Rocky A. Seals
Mechanical Construction and Commissioning
Profile
Thirty-four (35) years of industrial construction and mechanical commissioning experience including 20
years supporting start-up. Extensive experience in the construction, repair and start-up of boilers, gas and
steam turbine generators and related equipment; specializing in combined cycle and simple cycle plant
operations. Vast knowledge of the start-up and operation of Siemens 501F-SGT6, GE Frame 7 and
LM6000 gas turbines, GE D11 and A10 steam turbines and Pratt & Whitney FT8 gas turbines. Equipment
experience includes Ariel gas compressors, Caterpillar generators, Ingersoll-Rand air compressors,
Alstom and B&W boilers, Deltak, Alstom and Vogt-Nem HRSG’s, Pratt & Whitney and GE turbines,
Alstom and CE condensers, Alstom AQCS with FGD, York and Trane chillers, US Filter, Glegg and Betz
water treatment plants. Also, Beloit, Valmet and Tampella paper machines.
Experienced in:
 Commissioning & start-up.
 Permit to Work
 SYMOPS
 On-site monitoring & documentation of construction projects.
 Monitoring & documenting daily project activities.
 Tracking and managing project schedules.
 Punch list maintenance.
 LOTO coordination.
 System walk downs.
Experience
EPIC MANAGEMENT RESOURCES, LLC, Mechanical Commissioning Supervisor (2013 - 2015)
Williams Midstream, Gulfstar1 FPS
 Designated systems parameters on P&ID’s. Managed Topsides equipment preservation
program and personnel on the oil production platform prior to sea tow. Managed Permit to
Work and assisted LOTO, SIMOPS during offshore commissioning.
SOLAR RESERVE, Owner’s Representative (2012 - 2013)
Crescent Dunes Tonopah, NV
 Responsible for the scheduling, delivery, receiving and installation of a 160’ solar receiver
structure, solar panels, heat shields and large bore stainless piping mounted on a 550’
concrete tower.
KLEEN ENERGY, Mechanical Consultant (2010 - 2012)
Middletown, CT
 Responsible for monitoring construction and commissioning activities.
 Attended daily meetings with project management.
 Participated in system turnover walk downs for the rebuild of a Siemens 501F-SGT6
combined cycle power plant.
KCP&L, Mechanical Start-up Engineer (2010)
Kansas City, MO, Iatan II
 Reported directly to the start-up manager.
 Coordinated mechanical start-up activities for an Alstom 900 MW supercritical boiler and
Toshiba steam turbine generator.
 Duties included plant commissioning and overseeing AQCS.
HUNTSMAN AROMATICS & OLEFINS UNIT, Technical Consultant (2007 - 2009)
Port Arthur, TX, PABC Fire Rebuild
 Developed documents for the mechanical scope construction sequence, project schedule,
man-hour estimate and commissioning plan for arbitration arguments.
HUNTSMAN AROMATICS & OLEFINS UNIT, Sr. Mechanical Consultant (2006 - 2007)
Port Arthur, TX, PABC Fire Rebuild
 Monitored demolition and construction activities, reviewed rebuild plans, scheduling and
revised drawings for compliance to the insurer’s agreement.
 Attended progress meetings with the owner’s representatives.
SINCLAIR OIL REFINERY, Mechanical Superintendent (2006)
Tulsa, OK, Clean Fuels Upgrade
 Responsible for the field design of piping systems for various upgrades to existing
facilities.
 Directed construction of a 1K pph UOP CycleMax CCR Platformer unit with inter-heater
and reactor.
RENOVAR ENERGY CORP., Project Superintendent (2005 - 2006)
New Orleans, LA, Jefferson Parrish Compressor Station
 Responsible for engineering review, construction completion and subcontract
administration for a 1700 scfm methane compressor skid and 4 mile pipeline.
KINDER MORGAN, Start-up Manager (2005)
Snyder, TX, Spectrum Energy Project
 Responsible for the commissioning and start-up of a 2x1 LM6000 combined cycle plant
