John Flores has over 30 years of experience as a drafter, designer, and coordinator for engineering projects. He is currently working as a 2D CAD drafter, ISO coordinator, and PDS administrator for Parsons Government Services on projects decommissioning chemical weapons facilities. Prior experience includes working as an ISO coordinator, drafter, and database manager on various engineering projects for nuclear, chemical, and oil/gas facilities. He is proficient in AutoCAD, CadWorx, PDS, and other engineering software.
1. 6/15
JOHN A. FLORES Home Phone: (714) 841-3255
6600 Warner Ave. Unit 6, Cell Phone: (714) 642-1026
Huntington Beach, California, 92647 Home Email: JAFHB2001@aol.com
Work Email: John.Flores@Parsons.com
CAREER OBJECTIVES:
Seeking a design/engineering oriented position working with engineered products and/or systems utilizing my past technical
engineering experience. Ideal position will allow for personal growth and professional advancement. Self-starter capable of
working as a team member or individually, as required. Short-term travel/job assignment would be acceptable.
MOST RECENT EXPERIENCE:
PARSONS GOVERNMENT SERVICES/INFASTRUCTURE & TECHNOLOGY
100 W. WALNUT ST., PASADENA, CA
AUGUST 2008 – PRESENT
PROJECT: BGCAPP BLUEGRASS CHEMICAL AGENT DISTRUCTION PILOT PLANT
TITLE: 2D CAD DRAFTER /ISO COORDINATOR/PDS ADMIN
SUPERVISOR: TONY PEREZ/JACK CLINTON
Responsibilities included: 2D updates to PDS isometrics as needed in preparation for issue. Some limited PDS model updates
and administration duties. PDS duties included Piping Class updates and system loading, Reference Data updates and system
loading and Report generation. Setup orthographic drawing volumes and provided annotation as needed. Management of
the database for the project tracking status of all drawings, the extraction of PDS isometrics and routing through the checking
process. Transferring of material files to DMCS for processing by our DMCS department . Reviewing and approving piping
design model interferences with designers. Maintain equipment drawing status database. Training new employees to use the
iso tracking software. Coordinate delivery of issued files to fabricators to meet construction priorities and schedules.
OCTOBER 2008 - 2010
PROJECT: LES NATIONAL ENRICHMENT FACILITY
TITLE: ISO COORDINATOR /DRAWING DATABASE MANAGER
SUPERVISOR: Jim Cookmeyer
Responsibilities included: Management of the databases for the project tracking status of isometric drawings, the extraction of
CadWorx isometrics and routing through the checking process. Building and maintaining cad specifications. Developed and
implimented a line summary database for process and fire protection groups. Trained in the ASME NQA-1-1994, Quality
Assurance Requirements for Nuclear Facility Applications.
FEBRUARY 2008 – August 2008
PROJECT: RIT INTERNATIONAL METALS, INC, TITANIUM SPONGE PLANT
TITLE: 2D CAD DRAFTER /ISO COORDINATOR /DRAWING DATABASE MANAGER
SUPERVISOR: Jim Cookmeyer
Responsibilities included: 2D updates to PDS isometrics as needed in preparation for issue. Setup orthographic drawing
volumes and provide annotation as needed. Management of the databases for the project tracking status of all drawings, the
extraction of PDS isometrics and routing through the checking process. Transferring of material files to DMCS for processing.
Developed and implimented a line summary database for process group. Reviewing and approving piping design model
interferences with designers.
SEPTEMBER 2004 – FEBRUARY 2008
PROJECT: BGCAPP BLUEGRASS CHEMICAL AGENT DISTRUCTION PILOT PLANT
TITLE: 2D CAD DRAFTER /ISO COORDINATOR
SUPERVISOR: TONY PEREZ
Responsibilities included: 2D updates to PDS isometrics as needed in preparation for issue. Setup orthographic drawing
volumes and provide annotation as needed. Management of the database for the project tracking status of all drawings, the
extraction of PDS isometrics and routing through the checking process. Transferring of material files to DMCS for processing.
