SlideShare a Scribd company logo
TOM Hinton
3114 Victory Palm Dr.
Edgewater Fl. 32141
US cell (321) 201-7313
0BandPL@gmail.com
OBJECTIVE:
To obtain a permanent position in a growing company with advancement potential and an opportunityto
put my experience to work. In the past 34 years I have acquired a wealth of knowledge that willbenefit
greatly any employer. I have an excellent track record of delivering projects on time and within budget.
Please notice that while with DCK WW I went to problem jobs to get them back on track and compliant
with specifications.
My EMPLOYMENT
6/15 to 4/16 TD Industries
Construction Manager Special Projects, Ft. Worth Tx, MechanicalPM
My duties include but are not limited to, all day to day mechanical trade work and adherence to
schedules, review and approval of design documents and submittals, supervision of all phases of
mechanicaltrades, ie. HVAC, chilled water piping, all duct and air handling equipment, Plumbing,
Infrastructure, controls, TAB, grease hood ducting and testing. Full responsibility for all execution of such
work includingcode compliance, testing and coordination with other trades, day to day operations of all
field mechanical work and coordination and integration of these trades to facilitate needs and schedule,
evaluation ofdesign changes and scope mods as they pertain to these areas, also for all close out
documentation andowner instructions as per our contract. Responsible for price checking MEP change
orders from subcontractors and budget estimates for same. Most of our projects were on NAS JRB Ft. Worth
and under USACE control. Had to use their QCS program for all QA/QC for all of my projects.
1214 to 6/15 Gallo and Associates
Baha Mar Resort and Casino, Nassau, Bahamas, Senior MEP PM
My duties included but were not limited to, review and approval of design documents, supervision ofall
phases of mechanical trades, ie. HVAC, chilled water piping, all duct and air handlingequipment,
Plumbing, Electrical, Infrastructure, controls, TAB and Fire Sprinkler. Full responsibility for all execution of
such work including code compliance, testing and coordination with other trades, day to day operations of
all field MEP work, quality control, coordination and integration of these contractors to fit the overall
project needs. Also adherence to the schedule, evaluation of design changes and scope mods as they
pertain to these areas and for all close out documentation, owner instructions and quality of the project
as per our contract.
614 to 1214…Layton/dck Pacific Hawaii JV
Kapi'olani Medical Center Honolulu, Hi. MEP Coordinator/Supt
My duties included but were not limited to, all day to day inspection of MEP trade work and adherence to
schedules, review and approval of design documents, DFOW’s and submittals, supervision of all phases of
testing and documentation of mechanical trades. QA/QC of all HVAC, chilled water piping, all duct and air
handling equipment, Plumbing, Electrical, Infrastructure, controls, TAB, grease hood ducting and Fire
Sprinkler, including all initial, prep and follow up meetings. Full responsibility for all compliance of suchwork
including code compliance, testing and coordination with other trades, day to day observation of all field
MEP work, all site underground and drainage, compaction testing, asphalting the parking lot after such
work was complete, and coordination and integration of these tasks to meet DCK's needs and schedule,
evaluation of design changes and scope mods as they pertain to these areas, also for all documentation and
reporting to third party inspector as per our contract. Responsible for checking MEP change orders from
subcontractors and budget estimates for same. Also, was superintendent for the complete ground up build
of the boiler/sterilizer building from underground until completion. This included all MEP, underground
piping, reinforced concrete slab, block walls, roofing, windows and interior finishes.
6/13 to 6/14 dck Pacific Guam,
Guam Regional Medical Center, Dededo, Guam MEP QC
My duties included but were not limited to, review and approval of submittals and DFOW’s of MEP trades,
QC of all phases of mechanical trades including all prep, initial and follow up meetings as they pertained to
MEP, all lift plans that related to MEP, I was also associate QC for concrete, framing, interior finishes and
infrastructure work, site and underground utilities including all testing and documentation to the owner, I
helped hold the QC meetings for these with the other QA/QC member. I was QC in charge of HVAC, chilled
water piping above and below ground, all duct and air handling equipment, Plumbing, Electrical,
Infrastructure, controls, TAB, grease hood ducting and Fire Sprinkler. Full responsibility for all
documentation of such work including code compliance, testing and coordination with other trades,
coordination and integration of these contractors to DCK's needs and schedule, evaluation of design
changes and scope mods as they pertain to theseareas, also for all close out documentation and owner
