SlideShare a Scribd company logo
1 of 4
448 HelenSt.BrooklynMI 49230.
wckeane@yahoo.com Mobile 517-499-0380
P a g e | 1
William Keane
ProjectManagementProfessional
 Extensive experience in the management of DOD/Military/Federal construction projects
for large Corporations and Commercial/Industrial builders.
 Worked with budgets of 10M to 50M
 Strong understanding of safety and building codes, regulations and inspection
compliance.
 Highly capable of creating estimates, budgets, building plans and blueprints.
 Oversee all aspects of projects with full responsibility for completing construction on
time while maintain quality and safety standards.
 Direct project planning and finances with full responsibility for completing within
budget.
 Negotiate with subcontractors to perform specialized work and collaborate with multiple
groups to maintain tight schedules.
 Work with architects to create presentations to board members and executives
 Budget Analysis, Vendor and Materials Management, Quality Control Management,
Fixture Setup, Crew Supervision, QA/QC/Field Engineering, Environment Remediation,
Construction and Demolition, Safety Compliance, Architectural drawings and
specifications, RFP/RFQ experience, Construction Contract Documents
 Experienced working and managing diverse construction personnel
Key Skills
 Fire Suppression
 Electrical, HVAC,Nuclear power,
 Power generation
 Construction/Demolition
 Bidding Proposals
 Natural Gas Installation
 Major Airport Construction
 Mechanical and Fire Suppression systems
 Major Infrastructure roads
 High pressure Gas and Water systems
 Hydronic Heating systems
 Pneumatic Air Systems
 USACE RMS System
 Business Owner General Contractor
 All Microsoft Programs.
448 HelenSt.BrooklynMI 49230.
wckeane@yahoo.com Mobile 517-499-0380
P a g e | 2
William Keane
Employment History
Hawassa State University, Addis Ababa Ethiopia, Africa │ Consultant │Self Employed
│10M 03/2014- 11/2015
Conducting operational studies for the redistribution of manpower and savings for a $10M
Addition to Hawassa State University, Planning, organizing, and conducting operations analysis
activities of the local government programs in connection with competitive sourcing studies
Supervising consulting teams by providing direction, establishing goals and projecting outcomes
as this was a European Build. Designing and implementing analytical tools resulting in
identification of wasteful/abusive business practices and procedures, Analyzing problematic
areas and forming policies to determine needed modifications or improvements in routine
activities using analytical techniques such as flow charts, surveys, process mapping, time-motion
studies analyses to eliminate duplication, facilitate work-flow, and assure optimum utilization of
staff and equipment
Site Adapt Design Expansion for ANA 207th Compound Camp Zafar │ USACE │ Herat
Province, Afghanistan │ $50M │ 06/2012 – 11/2013 │ Project Manager/QC Manager
Possessed full responsibility for on-site completion of U.S. government construction projects
ranging from $10 to $50 million in value. Oversaw project planning and budgeting, and managed
resource allocation, subcontract and contract administration, business development functions.
Managed site studies, oversaw the development of cost estimates and reports during the
development and implementation project phases. Directed the development and maintenance of
the master project schedule, which incorporated dates and times for company decisions, design
information, materials and subcontracts procurement, fabrication and field installation lead
times. Oversaw the coordination of subcontractor work, obtaining performance guarantees from
subcontractors and enforcing project milestones. Directed the preparation and analysis of bidding
data for projects, and oversaw the preparation and submission of a monthly project status report
to the executive management team. . Resolved Variations & Claims, oversaw the timely
identification and analysis of financial, safety, and construction execution risks for projects.
Oversaw the preparation and issuance of purchase requisitions for materials and subcontractors,
and he managed the resolution of claims, cost overruns, and subcontractor non-conformance
issues in a timely manner. Oversaw the analysis of project drawings and specifications to timely
identify and resolve design deficiencies, impractical details, and code violations. Monitored and
enforced compliance with insurance, safety, labor relations, equal employment opportunity, and
tax requirements.
Supervised & controlled the work of 3 Managers and 30 Staff, indirectly managed a 500-person
labor force. Authorized to recommend personnel decisions such as hiring, promotion,
termination, and leave of absence authorization of employees.
Design-Build Waste Water Treatment Plant │ USACE │ ANA Camp Zafar Herat,
Afghanistan │ $18M │ 04/2011 –02/2012 │Project Manager
448 HelenSt.BrooklynMI 49230.
wckeane@yahoo.com Mobile 517-499-0380
P a g e | 3
William Keane
Served as Project Manager for this $18M design-build USACE waste water treatment plant
project that included work activities for water infrastructure, well boring and electrical
