-mapping connect everything, consistently, across every part of the enterprise - and keep it simple enough for everyone to use, everywhere
  • 98.
    Keep it simplewith a folder metaphor Missions act as containers for each set of tasks and their sub-tasks (tasks and their folders may be nested to any depth that we need)
  • 99.
    A core concept: everythingis a plug-in tool (even the method itself is just another plug-in tool…) Use fractality, dependencies, layering to link big-picture, context-neutral tools to all those context-specific tools that we need for detailed design
  • 100.
    Use any toolas a plug-in Every use of a tool is a ‘mini-task’ in its own right, following the same pattern, invoked in the same way, with its results stored in the respective folder
  • 101.
    Change-mapping is already provenin practice, using paper forms and physical folders - what’s needed next is the right software toolset, such as an expanded Gantt-chart with fully-fractal task-nesting, task-linking, plug-in tools and central repository (any developer interested in this, please get in touch with us!)
  • 102.
    Books on Change-mapping PublishedMarch 2020 Published March 2021 (to be published early 2022)
  • 103.
  • 104.
    As enterprise-architects, wecan address a whole-enterprise scope - any type of enterprise, at any scale, any context, any type of content, whatever Let’s do this! - and link everything together, consistently, in any way that we need
  • 105.
    Three takeaways: 1.The purposeof EA is enterprise effectiveness 2.EA must be able to extend to whole-enterprise 3.Tools and methods to do this do already exist (so let’s use them, make them easier to use) Conversations on this need to happen – let’s make them happen!
  • 106.
  • 107.
    Further information (page1 of 5) • (Slide 04) Post-series 'Towards a whole-enterprise architecture standard': summary at http://weblog.tetradian.com/2016/06/06/towards-a-whole-enterprise-architecture-standard- summary/ • (Slide 06) Enterprise-effectiveness: post 'A tagline for enterprise effectiveness', http://weblog.tetradian.com/2015/06/02/tagline-for-enterprise-effectiveness/ • (Slide 14) Wikipedia on Dowding system: 'Dowding system', https://en.wikipedia.org/wiki/Dowding_system • (Slide 23) IT-centrism: 'IT-centrism and real-world enterprise-architecture', http://weblog.tetradian.com/2014/03/24/it-centrism-and-real-world-ea/ • (Slide 31) Confusion from the 'BDAT-stack': 'On business-architecture and enterprise-architecture', http://weblog.tetradian.com/2017/07/03/on-ba-and-ea/ • (Slide 32) Consequences of IT-centrism: 'How IT-centrism creeps into enterprise-architecture', http://weblog.tetradian.com/2012/01/30/how-it-centrism-creeps-into-ea/ • (Slide 34) Over-emphasis on 'state': 'The no-plan plan: Architecture dynamics', http://weblog.tetradian.com/2011/10/21/the-no-plan-plan-architecture-dynamics/’
  • 108.
    Further information (page2 of 5) • (Slide 36) Slidedeck 'Same and different: architectures for mass-uniqueness', https://www.slideshare.net/tetradian/same-and-different-architectures-for-massuniqueness • (Slide 35) Post 'Documenting the Not-known', http://weblog.tetradian.com/2018/05/06/documenting-the-not-known/ • (Slide 36) Post 'Scalability and uniqueness', http://weblog.tetradian.com/2013/04/24/scalability- and-uniqueness/ • (Slide 37) Post 'More on backbone and edge', http://weblog.tetradian.com/2013/05/04/more-on- backbone-and-edge/ • (Slide 37) Slidedeck 'Backbone and edge: Architecting the balance between continuity and change', https://www.slideshare.net/tetradian/backbone-and-edge-architecting-the-balance- between-continuity-and-change • (Slide 38) Tools as walled-gardens: slidedeck 'Disintegrated enterprise-architecture?', https://www.slideshare.net/tetradian/disintegrated-enterprisearchitecture • (Slide 38) Post 'Toolsets, pinball and un-dotting the joins', http://weblog.tetradian.com/2015/01/16/toolsets-pinball-and-undotting-joins/
  • 109.
    Further information (page3 of 5) • (Slide 39) Slidedeck 'The enterprise is the story', https://www.slideshare.net/tetradian/the- enterprise-is-the-story-54141263 • (Slide 44) Slidedeck 'Whole-enterprise architecture', https://www.slideshare.net/tetradian/wholeenterprise-architecture • (Slide 48) Post 'Towards a whole-enterprise architecture standard – 3: Method', http://weblog.tetradian.com/2016/04/27/towards-a-whole-enterprise-architecture-standard-3- method/ • (Slide 48) Post 'Towards a whole-enterprise architecture standard – 4: Content', http://weblog.tetradian.com/2016/05/01/towards-a-whole-enterprise-architecture-standard-4- content/ • (Slide 52) Post 'An enterprise-architects' mantra', http://weblog.tetradian.com/2014/04/18/an-ea- mantra/ • (Slide 54) Video 'Introduction to visioning', https://youtu.be/z0ybs2VOI-M • (Slide 56) Post 'Services and Enterprise Canvas review - 4: Layers', http://weblog.tetradian.com/2014/10/24/services-and-ecanvas-review-4-layers/
  • 110.
    Further information (page4 of 5) • (Slide 61) Video 'Introduction to Holomap stakeholder-mapping', https://youtu.be/dZWFYbGcVgQ • (Slide 68) Slidedeck 'What's the SCORE?', https://www.slideshare.net/tetradian/whats-the-score- how-to-make-sense-of-a-business-change • (Slide 68) Video 'Introduction to SCORE', https://youtu.be/SdkhYl7ae0M • (Slide 70) Video 'Introduction to SCAN complexity-map', https://youtu.be/qvgBIXItVYw • (Slide 72) Video 'Introduction to Enterprise Canvas core', https://youtu.be/vcaeDwPtsJY • (Slide 72) Video 'Introduction to Enterprise Canvas support-services', https://youtu.be/1XscaHoNVTs • (Slide 72) Post-series ''"Services and Enterprise Canvas review': summary at http://weblog.tetradian.com/2014/10/29/services-and-ecanvas-review-summary/ • (Slide 75) Post 'Services and Enterprise Canvas review – 5: Service-content', http://weblog.tetradian.com/2014/10/27/services-and-ecanvas-review-5-service-content/ • (Slide 81) Post 'Architecture basics: The structure of a task', http://weblog.tetradian.com/2021/03/26/architecture-basics-the-structure-of-a-task/
  • 111.
    Further information (page5 of 5) • (Slide 92) Slidedeck 'Stepping-stones of enterprise-architecture', https://www.slideshare.net/tetradian/steppingstones-of-enterprisearchitecture-process-and- practice-in-the-real-enterprise • (Slide 94) Video 'Introduction to Change-mapping', https://youtu.be/uey79fSYSNM • (Slide 102) Change-mapping Books website: http://weblog.tetradian.com/2021/03/26/architecture- basics-the-structure-of-a-task/