Reviewing and approving piping design model interferences with designers. Maintain equipment drawing status database.
SEPTEMBER 2003 – SEPTEMBER 2004
PROJECT: PCAPP PUEBLO CHEMICAL AGENT DESTRUCTION PILOT PLANT
TITLE: 2D CAD DRAFTER /ISO COORDINATOR
SUPERVISOR: SAM MINASIAN
Responsibilities included: 2D updates to PDS isometrics as needed in preparation for issue. Setup orthographic drawing
volumes and provide annotation as needed. Management of the database for the project tracking status of all drawings, the
extraction of PDS isometrics and routing through checking process. Assisted CAD coordinator in the reporting and approving
of design interferences, downloading and uploading of PDS models between client server to project files. Transferring of
material files to DMCS for processing.
2. 6/15
PARSONS ENERGY & CHEMICALS
125 W. HUNTINGTON DRIVE, ARCADIA, CA
DECEMBER 2002- SEPTEMBER 2003
PROJECT: JOB SITE/ SHELL REFINERY/WILMINGTON, CALIF.
TITLE: 2D DRAFTER / PIPING DESIGNER / MATERIAL RECEIVING
SUPERVISOR: RON MYLES
Responsibilities included 2D ACAD updates to new and existing isometrics for FCCU turnaround using AutoCad Overlay or 2D
Acad. Duties included the preparation of work packages for multiple contractors, consisting of generating new and modifying
existing isometrics, field verifying existing piping, system transpositions and system database entry. Material receiving duties
included verifying materials ordered to materials received, identifying materials by on-site contractors and systems use, and
ensuring delivery to proper on-site contractor. Also received pipe spools from fabricators, identifying spools by contractor and
process system, checking for correct spool configuration and any damage in shipping also notified contractors of receipt of
spools for pick up during unit shutdown.
PARSONS GOVERNMENT SERVICES/INFASTRUCTURE & TECHNOLOGY
100 W. WALNUT ST., PASADENA, CA
NOVEMBER 2002
PROJECT: JOB SITE/NEWPORT CHEMICAL DEPOT/NEWPORT, INDIANA
TITLE: SHOP SPOOL CHECKER / 2D DRAFTER
SUPERVISOR: JIM COOKMEYER
My major responsibilities were to perform as checker of pipe spool isometrics generated by designers. Checked isos for
constructibility, correctness, and compliance with specifications and standards. Additional duties were to help in the 2D
preparation of project orthographics, converting electronic drawing files to ACAD for delivery to client, and updating P&ID
drawings in Piping Dept. master files.
PARSONS ENERGY & CHEMICALS
125 W. HUNTINGTON DRIVE, ARCADIA, CA
JANUARY 2002 – OCTOBER 2002
PROJECT: JOB SITE/SHELL REFINERY/WILMINGTON, CALIF.
TITLE: 2D DRAFTER / PIPING DESIGNER
SUPERVISOR: RON MYLES
Responsibilities included 2D ACAD updates to new and existing isometrics and plan drawngs. The design and layout of
projects including, preparing work packages for client review. Design projects included rerouting existing heater piping in
conjunction with other contractors and disciplines, developing isometrics and plans to support design by field measurements.
Developed vessel orientation and piping of new acid KO pot and developed isometric and orthographic drawings for design
support.
SEPTEMBER 2001 – DECEMBER 2001
PROJECT: VALERO
TITLE: 2D DRAFTER / ISO COORDINATOR
SUPERVISOR: BILL DOWLING
Responsibilities included 2D updates to PDS isometrics as needed in preparation for issue. Management of the database for
the project tracking status of all drawings, the extraction of PDS isometrics and routing through checking process. Transferring
of material files to DMCS for processing.
MARCH 2000 – SEPTEMBER 2001
PROJECT: BOQUERON
TITLE: 2D DRAFTER / ISO COORDINATOR
SUPERVISOR: GEORGE FERREIRO
Responsibilities included 2D updates to PDS isometrics and orthographics as needed in preparation for issue. Management of
the database for the project tracking status of all isometric and orthographic drawings, the extraction of PDS isometrics and
routing through checking process. Transferring of material files to DMCS for processing. Input manpower data for supervisor
review.
