THOMAS “Tom” J. JOHNSON P.E.
10229 Springtree Av, Baton Rouge, LA 70810
Cell: 337-258-7283 email: tjjohnson2@cox.net
SUMMARY OF EXPERIENCE:
Top performing and results driven professional mechanical engineer offering 30 years
mechanical project management, design engineering, and construction engineering experience
with ventilating, and air conditioning (HVAC) systems, fire protection systems, and plumbing
systems for marine, commercial, institutional, healthcare, military, and industrial projects.
Demonstrates strong leadership, analytical problem solving, interpersonal skills, and informed
decision making capabilities.
Key strengths include successful project experience working independently or in large project
teams with a positive attitude.
As a project manager consistent project progress was achieved producing timely continuous
workflow of documents by the team; maintaining client project updates; coordinating with
disciplines for change management; reassessing work scope and design changes for optimal
system performance all while adhering to schedule, budget, document control constraints.
QUALIFICATIONS:
• 28+ years experience managing engineers, designers, and support personnel.
• 25+ years experience in all aspects of project management and design work including
initiating and maintaining client contacts, tracking project progress and budget, scope
development, all phases of design, and construction administration work.
• Heating, ventilating, and air-conditioning (HVAC) systems experience includes central
plant design with chillers (centrifugal, reciprocating, screw, scroll) and boilers
(atmospheric and fire tube boilers), water source heat pump systems, and direct
expansion systems (split, rooftop, PTAC). Air systems design includes: variable air
volume systems, constant volume systems, and laboratory systems with VAV supply
and exhaust systems, and distributed fan coil units.
• Fire protection systems experience includes wet, dry, deluge, pre-action, adapting dry to
wet pipe systems, fire pump systems, and air smoke evacuation systems design.
• Plumbing experience includes restaurant and school kitchens, laboratory, RV parks
sewage systems, low rise buildings systems, domestic water pumps, lift stations.
• Extremely organized and methodical in approach to project management and design
engineering. Project deliverable, contract documents are approached as a prioritized list
of tasks requiring timely resource coordination, discipline coordination, client prior
approvals/discussions for major systems/approaches and daily attention to engineering/
drafting task work flow.
• Capable of engineering and managing projects to completion, on time.
• Good oral, written, and communication skills.
• Ability to identify and solve problems effectively and efficiently.
• Experience with Trace 600, Carrier HAP, Elite, Excel, Word, and other Microsoft Office
Programs.
• Project management of schedules, budgets, personnel, control activities, etc.
Page 1 of 6
PROFESSIONAL ACHIEVEMENTS:
MARINE PROJECTS:
• Seven (7) Years Design and Build Experience with Largest Design/Build Olympus
Offshore Living Quarters & Miscellaneous Building Offshore Platforms in the Gulf of
Mexico
• Maintained long term working relationships with large oil upstream client for three new
Gulf of Mexico deep water projects designing and building HVAC and plumbing for
Living Quarters and Miscellaneous Buildings on tension leg platforms and floating
restrained platforms. Projects: Olympus, Appomattox, and Vito.
• Quickly learned policies, procedures, and client / United States Coast Guard (USCG)
requirements on the job while designing and building the largest offshore Living Quarters
and Miscellaneous Electrical Buildings in the Gulf of Mexico. (Olympus)
• Designed client guidelines and standards for HVAC, and plumbing for offshore
platforms. Compliance with client and USCG standards.
• Presented options, discussed pros and cons for options with clients, and designed
mechanical systems up to the 50% level completion level for HVAC, plumbing, and fire
protection for Mars B / Olympus project. Post 50% required delegation of plumbing and
fire protection to other discipline leads for completing the detail design.
• Chief HVAC Engineer responsible for simultaneously expediting project progress by
designing, reviewing submittals, and providing construction support during the course of
the 3 year design/build projects (Olympus and Appomattox).
LAND BASED PROJECTS:
• Helped develop procedures for handling difficult clients (Military, Defense Contractors,
and Industrial Corporations). These procedures included project planning, detailed
meeting agendas; addressing sensitive issues diplomatically and fairly, on an item by
item basis; providing demonstrations for clarification of design intent; and presenting on
the spot alternatives for problematic issues.
• Assumed responsibility of twenty-two projects (Dallas Independent School District) under
design and construction. Resolution of project issues resulted in minimizing liability
exposure by solving critical construction issues with minimum cost impact, in a timely
manner while preserving the company’s reputation. Client relations were improved
through better service and diligent construction administration.
• Satisfied difficult clients by providing on site construction administration support and one-
on-one site consults to address specific concerns with an expedited path forward for
issue resolutions.
• Designed state-of-the-art low pressure VAV HVAC system and provided construction
administration for State Capital Complex - Claiborne Office Building. (Offices for State of
Louisiana Facility Planning and Control).
