Curriculum Vitae
MohammedThousif
Electrical Engineer
Mobile:00966-582524567
CurrentLocation:Al-Khobar
Email:thousif3039@gmail.com
Profile:
Having2+ Years of work experience inExecutionof Turnkey Electrical andMechanical Projectsin
Thermal PowerPlantsandOil andRefineryPlants, Goodunderstandingof GA (P& I,Pipinglayout,
Civil) Mechanical andElectrical Drawings,Planningof Projects,Maintenance,Erectionand
Commissioning.
Both practical as well astheoretical knowledge of AshhandlingplantandErectionof 120 Kg Per/Hr
Gas Chlorinationplants,DM(De Mineralizationplant),STP(Sewage TreatmentPlants),ETP(Effluent
TreatmentPlants),RO(ReverseOsmosis).
Electrical Instrumentsinstallationof Transformers,cable laying, routing,trayrouting,cable
selection,cable termination andMEPknowledge.
Workingmore efficientlyandproductivelysothatmaximumoutputcomes.
Strategic Planning:
1. Regular analyzing execution of work.
2. Regular analyzing organizations Electrical Load Consumption with Ratios and analysis.
3. Planning & scheduling assignments to achieve pre-set goals within time parameters.
4. Formulating long term/short term strategic plans to enhance operations.
Computer Proficiency:
1. Well versed in Windows 7 and 8
2. Proficiency in entire MS-Office and Outlook mails.
3. Good understanding of engineering software tools and MATLAB.
Personal Qualities:
1. Excellent Communication Skills, Listening and motivating skills.
2. Ability to learn quickly is my forte that has helped me successfully manage various jobs
given.
3. Abilitytoworkwitha teamof dedicatedprofessionalsforachievingthe deadlines for
the execution of work.
Professional Experience:
Project 4: Reliance Jamnagar Oil Refinery
Designation: Electrical Site Engineer
Duration: April 2014 to December 2014
Responsibility:
1. Electrical Specification (Transformers,HT & LT panels, HV & LV power & control cables,
DG set,Battery & Battery charger, UPS,Heat Tracing, Erection Packages).
2. Installation electrical equipments such as switchgear, power & instrument cable termination.
3. Installation of grounding cable, cable tray, conduct, power transformer.
4. Design electrical cabling, lighting, earthing and lightening protection plans.
5. STP, WTP and RO plant maintenance and working knowledge of Computerized Maintenance
Management System (CMMS). Testing and making analysis reports.
Project 3: MERCK LIMITED GOA,INDIA
Designation:Site Engineer
Duration: January 2014 to April 2014
Responsibility:
1. In charge for Complete execution of 12 M3 per/hr DMplant and 28 M3 per/hr M.G.F.
2. To do the entire Erection and Commissioning 12 M3 per/hr DM plant and 28 M3 per/hr
M.G.F.
3. Installation of Control panel and termination as per approved drawing.
4. Laying of HT and LT Cables under Ground with brick work.
5. Erection of 2X1400 Dia, 2X800 Dia, 6X600 Dia MSRL tanks including with piping, motorized
valves, Diaphragm valves, Pressure gauges, Temperature Indicator, Chemical seal.
Project 2: (2X685 MW) GMR THERMAL POWER PLANT AT TILDA, INDIA
Designation:Electrical Engineer(Project& Maintenance)
Duration: Sept 2013 to December 2013
Responsibility:
1 I was appointedasJuniorElectrical EngineerbutIwasresponsibleforcomplete
Erection& Commissioningof the project.Site VerificationaccordingtoIFCdrawing,
DesignReview,Material Take Off orBill of Material preparationasper IFCdrawingand
Electrical & InstrumentationSpecasperNTPCStandards.
2 Risingof Technical Query,Material Approval,QuotationReview,NMR-601& NMR-602
Review.TechnicalProposal Preparationaspersite condition&preparationof Electrical
Pre-CommissioningProcedure.
3 Coordinationbetweenthe vendorandengineeringfordispatchingthe RFQ’sand
expeditingquotes.Carryingoutthe workaccordingto the specifieddrawingsand
layoutswhichincludesElectrical aswell asmechanical andcivil specifications.
4 Constructionactivitymonitoringonsite andinstallationactivity.Dailyreports