including a Glegg water treatment plant, Deltak HRSG’s and a Turbodyne steam turbine
generator.
MID-AMERICA ENERGY, Field Engineer (2004 - 2005)
Sioux City, IA, Neal Station
 Coordinated the systematic walk down and as-built drawings review on a coal fired
1680MW power plant consisting of over 800 P&ID’s and vendor schematics.
 Captured all changes over a 30 year time frame of plant modifications and operations
upgrades.
ALLIANT ENERGY, Project Superintendent (2003 - 2004)
Clear Lake, IA, Emery Station Project
 Directed a crew of 300 in all construction activities and a crew of 24 in all start-up
activities with zero lost time accidents.
 Project was on time and under budget.
 Project consisted of 2x GE frame 7FA combustion turbines, 2 Alstom HRSG’s and 1 GE
D11 steam turbine generator.
MIRANT CORP., Lead Mechanical Start-up Engineer (2003)
Terre Haute, IN, Sugar Creek Project
 Responsible for the testing, flushing, start-up and commissioning of balance of plant
systems, turbine lube oil and hydraulics and generator hydrogen/CO2 systems.
 Updated activities for the site schedule daily and interfaced with operations.
 Project consisted of 2x GE frame 7FA combustion turbines, 2 Vogt-Nem HRSG’s, 1 GE
D11 steam turbine generator and GE Betz water treatment system.
THUMS, Lead Mechanical Start-up Engineer (2002 - 2003)
Long Beach, CA, Co-Gen Project
 Responsible for developing and conducting the flushing and start-up procedures for
balance of plant.
 Conducted lube oil flushes for the turbine and generator.
 Developed as-built drawings and assisted operator training.
 Simple cycle plant consisted of 1 GE LM6000 combustion turbine, Peerless SCR, Evapco
cooling tower, 2 Ariel gas compressors, Trane chiller, Atlas air compressor and US Filter
water treatment system.
THUMS, Lead Mechanical Start-up Engineer (2002)
Kalkaska, MI, Co-Gen Project
 Responsible for developing and conducting the testing, flushing and start-up procedures
for balance of plant systems.
 Performed oil flushes, point to point electrical checks for the fire suppression system and
the CO2 dump test for the turbines and generator.
 Served as the LOTO authority.
 Developed the as-built drawings and final punch list.
 Simple cycle facility consisted of 2x Pratt & Whitney FT8 turbines, 1 Brush generator, 1
Coon– DeVisser fire pump skid, Atlas Copco air compressor and US Filter water
treatment unit.
KMPC, Mechanical Superintendent/Start-up Manager (2001 - 2002)
Wrightsville, AR, Orion Project
 Supervised all mechanical construction activities, testing, flushing, start-up,
commissioning and turnover to the client.
 Developed system turnover packages, initiated and maintained the LOTO program,
updated project schedule daily.
 Chaired daily start-up meetings, generated procedures, supervised commissioning
activities, interfaced with client operations and maintained project punch list, vendor
support and turnover of spares.
 Facility consisted of (1) GE F7EA CT, (6) GE LM6000 CT’s, (2) GE A10 STG’s and (7)
Deltak HRSG’s.
CONSTELLATION ENERGY, Mechanical Superintendent/Start-up Engineer (2000 - 2001)
Kenova, WV, Big Sandy Peaker
 Supervised the construction of (12) Pratt & Whitney FT8 combustion turbines and balance
of plant systems.
 Responsible for site LOTO program, commissioning of all balance of plant equipment and
operating maintenance on all equipment during performance testing.
DOD CONTRACT, Project Superintendent/Start-up Manager (1998 - 2000)
Valparaiso, FL, Eglin AFB
 Supervised the construction of the central HVAC facility which included the installation of
(4) York 650 ton chillers and (4) United package boilers.
 Interfaced with Base Operations, performed site LOTO activities, coordinated