Page 2 of 6
• Designed semiconductor fabrication plant exhaust system for optimum, cost effective,
configuration with minimum ductwork, simplified installation, fabrication, and
maintenance using new products and technology. This resulted in a 25 % savings in
ductwork installation costs and shorter schedule of installation.
• Designed 0-100 % contract documents for Laredo International Airport in 5 weeks.
Project was delivered on time and under budget.
EDUCATION:
University of Louisiana at Lafayette, Lafayette, LA.
Master of Science Degree, Engineering Management, 1984
Bachelor of Science Degree, Mechanical Engineering, 1985
PROFESSIONAL MECHANICAL ENGINEER REGISTRATION:
California (by Exam 1989)
Texas (reciprocity 1994)
Louisiana (reciprocity 1998)
Mississippi (reciprocity 2004).
PROFESSIONAL ACTIVITIES:
·Louisiana Engineering Society (LES), Member.
·American Society of Heating Air Conditioning Engineers (ASHRAE), Member.
·American Society of Mechanical Engineers (ASME), Member.
EMPLOYMENT EXPERIENCE: (1986-PRESENT – Reverse Chronological Order):
Employer 2006-Present.
Company: Jacobs Engineering Group
Division: Upstream Alliance. (2009- Present) New Orleans & Metairie, LA.
Role: Lead HVAC & Plumbing Mechanical Engineer
Description: HVAC Lead for large offshore Living Quarters and Miscellaneous Buildings projects
($100 Million Total Installed Cost Quarters and Miscellaneous Buildings). Responsibilities
include Lead (Engineer of Record) Engineer for all HVAC system contract documents
(specifications and drawings), HVAC design approach, calculations, design layout of ductwork,
chilled water piping systems, document production checking, equipment selection, coordination
with disciplines, team meetings, client meetings, model reviews, final checking, etc. Projects
consisted of offshore marine topsides Living Quarters and Miscellaneous Buildings. Contact
Randy Hasling and Malcolm Melancon.
Division: Downstream Alliance. (2006-2009) Baton Rouge, LA.
Role: Project Engineer
Description: PE for small cap projects (under $ 10 million Total Installed Cost). Support role for
Project Manager and technically responsible for continuity of workflow between disciplines,
client coordination, meeting activities, production of deliverables. Small Cap projects summary
is at the end of the resume. Contact Bob Raborn and John Kobe.
Employer 2003-2006.
Company: Marrero, Couvillon & Associates, LLC. Baton Rouge, LA.
Role: Mechanical Department Manager, Project Manager, Senior Mechanical Engineer.
Description: Managed 15-20 HVAC projects simultaneously. Responsibilities are similar to
Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities also
Page 3 of 6
included plumbing and fire protection systems design. Projects consisted of commercial,
industrial, and healthcare. Contact Hugo Marrero.
Employer 1998-2002.
Company: Associated Design Group, Inc. Lafayette, LA.
Role: Project Manager and Senior Mechanical Engineer.
Description: Managed 15-20 HVAC projects simultaneously. Responsibilities are similar to
Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities also
included plumbing and fire protection. Projects consisted of commercial, industrial, and
healthcare. Contact Larry Blanchette.
Employer 1994-1998.
Company: Mateo Consulting Engineers, Dallas, TX. Business sold 1999.
Role: Mechanical Department Manager and Senior Mechanical Engineer.
Description: Managed 15-20 HVAC projects simultaneously. Responsibilities are similar to
Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities also
included plumbing and fire protection. Projects consisted of commercial, industrial, and
healthcare. Contact Sterling Forsythe.
Employer 1988-1994.
Company: Norman Engineering Company, Los Angeles, CA. Business closed 1995.
Role: Senior Mechanical Engineer and Project Manager.
Description: Managed 10-15 HVAC projects simultaneously. Responsibilities are similar to
Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities also
included plumbing and fire protection. Projects consisted of military, industrial, and defense
contractors. Contact Ken Goodwin.
Employer 1986-1988.
Company: Holmes & Narver, Inc., Orange, CA.
Role: Mechanical Engineer.
Description: Responsibilities are similar to Jacobs Engineering Group Upstream Alliance
responsibilities. Design responsibilities included HVAC engineering task work, HVAC
mechanical room design, and ACAD drafting. Projects consisted of military, industrial, and
defense contractors. Contact Dennis Berejka.
ABBREVIATED REPRESENTATIVE HVAC PROJECT EXPERIENCE:
Grouped by Project Type. (Other experience is available upon request.)