preparation,Weeklyreportpreparation,handlingconstructionactivityaspertwo
weekscheduleforNTPC.ErectionandCommissioningof BeltCoal ConveyerSystem.
5 Erection of 150 NB MS pipe line from Pump house to bay and Diffusers.
6 Erection of Belt Conveyor system, Chute Block Switch, Sensors with cabling.
7 Erection of lighting in crusher house.
8 To provide the proper Preventive maintenance of machines of boiler (8MT, 12MT,
20MT maintenance of thermal fluid (25Kcal, 40Kcal).
Project 1: (2X500 MW) NTPC THERMAL POWER PLANT AT MOUDA,INDIA
Duration: August 2012 to August 2013
Designation:Electrical Engineer
Responsibility:
1 DailySite monitoringandverifyingthatthe workcomplieswiththe projectspecification.
PreparingdailySurveillance report.Inspection&supervisionof all Electrical workgoingon
the site as perthe IFC,P & I, GI drawings.Performinspectionsandtestsasrequiredbythe
Electrical installationactivitiesatsite.
2 Prepare inspection/test reports and maintain the QA/QC files related to assignment. Assist with
tracking and logging Non-Conformance Reports, Quality/Productivity Improvement reports.
3 Implementationof qualityplanforthisproject,whichinclude inspection,testingand
properdocumentation.Verygoodknowledgeof the electrical drawingsensurethatall
workscompliedwithclient/contractorissued(IFC) drawing,applicable standardsand
specification.Inspectandwitnessthe constructionworkslike Installationof Grounding
systems,Cable Trays,Equipments,HVACSystemsPower&Control Cables,Fire &Alarm
systemsasper theirapprovedInspectionTestPlan.
4 Installation,wiringandcable laying,termination,witnessingof insulationresistance test
of LV and MV Power& Control CablesandHipottestof MV & HV PowerCables.Having
thoroughknowledgeforthe installationandtestingof the HV,MV & LV Switchgear–
230KV, 34.5KV, 4.16KV, 480V, & MCC’s, andother electrical systems.
5 Coordinating with third Parties in Relay Testing of LV, MV & HV Panels, CT & PT’s
Testing of Transformers and other related Testing & Commissioning Activities.
6 Experience inthe installationandtestingof the IndoorandOutdoorlighting.Responsible
for conducting the Inspections of all Low Current Activities such as the Installation,
Termination, Fire Alarm System.
7 InvolvedinPreparationof Electrical SystemandSub-systemPackagesandHanding
overto Client(TurnOverDepartment).Review &finalize all technical report,work
schedules,requirementneedssuchasman-powerandequipmentonthe jobsite.
8 Handling of electrical load as per requirement, Erection and Commissioning of (120 Kg
Per/Hr) Gas Chlorination plant complete execution of project.
9 Erection of HT & LT cable, Oil type and Dry type transformer erection and matching of Bus
Duct.
10 Co-ordinate with Electrical Contractor for Execution of work on site and to provide the
entire Mechanical and Electrical solutions as per approved drawings by NTPC.
11 To maintain the DPR (Daily Progress Report).
12 Checking in stores daily availability of material for smooth work on site.
Academic:
Bachelor of Technology2008 to 2012
Specialization-Electrical &ElectronicsEngineer(EEE) (Full Time) fromJNTUUniversity.
Intermediate in2006 to 2008
From KakatiyaJuniorCollege APBoardof Intermediate.
High School in2006
From Matru Sri highschool fromAPBoard of SecondaryEducation
Academic Project: WorkedOnautomaticcontrollingof steppermotor.
Project Description:
In thisprojectthe speedof steppermotoriscontrolledbyusingthe microcontrollerbygivingelectric
pulsestothe motor.In thisprojectAT89C51 microcontrollerisusedforcontrollingof permanent
magnettype steppermotor.
Personal Details:
Date of Birth : 19th January1990
Language Known : English,TeluguandHindi.
Marital Status : Unmarried
Nationality : Indian
PassportNo : K6869848
PresentLocation : Al-Khobar
VisaStatus : ValidandTransferable
DrivingLicense : ValidIndian

