SlideShare a Scribd company logo
AMIT KUMAR
Contact No.: 09549582674 / 07297878456
E-Mail: akumar.ak21@gmail.com
SENIOR PROFESSIONAL
Site Engineer
Location Preference: Any where in India
OBJECTIVE
To be a part of dynamicteamina solar organizationthatstrivesforexcellence, where Icanutilize andimprove myskills
enablingpersonalaswell asprofessional growth. Seekingachallengingopportunityinenergyvertical topractice the
knowledge andskillsthatIhave developedoveraperiodof time towardsthe growthof the organization.
PROFILE SUMMARY
 A Result oriented professional with nearly 3 years 4 months of experience in:
 Installation & Commissioning of solar module
 Testing of Transformer such as Magnetic balance test, Ratio test & Megger
 Supervising the electrical works in construction phase
 Quality Management
 Operation & Maintenance of ground mounted solar plant
 Comparison of inverter generation with seasonal tilt & fixed tilt solar structure
 Strong relationship management & communication skills with abilities in networking with Factory Managers,
Vendors,ProcessEngineersandContractorsfortechnical negotiations,assistanceandidentifyingrecommendations
for establishing establish production and quality standards
 Well versed with installation, commissioning, Operation and Maintenance, testing of ground mounted & rooftop
solar projects, solar PV electrical engineering
WORK EXPERIENCE
Aug’14 to till date Azure Power India Pvt. Ltd., Jodhpur as Site Engg. (Electrical)
Project Dept. and O & M Dept. also
Projects: 100 MW On-Grid Solar Power Plant in Jodhpur (RAJASTHAN)
 Currently working as a Site Engineer of 100 MW at Single location with Azure Power India Private Limited,
Baori, Jodhpur, Rajasthan, India from April -2015 to till Date.
Technology Used at 100 MW
Module - Thin Film(FirstSolar), MULTICRYSTALINE (WAREEMAKE)
Inverter- 990 CP (SMA MAKE),XC 680 (SchneiderMake)
Transformer- 2 MVA to 21 MVA (SchneiderMake)
RMU- Type- CCT2 & CT2 (SchneiderMake)
Transmission– 132 KV.
Structure- Unirack, Nueosol
Job Responsibilities in Project Dept.
 Preparing:
o Testing report of Equipments and commissioning report of inverter
o Detail daily & weekly Project progress Report
 Supervising electrical contractor for electrical work
 Installation & Testing of Transformer such as Magnetic balance test, Ratio test & Megger
 Supervising DC contractor for DC work
 Responsible forinstallation&commissioning of Sunny central (SMA 900 CP XT) and Sunny Tripower string Inverter
 Checking of voltage & current in all combiner boxes at the time of commissioning phase to stablised the plant
 Involved in cable laying, testing & termination
 Installation of Annemometer, Pyranometer, PT 100 Ambient temperature Sensor & PT 100 Module temperature
Sensor.
Job Responsibilities in O&M Dept.
 Responsible for all technical issuesatSite relatedto3 Phase SolarInverter, Transformer, Switchyard&Control
Panel.Maintainingandrepairing inverters/transformers inphotovoltaicplantson-site withthe helpof concerned
personof Inverter/TransformerCompany.
 Implementationof plantmaintenance onSAP PMmodule
 Conducting seasonal tilting with multi crystline module
 Comparison of inverter generation with seasonal tilt & fixed tilt structure and plot grap of both generation
 Collecting and monitoring with Sunny Portal (SMA)
 Checking of daily, weekly & monthly maintenance schedule
 Responsible forschedulingdayahead generation, daily generation & monthly generation to SECI, MNRE, SLDC etc.
 Preparing & sending of daily generation report to HO
 Weatherstationandstringcurrent monitoring
 Joint Meter Reading of monthly Billing with Government Body
EXPERIENCE SUMMARY
AZURE SURYA PVT. LTD.
 Workedas a Site Engineer 10 MW (Thin Film)SPVplant,Mahoba,Uttar Pradesh fromNovember2014 to
March 2015.
Technology Used at 10 MW
Module - Thin Film(FirstSolar)