MARINE EXPERIENCE: (2009 TO PRESENT):
Project, Location: Project Description
Shell Vito FPS, Gulf of Mexico: Preliminary Design Living Quarters & Misc Bldgs
Shell Appomattox FPS, Gulf of Mexico: 65,000 SF Total with Living Quarters & Misc Bldgs
Shell Olympus TLP, Gulf of Mexico: 60,000 SF Total with Living Quarters & Misc Bldgs
INDUSTRIAL & MILITARY EXPERIENCE:
Project, Location: Project Description
Semiconductor Clean Rooms:
Texas Instruments, Dallas, TX: Emergency System Modifications
Texas Instruments, Dallas, TX: 250,000 Gallon D. I. System Mods
SGS Thomson, Dallas, TX: 8,500 SF Clean Room Cleanroom/Tool Mods
Texas Instruments 605 New Fab, Dallas TX New Central Exhaust Systems, Class 100
Cleanroom
Page 4 of 6
Texas Instruments, Dallas, TX: Make-up Air Handling Cleanroom Units
Laboratories & Testing:
Missile Systems Lab, Pt. Mugu, CA: Missile Testing & Assembly
Naval Ordnance Station, Indianhead, MD: Warhead Factory
Boeing 747/757 Paint Facility, Seattle, WA: Jet Painting Facility
NASA Ames Research Ctr, Moffit Field, CA: 30,000SF Wind Tunnel Laboratory
Acoustic Testing Facility, San Diego, CA: Class 100,000 Clean Room
Flow Booth Testing Facility, San Diego, CA: Class 10,000 Flow Hoods/ Clean Room
TRW Space Park, El Segundo, CA: Laboratory Renovations
Fish Technology Center, Bozeman, MT: New 14,000 SF Fisheries Laboratory & Office
Military Renovation Projects:
Boiler Renovations, Vandenburg AFB, CA: Central Plant Renovations
Housing Renovations, Vandenburg AFB, CA: 130 Housing Unit Modifications Steam System
Mods, Vandenberg AFB, CA: Acid Bath Area Modifications
Cleaning Facility, Vandenberg AFB, CA: Acid Bath Area Mods National Air Guard,
Maintenance Facility, Hammond, LA: 16,000 SF HVAC Modifications
Naval Ordinance Station, Indianhead, MD 30,000 SF New Warhead Factory
Industrial Projects:
BellSouth Suburban, Baton Rouge, LA: Upgrade to 2-400 KW Standby Engines
BellSouth Goodwood, Baton Rouge, LA: Upgrade to 750 KW Standby Engines
US Sugar, Clewiston, Florida: Central Plant Mods
Vetrotex Certainteed, Wichita Falls, TX: 105,000 CFM Air Scrubber System Mods
COMMERCIAL EXPERIENCE:
Project, Location: Project Description
Education
St Augustine School, New Orleans, LA: New 30,000 SF School & 20,000 SF Renovations
Isidore Newman School, New Orleans, LA: New 50,000 SF School Addition
Tulane A B Freeman Bldg, New Orleans, LA: New 50,000 SF Business School Building
Parkview School Mods, Baton Rouge, LA: 15,000 SF Stadium Renovations
4 DISD Elem Schools, Dallas, TX 4 -New 120,000 SF Schools HVAC Systems
30+ School Renovations, CA, TX, & LA Various Renovations Projects - HVAC & Plumbing
Office Buildings:
Claiborne Office Bldg, Baton Rouge, LA; New 460,000 SF Office Bldg
NASA Marshall Sp Flt Center, Huntsville,AL New 400,000 SF Six Story Office Building
National Test Facility, Colorado Springs,CO New 1,000,000 SF 5 Bldg Campus
Aggreko Executive Off Bldg, New Iberia, LA New 50,000 SF Office Bldg
BellSouth Landmark Center, Jackson, MS: HVAC Renovations, 90,000 SF Renovations
Exec Bldg, Warner Brothers, Burbank, CA 12,000 SF HVAC Renovations
US Courthouse, St Louis, MO New 30 Story Courthouse – HVAC Systems
Healthcare:
American Legion Hospital, Jennings, LA: New 48,000 SF 3-Story Bed Tower
Medical Surgery Center, New Iberia, LA New 7,500 SF Outpatient Surgery Suite
HVAC System Additions, New Orleans, LA: The Blood Center, Training 5,000 SF
Lift Station Mods, Belle Chase, LA: 1,000,000 SF Board & Healthcare Facility
Fire Protection Mods, Hammond, LA: 245,000 SF Healthcare Facility
Public Buildings & Transportation:
Laredo International Airport, Laredo, TX New 125,000SF Airport Terminal HVAC Systems
MSY Airport Mods, New Orleans, LA: 25,000 SF Airport Renovations
Page 5 of 6
MSY Airport Mods, New Orleans, LA: Airport Boiler Plant Replacement Renovations
East Airport Mechanical Survey: 1,200,000 SF New Orleans Airport Survey
New Orleans Airport, Kenner, LA: Katrina Emergency Responder
New Orleans Airport Mods, Kenner, LA: Misc Concourse B Renovations
Hotels, Convention Centers, Museums:
Audubon Insectarium, New Orleans, LA: 40,000 SF Historical Renovation & Museum