More Related Content

What's hot

JAM_RESUME
JAM_RESUMEJAM_RESUME
JAM_RESUME
Jose Mora
 
Commission resume
Commission resumeCommission resume
Commission resume
Manos Thangaraja
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
VEERABHARATHI MUNI
 
Cover letter
Cover letterCover letter
POWER SOLUTIONS
POWER SOLUTIONSPOWER SOLUTIONS
POWER SOLUTIONS
Berr Industry
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
Kumar murugesan
 
KALAISELVAN-CV
KALAISELVAN-CVKALAISELVAN-CV
KALAISELVAN-CV
kalaiselvan anbazhagan
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BE
mirza gulrez
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
Mohammad Asif haneef
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
MANNANNATARAJAN
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
Ankit Agarwal
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
Kiran Y V N Rao
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
ROYAPPAN JOSEPH JESU RAJA
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
Michael Dunlap
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
vineeth ravi
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
john britto
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
Rama Nand Yadav
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
nestor alega
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin Resume
Vipin Das
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
KumaresanT7
 

What's hot (20)

JAM_RESUME
JAM_RESUMEJAM_RESUME
JAM_RESUME
 
Commission resume
Commission resumeCommission resume
Commission resume
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Cover letter
Cover letterCover letter
Cover letter
 
POWER SOLUTIONS
POWER SOLUTIONSPOWER SOLUTIONS
POWER SOLUTIONS
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
KALAISELVAN-CV
KALAISELVAN-CVKALAISELVAN-CV
KALAISELVAN-CV
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BE
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Mn cv (777)
Mn cv (777)Mn cv (777)
Mn cv (777)
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
Resume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripitionResume- Electrical Engineer-project descripition
Resume- Electrical Engineer-project descripition
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
Rama nand yadav cv
Rama nand yadav   cvRama nand yadav   cv
Rama nand yadav cv
 
NESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGANESTOR-UPDATED-CV-1 ALEGA
NESTOR-UPDATED-CV-1 ALEGA
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin Resume
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 

Viewers also liked

Vultures Circling The Sky
Vultures Circling The SkyVultures Circling The Sky
Vultures Circling The Sky
Jan Bak
 
Trade Secrets
Trade SecretsTrade Secrets
Trade Secrets
Jan Bak
 
1979 Techint Engineering Co Venezuela
1979 Techint Engineering Co Venezuela1979 Techint Engineering Co Venezuela
1979 Techint Engineering Co VenezuelaJose Lorenzo
 
MCSD - App Builder
MCSD - App BuilderMCSD - App Builder
MCSD - App Builder
Dirk Botha
 
Brabantia international-lookbook-autumn-winter-2016-int en
Brabantia international-lookbook-autumn-winter-2016-int enBrabantia international-lookbook-autumn-winter-2016-int en
Brabantia international-lookbook-autumn-winter-2016-int en
Davide Nardi
 
Eccellenze in digitale - Certificato (3)
Eccellenze in digitale - Certificato (3)Eccellenze in digitale - Certificato (3)
Eccellenze in digitale - Certificato (3)Andrea Vallavanti
 
A Cold World
A Cold WorldA Cold World
A Cold World
Jan Bak
 
Measuring normalized areal density of pore/fiber volume fraction through imag...
Measuring normalized areal density of pore/fiber volume fraction through imag...Measuring normalized areal density of pore/fiber volume fraction through imag...
Measuring normalized areal density of pore/fiber volume fraction through imag...
Trevor Aguirre, E.I.T.
 
Sick Societies Of This Dirty World
Sick Societies Of This Dirty WorldSick Societies Of This Dirty World
Sick Societies Of This Dirty World
BOL Advisory Group
 
Report quaderno dello_studente_primaria_ ud_a
Report quaderno dello_studente_primaria_ ud_aReport quaderno dello_studente_primaria_ ud_a
Report quaderno dello_studente_primaria_ ud_a
icfalcone
 
Uda 1 secondaria i grado_storia jack e angel
Uda 1  secondaria i grado_storia jack e angelUda 1  secondaria i grado_storia jack e angel
Uda 1 secondaria i grado_storia jack e angel
Progetto Safeschoolduepuntozero
 
Blue Eyed Devil
Blue Eyed DevilBlue Eyed Devil
Blue Eyed Devil
BOL Advisory Group
 
Compito di realtà Palasciano
Compito di realtà PalascianoCompito di realtà Palasciano
Compito di realtà Palasciano
icfalcone
 
Revolución de mayo
Revolución de mayoRevolución de mayo
Revolución de mayo
primariasb
 
Servizio di prevenzione e protezione
Servizio di prevenzione e protezioneServizio di prevenzione e protezione
Servizio di prevenzione e protezione
Progetto Safeschoolduepuntozero
 
Power point storia dory
Power point storia doryPower point storia dory
Power point storia dory
Progetto Safeschoolduepuntozero
 