infrastructure. As Project Manager, coordinated meetings with site supervisors regarding project
status, current activities, issues and concerns, project schedule and project costs. Also
coordinated contract negotiations and processed monthly invoices.
.
Design-Build Djibouti Projects │ NAVFAC │ Djibouti, Africa │ $18M │ 07/2009 – 03/2011
│ QC Manager
Served as QC Manager for this $18M NAVFAC project at Camp Lemonier, Djibouti, Africa. For
this design-build project, I was responsible for organizing and managing a multi-national work
force, development of work plans and procedures and standards. Quality control activities
included submittal of daily production and quality control reports to monitor progress against
project schedules and cost, plan and coordinate on-site QC meetings, QC training, mock-ups, and
other QC related activities. Additionally managed coordinated the three phases of control and
documentation, supervised subcontractor Quality Control Inspectors, coordinated inspection
activities with and subcontractors, client, Title II inspectors, and third-party inspectors to ensure
material complied with the requirements also coordinated and resolved comments on
subcontractor Quality Control Plans, ensured that inspection reports were received in a timely
manner and were reviewed for compliance with scope and forwarded to all concerned. Schedule,
and validation of design. Work activities included erection of pre-engineered buildings and a
satellite fire station. We paved a new 2743m x 45m runway, 2 exit taxiways, and 3
interconnecting aprons, I coordinated all subcontractors, monitored work progress, and oversaw
the projects’ quality control and safety issues ae needed
Iraq Projects │ USACE │ Iraq │ $40M │ 02/2008 – 06/2009 │ Assistant Project Manager /
QC Manager
Served as QC Manager/Assistant Project manager for three (3) USACE projects in Iraq totaling
$40M. Directed and led multi-disciplinary teams in the development of plans, goals, objectives,
policies and procedures for three (3) construction projects, including the Al Assad Replacement
Facilities, Speicher Replacement Facilities and the Speicher Combat Surgical Hospital. Ensured
all subcontractors performed engineering and construction activities in accordance with
Government/USACE and RFP requirements, especially safety and security protocols.
Camp Anaconda Projects │ Navy & USACE │ Balad, Iraq │ $35M │ 02/2007 – 01/2008 │
QC Manager/Inspection Team
Served as QC Manager and served on the Inspection Team for KBR to inspect and evaluate new
and existing electrical, plumbing, heating, ventilating, and cooling systems to conform to
approved plans. Checking the construction, alteration, or repair of Camp Anaconda and other
structures to ensure compliance with building codes and ordinances, zoning regulations and
contract specifications. Served as lead Quality Assurance Inspector for Plumbing, HVAC, Civil,
and Electrical systems, initiated new technical inspection process and administered the Technical
Inspection team at Camp Anaconda. Oversaw more than 450 technical inspections to ensure
448 HelenSt.BrooklynMI 49230.
wckeane@yahoo.com Mobile 517-499-0380
P a g e | 4
William Keane
quality assurance for HVAC, Electrical, Plumbing, and Civil. Inspected and analyzed all aspects
of work to ensure Quality Control and Quality Assurance standards were in place, and existing
and new construction activities complied with all applicable codes, standards and specifications
regarding Electrical, Grounding and Bonding, Plumbing, HVAC and Civil.
Fermi Nuclear Power Plant│ Three Towers FP│ Detroit MI │ $5M │ 03/2004 – 11/2006 │
Mechanical Project Manager
Upgradedmultiple pre-actionfiresuppressionsystemsintwocoolingtowers,installedfournew FM300
Agent1000G storage tanks,withpre-actionvalvesandall necessaryjockeypumps.
Local Union 704 │Detroit MI │ 11/1998 – 1/2004 │ Project Manager │
Worked on many Commercial, Industrial, and residential mechanical systems to many to document in
detail over this period,
Business Owner
Public Storage Projects │ Los Angeles CA │ $27M │04/1996 – 01/1998 │Project Manager
Served as Senior Project Manager and business owner for a design build 60.725 sf Climate Controlled
Unit, Was responsible for the overall Mechanical, Fire Suppression, Plumbing, and Electrical installation,
Project was a design build with multiple internal units used as office space
Boston Massachusetts 1987-1992
Specialized on mechanical systems: plumbing, fire protection positions as a superintendent, and
area project superintendent.
Cork City Ireland 1975-1987
Specialized working on Construction. Natural Gas, Mechanical, Fire Suppression and HVAC
Systems,
Training & Certifications
 C-16 Master Plumbing License,
 B- General Contractor License,
 2011. Construction Quality Management for Contractors Certification (USACE)
 C-16 Pire Protection
 City and Guilds in Gas Fitting.
 USACE EM 385-1-1
 OSHA 30
Education
 1980-1984. Building and Construction Technology. Regional Technical College, Cork,
Ireland
 1989/90 Northeastern University, Building and Construction Technology Technical
Program,