subcontractor activities and developed the punch list.
 Conducted facility start-up and commissioning activities.
DOD CONTRACT, Project Superintendent/Start-up Manager (1996 - 1997)
Fort Walton Beach, FL, Hurlburt Field AFB
 Supervised the construction of a jet fuel storage and flight line delivery facility which
included a 50,000 barrel floating roof storage tank, 2 pumping stations, 2 truck unload
stands and a 1200 gpm flight line pantograph with concrete zero liquid discharge
containment.
USACE POL PIPELINE/JET FUEL STORAGE, Project Superintendent/Start-up Manager (1994 - 1996)
Valparaiso, FL, Eglin AFB
 Responsible for construction, testing, start-up and commissioning.
 Prepared system turnover packages, controlled LOTO program and generated test
procedures.
 Supervised and updated all start-up activities in the project schedule daily.
 Maintained the punch list.
 Facility consisted of a 5 mile pipeline, (2) 1mm gallon floating roof tanks and (2) 20,000
gpm vertical turbine pumps.
BABCOCK & WILCOX, Project Superintendent/Start-up Manager (1993 - 1994)
Delaware City, DE, Texaco Star Refinery
 Responsible for construction, testing, start-up and commissioning.
 Supervised all construction activities, prepared system turnover packages, initiated LOTO
permits, reviewed all QA/QC documentation and conducted steam blows and start-up
activities.
 Included the demolition of an existing boiler and installation of a B&W 1200 TPD coker
boiler.
BABCOCK & WILCOX, Mechanical Superintendent/Start-up Manager (1991 - 1993)
Pennington, AL, Naheola Co-gen
 Responsible for all aspects of erection completion, start-up, commissioning and
performance testing.
 Prepared flush, test, steam blow and start-up procedures, developed and maintained the
start-up schedule and interfaced with engineering and operations personnel and prepared
system turnover packages.
 Project consisted of a 1715 TPD B&W chemical recovery boiler and an HPD black liquor
concentrator island.
BABCOCK & WILCOX, Mechanical Superintendent/Start-up Engineer (1990 - 1991)
Cedar Springs, GA, Georgia Pacific
 Supervised mechanical subcontractors, assisted with the development of start-up
procedures, supervised outage and start-up activities.
 Maintained LOTO, conducted steam blows, and prepared system turnover packages.
 Project consisted of (2) 850 TPD B&W chemical recovery boilers and an HPD black liquor
concentrator island.
TIDEWATER CORPORATION, Pipe Superintendent (1988 - 1990)
Marht, AL, Mead Paper Co.
 Supervised the installation, testing and flushing of piping systems.
 Assisted with development of the project schedule, coordinated with craft supervisors and
maintained the punch list.
 Project consisted of a Valmet paper machine and Black Clawson chemical pulp mill with
various upgrades to existing systems.
RUST INTERNATIONAL, Mechanical Superintendent (1987 - 1988)
Greneda, MS, Newsprint South Corp.
 Supervised the installation of piping and equipment for a Greenfield Tampella paper
machine with a thermo-mechanical pulp mill.
BLOUNT CONSTRUCTORS, Mechanical General Foreman (1985 - 1987)
Prattville, AL, Union Camp Paper Co.
 Supervised the installation of piping and equipment for a new Beloit paper machine.
 Coordinated with plant operations to conduct outages, maintained the punch list,
conducted LOTO and assisted start-up.
BLOUNT CONSTRUCTORS, Pipe Foreman (1984 - 1985)
Pennington, AL, James River Corp.
 Supervised the installation of pipe and equipment for the pulp mill renovation and wood
yard.
VARIOUS, Pipefitter/Pipe Welder (1980 - 1984)
 Certified pipe welder and pipefitter while working in paper mills and chemical plants
throughout the southeastern U.S.