Introduction to flexible manufacturing system (fms)
Introduction to flexible manufacturing system (fms)Introduction to flexible manufacturing system (fms)
Introduction to flexible manufacturing system (fms)
Nilraj Vasandia
 
B6 movimentazione dei carichi
B6 movimentazione dei carichiB6 movimentazione dei carichi
B6 movimentazione dei carichi
Progetto Safeschoolduepuntozero
 

Viewers also liked (19)

Vultures Circling The Sky
Vultures Circling The SkyVultures Circling The Sky
Vultures Circling The Sky
 
HighAchieversDiploma_Mantas
HighAchieversDiploma_MantasHighAchieversDiploma_Mantas
HighAchieversDiploma_Mantas
 
Trade Secrets
Trade SecretsTrade Secrets
Trade Secrets
 
1979 Techint Engineering Co Venezuela
1979 Techint Engineering Co Venezuela1979 Techint Engineering Co Venezuela
1979 Techint Engineering Co Venezuela
 
MCSD - App Builder
MCSD - App BuilderMCSD - App Builder
MCSD - App Builder
 
Brabantia international-lookbook-autumn-winter-2016-int en
Brabantia international-lookbook-autumn-winter-2016-int enBrabantia international-lookbook-autumn-winter-2016-int en
Brabantia international-lookbook-autumn-winter-2016-int en
 
Eccellenze in digitale - Certificato (3)
Eccellenze in digitale - Certificato (3)Eccellenze in digitale - Certificato (3)
Eccellenze in digitale - Certificato (3)
 
A Cold World
A Cold WorldA Cold World
A Cold World
 
Measuring normalized areal density of pore/fiber volume fraction through imag...
Measuring normalized areal density of pore/fiber volume fraction through imag...Measuring normalized areal density of pore/fiber volume fraction through imag...
Measuring normalized areal density of pore/fiber volume fraction through imag...
 
Sick Societies Of This Dirty World
Sick Societies Of This Dirty WorldSick Societies Of This Dirty World
Sick Societies Of This Dirty World
 
Report quaderno dello_studente_primaria_ ud_a
Report quaderno dello_studente_primaria_ ud_aReport quaderno dello_studente_primaria_ ud_a
Report quaderno dello_studente_primaria_ ud_a
 
Uda 1 secondaria i grado_storia jack e angel
Uda 1  secondaria i grado_storia jack e angelUda 1  secondaria i grado_storia jack e angel
Uda 1 secondaria i grado_storia jack e angel
 
Blue Eyed Devil
Blue Eyed DevilBlue Eyed Devil
Blue Eyed Devil
 
Compito di realtà Palasciano
Compito di realtà PalascianoCompito di realtà Palasciano
Compito di realtà Palasciano
 
Revolución de mayo
Revolución de mayoRevolución de mayo
Revolución de mayo
 
Servizio di prevenzione e protezione
Servizio di prevenzione e protezioneServizio di prevenzione e protezione
Servizio di prevenzione e protezione
 
Power point storia dory
Power point storia doryPower point storia dory
Power point storia dory
 
Introduction to flexible manufacturing system (fms)
Introduction to flexible manufacturing system (fms)Introduction to flexible manufacturing system (fms)
Introduction to flexible manufacturing system (fms)
 
B6 movimentazione dei carichi
B6 movimentazione dei carichiB6 movimentazione dei carichi
B6 movimentazione dei carichi
 

Similar to Thousif_CV

Resume mohan
Resume mohanResume mohan
Resume mohan
MOHANRAJ N
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
Zaheer Ahmed
 
Resume of Dileep K 2017
Resume of Dileep K 2017Resume of Dileep K 2017
Resume of Dileep K 2017
Dileep Kuruvila
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
NAVNATH BHALERAO
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
Bidhan Dey
 
venkatCV
venkatCVvenkatCV
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
prashant ponkshe
 
Amit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar_CV_100_MW
Amit Kumar_CV_100_MW
Amit Kumar
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
tanweer alam
 
ZISHAN
ZISHANZISHAN
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
satham mohamed
 
Loganathan Resume
Loganathan ResumeLoganathan Resume
Loganathan Resume
Loga nathan
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
Farrukh Chughtai
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
Reynaldo Carlos,Jr. Duyanen
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
Ajit Bhaskaran
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
Sankar Vaidhynathan
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
Blair Mcintosh
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
tanweer alam
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
Naveed Akhtar
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
Mukhtar Ahmad
 