Inverter- 990 CP (SMA MAKE),Sunny Tripower string Inverter(SMA MAKE)
Transformer- 2 MVA to 12 MVA (SchneiderMake)
RMU- Type CCT2 & CT2 (SchneiderMake)
Transmission– 33 KV.
Structure- Unirack, Nueosol
Job Responsibilities in O&M Dept.
 Responsible for all technical issuesatSite relatedto3 Phase SolarInverter, Transformer, Switchyard&Control
Panel.Maintainingandrepairinginverters/transformers inphotovoltaicplantson-site withthe helpof concerned
personof Inverter/TransformerCompany.
 Installationof Annemometer,Pyranometer,PT100 Ambienttemperature Sensor& PT 100 Module temperature
Sensor.
 Conducting seasonal tilting with thin film
 Comparison of inverter generation with seasonal tilt & fixed tilt structure and plot grap of both generation
 Collecting and monitoring with Sunny Portal (SMA)
 Checking of daily, weekly & monthly maintenance schedule
 Responsible for scheduling day ahead generation, daily generation & monthly generation to SLDC.
 Preparing & sending of daily generation report to HO
 Weatherstationandstringcurrent monitoring
 Joint Meter Reading of monthly Billing with Government Body
AZURE POWER DLF HYDERABAD
 Workedas a Site Engineer 518 KW (Multicrystaline, WAREEMAKE) SPVplant, DLF, Hyderabad fromAugust
2014 to October 2014.
Technology Used at 518 KW
Module - Multicrystaline (WAREEMAKE)
Inverter- Sunny Tripower string Inverter(SMAMAKE)
Job Responsibilities in O&M Dept.
 Responsible for all technical issuesatSite relatedto3 Phase String SolarInverter, LT Panel &Meter Panel.
Maintainingandrepairinginverteinphotovoltaicplantson-sitewiththe helpof concernedperson of Inverter
Company.
 Installationof Annemometer,Pyranometer,PT100 Ambienttemperature Sensor& PT 100 Module temperature
Sensor.
 Comparison of inverter generation with help of generation graph
 Collecting and monitoring with Sunny Portal (SMA)
 Checking of daily, weekly & monthly maintenance schedule
 Preparing & sending of daily generation report to HO
 Weatherstationandstringcurrent monitoring
 Joint Meter Reading of monthly Billing with DLF Building Manager
Highlights:
 Involved in Cable Testing, DC Cable Laying and Termination; pre-generation assessment
 Gainedknowledgeof TransformerInstallation, Commissioning and testing, HT Cable Termination and tasks related
to Plant Execution
 Completed projects on 10 MW Solar Power Project commissioned in Mahoba Uttar Pradesh
 518 KW Rooftop solar power Project on DLF building in Hyderabad.
TRAINING AND PROJECT UNDERTAKEN
 Successfullycompleted one monthin plant training in “Kanti Bijlee Utpadan Nigam Limited” , Muzaffarpur, Bihar (
A joint Organization of NTPC & BSEB) from 1st
July’09 to 30th
July’09.
 Successfullycompleted projecton Construction of 132/33KV Sub-station in “Adhunik Alloys & Power Ltd.” Kandra,
Jamshedpur, Jharkhand from 15th
Jan’10 to 15th
May’10. (4 Months)
IT SKILLS
 MS Office (Excel, Word, PowerPoint)
ACADEMIC DETAILS
 Diploma in Electronics and Communication Engineering from T. B. G. Polytechnic, Ambajogai, Maharastra in 2006.
 B. Tech. in Electrical and Electronics Engineering from Sikkim Manipal Institute of Technology, Majitar, Sikkim in
2010.
PERSONAL DETAILS
Date of Birth: 16th
Feb 1983
PresentAddress: House No.-113,Maa Bhagwati Nagar, BalsamandRoad,Near BSF gate no.-1, Jodhpur, Rajasthan
Permanent Address: At.- Rampurlahi, P.O.- Bathan Parsa, P.S.- Shankarpur, Dist- Madhepura-852128, Bihar
Languages Known: English and Hindi
Hobbies: Listning to music, travelling, reading books
ANNEXURE
PREVIOUS EXPERIENCE
Oct’12-Feb’14 Anand & Company, New Delhi as Site Supervisor
Deputation:
Operation & Maintenance of Transformer, Roof top solar system and floor lighting system
PREVIOUS EXPERIENCE
Mar’14-Jul’14 Rare Engineers, New Delhi as Site Supervisor
Deputation:
Operation & Maintenance of Transformer and Roof top solar system
(AMIT KUMAR)
Date:-