More Related Content

What's hot

Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016Larry Wicker
 
Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014Joseph Pirrone
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar Sheikh
 
curriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieterscurriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pietersPieters (Paul)
 
Shakeel ahmed resume
Shakeel ahmed  resumeShakeel ahmed  resume
Shakeel ahmed resumeShakeel Ahmed
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnesto Costorio
 
RFI_RodnyBrown 2015
RFI_RodnyBrown 2015RFI_RodnyBrown 2015
RFI_RodnyBrown 2015Rodney Brown
 
Hi! I'm Holly "Fracking" Wells
Hi!  I'm Holly "Fracking" Wells Hi!  I'm Holly "Fracking" Wells
Hi! I'm Holly "Fracking" Wells Holly Wells
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
Philip_Murray_ CV 13-01-16
Philip_Murray_  CV 13-01-16Philip_Murray_  CV 13-01-16
Philip_Murray_ CV 13-01-16Phil Murray
 

What's hot (17)

CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015
 
Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014Resume_JosephPirrone_11-2014
Resume_JosephPirrone_11-2014
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
 
curriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieterscurriculum-vitae-paul-johan-pieters
curriculum-vitae-paul-johan-pieters
 
Shakeel ahmed resume
Shakeel ahmed  resumeShakeel ahmed  resume
Shakeel ahmed resume
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
RFI_RodnyBrown 2015
RFI_RodnyBrown 2015RFI_RodnyBrown 2015
RFI_RodnyBrown 2015
 
Hi! I'm Holly "Fracking" Wells
Hi!  I'm Holly "Fracking" Wells Hi!  I'm Holly "Fracking" Wells
Hi! I'm Holly "Fracking" Wells
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Philip_Murray_ CV 13-01-16
Philip_Murray_  CV 13-01-16Philip_Murray_  CV 13-01-16
Philip_Murray_ CV 13-01-16
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 

Viewers also liked

Draft - Email to Rt Hon John Key DBA Prime Minister NZ Govt - Statutory Deman...
Draft - Email to Rt Hon John Key DBA Prime Minister NZ Govt - Statutory Deman...Draft - Email to Rt Hon John Key DBA Prime Minister NZ Govt - Statutory Deman...
Draft - Email to Rt Hon John Key DBA Prime Minister NZ Govt - Statutory Deman...Bruce Mita
 
Estategias ruth harf
Estategias ruth harfEstategias ruth harf
Estategias ruth harfanep
 
Presentacion anteproyecto
Presentacion anteproyectoPresentacion anteproyecto
Presentacion anteproyectoJersonCP17
 
My hobby by Maricn Ciołkosz
My hobby  by Maricn CiołkoszMy hobby  by Maricn Ciołkosz
My hobby by Maricn CiołkoszMonika MMBIEN
 
Je suis un consommateur responsable
Je suis un consommateur responsableJe suis un consommateur responsable
Je suis un consommateur responsableHenri Willox
 