Similar to Thousif_CV (20)

Resume mohan
Resume mohanResume mohan
Resume mohan
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Resume of Dileep K 2017
Resume of Dileep K 2017Resume of Dileep K 2017
Resume of Dileep K 2017
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 
Amit Kumar_CV_100_MW
Amit Kumar_CV_100_MWAmit Kumar_CV_100_MW
Amit Kumar_CV_100_MW
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
ZISHAN
ZISHANZISHAN
ZISHAN
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
Loganathan Resume
Loganathan ResumeLoganathan Resume
Loganathan Resume
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 

Thousif_CV

  • 1. Curriculum Vitae MohammedThousif Electrical Engineer Mobile:00966-582524567 CurrentLocation:Al-Khobar Email:thousif3039@gmail.com Profile: Having2+ Years of work experience inExecutionof Turnkey Electrical andMechanical Projectsin Thermal PowerPlantsandOil andRefineryPlants, Goodunderstandingof GA (P& I,Pipinglayout, Civil) Mechanical andElectrical Drawings,Planningof Projects,Maintenance,Erectionand Commissioning. Both practical as well astheoretical knowledge of AshhandlingplantandErectionof 120 Kg Per/Hr Gas Chlorinationplants,DM(De Mineralizationplant),STP(Sewage TreatmentPlants),ETP(Effluent TreatmentPlants),RO(ReverseOsmosis). Electrical Instrumentsinstallationof Transformers,cable laying, routing,trayrouting,cable selection,cable termination andMEPknowledge. Workingmore efficientlyandproductivelysothatmaximumoutputcomes. Strategic Planning: 1. Regular analyzing execution of work. 2. Regular analyzing organizations Electrical Load Consumption with Ratios and analysis. 3. Planning & scheduling assignments to achieve pre-set goals within time parameters. 4. Formulating long term/short term strategic plans to enhance operations. Computer Proficiency: 1. Well versed in Windows 7 and 8 2. Proficiency in entire MS-Office and Outlook mails. 3. Good understanding of engineering software tools and MATLAB. Personal Qualities: 1. Excellent Communication Skills, Listening and motivating skills. 2. Ability to learn quickly is my forte that has helped me successfully manage various jobs given. 3. Abilitytoworkwitha teamof dedicatedprofessionalsforachievingthe deadlines for the execution of work. Professional Experience: Project 4: Reliance Jamnagar Oil Refinery Designation: Electrical Site Engineer Duration: April 2014 to December 2014 Responsibility: 1. Electrical Specification (Transformers,HT & LT panels, HV & LV power & control cables, DG set,Battery & Battery charger, UPS,Heat Tracing, Erection Packages). 2. Installation electrical equipments such as switchgear, power & instrument cable termination. 3. Installation of grounding cable, cable tray, conduct, power transformer. 4. Design electrical cabling, lighting, earthing and lightening protection plans. 5. STP, WTP and RO plant maintenance and working knowledge of Computerized Maintenance Management System (CMMS). Testing and making analysis reports.
  • 2. Project 3: MERCK LIMITED GOA,INDIA Designation:Site Engineer Duration: January 2014 to April 2014 Responsibility: 1. In charge for Complete execution of 12 M3 per/hr DMplant and 28 M3 per/hr M.G.F. 2. To do the entire Erection and Commissioning 12 M3 per/hr DM plant and 28 M3 per/hr M.G.F. 3. Installation of Control panel and termination as per approved drawing. 4. Laying of HT and LT Cables under Ground with brick work. 5. Erection of 2X1400 Dia, 2X800 Dia, 6X600 Dia MSRL tanks including with piping, motorized valves, Diaphragm valves, Pressure gauges, Temperature Indicator, Chemical seal. Project 2: (2X685 MW) GMR THERMAL POWER PLANT AT TILDA, INDIA Designation:Electrical Engineer(Project& Maintenance) Duration: Sept 2013 to December 2013 Responsibility: 1 I was appointedasJuniorElectrical EngineerbutIwasresponsibleforcomplete Erection& Commissioningof the project.Site VerificationaccordingtoIFCdrawing, DesignReview,Material Take Off orBill of Material preparationasper IFCdrawingand Electrical & InstrumentationSpecasperNTPCStandards. 2 Risingof Technical Query,Material Approval,QuotationReview,NMR-601& NMR-602 Review.TechnicalProposal Preparationaspersite condition&preparationof Electrical Pre-CommissioningProcedure. 