instructions as per our contract. Responsible for checking documentation for med gas installation and
testing as well as reporting test results to owner.
10/12 to 6/13……………Betenbow/dck St. Maarten NV JV
A.U.C. St Maarten Senior MEP Coordinator
DCK self-performed, by hiring local sub-contractors and laborers, all MEP, concrete and interior framing
and finish work. There was also an extensive amount of infrastructure work like new underground
drainage, new water lines, new small reverse osmosis water treatment plant and new septic system
including new underground tanks and pumping station for the lower half of the campus. I was responsible
for all installation and QC for these areas, and submittals of all trades. HVAC, chilled water piping, all
duct and air handlingequipment, Plumbing, Electrical, Infrastructure, controls, TAB and Fire Sprinkler. Full
responsibility for all execution of such work including code compliance, testing and coordination, day to
day operations of all field MEP work and coordination and integration of these operations to DCK's needs
and schedule, evaluation of design changes and scope mods as they pertain to these areas, also for all
close out documentation to owner and owner instructions as per our contract. Held weekly MEP meetings
for all phases of this work.
8/11 to 10/12…………dck Ttec JV MCAS Yuma
MEP Engineer/ MEP Coordinator
My duties included but were not limited to, review and approval of design documents, reviewing and
approval of MEP contractor submittals such as HVAC equipment, ductwork, DDC controls, Chillers, boilers,
etc. Also fire sprinkler piping, valves, pre-action systems as well as Dry Agent systems, plumbing pipe
designs, fixtures backflow preventers and automated flush valves, also involved in low voltage and line
voltage electrical equipment and large emergency generators, day to day operations of field MEP
contractors and the integration of the contractors to dck Ttec needs and schedule, evaluation of CR´s,
design changes and scope modifications as it effects the contract costs. There was also extensive
infrastructure work like pipe bursting, pump stations, new underground piping, new underground electrical
piping, new sub station including slab and fence work. Had to comply with all NAVFAC safety and submittal
requirements.
Training:
A.H.A.
S.T.A.R.T
Safety Health and Environmental Manual
Construction Quality Management for Contractors Certified USACE OSHA 30 Hour
JS-US007 Level 1 Antiterrorism Awareness Training
04/04 to 7/11… Climatic Refrigeration and A/C
West Melbourne, Florida
Project Manager/ Estimator
My duties include but are not limited to, management of all phases ofprojects ranging from small DX systems
to large chilled water systems includingduct work, black iron and pre-insulated PVC piping and various types of
insulation, estimating and buying out of these types of projects. Also, negotiation ofchange orders for both
civilian and govt. projects and all related documentation involved in these. Manpower loading for both small
and large projects andmatching people with their skill set as needed to facilitate the needs for a givenproject.
Projects managed and estimated include NASA, US Air Force, state, countyand large retail malls and shopping
plazas. Also, was PM on two hospital jobs,the Palm Bay and Cape Canaveral hospitals, also 3 surgery centers,
includingall HVAC, C/W and H/W piping, DDC controls and all stainless steel med gas.piping and butt fusion
welds. Responsible for all UL assemblies related toHVAC.
09/98 to 04/04 City of Cocoa Beach Golf Course Cocoa
Beach, Florida
Assistant Golf Pro
• Greeting guests, managing the pro shop, teaching and staff management. Took
time to play tournament golf to attempt to get my Senior PGA Tourcard.
• 04/96 to 06/98 Britt's A/C and Fire Sprinkler
Titusville, Florida
Project Manager/Estimator
Managed and estimated commercial projects mainly for NASA and USAF for work at Cape Canaveral AFS
and KSC. Responsibilities included but not limited to scheduling, manpower estimations, RFP
documentation for several disciplines of mechanical contracting. ie. duct work, chilled water piping, fire
sprinkler piping, plumbing piping as well as controls and subcontractors. 04/93 to 03/96 Coastal
Mechanical Co. Inc.
West Melbourne, Florida
Sheet metal shop and Special Projects Manager/Estimator
Initially held position as sheet metal shop manager. Responsibilities included but were not limited to,
supplies & inventory, shipping/receiving, input of duct and fittings into Vulcan system along with
scheduling deliveries to job sites and material procurement for those jobs. Assumed the additional position
of Special Projects Div. Manager and estimated and ran smaller projects. Responsible for
all aspects of these projects and design and layout throughout the project as well as warranty.
1978 THROUGH 1993 ESTIMATING EXPERIENCE UPON REQUEST EDUCATION
Dekalb Community College Decatur, Georgia West
Georgia College Carrollton, Georgia
Carrier Engineering School Atlanta, Georgia
Trane Engineering School Orlando Fl.
U S A C E Q A / Q C C e r t i f i e d L . A . 2 0 1 2
REFERENCES Available upon request.