Events Center, Natchitoches, LA: New 40,000 SF Convention Center
Hilton Homewood Suites, Lafayette, LA: New 130,000 SF Hotel Suites and Luxury Condos
Healthcare Center, Belle Chase, LA: 200,000 SF Fire Protection Renovations
LA Convention Center, Los Angeles, CA New 1,000,000 SF Construction Support
Restaurants:
Piccadilly Prototype, SE Region New 4,500 SF restaurant
Copelands Restaurant, Lafayette, LA New 30,000 SF restaurant
Exxon Travel Center, Broussard, LA New 20,000SF
Historical Renovations:
Warner Bros Motion Pictures, Burbank, CA 12,000 SF Main Admin - HVAC renovations
Warner Bros Motion Pictures, Burbank, CA 30,000 SF Admin Offices - HVAC renovations
US Custom House New Orleans, LA 50,000 SF Bldg Master Plan Renovations
Fair Park, Dallas TX Centennial Bldg, Food/Fiber
Miscellaneous:
No Limit Records Studio, Baton Rouge, LA New 30,000SF Recording Studio Complex - HVAC
San Antonio Natatorium, San Antonio, TX New 35,000 SF Recreation Facility HVAC Systems
Port Vincent Marina, Port Vincent, LA: 20,000 SF Clubhouse, Boat Storage & Resort Area
ABBREVIATED REPRESENTATIVE PROJECT ENGINEER EXPERIENCE:
Jacobs Project Engineer 2006-2009 Chemical Plants and Oil Refineries:
Project, Location: Project Description/Construction Budget
ConocoPhillips, Lake Charles HCGO Strainers $ 1.5MM
C-1101 KO Drum, $ 750,000
FCC Recontact Drum,
LCR Closed Blowdown $ 1.25
Reformate Heartcut to Alliance $ 3.6MM
Cryogenic Improvements $ 3.5MM
SRU Corrosion Probe- Turn Around Project $ 1MM
SRU Igniter Project (TAR 10/07) $ 1MM
SRU Air Demand Analyzer (TAR 10/07) $1.5MM
API Flare $ 2.5MM
Fuel Gas Treating Improvements, $ 1MM
Coke Egress Stair, $ 2MM
Marathon Petroleum Corporation LP Vapor, Gas, Oil Separator, $ 10 MM
Rohm & Haas WAM 7 High Temperature Furnace, $ 3.4 MM
Valero Aruba Refinery SGAR Piperack Improvements Phase 1, $ 4. MM
Page 6 of 6
MSY Airport Mods, New Orleans, LA: Airport Boiler Plant Replacement Renovations
East Airport Mechanical Survey: 1,200,000 SF New Orleans Airport Survey
New Orleans Airport, Kenner, LA: Katrina Emergency Responder
New Orleans Airport Mods, Kenner, LA: Misc Concourse B Renovations
Hotels, Convention Centers, Museums:
Audubon Insectarium, New Orleans, LA: 40,000 SF Historical Renovation & Museum
Events Center, Natchitoches, LA: New 40,000 SF Convention Center
Hilton Homewood Suites, Lafayette, LA: New 130,000 SF Hotel Suites and Luxury Condos
Healthcare Center, Belle Chase, LA: 200,000 SF Fire Protection Renovations
LA Convention Center, Los Angeles, CA New 1,000,000 SF Construction Support
Restaurants:
Piccadilly Prototype, SE Region New 4,500 SF restaurant
Copelands Restaurant, Lafayette, LA New 30,000 SF restaurant
Exxon Travel Center, Broussard, LA New 20,000SF
Historical Renovations:
Warner Bros Motion Pictures, Burbank, CA 12,000 SF Main Admin - HVAC renovations
Warner Bros Motion Pictures, Burbank, CA 30,000 SF Admin Offices - HVAC renovations
US Custom House New Orleans, LA 50,000 SF Bldg Master Plan Renovations
Fair Park, Dallas TX Centennial Bldg, Food/Fiber
Miscellaneous:
No Limit Records Studio, Baton Rouge, LA New 30,000SF Recording Studio Complex - HVAC
San Antonio Natatorium, San Antonio, TX New 35,000 SF Recreation Facility HVAC Systems
Port Vincent Marina, Port Vincent, LA: 20,000 SF Clubhouse, Boat Storage & Resort Area
ABBREVIATED REPRESENTATIVE PROJECT ENGINEER EXPERIENCE:
Jacobs Project Engineer 2006-2009 Chemical Plants and Oil Refineries:
Project, Location: Project Description/Construction Budget
ConocoPhillips, Lake Charles HCGO Strainers $ 1.5MM
C-1101 KO Drum, $ 750,000
FCC Recontact Drum,
LCR Closed Blowdown $ 1.25
Reformate Heartcut to Alliance $ 3.6MM
Cryogenic Improvements $ 3.5MM
SRU Corrosion Probe- Turn Around Project $ 1MM
SRU Igniter Project (TAR 10/07) $ 1MM
SRU Air Demand Analyzer (TAR 10/07) $1.5MM
API Flare $ 2.5MM
Fuel Gas Treating Improvements, $ 1MM
Coke Egress Stair, $ 2MM
Marathon Petroleum Corporation LP Vapor, Gas, Oil Separator, $ 10 MM
Rohm & Haas WAM 7 High Temperature Furnace, $ 3.4 MM
Valero Aruba Refinery SGAR Piperack Improvements Phase 1, $ 4. MM
Page 6 of 6

TJJ Master Resume 4.08.16

  • 1.