NETendances 2011 - L'engouement pour les médias sociaux au Québec
NETendances 2011 - L'engouement pour les médias sociaux au QuébecNETendances 2011 - L'engouement pour les médias sociaux au Québec
NETendances 2011 - L'engouement pour les médias sociaux au QuébecCEFRIO
 

Viewers also liked (8)

Draft - Email to Rt Hon John Key DBA Prime Minister NZ Govt - Statutory Deman...
Draft - Email to Rt Hon John Key DBA Prime Minister NZ Govt - Statutory Deman...Draft - Email to Rt Hon John Key DBA Prime Minister NZ Govt - Statutory Deman...
Draft - Email to Rt Hon John Key DBA Prime Minister NZ Govt - Statutory Deman...
 
Questionnaire
QuestionnaireQuestionnaire
Questionnaire
 
Estategias ruth harf
Estategias ruth harfEstategias ruth harf
Estategias ruth harf
 
Presentacion anteproyecto
Presentacion anteproyectoPresentacion anteproyecto
Presentacion anteproyecto
 
My hobby by Maricn Ciołkosz
My hobby  by Maricn CiołkoszMy hobby  by Maricn Ciołkosz
My hobby by Maricn Ciołkosz
 
Je suis un consommateur responsable
Je suis un consommateur responsableJe suis un consommateur responsable
Je suis un consommateur responsable
 
NETendances 2011 - L'engouement pour les médias sociaux au Québec
NETendances 2011 - L'engouement pour les médias sociaux au QuébecNETendances 2011 - L'engouement pour les médias sociaux au Québec
NETendances 2011 - L'engouement pour les médias sociaux au Québec
 
La plaquette Fondation
La plaquette FondationLa plaquette Fondation
La plaquette Fondation
 

Similar to William keane. 03.25.2016 final

Similar to William keane. 03.25.2016 final (20)

Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Construction cv 2015 aug revised (1)
Construction cv 2015  aug revised (1)Construction cv 2015  aug revised (1)
Construction cv 2015 aug revised (1)
 
Word Doc CV
Word Doc CVWord Doc CV
Word Doc CV
 
Lukas CV
Lukas CVLukas CV
Lukas CV
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
Rusty McEacern Project Manager
Rusty McEacern Project ManagerRusty McEacern Project Manager
Rusty McEacern Project Manager
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
James Beam resume1
James Beam resume1James Beam resume1
James Beam resume1
 
Construction CV 2015- May Revised
Construction CV 2015- May RevisedConstruction CV 2015- May Revised
Construction CV 2015- May Revised
 
Jon Roloff Resume 2FMbh
Jon Roloff Resume 2FMbhJon Roloff Resume 2FMbh
Jon Roloff Resume 2FMbh
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
Bwk pipeline resume_0716
Bwk pipeline resume_0716Bwk pipeline resume_0716
Bwk pipeline resume_0716
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
William Thomas Beckley resume
William Thomas Beckley resumeWilliam Thomas Beckley resume
William Thomas Beckley resume
 
ASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR octoberASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR october
 
towerst-resume-2a
towerst-resume-2atowerst-resume-2a
towerst-resume-2a
 
Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
Scott Frisa Resume
Scott Frisa ResumeScott Frisa Resume
Scott Frisa Resume
 