More Related Content

What's hot

vijay new resume[1].DOC
vijay new resume[1].DOCvijay new resume[1].DOC
vijay new resume[1].DOCVijayakumar M
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..Keshari Mishra
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
SUDESH KUMAR
 
Amrit kumar pattanaik resume
Amrit kumar pattanaik resumeAmrit kumar pattanaik resume
Amrit kumar pattanaik resumeamrit pattanaik
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resumeprasunkishoreroy
 
Morpal mehara 2016- cv
Morpal mehara 2016- cvMorpal mehara 2016- cv
Morpal mehara 2016- cvMorpal Mehara
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERjongguanzon
 
CV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy NasirepallyCV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy NasirepallySrinivas Reddy
 
L narayan's resume
L narayan's resumeL narayan's resume
L narayan's resume
Laxmi Narayan
 
Cover letter
Cover letterCover letter

What's hot (20)

Resume- Plant Manager- Harish
Resume- Plant Manager- HarishResume- Plant Manager- Harish
Resume- Plant Manager- Harish
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
Resume
ResumeResume
Resume
 
vijay new resume[1].DOC
vijay new resume[1].DOCvijay new resume[1].DOC
vijay new resume[1].DOC
 
CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..CURRICULUM__VITAE_Keshari..
CURRICULUM__VITAE_Keshari..
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
SRIDHARAN.R RESUME
SRIDHARAN.R RESUMESRIDHARAN.R RESUME
SRIDHARAN.R RESUME
 
Amrit kumar pattanaik resume
Amrit kumar pattanaik resumeAmrit kumar pattanaik resume
Amrit kumar pattanaik resume
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
rony resume update july16.
rony resume update july16.rony resume update july16.
rony resume update july16.
 
Morpal mehara 2016- cv
Morpal mehara 2016- cvMorpal mehara 2016- cv
Morpal mehara 2016- cv
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 
CV_Mahesh Prajapati
CV_Mahesh PrajapatiCV_Mahesh Prajapati
CV_Mahesh Prajapati
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
CV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy NasirepallyCV - Srinivas Reddy Nasirepally
CV - Srinivas Reddy Nasirepally
 
L narayan's resume
L narayan's resumeL narayan's resume
L narayan's resume
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
Cover letter
Cover letterCover letter
Cover letter
 

Similar to Amit Kumar_CV_100_MW

Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
tanweer alam
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANtanweer alam
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companiesbala madhu
 

Similar to Amit Kumar_CV_100_MW (20)

Nagamalleswara rao cv
Nagamalleswara rao cvNagamalleswara rao cv
Nagamalleswara rao cv
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Resume of Dileep K 2017
Resume of Dileep K 2017Resume of Dileep K 2017
Resume of Dileep K 2017
 
shoaib CV
shoaib CVshoaib CV
shoaib CV
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
JAM_RESUME
JAM_RESUMEJAM_RESUME
JAM_RESUME
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Santhu CV Resume.
Santhu CV Resume.Santhu CV Resume.
Santhu CV Resume.
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
CV of PK Mishra_Update
CV of PK Mishra_UpdateCV of PK Mishra_Update
CV of PK Mishra_Update
 
Electrical engg 3 year
Electrical engg 3 yearElectrical engg 3 year
Electrical engg 3 year
 