    THOMAS “Tom” J.JOHNSON P.E. 10229 Springtree Av, Baton Rouge, LA 70810 Cell: 337-258-7283 email: tjjohnson2@cox.net SUMMARY OF EXPERIENCE: Top performing and results driven professional mechanical engineer offering 30 years mechanical project management, design engineering, and construction engineering experience with ventilating, and air conditioning (HVAC) systems, fire protection systems, and plumbing systems for marine, commercial, institutional, healthcare, military, and industrial projects. Demonstrates strong leadership, analytical problem solving, interpersonal skills, and informed decision making capabilities. Key strengths include successful project experience working independently or in large project teams with a positive attitude. As a project manager consistent project progress was achieved producing timely continuous workflow of documents by the team; maintaining client project updates; coordinating with disciplines for change management; reassessing work scope and design changes for optimal system performance all while adhering to schedule, budget, document control constraints. QUALIFICATIONS: • 28+ years experience managing engineers, designers, and support personnel. • 25+ years experience in all aspects of project management and design work including initiating and maintaining client contacts, tracking project progress and budget, scope development, all phases of design, and construction administration work. • Heating, ventilating, and air-conditioning (HVAC) systems experience includes central plant design with chillers (centrifugal, reciprocating, screw, scroll) and boilers (atmospheric and fire tube boilers), water source heat pump systems, and direct expansion systems (split, rooftop, PTAC). Air systems design includes: variable air volume systems, constant volume systems, and laboratory systems with VAV supply and exhaust systems, and distributed fan coil units. • Fire protection systems experience includes wet, dry, deluge, pre-action, adapting dry to wet pipe systems, fire pump systems, and air smoke evacuation systems design. • Plumbing experience includes restaurant and school kitchens, laboratory, RV parks sewage systems, low rise buildings systems, domestic water pumps, lift stations. • Extremely organized and methodical in approach to project management and design engineering. Project deliverable, contract documents are approached as a prioritized list of tasks requiring timely resource coordination, discipline coordination, client prior approvals/discussions for major systems/approaches and daily attention to engineering/ drafting task work flow. • Capable of engineering and managing projects to completion, on time. • Good oral, written, and communication skills. • Ability to identify and solve problems effectively and efficiently. • Experience with Trace 600, Carrier HAP, Elite, Excel, Word, and other Microsoft Office Programs. • Project management of schedules, budgets, personnel, control activities, etc. Page 1 of 6
  • 2.
    PROFESSIONAL ACHIEVEMENTS: MARINE PROJECTS: •Seven (7) Years Design and Build Experience with Largest Design/Build Olympus Offshore Living Quarters & Miscellaneous Building Offshore Platforms in the Gulf of Mexico • Maintained long term working relationships with large oil upstream client for three new Gulf of Mexico deep water projects designing and building HVAC and plumbing for Living Quarters and Miscellaneous Buildings on tension leg platforms and floating restrained platforms. Projects: Olympus, Appomattox, and Vito. • Quickly learned policies, procedures, and client / United States Coast Guard (USCG) requirements on the job while designing and building the largest offshore Living Quarters and Miscellaneous Electrical Buildings in the Gulf of Mexico. (Olympus) • Designed client guidelines and standards for HVAC, and plumbing for offshore platforms. Compliance with client and USCG standards. • Presented options, discussed pros and cons for options with clients, and designed mechanical systems up to the 50% level completion level for HVAC, plumbing, and fire protection for Mars B / Olympus project. Post 50% required delegation of plumbing and fire protection to other discipline leads for completing the detail design. • Chief HVAC Engineer responsible for simultaneously expediting project progress by designing, reviewing submittals, and providing construction support during the course of the 3 year design/build projects (Olympus and Appomattox). LAND BASED PROJECTS: • Helped develop procedures for handling difficult clients (Military, Defense Contractors, and Industrial Corporations). These procedures included project planning, detailed meeting agendas; addressing sensitive issues diplomatically and fairly, on an item by item basis; providing demonstrations for clarification of design intent; and presenting on the spot alternatives for problematic issues. • Assumed responsibility of twenty-two projects (Dallas Independent School District) under design and construction. Resolution of project issues resulted in minimizing liability exposure by solving critical construction issues with minimum cost impact, in a timely manner while preserving the company’s reputation. Client relations were improved through better service and diligent construction administration. • Satisfied difficult clients by providing on site construction administration support and one- on-one site consults to address specific concerns with an expedited path forward for issue resolutions. • Designed state-of-the-art low pressure VAV HVAC system and provided construction administration for State Capital Complex - Claiborne Office Building. (Offices for State of Louisiana Facility Planning and Control). Page 2 of 6
  • 3.