More Related Content

What's hot

MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
Midel Dalangin
 
JAF_RESUME_2015a
JAF_RESUME_2015aJAF_RESUME_2015a
JAF_RESUME_2015a
John Flores
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
William Keane
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
kim himel
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -
Abdulkader Sayed
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
Stevie Nimmo
 
CV Alberto Uribe English
CV Alberto Uribe EnglishCV Alberto Uribe English
CV Alberto Uribe English
ALBERTO URIBE
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
Tomy Pappu
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
jim matthews
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
proactives
 
cv 2016
cv 2016cv 2016
CV.
CV.CV.
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
Larry Wicker
 
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
Steve McClimon
 
RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1
William Crowley
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
Jim Reaves
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2
JB Nartey
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
Marcel Boutin
 
JakeA_resume Oct14
JakeA_resume Oct14JakeA_resume Oct14
JakeA_resume Oct14
J E Project Management LLC
 
DHindmon_Resume2016
DHindmon_Resume2016DHindmon_Resume2016
DHindmon_Resume2016
DAVID HINDMON
 

What's hot (20)

MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
 
JAF_RESUME_2015a
JAF_RESUME_2015aJAF_RESUME_2015a
JAF_RESUME_2015a
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
CV Alberto Uribe English
CV Alberto Uribe EnglishCV Alberto Uribe English
CV Alberto Uribe English
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
cv 2016
cv 2016cv 2016
cv 2016
 
CV.
CV.CV.
CV.
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
 
RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
 
GCC2015 Course_Day2
GCC2015 Course_Day2GCC2015 Course_Day2
GCC2015 Course_Day2
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
 
JakeA_resume Oct14
JakeA_resume Oct14JakeA_resume Oct14
JakeA_resume Oct14
 
DHindmon_Resume2016
DHindmon_Resume2016DHindmon_Resume2016
DHindmon_Resume2016
 

Viewers also liked

Top 8 title processor resume samples
Top 8 title processor resume samplesTop 8 title processor resume samples
Top 8 title processor resume samples
greenerlead4
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
Robert Whitney
 
Top 8 advertising sales coordinator resume samples
Top 8 advertising sales coordinator resume samplesTop 8 advertising sales coordinator resume samples
Top 8 advertising sales coordinator resume samples
owenrodriguez458
 
Angel-Cristo-Resume-2015
Angel-Cristo-Resume-2015Angel-Cristo-Resume-2015
Angel-Cristo-Resume-2015
Angel Cristo
 
Resume_-_Scott_Bowman
Resume_-_Scott_BowmanResume_-_Scott_Bowman
Resume_-_Scott_Bowman
Scott Bowman
 
Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)
Brian Loftus
 
Joseph Resume (2)
Joseph Resume (2)Joseph Resume (2)
Joseph Resume (2)
Jody Reid
 
Resume_KR_1_final_1
Resume_KR_1_final_1Resume_KR_1_final_1
Resume_KR_1_final_1
kr rk
 
System Engineer Resume
System Engineer ResumeSystem Engineer Resume
System Engineer Resume
douk66t6gr
 