OCTOBER 1999 – MARCH 2000
PROJECT: PETROKEMYA
TITLE: 2D DRAFTER
SUPERVISOR: ROBERT GALLARDO
Responsibilities included 2D updates to PDS isometrics as needed in preparation for issue. Setting up and creating
orthographics from the PDS models, and annotating as needed for issue.
3. 6/15
JUNE 1998 – OCTOBER 1999
PROJECT: KEMYA MAJOR PROJECTS
TITLE: ISO COORDINATOR
SUPERVISOR: KEITH HAMMOND
Responsibilities included the management of the database for the project tracking status of all isometric and orthographic
drawings. The extraction of PDS isometrics and routing through checking process. The addition of 2D notes and details to
isometrics as needed for issue. Transferring of material files to DMCS for processing.
PIPE FABRICATING & SUPPLY CO., 9703 S. NORWALK BLVD.
SANTA FE SPRINGS, CALIFORNIA 90670
JULY 1996 – JULY 1998
TITLE - Engineer/Estimator
Responsibilities included drawing and checking of shop spool detail sketches. Layouts of skid piping on 2D ACAD. Developing
material and labor take-offs for shop fabricated piping from A&E orthographic/isometric drawings. Interface with clients as
needed to facilitate shop fabrication of piping systems. Assisted Purchasing Dept. in material requisition of proposed projects
performing material supplier evaluations based on cost and delivery to meet schedules.
ARB FABRICATED SYSTEMS INC./ ARB INC., 14409 Paramount Blvd.
Paramount, California 90723
JULY 1989 - JULY 1996
TITLE - Project Engineer/Estimator
Responsibilities to A&E’s of petroleum production/refining design and power generation systems, included coordination with
customers and ARB engineering department during the fabrication of piping systems in shop. Also supervised the drawing and
checking of shop spool detail sketches for dimensional correctness and conformance with material/fabrication specifications
and applicable piping codes (B31.3, B31.3). Assisted in the development of computerized production schedules for projects.
Reported progress of projects at weekly production meetings. Interfaced with clients when engineering questions arose during
shop fabrication that might impact delivery.
As estimator was responsible for attending job walks, both in local and out of state locations for proposed projects. Developed
material and labor take-offs for mechanical installation of proposed projects from client supplied isometric/orthographic/P&ID
drawings. Evaluated vendor material prices for best buy/delivery. Worked in field when needed in preparation and inspection
of hydro packages prior to hydro testing, spot checking of piping installation for completeness and accuracy.
ACM DESIGN c/o CHEVRON USA, 1300 S. BEACH BLVD.
LA HABRA, CALIFORNIA 90632
NOVEMBER 1987 - JULY 1989
TITLE - Drafter/Permitter
Worked as part of the in-house designers for Chevron USA Marketing Southwest Division, in the design of new and refurbished
service stations for the southwest region, involved developing and preparing of all design drawings for service stations
buildings, product piping systems and product tank placement. Acquiring any necessary permits as required for construction
from various city agencies. Interfacing with Chevron engineers through project development.
PIPE FABRICATING & SUPPLY CO., 9703 S. NORWALK BLVD.
SANTA FE SPRINGS, CALIFORNIA 90670
JULY 1979 - AUGUST 1987
TITLE - Assistant Engineer
Responsibilities included drawing and checking of shop spool detail sketches. Checking spools drawings for dimensional
correctness, and compliance with specifications and applicable piping codes. Interfaced with clients when engineering
questions arose during shop fabrication.
COMPUTER SKILLS:
SOFTWARE: AutoCad/CadWorx 2009/10, AutoCad Overlay, Microstation J, Intergraph PDS/Isogen, Microsoft Office ’07&
‘10(Excel, Word, Access), Adobe Acrobat, Parsons EDMS.
EDUCATION:
Graduated from Mt.San Antonio College with A.S. Degree in Architectural Drafting. Strong drafting skills.
REFERENCES:
Will be furnished upon request.