More Related Content

What's hot

Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1
Zane Peter Engelbrcht
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)
Phillip Evans
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
John P. Henderson
 
Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
Richard Martinez
 
BDSResume1
BDSResume1BDSResume1
Resume ali mohamed mahmoud 2018
Resume ali mohamed mahmoud   2018Resume ali mohamed mahmoud   2018
Resume ali mohamed mahmoud 2018
Ali Mahmoud
 
Resume CV
Resume CVResume CV
Resume CV
Ali Mmmh
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
Talal Bayoumi CCNA, MCSE
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History Details
Max Simnitt
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
DVR Murthy
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
rickyhargrove
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
DOE Office of River Protection
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
Anilkumar Cp
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
walaa ahmed ahmed attiia
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
Nazmy Markos
 
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
JAGADEESAN MANICKA
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
Joe Fain
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
Russell Bruce
 

What's hot (18)

Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
 
BDSResume1
BDSResume1BDSResume1
BDSResume1
 
Resume ali mohamed mahmoud 2018
Resume ali mohamed mahmoud   2018Resume ali mohamed mahmoud   2018
Resume ali mohamed mahmoud 2018
 
Resume CV
Resume CVResume CV
Resume CV
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History Details
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
1.1. CHEVRON - ANGOLA LNG Job Description of JAGADEESAN Manicka A - Copy - Co...
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
 

Viewers also liked

Public Speaking Dari Muhammad Noor
Public Speaking Dari Muhammad NoorPublic Speaking Dari Muhammad Noor
Public Speaking Dari Muhammad Noor
Muhammad Noor
 
Asset Allocation
Asset AllocationAsset Allocation
Asset Allocation
Adam Batstone
 
Aplicatii utilizate si aplicatii interesante
Aplicatii utilizate si aplicatii interesanteAplicatii utilizate si aplicatii interesante
Aplicatii utilizate si aplicatii interesante
Milosescu Izabela
 
Walking Roegner Park
Walking Roegner ParkWalking Roegner Park
Walking Roegner Park
Debi Taylor-Hough
 
Where to Begin with CM?
Where to Begin with CM?Where to Begin with CM?
Where to Begin with CM?
Debi Taylor-Hough
 
Resume
ResumeResume
Resume
Ahmed Samy
 
Charlotte Mason in a Nutshell
Charlotte Mason in a NutshellCharlotte Mason in a Nutshell
Charlotte Mason in a Nutshell
Debi Taylor-Hough
 
Final PPP Slides by Ali Fossell
Final PPP Slides by Ali FossellFinal PPP Slides by Ali Fossell
Final PPP Slides by Ali Fossell
Ali Fossell
 
Air revive refurbish recommission fan coil unit
Air revive refurbish recommission fan coil unitAir revive refurbish recommission fan coil unit
Air revive refurbish recommission fan coil unit
AirRevive
 
Journey into the Genome: Bioinformatics
Journey into the Genome: BioinformaticsJourney into the Genome: Bioinformatics
Journey into the Genome: Bioinformatics
Ibrahim Vazirabad
 
Whole exome sequencing(wes)
Whole exome sequencing(wes)Whole exome sequencing(wes)
Whole exome sequencing(wes)
Ibrahim Vazirabad
 

Viewers also liked (11)

Public Speaking Dari Muhammad Noor
Public Speaking Dari Muhammad NoorPublic Speaking Dari Muhammad Noor
Public Speaking Dari Muhammad Noor
 
Asset Allocation
Asset AllocationAsset Allocation
Asset Allocation
 
Aplicatii utilizate si aplicatii interesante
Aplicatii utilizate si aplicatii interesanteAplicatii utilizate si aplicatii interesante
Aplicatii utilizate si aplicatii interesante
 
Walking Roegner Park
Walking Roegner ParkWalking Roegner Park
Walking Roegner Park
 
Where to Begin with CM?
Where to Begin with CM?Where to Begin with CM?
Where to Begin with CM?
 
Resume
ResumeResume
Resume
 
Charlotte Mason in a Nutshell
Charlotte Mason in a NutshellCharlotte Mason in a Nutshell
Charlotte Mason in a Nutshell
 
Final PPP Slides by Ali Fossell
Final PPP Slides by Ali FossellFinal PPP Slides by Ali Fossell
Final PPP Slides by Ali Fossell
 
Air revive refurbish recommission fan coil unit
Air revive refurbish recommission fan coil unitAir revive refurbish recommission fan coil unit
Air revive refurbish recommission fan coil unit
 
Journey into the Genome: Bioinformatics
Journey into the Genome: BioinformaticsJourney into the Genome: Bioinformatics
Journey into the Genome: Bioinformatics
 
Whole exome sequencing(wes)
Whole exome sequencing(wes)Whole exome sequencing(wes)
Whole exome sequencing(wes)
 