    • Designed semiconductorfabrication plant exhaust system for optimum, cost effective, configuration with minimum ductwork, simplified installation, fabrication, and maintenance using new products and technology. This resulted in a 25 % savings in ductwork installation costs and shorter schedule of installation. • Designed 0-100 % contract documents for Laredo International Airport in 5 weeks. Project was delivered on time and under budget. EDUCATION: University of Louisiana at Lafayette, Lafayette, LA. Master of Science Degree, Engineering Management, 1984 Bachelor of Science Degree, Mechanical Engineering, 1985 PROFESSIONAL MECHANICAL ENGINEER REGISTRATION: California (by Exam 1989) Texas (reciprocity 1994) Louisiana (reciprocity 1998) Mississippi (reciprocity 2004). PROFESSIONAL ACTIVITIES: ·Louisiana Engineering Society (LES), Member. ·American Society of Heating Air Conditioning Engineers (ASHRAE), Member. ·American Society of Mechanical Engineers (ASME), Member. EMPLOYMENT EXPERIENCE: (1986-PRESENT – Reverse Chronological Order): Employer 2006-Present. Company: Jacobs Engineering Group Division: Upstream Alliance. (2009- Present) New Orleans & Metairie, LA. Role: Lead HVAC & Plumbing Mechanical Engineer Description: HVAC Lead for large offshore Living Quarters and Miscellaneous Buildings projects ($100 Million Total Installed Cost Quarters and Miscellaneous Buildings). Responsibilities include Lead (Engineer of Record) Engineer for all HVAC system contract documents (specifications and drawings), HVAC design approach, calculations, design layout of ductwork, chilled water piping systems, document production checking, equipment selection, coordination with disciplines, team meetings, client meetings, model reviews, final checking, etc. Projects consisted of offshore marine topsides Living Quarters and Miscellaneous Buildings. Contact Randy Hasling and Malcolm Melancon. Division: Downstream Alliance. (2006-2009) Baton Rouge, LA. Role: Project Engineer Description: PE for small cap projects (under $ 10 million Total Installed Cost). Support role for Project Manager and technically responsible for continuity of workflow between disciplines, client coordination, meeting activities, production of deliverables. Small Cap projects summary is at the end of the resume. Contact Bob Raborn and John Kobe. Employer 2003-2006. Company: Marrero, Couvillon & Associates, LLC. Baton Rouge, LA. Role: Mechanical Department Manager, Project Manager, Senior Mechanical Engineer. Description: Managed 15-20 HVAC projects simultaneously. Responsibilities are similar to Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities also Page 3 of 6
  • 4.
    included plumbing andfire protection systems design. Projects consisted of commercial, industrial, and healthcare. Contact Hugo Marrero. Employer 1998-2002. Company: Associated Design Group, Inc. Lafayette, LA. Role: Project Manager and Senior Mechanical Engineer. Description: Managed 15-20 HVAC projects simultaneously. Responsibilities are similar to Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities also included plumbing and fire protection. Projects consisted of commercial, industrial, and healthcare. Contact Larry Blanchette. Employer 1994-1998. Company: Mateo Consulting Engineers, Dallas, TX. Business sold 1999. Role: Mechanical Department Manager and Senior Mechanical Engineer. Description: Managed 15-20 HVAC projects simultaneously. Responsibilities are similar to Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities also included plumbing and fire protection. Projects consisted of commercial, industrial, and healthcare. Contact Sterling Forsythe. Employer 1988-1994. Company: Norman Engineering Company, Los Angeles, CA. Business closed 1995. Role: Senior Mechanical Engineer and Project Manager. Description: Managed 10-15 HVAC projects simultaneously. Responsibilities are similar to Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities also included plumbing and fire protection. Projects consisted of military, industrial, and defense contractors. Contact Ken Goodwin. Employer 1986-1988. Company: Holmes & Narver, Inc., Orange, CA. Role: Mechanical Engineer. Description: Responsibilities are similar to Jacobs Engineering Group Upstream Alliance responsibilities. Design responsibilities included HVAC engineering task work, HVAC mechanical room design, and ACAD drafting. Projects consisted of military, industrial, and defense contractors. Contact Dennis Berejka. ABBREVIATED REPRESENTATIVE HVAC PROJECT EXPERIENCE: Grouped by Project Type. (Other experience is available upon request.) MARINE EXPERIENCE: (2009 TO PRESENT): Project, Location: Project Description Shell Vito FPS, Gulf of Mexico: Preliminary Design Living Quarters & Misc Bldgs Shell Appomattox FPS, Gulf of Mexico: 65,000 SF Total with Living Quarters & Misc Bldgs Shell Olympus TLP, Gulf of Mexico: 60,000 SF Total with Living Quarters & Misc Bldgs INDUSTRIAL & MILITARY EXPERIENCE: Project, Location: Project Description Semiconductor Clean Rooms: Texas Instruments, Dallas, TX: Emergency System Modifications Texas Instruments, Dallas, TX: 250,000 Gallon D. I. System Mods SGS Thomson, Dallas, TX: 8,500 SF Clean Room Cleanroom/Tool Mods Texas Instruments 605 New Fab, Dallas TX New Central Exhaust Systems, Class 100 Cleanroom Page 4 of 6
  • 5.