Resume for Management position 14-05-15
Resume for Management position 14-05-15Resume for Management position 14-05-15
Resume for Management position 14-05-15
John Barnett
 
Final Resume Deepak Sir
Final Resume Deepak SirFinal Resume Deepak Sir
Final Resume Deepak Sir
DEEPAK GIRASE
 
Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21
Craig Marshall
 
Top 8 referral clerk resume samples
Top 8 referral clerk resume samplesTop 8 referral clerk resume samples
Top 8 referral clerk resume samples
alibdolnan
 
Soumya exp resume
Soumya exp resumeSoumya exp resume
Soumya exp resume
Soumya Ranjan
 
Top 8 division director resume samples
Top 8 division director resume samplesTop 8 division director resume samples
Top 8 division director resume samples
tonychoper5505
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand Resume
Jerry Durand
 
Bryan Robinson - Resume CV12082014
Bryan Robinson - Resume CV12082014Bryan Robinson - Resume CV12082014
Bryan Robinson - Resume CV12082014
Bryan Robinson
 
Mohamed Mokhtar Resume_2016
Mohamed Mokhtar Resume_2016Mohamed Mokhtar Resume_2016
Mohamed Mokhtar Resume_2016
Mohamed Mohamed
 
Top 8 system librarian resume samples
Top 8 system librarian resume samplesTop 8 system librarian resume samples
Top 8 system librarian resume samples
LeonJackson789
 
Resume 2016 - Product Scheduler
Resume 2016 - Product SchedulerResume 2016 - Product Scheduler
Resume 2016 - Product Scheduler
Tim Chau
 

Viewers also liked (20)

Top 8 title processor resume samples
Top 8 title processor resume samplesTop 8 title processor resume samples
Top 8 title processor resume samples
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
Top 8 advertising sales coordinator resume samples
Top 8 advertising sales coordinator resume samplesTop 8 advertising sales coordinator resume samples
Top 8 advertising sales coordinator resume samples
 
Angel-Cristo-Resume-2015
Angel-Cristo-Resume-2015Angel-Cristo-Resume-2015
Angel-Cristo-Resume-2015
 
Resume_-_Scott_Bowman
Resume_-_Scott_BowmanResume_-_Scott_Bowman
Resume_-_Scott_Bowman
 
Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)
 
Joseph Resume (2)
Joseph Resume (2)Joseph Resume (2)
Joseph Resume (2)
 
Resume_KR_1_final_1
Resume_KR_1_final_1Resume_KR_1_final_1
Resume_KR_1_final_1
 
System Engineer Resume
System Engineer ResumeSystem Engineer Resume
System Engineer Resume
 
Resume for Management position 14-05-15
Resume for Management position 14-05-15Resume for Management position 14-05-15
Resume for Management position 14-05-15
 
Final Resume Deepak Sir
Final Resume Deepak SirFinal Resume Deepak Sir
Final Resume Deepak Sir
 
Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21
 
Top 8 referral clerk resume samples
Top 8 referral clerk resume samplesTop 8 referral clerk resume samples
Top 8 referral clerk resume samples
 
Soumya exp resume
Soumya exp resumeSoumya exp resume
Soumya exp resume
 
Top 8 division director resume samples
Top 8 division director resume samplesTop 8 division director resume samples
Top 8 division director resume samples
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand Resume
 
Bryan Robinson - Resume CV12082014
Bryan Robinson - Resume CV12082014Bryan Robinson - Resume CV12082014
Bryan Robinson - Resume CV12082014
 
Mohamed Mokhtar Resume_2016
Mohamed Mokhtar Resume_2016Mohamed Mokhtar Resume_2016
Mohamed Mokhtar Resume_2016
 
Top 8 system librarian resume samples
Top 8 system librarian resume samplesTop 8 system librarian resume samples
Top 8 system librarian resume samples
 
Resume 2016 - Product Scheduler
Resume 2016 - Product SchedulerResume 2016 - Product Scheduler
Resume 2016 - Product Scheduler
 

Similar to Tom resume' updated june 2016 pm

CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
Jomy Thalakkottur
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
Abhinav Rawat
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
Tony Lowery
 