Similar to R_SealsResume2015

Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
Lee Riopel
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
Derek Dhonau
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
Tj Dickey
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
Leslie Banks
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
Mike Koons
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
Abbas Saeidi
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
Steve Chu
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
Charernsook Siriyong
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
Roy Firtha
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
Leon Chacon
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
Ron Bray
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
Jack Dickerson
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
Edward Ruebling
 
++++byanar cv
++++byanar cv++++byanar cv
++++byanar cv
Bahattin Yanar
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
Michael Dunlap
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
Karl Keller
 
Cantrell Steve H
Cantrell Steve HCantrell Steve H
Cantrell Steve H
Steve Cantrell
 
West.Robert.resume.2016-02
West.Robert.resume.2016-02West.Robert.resume.2016-02
West.Robert.resume.2016-02
Robert West
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper
 

Similar to R_SealsResume2015 (20)

Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
++++byanar cv
++++byanar cv++++byanar cv
++++byanar cv
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
Cantrell Steve H
Cantrell Steve HCantrell Steve H
Cantrell Steve H
 
West.Robert.resume.2016-02
West.Robert.resume.2016-02West.Robert.resume.2016-02
West.Robert.resume.2016-02
 
Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015Rocky Prosper PMP - Project Manager - June 2015
Rocky Prosper PMP - Project Manager - June 2015
 