    Texas Instruments, Dallas,TX: Make-up Air Handling Cleanroom Units Laboratories & Testing: Missile Systems Lab, Pt. Mugu, CA: Missile Testing & Assembly Naval Ordnance Station, Indianhead, MD: Warhead Factory Boeing 747/757 Paint Facility, Seattle, WA: Jet Painting Facility NASA Ames Research Ctr, Moffit Field, CA: 30,000SF Wind Tunnel Laboratory Acoustic Testing Facility, San Diego, CA: Class 100,000 Clean Room Flow Booth Testing Facility, San Diego, CA: Class 10,000 Flow Hoods/ Clean Room TRW Space Park, El Segundo, CA: Laboratory Renovations Fish Technology Center, Bozeman, MT: New 14,000 SF Fisheries Laboratory & Office Military Renovation Projects: Boiler Renovations, Vandenburg AFB, CA: Central Plant Renovations Housing Renovations, Vandenburg AFB, CA: 130 Housing Unit Modifications Steam System Mods, Vandenberg AFB, CA: Acid Bath Area Modifications Cleaning Facility, Vandenberg AFB, CA: Acid Bath Area Mods National Air Guard, Maintenance Facility, Hammond, LA: 16,000 SF HVAC Modifications Naval Ordinance Station, Indianhead, MD 30,000 SF New Warhead Factory Industrial Projects: BellSouth Suburban, Baton Rouge, LA: Upgrade to 2-400 KW Standby Engines BellSouth Goodwood, Baton Rouge, LA: Upgrade to 750 KW Standby Engines US Sugar, Clewiston, Florida: Central Plant Mods Vetrotex Certainteed, Wichita Falls, TX: 105,000 CFM Air Scrubber System Mods COMMERCIAL EXPERIENCE: Project, Location: Project Description Education St Augustine School, New Orleans, LA: New 30,000 SF School & 20,000 SF Renovations Isidore Newman School, New Orleans, LA: New 50,000 SF School Addition Tulane A B Freeman Bldg, New Orleans, LA: New 50,000 SF Business School Building Parkview School Mods, Baton Rouge, LA: 15,000 SF Stadium Renovations 4 DISD Elem Schools, Dallas, TX 4 -New 120,000 SF Schools HVAC Systems 30+ School Renovations, CA, TX, & LA Various Renovations Projects - HVAC & Plumbing Office Buildings: Claiborne Office Bldg, Baton Rouge, LA; New 460,000 SF Office Bldg NASA Marshall Sp Flt Center, Huntsville,AL New 400,000 SF Six Story Office Building National Test Facility, Colorado Springs,CO New 1,000,000 SF 5 Bldg Campus Aggreko Executive Off Bldg, New Iberia, LA New 50,000 SF Office Bldg BellSouth Landmark Center, Jackson, MS: HVAC Renovations, 90,000 SF Renovations Exec Bldg, Warner Brothers, Burbank, CA 12,000 SF HVAC Renovations US Courthouse, St Louis, MO New 30 Story Courthouse – HVAC Systems Healthcare: American Legion Hospital, Jennings, LA: New 48,000 SF 3-Story Bed Tower Medical Surgery Center, New Iberia, LA New 7,500 SF Outpatient Surgery Suite HVAC System Additions, New Orleans, LA: The Blood Center, Training 5,000 SF Lift Station Mods, Belle Chase, LA: 1,000,000 SF Board & Healthcare Facility Fire Protection Mods, Hammond, LA: 245,000 SF Healthcare Facility Public Buildings & Transportation: Laredo International Airport, Laredo, TX New 125,000SF Airport Terminal HVAC Systems MSY Airport Mods, New Orleans, LA: 25,000 SF Airport Renovations Page 5 of 6
  • 6.