Joe Couillards Resume-2-2016
Joe Couillards Resume-2-2016Joe Couillards Resume-2-2016
Joe Couillards Resume-2-2016
Joseph Couillard
 
Resume2016
Resume2016Resume2016
Resume2016
Kevin M. Walker
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
Rushi Pru Dhvi
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
Rushi Pru Dhvi
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
Zahir Hussain
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
Roger Berryment
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116
Bruce Kain
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
Arun Das
 
Instrument commissioning engineer
Instrument commissioning engineerInstrument commissioning engineer
Instrument commissioning engineer
Maire Tecnimont
 
CV
CVCV
C V
C VC V
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
Diosdado Dolocanog
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
Dave Harrison CV December 2016
Dave Harrison CV December 2016Dave Harrison CV December 2016
Dave Harrison CV December 2016
David Harrison
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
Malcolm Kiper
 
KJGResume2015
KJGResume2015KJGResume2015
KJGResume2015
K Jeffrey (Jeff) Glenn
 
Chris perry resume_2016
Chris perry resume_2016Chris perry resume_2016
Chris perry resume_2016
Chris Perry
 

Similar to Tom resume' updated june 2016 pm (20)

CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 
Joe Couillards Resume-2-2016
Joe Couillards Resume-2-2016Joe Couillards Resume-2-2016
Joe Couillards Resume-2-2016
 
Resume2016
Resume2016Resume2016
Resume2016
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
Instrument commissioning engineer
Instrument commissioning engineerInstrument commissioning engineer
Instrument commissioning engineer
 
CV
CVCV
CV
 
C V
C VC V
C V
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Dave Harrison CV December 2016
Dave Harrison CV December 2016Dave Harrison CV December 2016
Dave Harrison CV December 2016
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
KJGResume2015
KJGResume2015KJGResume2015
KJGResume2015
 
Chris perry resume_2016
Chris perry resume_2016Chris perry resume_2016
Chris perry resume_2016
 

Recently uploaded

Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Alexey Krivitsky
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
Ahmed AbdelMoneim
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
8p28uk6g
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
Bill641377
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
TulsiDhidhi1
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
dsnow9802
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Dr. Nazrul Islam
 
Team Building and TUCKMANS MODEL Explained
Team Building and TUCKMANS MODEL ExplainedTeam Building and TUCKMANS MODEL Explained
Team Building and TUCKMANS MODEL Explained
iampriyanshujaiswal
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
Pierre E. NEIS
 
Chart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spentChart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spent
spandane
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
stuwilson.co.uk
 
Conflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolutionConflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolution
Dr. Christine Ngari ,Ph.D (HRM)
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
GanpatiKumarChoudhar
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
Alberto Brandolini
 

Recently uploaded (14)

Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
Designing and Sustaining Large-Scale Value-Centered Agile Ecosystems (powered...
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
 
innovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptxinnovation in nursing practice, education and management.pptx
innovation in nursing practice, education and management.pptx
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
 
Team Building and TUCKMANS MODEL Explained
Team Building and TUCKMANS MODEL ExplainedTeam Building and TUCKMANS MODEL Explained
Team Building and TUCKMANS MODEL Explained
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
 
Chart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spentChart--Time Management.pdf How to time is spent
Chart--Time Management.pdf How to time is spent
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
 
Conflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolutionConflict resololution,role of hr in resolution
Conflict resololution,role of hr in resolution
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
 