R_SealsResume2015

  • 1. raseals@msn.com 850-501-9986 Rocky A. Seals Mechanical Construction and Commissioning Profile Thirty-four (35) years of industrial construction and mechanical commissioning experience including 20 years supporting start-up. Extensive experience in the construction, repair and start-up of boilers, gas and steam turbine generators and related equipment; specializing in combined cycle and simple cycle plant operations. Vast knowledge of the start-up and operation of Siemens 501F-SGT6, GE Frame 7 and LM6000 gas turbines, GE D11 and A10 steam turbines and Pratt & Whitney FT8 gas turbines. Equipment experience includes Ariel gas compressors, Caterpillar generators, Ingersoll-Rand air compressors, Alstom and B&W boilers, Deltak, Alstom and Vogt-Nem HRSG’s, Pratt & Whitney and GE turbines, Alstom and CE condensers, Alstom AQCS with FGD, York and Trane chillers, US Filter, Glegg and Betz water treatment plants. Also, Beloit, Valmet and Tampella paper machines. Experienced in:  Commissioning & start-up.  Permit to Work  SYMOPS  On-site monitoring & documentation of construction projects.  Monitoring & documenting daily project activities.  Tracking and managing project schedules.  Punch list maintenance.  LOTO coordination.  System walk downs. Experience EPIC MANAGEMENT RESOURCES, LLC, Mechanical Commissioning Supervisor (2013 - 2015) Williams Midstream, Gulfstar1 FPS  Designated systems parameters on P&ID’s. Managed Topsides equipment preservation program and personnel on the oil production platform prior to sea tow. Managed Permit to Work and assisted LOTO, SIMOPS during offshore commissioning. SOLAR RESERVE, Owner’s Representative (2012 - 2013) Crescent Dunes Tonopah, NV  Responsible for the scheduling, delivery, receiving and installation of a 160’ solar receiver structure, solar panels, heat shields and large bore stainless piping mounted on a 550’ concrete tower. KLEEN ENERGY, Mechanical Consultant (2010 - 2012) Middletown, CT  Responsible for monitoring construction and commissioning activities.  Attended daily meetings with project management.  Participated in system turnover walk downs for the rebuild of a Siemens 501F-SGT6 combined cycle power plant. KCP&L, Mechanical Start-up Engineer (2010) Kansas City, MO, Iatan II  Reported directly to the start-up manager.  Coordinated mechanical start-up activities for an Alstom 900 MW supercritical boiler and Toshiba steam turbine generator.  Duties included plant commissioning and overseeing AQCS. HUNTSMAN AROMATICS & OLEFINS UNIT, Technical Consultant (2007 - 2009) Port Arthur, TX, PABC Fire Rebuild  Developed documents for the mechanical scope construction sequence, project schedule, man-hour estimate and commissioning plan for arbitration arguments.
  • 2. HUNTSMAN AROMATICS & OLEFINS UNIT, Sr. Mechanical Consultant (2006 - 2007) Port Arthur, TX, PABC Fire Rebuild  Monitored demolition and construction activities, reviewed rebuild plans, scheduling and revised drawings for compliance to the insurer’s agreement.  Attended progress meetings with the owner’s representatives. SINCLAIR OIL REFINERY, Mechanical Superintendent (2006) Tulsa, OK, Clean Fuels Upgrade  Responsible for the field design of piping systems for various upgrades to existing facilities.  Directed construction of a 1K pph UOP CycleMax CCR Platformer unit with inter-heater and reactor. RENOVAR ENERGY CORP., Project Superintendent (2005 - 2006) New Orleans, LA, Jefferson Parrish Compressor Station  Responsible for engineering review, construction completion and subcontract administration for a 1700 scfm methane compressor skid and 4 mile pipeline. KINDER MORGAN, Start-up Manager (2005) Snyder, TX, Spectrum Energy Project  Responsible for the commissioning and start-up of a 2x1 LM6000 combined cycle plant including a Glegg water treatment plant, Deltak HRSG’s and a Turbodyne steam turbine generator. MID-AMERICA ENERGY, Field Engineer (2004 - 2005) Sioux City, IA, Neal Station  Coordinated the systematic walk down and as-built drawings review on a coal fired 1680MW power plant consisting of over 800 P&ID’s and vendor schematics.  Captured all changes over a 30 year time frame of plant modifications and operations upgrades. ALLIANT ENERGY, Project Superintendent (2003 - 2004) Clear Lake, IA, Emery Station Project  Directed a crew of 300 in all construction activities and a crew of 24 in all start-up activities with zero lost time accidents.  Project was on time and under budget.  Project consisted of 2x GE frame 7FA combustion turbines, 2 Alstom HRSG’s and 1 GE D11 steam turbine generator. MIRANT CORP., Lead Mechanical Start-up Engineer (2003) Terre Haute, IN, Sugar Creek Project  Responsible for the testing, flushing, start-up and commissioning of balance of plant systems, turbine lube oil and hydraulics and generator hydrogen/CO2 systems.  Updated activities for the site schedule daily and interfaced with operations.  Project consisted of 2x GE frame 7FA combustion turbines, 2 Vogt-Nem HRSG’s, 1 GE D11 steam turbine generator and GE Betz water treatment system. THUMS, Lead Mechanical Start-up Engineer (2002 - 2003) Long Beach, CA, Co-Gen Project  Responsible for developing and conducting the flushing and start-up procedures for balance of plant.  Conducted lube oil flushes for the turbine and generator.  Developed as-built drawings and assisted operator training.  Simple cycle plant consisted of 1 GE LM6000 combustion turbine, Peerless SCR, Evapco cooling tower, 2 Ariel gas compressors, Trane chiller, Atlas air compressor and US Filter water treatment system.