    MSY Airport Mods,New Orleans, LA: Airport Boiler Plant Replacement Renovations East Airport Mechanical Survey: 1,200,000 SF New Orleans Airport Survey New Orleans Airport, Kenner, LA: Katrina Emergency Responder New Orleans Airport Mods, Kenner, LA: Misc Concourse B Renovations Hotels, Convention Centers, Museums: Audubon Insectarium, New Orleans, LA: 40,000 SF Historical Renovation & Museum Events Center, Natchitoches, LA: New 40,000 SF Convention Center Hilton Homewood Suites, Lafayette, LA: New 130,000 SF Hotel Suites and Luxury Condos Healthcare Center, Belle Chase, LA: 200,000 SF Fire Protection Renovations LA Convention Center, Los Angeles, CA New 1,000,000 SF Construction Support Restaurants: Piccadilly Prototype, SE Region New 4,500 SF restaurant Copelands Restaurant, Lafayette, LA New 30,000 SF restaurant Exxon Travel Center, Broussard, LA New 20,000SF Historical Renovations: Warner Bros Motion Pictures, Burbank, CA 12,000 SF Main Admin - HVAC renovations Warner Bros Motion Pictures, Burbank, CA 30,000 SF Admin Offices - HVAC renovations US Custom House New Orleans, LA 50,000 SF Bldg Master Plan Renovations Fair Park, Dallas TX Centennial Bldg, Food/Fiber Miscellaneous: No Limit Records Studio, Baton Rouge, LA New 30,000SF Recording Studio Complex - HVAC San Antonio Natatorium, San Antonio, TX New 35,000 SF Recreation Facility HVAC Systems Port Vincent Marina, Port Vincent, LA: 20,000 SF Clubhouse, Boat Storage & Resort Area ABBREVIATED REPRESENTATIVE PROJECT ENGINEER EXPERIENCE: Jacobs Project Engineer 2006-2009 Chemical Plants and Oil Refineries: Project, Location: Project Description/Construction Budget ConocoPhillips, Lake Charles HCGO Strainers $ 1.5MM C-1101 KO Drum, $ 750,000 FCC Recontact Drum, LCR Closed Blowdown $ 1.25 Reformate Heartcut to Alliance $ 3.6MM Cryogenic Improvements $ 3.5MM SRU Corrosion Probe- Turn Around Project $ 1MM SRU Igniter Project (TAR 10/07) $ 1MM SRU Air Demand Analyzer (TAR 10/07) $1.5MM API Flare $ 2.5MM Fuel Gas Treating Improvements, $ 1MM Coke Egress Stair, $ 2MM Marathon Petroleum Corporation LP Vapor, Gas, Oil Separator, $ 10 MM Rohm & Haas WAM 7 High Temperature Furnace, $ 3.4 MM Valero Aruba Refinery SGAR Piperack Improvements Phase 1, $ 4. MM Page 6 of 6
  • 7.
    MSY Airport Mods,New Orleans, LA: Airport Boiler Plant Replacement Renovations East Airport Mechanical Survey: 1,200,000 SF New Orleans Airport Survey New Orleans Airport, Kenner, LA: Katrina Emergency Responder New Orleans Airport Mods, Kenner, LA: Misc Concourse B Renovations Hotels, Convention Centers, Museums: Audubon Insectarium, New Orleans, LA: 40,000 SF Historical Renovation & Museum Events Center, Natchitoches, LA: New 40,000 SF Convention Center Hilton Homewood Suites, Lafayette, LA: New 130,000 SF Hotel Suites and Luxury Condos Healthcare Center, Belle Chase, LA: 200,000 SF Fire Protection Renovations LA Convention Center, Los Angeles, CA New 1,000,000 SF Construction Support Restaurants: Piccadilly Prototype, SE Region New 4,500 SF restaurant Copelands Restaurant, Lafayette, LA New 30,000 SF restaurant Exxon Travel Center, Broussard, LA New 20,000SF Historical Renovations: Warner Bros Motion Pictures, Burbank, CA 12,000 SF Main Admin - HVAC renovations Warner Bros Motion Pictures, Burbank, CA 30,000 SF Admin Offices - HVAC renovations US Custom House New Orleans, LA 50,000 SF Bldg Master Plan Renovations Fair Park, Dallas TX Centennial Bldg, Food/Fiber Miscellaneous: No Limit Records Studio, Baton Rouge, LA New 30,000SF Recording Studio Complex - HVAC San Antonio Natatorium, San Antonio, TX New 35,000 SF Recreation Facility HVAC Systems Port Vincent Marina, Port Vincent, LA: 20,000 SF Clubhouse, Boat Storage & Resort Area ABBREVIATED REPRESENTATIVE PROJECT ENGINEER EXPERIENCE: Jacobs Project Engineer 2006-2009 Chemical Plants and Oil Refineries: Project, Location: Project Description/Construction Budget ConocoPhillips, Lake Charles HCGO Strainers $ 1.5MM C-1101 KO Drum, $ 750,000 FCC Recontact Drum, LCR Closed Blowdown $ 1.25 Reformate Heartcut to Alliance $ 3.6MM Cryogenic Improvements $ 3.5MM SRU Corrosion Probe- Turn Around Project $ 1MM SRU Igniter Project (TAR 10/07) $ 1MM SRU Air Demand Analyzer (TAR 10/07) $1.5MM API Flare $ 2.5MM Fuel Gas Treating Improvements, $ 1MM Coke Egress Stair, $ 2MM Marathon Petroleum Corporation LP Vapor, Gas, Oil Separator, $ 10 MM Rohm & Haas WAM 7 High Temperature Furnace, $ 3.4 MM Valero Aruba Refinery SGAR Piperack Improvements Phase 1, $ 4. MM Page 6 of 6