Tom resume' updated june 2016 pm

  • 1. TOM Hinton 3114 Victory Palm Dr. Edgewater Fl. 32141 US cell (321) 201-7313 0BandPL@gmail.com OBJECTIVE: To obtain a permanent position in a growing company with advancement potential and an opportunityto put my experience to work. In the past 34 years I have acquired a wealth of knowledge that willbenefit greatly any employer. I have an excellent track record of delivering projects on time and within budget. Please notice that while with DCK WW I went to problem jobs to get them back on track and compliant with specifications. My EMPLOYMENT 6/15 to 4/16 TD Industries Construction Manager Special Projects, Ft. Worth Tx, MechanicalPM My duties include but are not limited to, all day to day mechanical trade work and adherence to schedules, review and approval of design documents and submittals, supervision of all phases of mechanicaltrades, ie. HVAC, chilled water piping, all duct and air handling equipment, Plumbing, Infrastructure, controls, TAB, grease hood ducting and testing. Full responsibility for all execution of such work includingcode compliance, testing and coordination with other trades, day to day operations of all field mechanical work and coordination and integration of these trades to facilitate needs and schedule, evaluation ofdesign changes and scope mods as they pertain to these areas, also for all close out documentation andowner instructions as per our contract. Responsible for price checking MEP change orders from subcontractors and budget estimates for same. Most of our projects were on NAS JRB Ft. Worth and under USACE control. Had to use their QCS program for all QA/QC for all of my projects. 1214 to 6/15 Gallo and Associates Baha Mar Resort and Casino, Nassau, Bahamas, Senior MEP PM My duties included but were not limited to, review and approval of design documents, supervision ofall phases of mechanical trades, ie. HVAC, chilled water piping, all duct and air handlingequipment, Plumbing, Electrical, Infrastructure, controls, TAB and Fire Sprinkler. Full responsibility for all execution of such work including code compliance, testing and coordination with other trades, day to day operations of all field MEP work, quality control, coordination and integration of these contractors to fit the overall project needs. Also adherence to the schedule, evaluation of design changes and scope mods as they pertain to these areas and for all close out documentation, owner instructions and quality of the project as per our contract. 614 to 1214…Layton/dck Pacific Hawaii JV Kapi'olani Medical Center Honolulu, Hi. MEP Coordinator/Supt My duties included but were not limited to, all day to day inspection of MEP trade work and adherence to schedules, review and approval of design documents, DFOW’s and submittals, supervision of all phases of testing and documentation of mechanical trades. QA/QC of all HVAC, chilled water piping, all duct and air handling equipment, Plumbing, Electrical, Infrastructure, controls, TAB, grease hood ducting and Fire Sprinkler, including all initial, prep and follow up meetings. Full responsibility for all compliance of suchwork including code compliance, testing and coordination with other trades, day to day observation of all field MEP work, all site underground and drainage, compaction testing, asphalting the parking lot after such work was complete, and coordination and integration of these tasks to meet DCK's needs and schedule, evaluation of design changes and scope mods as they pertain to these areas, also for all documentation and reporting to third party inspector as per our contract. Responsible for checking MEP change orders from subcontractors and budget estimates for same. Also, was superintendent for the complete ground up build of the boiler/sterilizer building from underground until completion. This included all MEP, underground piping, reinforced concrete slab, block walls, roofing, windows and interior finishes.
  • 2. 6/13 to 6/14 dck Pacific Guam, Guam Regional Medical Center, Dededo, Guam MEP QC My duties included but were not limited to, review and approval of submittals and DFOW’s of MEP trades, QC of all phases of mechanical trades including all prep, initial and follow up meetings as they pertained to MEP, all lift plans that related to MEP, I was also associate QC for concrete, framing, interior finishes and infrastructure work, site and underground utilities including all testing and documentation to the owner, I helped hold the QC meetings for these with the other QA/QC member. I was QC in charge of HVAC, chilled water piping above and below ground, all duct and air handling equipment, Plumbing, Electrical, Infrastructure, controls, TAB, grease hood ducting and Fire Sprinkler. Full responsibility for all documentation of such work including code compliance, testing and coordination with other trades, coordination and integration of these contractors to DCK's needs and schedule, evaluation of design changes and scope mods as they pertain to theseareas, also for all close out documentation and owner instructions as per our contract. Responsible for checking documentation for med gas installation and testing as well as reporting test results to owner. 