3 Coordinationbetweenthe vendorandengineeringfordispatchingthe RFQ’sand expeditingquotes.Carryingoutthe workaccordingto the specifieddrawingsand layoutswhichincludesElectrical aswell asmechanical andcivil specifications. 4 Constructionactivitymonitoringonsite andinstallationactivity.Dailyreports preparation,Weeklyreportpreparation,handlingconstructionactivityaspertwo weekscheduleforNTPC.ErectionandCommissioningof BeltCoal ConveyerSystem. 5 Erection of 150 NB MS pipe line from Pump house to bay and Diffusers. 6 Erection of Belt Conveyor system, Chute Block Switch, Sensors with cabling. 7 Erection of lighting in crusher house. 8 To provide the proper Preventive maintenance of machines of boiler (8MT, 12MT, 20MT maintenance of thermal fluid (25Kcal, 40Kcal). Project 1: (2X500 MW) NTPC THERMAL POWER PLANT AT MOUDA,INDIA Duration: August 2012 to August 2013 Designation:Electrical Engineer Responsibility: 1 DailySite monitoringandverifyingthatthe workcomplieswiththe projectspecification. PreparingdailySurveillance report.Inspection&supervisionof all Electrical workgoingon the site as perthe IFC,P & I, GI drawings.Performinspectionsandtestsasrequiredbythe Electrical installationactivitiesatsite. 2 Prepare inspection/test reports and maintain the QA/QC files related to assignment. Assist with tracking and logging Non-Conformance Reports, Quality/Productivity Improvement reports. 3 Implementationof qualityplanforthisproject,whichinclude inspection,testingand properdocumentation.Verygoodknowledgeof the electrical drawingsensurethatall workscompliedwithclient/contractorissued(IFC) drawing,applicable standardsand specification.Inspectandwitnessthe constructionworkslike Installationof Grounding systems,Cable Trays,Equipments,HVACSystemsPower&Control Cables,Fire &Alarm systemsasper theirapprovedInspectionTestPlan.
  • 3. 4 Installation,wiringandcable laying,termination,witnessingof insulationresistance test of LV and MV Power& Control CablesandHipottestof MV & HV PowerCables.Having thoroughknowledgeforthe installationandtestingof the HV,MV & LV Switchgear– 230KV, 34.5KV, 4.16KV, 480V, & MCC’s, andother electrical systems. 5 Coordinating with third Parties in Relay Testing of LV, MV & HV Panels, CT & PT’s Testing of Transformers and other related Testing & Commissioning Activities. 6 Experience inthe installationandtestingof the IndoorandOutdoorlighting.Responsible for conducting the Inspections of all Low Current Activities such as the Installation, Termination, Fire Alarm System. 7 InvolvedinPreparationof Electrical SystemandSub-systemPackagesandHanding overto Client(TurnOverDepartment).Review &finalize all technical report,work schedules,requirementneedssuchasman-powerandequipmentonthe jobsite. 8 Handling of electrical load as per requirement, Erection and Commissioning of (120 Kg Per/Hr) Gas Chlorination plant complete execution of project. 9 Erection of HT & LT cable, Oil type and Dry type transformer erection and matching of Bus Duct. 10 Co-ordinate with Electrical Contractor for Execution of work on site and to provide the entire Mechanical and Electrical solutions as per approved drawings by NTPC. 11 To maintain the DPR (Daily Progress Report). 12 Checking in stores daily availability of material for smooth work on site. Academic: Bachelor of Technology2008 to 2012 Specialization-Electrical &ElectronicsEngineer(EEE) (Full Time) fromJNTUUniversity. Intermediate in2006 to 2008 From KakatiyaJuniorCollege APBoardof Intermediate. High School in2006 From Matru Sri highschool fromAPBoard of SecondaryEducation Academic Project: WorkedOnautomaticcontrollingof steppermotor. Project Description: In thisprojectthe speedof steppermotoriscontrolledbyusingthe microcontrollerbygivingelectric pulsestothe motor.In thisprojectAT89C51 microcontrollerisusedforcontrollingof permanent magnettype steppermotor. Personal Details: Date of Birth : 19th January1990 Language Known : English,TeluguandHindi. Marital Status : Unmarried Nationality : Indian PassportNo : K6869848 PresentLocation : Al-Khobar VisaStatus : ValidandTransferable DrivingLicense : ValidIndian