William keane. 03.25.2016 final

  • 1. 448 HelenSt.BrooklynMI 49230. wckeane@yahoo.com Mobile 517-499-0380 P a g e | 1 William Keane ProjectManagementProfessional  Extensive experience in the management of DOD/Military/Federal construction projects for large Corporations and Commercial/Industrial builders.  Worked with budgets of 10M to 50M  Strong understanding of safety and building codes, regulations and inspection compliance.  Highly capable of creating estimates, budgets, building plans and blueprints.  Oversee all aspects of projects with full responsibility for completing construction on time while maintain quality and safety standards.  Direct project planning and finances with full responsibility for completing within budget.  Negotiate with subcontractors to perform specialized work and collaborate with multiple groups to maintain tight schedules.  Work with architects to create presentations to board members and executives  Budget Analysis, Vendor and Materials Management, Quality Control Management, Fixture Setup, Crew Supervision, QA/QC/Field Engineering, Environment Remediation, Construction and Demolition, Safety Compliance, Architectural drawings and specifications, RFP/RFQ experience, Construction Contract Documents  Experienced working and managing diverse construction personnel Key Skills  Fire Suppression  Electrical, HVAC,Nuclear power,  Power generation  Construction/Demolition  Bidding Proposals  Natural Gas Installation  Major Airport Construction  Mechanical and Fire Suppression systems  Major Infrastructure roads  High pressure Gas and Water systems  Hydronic Heating systems  Pneumatic Air Systems  USACE RMS System  Business Owner General Contractor  All Microsoft Programs.
  • 2. 448 HelenSt.BrooklynMI 49230. wckeane@yahoo.com Mobile 517-499-0380 P a g e | 2 William Keane Employment History Hawassa State University, Addis Ababa Ethiopia, Africa │ Consultant │Self Employed │10M 03/2014- 11/2015 Conducting operational studies for the redistribution of manpower and savings for a $10M Addition to Hawassa State University, Planning, organizing, and conducting operations analysis activities of the local government programs in connection with competitive sourcing studies Supervising consulting teams by providing direction, establishing goals and projecting outcomes as this was a European Build. Designing and implementing analytical tools resulting in identification of wasteful/abusive business practices and procedures, Analyzing problematic areas and forming policies to determine needed modifications or improvements in routine activities using analytical techniques such as flow charts, surveys, process mapping, time-motion studies analyses to eliminate duplication, facilitate work-flow, and assure optimum utilization of staff and equipment Site Adapt Design Expansion for ANA 207th Compound Camp Zafar │ USACE │ Herat Province, Afghanistan │ $50M │ 06/2012 – 11/2013 │ Project Manager/QC Manager Possessed full responsibility for on-site completion of U.S. government construction projects ranging from $10 to $50 million in value. Oversaw project planning and budgeting, and managed resource allocation, subcontract and contract administration, business development functions. Managed site studies, oversaw the development of cost estimates and reports during the development and implementation project phases. Directed the development and maintenance of the master project schedule, which incorporated dates and times for company decisions, design information, materials and subcontracts procurement, fabrication and field installation lead times. Oversaw the coordination of subcontractor work, obtaining performance guarantees from subcontractors and enforcing project milestones. Directed the preparation and analysis of bidding data for projects, and oversaw the preparation and submission of a monthly project status report to the executive management team. . Resolved Variations & Claims, oversaw the timely identification and analysis of financial, safety, and construction execution risks for projects. Oversaw the preparation and issuance of purchase requisitions for materials and subcontractors, and he managed the resolution of claims, cost overruns, and subcontractor non-conformance issues in a timely manner. Oversaw the analysis of project drawings and specifications to timely identify and resolve design deficiencies, impractical details, and code violations. Monitored and enforced compliance with insurance, safety, labor relations, equal employment opportunity, and tax requirements. Supervised & controlled the work of 3 Managers and 30 Staff, indirectly managed a 500-person labor force. Authorized to recommend personnel decisions such as hiring, promotion, termination, and leave of absence authorization of employees. Design-Build Waste Water Treatment Plant │ USACE │ ANA Camp Zafar Herat, Afghanistan │ $18M │ 04/2011 –02/2012 │Project Manager