10/12 to 6/13……………Betenbow/dck St. Maarten NV JV A.U.C. St Maarten Senior MEP Coordinator DCK self-performed, by hiring local sub-contractors and laborers, all MEP, concrete and interior framing and finish work. There was also an extensive amount of infrastructure work like new underground drainage, new water lines, new small reverse osmosis water treatment plant and new septic system including new underground tanks and pumping station for the lower half of the campus. I was responsible for all installation and QC for these areas, and submittals of all trades. HVAC, chilled water piping, all duct and air handlingequipment, Plumbing, Electrical, Infrastructure, controls, TAB and Fire Sprinkler. Full responsibility for all execution of such work including code compliance, testing and coordination, day to day operations of all field MEP work and coordination and integration of these operations to DCK's needs and schedule, evaluation of design changes and scope mods as they pertain to these areas, also for all close out documentation to owner and owner instructions as per our contract. Held weekly MEP meetings for all phases of this work. 8/11 to 10/12…………dck Ttec JV MCAS Yuma MEP Engineer/ MEP Coordinator My duties included but were not limited to, review and approval of design documents, reviewing and approval of MEP contractor submittals such as HVAC equipment, ductwork, DDC controls, Chillers, boilers, etc. Also fire sprinkler piping, valves, pre-action systems as well as Dry Agent systems, plumbing pipe designs, fixtures backflow preventers and automated flush valves, also involved in low voltage and line voltage electrical equipment and large emergency generators, day to day operations of field MEP contractors and the integration of the contractors to dck Ttec needs and schedule, evaluation of CR´s, design changes and scope modifications as it effects the contract costs. There was also extensive infrastructure work like pipe bursting, pump stations, new underground piping, new underground electrical piping, new sub station including slab and fence work. Had to comply with all NAVFAC safety and submittal requirements. Training: A.H.A. S.T.A.R.T Safety Health and Environmental Manual Construction Quality Management for Contractors Certified USACE OSHA 30 Hour JS-US007 Level 1 Antiterrorism Awareness Training 04/04 to 7/11… Climatic Refrigeration and A/C West Melbourne, Florida Project Manager/ Estimator My duties include but are not limited to, management of all phases ofprojects ranging from small DX systems to large chilled water systems includingduct work, black iron and pre-insulated PVC piping and various types of insulation, estimating and buying out of these types of projects. Also, negotiation ofchange orders for both civilian and govt. projects and all related documentation involved in these. Manpower loading for both small
  • 3. and large projects andmatching people with their skill set as needed to facilitate the needs for a givenproject. Projects managed and estimated include NASA, US Air Force, state, countyand large retail malls and shopping plazas. Also, was PM on two hospital jobs,the Palm Bay and Cape Canaveral hospitals, also 3 surgery centers, includingall HVAC, C/W and H/W piping, DDC controls and all stainless steel med gas.piping and butt fusion welds. Responsible for all UL assemblies related toHVAC. 09/98 to 04/04 City of Cocoa Beach Golf Course Cocoa Beach, Florida Assistant Golf Pro • Greeting guests, managing the pro shop, teaching and staff management. Took time to play tournament golf to attempt to get my Senior PGA Tourcard. • 04/96 to 06/98 Britt's A/C and Fire Sprinkler Titusville, Florida Project Manager/Estimator Managed and estimated commercial projects mainly for NASA and USAF for work at Cape Canaveral AFS and KSC. Responsibilities included but not limited to scheduling, manpower estimations, RFP documentation for several disciplines of mechanical contracting. ie. duct work, chilled water piping, fire sprinkler piping, plumbing piping as well as controls and subcontractors. 04/93 to 03/96 Coastal Mechanical Co. Inc. West Melbourne, Florida Sheet metal shop and Special Projects Manager/Estimator Initially held position as sheet metal shop manager. Responsibilities included but were not limited to, supplies & inventory, shipping/receiving, input of duct and fittings into Vulcan system along with scheduling deliveries to job sites and material procurement for those jobs. Assumed the additional position of Special Projects Div. Manager and estimated and ran smaller projects. Responsible for all aspects of these projects and design and layout throughout the project as well as warranty. 1978 THROUGH 1993 ESTIMATING EXPERIENCE UPON REQUEST EDUCATION Dekalb Community College Decatur, Georgia West Georgia College Carrollton, Georgia Carrier Engineering School Atlanta, Georgia Trane Engineering School Orlando Fl. U S A C E Q A / Q C C e r t i f i e d L . A . 2 0 1 2 REFERENCES Available upon request.