  • 3. THUMS, Lead Mechanical Start-up Engineer (2002) Kalkaska, MI, Co-Gen Project  Responsible for developing and conducting the testing, flushing and start-up procedures for balance of plant systems.  Performed oil flushes, point to point electrical checks for the fire suppression system and the CO2 dump test for the turbines and generator.  Served as the LOTO authority.  Developed the as-built drawings and final punch list.  Simple cycle facility consisted of 2x Pratt & Whitney FT8 turbines, 1 Brush generator, 1 Coon– DeVisser fire pump skid, Atlas Copco air compressor and US Filter water treatment unit. KMPC, Mechanical Superintendent/Start-up Manager (2001 - 2002) Wrightsville, AR, Orion Project  Supervised all mechanical construction activities, testing, flushing, start-up, commissioning and turnover to the client.  Developed system turnover packages, initiated and maintained the LOTO program, updated project schedule daily.  Chaired daily start-up meetings, generated procedures, supervised commissioning activities, interfaced with client operations and maintained project punch list, vendor support and turnover of spares.  Facility consisted of (1) GE F7EA CT, (6) GE LM6000 CT’s, (2) GE A10 STG’s and (7) Deltak HRSG’s. CONSTELLATION ENERGY, Mechanical Superintendent/Start-up Engineer (2000 - 2001) Kenova, WV, Big Sandy Peaker  Supervised the construction of (12) Pratt & Whitney FT8 combustion turbines and balance of plant systems.  Responsible for site LOTO program, commissioning of all balance of plant equipment and operating maintenance on all equipment during performance testing. DOD CONTRACT, Project Superintendent/Start-up Manager (1998 - 2000) Valparaiso, FL, Eglin AFB  Supervised the construction of the central HVAC facility which included the installation of (4) York 650 ton chillers and (4) United package boilers.  Interfaced with Base Operations, performed site LOTO activities, coordinated subcontractor activities and developed the punch list.  Conducted facility start-up and commissioning activities. DOD CONTRACT, Project Superintendent/Start-up Manager (1996 - 1997) Fort Walton Beach, FL, Hurlburt Field AFB  Supervised the construction of a jet fuel storage and flight line delivery facility which included a 50,000 barrel floating roof storage tank, 2 pumping stations, 2 truck unload stands and a 1200 gpm flight line pantograph with concrete zero liquid discharge containment. USACE POL PIPELINE/JET FUEL STORAGE, Project Superintendent/Start-up Manager (1994 - 1996) Valparaiso, FL, Eglin AFB  Responsible for construction, testing, start-up and commissioning.  Prepared system turnover packages, controlled LOTO program and generated test procedures.  Supervised and updated all start-up activities in the project schedule daily.  Maintained the punch list.  Facility consisted of a 5 mile pipeline, (2) 1mm gallon floating roof tanks and (2) 20,000 gpm vertical turbine pumps.
  • 4. BABCOCK & WILCOX, Project Superintendent/Start-up Manager (1993 - 1994) Delaware City, DE, Texaco Star Refinery  Responsible for construction, testing, start-up and commissioning.  Supervised all construction activities, prepared system turnover packages, initiated LOTO permits, reviewed all QA/QC documentation and conducted steam blows and start-up activities.  Included the demolition of an existing boiler and installation of a B&W 1200 TPD coker boiler. BABCOCK & WILCOX, Mechanical Superintendent/Start-up Manager (1991 - 1993) Pennington, AL, Naheola Co-gen  Responsible for all aspects of erection completion, start-up, commissioning and performance testing.  Prepared flush, test, steam blow and start-up procedures, developed and maintained the start-up schedule and interfaced with engineering and operations personnel and prepared system turnover packages.  Project consisted of a 1715 TPD B&W chemical recovery boiler and an HPD black liquor concentrator island. BABCOCK & WILCOX, Mechanical Superintendent/Start-up Engineer (1990 - 1991) Cedar Springs, GA, Georgia Pacific  Supervised mechanical subcontractors, assisted with the development of start-up procedures, supervised outage and start-up activities.  Maintained LOTO, conducted steam blows, and prepared system turnover packages.  Project consisted of (2) 850 TPD B&W chemical recovery boilers and an HPD black liquor concentrator island. TIDEWATER CORPORATION, Pipe Superintendent (1988 - 1990) Marht, AL, Mead Paper Co.  Supervised the installation, testing and flushing of piping systems.  Assisted with development of the project schedule, coordinated with craft supervisors and maintained the punch list.  Project consisted of a Valmet paper machine and Black Clawson chemical pulp mill with various upgrades to existing systems. RUST INTERNATIONAL, Mechanical Superintendent (1987 - 1988) Greneda, MS, Newsprint South Corp.  Supervised the installation of piping and equipment for a Greenfield Tampella paper machine with a thermo-mechanical pulp mill. BLOUNT CONSTRUCTORS, Mechanical General Foreman (1985 - 1987) Prattville, AL, Union Camp Paper Co.  Supervised the installation of piping and equipment for a new Beloit paper machine.  Coordinated with plant operations to conduct outages, maintained the punch list, conducted LOTO and assisted start-up. BLOUNT CONSTRUCTORS, Pipe Foreman (1984 - 1985) Pennington, AL, James River Corp.  Supervised the installation of pipe and equipment for the pulp mill renovation and wood yard. VARIOUS, Pipefitter/Pipe Welder (1980 - 1984)  Certified pipe welder and pipefitter while working in paper mills and chemical plants throughout the southeastern U.S.