  • 3. 448 HelenSt.BrooklynMI 49230. wckeane@yahoo.com Mobile 517-499-0380 P a g e | 3 William Keane Served as Project Manager for this $18M design-build USACE waste water treatment plant project that included work activities for water infrastructure, well boring and electrical infrastructure. As Project Manager, coordinated meetings with site supervisors regarding project status, current activities, issues and concerns, project schedule and project costs. Also coordinated contract negotiations and processed monthly invoices. . Design-Build Djibouti Projects │ NAVFAC │ Djibouti, Africa │ $18M │ 07/2009 – 03/2011 │ QC Manager Served as QC Manager for this $18M NAVFAC project at Camp Lemonier, Djibouti, Africa. For this design-build project, I was responsible for organizing and managing a multi-national work force, development of work plans and procedures and standards. Quality control activities included submittal of daily production and quality control reports to monitor progress against project schedules and cost, plan and coordinate on-site QC meetings, QC training, mock-ups, and other QC related activities. Additionally managed coordinated the three phases of control and documentation, supervised subcontractor Quality Control Inspectors, coordinated inspection activities with and subcontractors, client, Title II inspectors, and third-party inspectors to ensure material complied with the requirements also coordinated and resolved comments on subcontractor Quality Control Plans, ensured that inspection reports were received in a timely manner and were reviewed for compliance with scope and forwarded to all concerned. Schedule, and validation of design. Work activities included erection of pre-engineered buildings and a satellite fire station. We paved a new 2743m x 45m runway, 2 exit taxiways, and 3 interconnecting aprons, I coordinated all subcontractors, monitored work progress, and oversaw the projects’ quality control and safety issues ae needed Iraq Projects │ USACE │ Iraq │ $40M │ 02/2008 – 06/2009 │ Assistant Project Manager / QC Manager Served as QC Manager/Assistant Project manager for three (3) USACE projects in Iraq totaling $40M. Directed and led multi-disciplinary teams in the development of plans, goals, objectives, policies and procedures for three (3) construction projects, including the Al Assad Replacement Facilities, Speicher Replacement Facilities and the Speicher Combat Surgical Hospital. Ensured all subcontractors performed engineering and construction activities in accordance with Government/USACE and RFP requirements, especially safety and security protocols. Camp Anaconda Projects │ Navy & USACE │ Balad, Iraq │ $35M │ 02/2007 – 01/2008 │ QC Manager/Inspection Team Served as QC Manager and served on the Inspection Team for KBR to inspect and evaluate new and existing electrical, plumbing, heating, ventilating, and cooling systems to conform to approved plans. Checking the construction, alteration, or repair of Camp Anaconda and other structures to ensure compliance with building codes and ordinances, zoning regulations and contract specifications. Served as lead Quality Assurance Inspector for Plumbing, HVAC, Civil, and Electrical systems, initiated new technical inspection process and administered the Technical Inspection team at Camp Anaconda. Oversaw more than 450 technical inspections to ensure
  • 4. 448 HelenSt.BrooklynMI 49230. wckeane@yahoo.com Mobile 517-499-0380 P a g e | 4 William Keane quality assurance for HVAC, Electrical, Plumbing, and Civil. Inspected and analyzed all aspects of work to ensure Quality Control and Quality Assurance standards were in place, and existing and new construction activities complied with all applicable codes, standards and specifications regarding Electrical, Grounding and Bonding, Plumbing, HVAC and Civil. Fermi Nuclear Power Plant│ Three Towers FP│ Detroit MI │ $5M │ 03/2004 – 11/2006 │ Mechanical Project Manager Upgradedmultiple pre-actionfiresuppressionsystemsintwocoolingtowers,installedfournew FM300 Agent1000G storage tanks,withpre-actionvalvesandall necessaryjockeypumps. Local Union 704 │Detroit MI │ 11/1998 – 1/2004 │ Project Manager │ Worked on many Commercial, Industrial, and residential mechanical systems to many to document in detail over this period, Business Owner Public Storage Projects │ Los Angeles CA │ $27M │04/1996 – 01/1998 │Project Manager Served as Senior Project Manager and business owner for a design build 60.725 sf Climate Controlled Unit, Was responsible for the overall Mechanical, Fire Suppression, Plumbing, and Electrical installation, Project was a design build with multiple internal units used as office space Boston Massachusetts 1987-1992 Specialized on mechanical systems: plumbing, fire protection positions as a superintendent, and area project superintendent. Cork City Ireland 1975-1987 Specialized working on Construction. Natural Gas, Mechanical, Fire Suppression and HVAC Systems, Training & Certifications  C-16 Master Plumbing License,  B- General Contractor License,  2011. Construction Quality Management for Contractors Certification (USACE)  C-16 Pire Protection  City and Guilds in Gas Fitting.  USACE EM 385-1-1  OSHA 30 Education  1980-1984. Building and Construction Technology. Regional Technical College, Cork, Ireland  1989/90 Northeastern University, Building and Construction Technology Technical Program,