Resume
ResumeResume
Resume
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Jose_resume 1
 
deo@dipankar.doc
deo@dipankar.docdeo@dipankar.doc
deo@dipankar.doc
 
dharma cv . Ts
dharma cv . Tsdharma cv . Ts
dharma cv . Ts
 

Amit Kumar_CV_100_MW

  • 1. AMIT KUMAR Contact No.: 09549582674 / 07297878456 E-Mail: akumar.ak21@gmail.com SENIOR PROFESSIONAL Site Engineer Location Preference: Any where in India OBJECTIVE To be a part of dynamicteamina solar organizationthatstrivesforexcellence, where Icanutilize andimprove myskills enablingpersonalaswell asprofessional growth. Seekingachallengingopportunityinenergyvertical topractice the knowledge andskillsthatIhave developedoveraperiodof time towardsthe growthof the organization. PROFILE SUMMARY  A Result oriented professional with nearly 3 years 4 months of experience in:  Installation & Commissioning of solar module  Testing of Transformer such as Magnetic balance test, Ratio test & Megger  Supervising the electrical works in construction phase  Quality Management  Operation & Maintenance of ground mounted solar plant  Comparison of inverter generation with seasonal tilt & fixed tilt solar structure  Strong relationship management & communication skills with abilities in networking with Factory Managers, Vendors,ProcessEngineersandContractorsfortechnical negotiations,assistanceandidentifyingrecommendations for establishing establish production and quality standards  Well versed with installation, commissioning, Operation and Maintenance, testing of ground mounted & rooftop solar projects, solar PV electrical engineering WORK EXPERIENCE Aug’14 to till date Azure Power India Pvt. Ltd., Jodhpur as Site Engg. (Electrical) Project Dept. and O & M Dept. also Projects: 100 MW On-Grid Solar Power Plant in Jodhpur (RAJASTHAN)  Currently working as a Site Engineer of 100 MW at Single location with Azure Power India Private Limited, Baori, Jodhpur, Rajasthan, India from April -2015 to till Date. Technology Used at 100 MW Module - Thin Film(FirstSolar), MULTICRYSTALINE (WAREEMAKE) Inverter- 990 CP (SMA MAKE),XC 680 (SchneiderMake) Transformer- 2 MVA to 21 MVA (SchneiderMake) RMU- Type- CCT2 & CT2 (SchneiderMake) Transmission– 132 KV. Structure- Unirack, Nueosol Job Responsibilities in Project Dept.  Preparing: o Testing report of Equipments and commissioning report of inverter o Detail daily & weekly Project progress Report  Supervising electrical contractor for electrical work  Installation & Testing of Transformer such as Magnetic balance test, Ratio test & Megger
  • 2.  Supervising DC contractor for DC work  Responsible forinstallation&commissioning of Sunny central (SMA 900 CP XT) and Sunny Tripower string Inverter  Checking of voltage & current in all combiner boxes at the time of commissioning phase to stablised the plant  Involved in cable laying, testing & termination  Installation of Annemometer, Pyranometer, PT 100 Ambient temperature Sensor & PT 100 Module temperature Sensor. Job Responsibilities in O&M Dept.  Responsible for all technical issuesatSite relatedto3 Phase SolarInverter, Transformer, Switchyard&Control Panel.Maintainingandrepairing inverters/transformers inphotovoltaicplantson-site withthe helpof concerned personof Inverter/TransformerCompany.  Implementationof plantmaintenance onSAP PMmodule  Conducting seasonal tilting with multi crystline module  Comparison of inverter generation with seasonal tilt & fixed tilt structure and plot grap of both generation  Collecting and monitoring with Sunny Portal (SMA)  Checking of daily, weekly & monthly maintenance schedule  Responsible forschedulingdayahead generation, daily generation & monthly generation to SECI, MNRE, SLDC etc.  Preparing & sending of daily generation report to HO  Weatherstationandstringcurrent monitoring  Joint Meter Reading of monthly Billing with Government Body EXPERIENCE SUMMARY AZURE SURYA PVT. LTD.  Workedas a Site Engineer 10 MW (Thin Film)SPVplant,Mahoba,Uttar Pradesh fromNovember2014 to March 2015. Technology Used at 10 MW Module - Thin Film(FirstSolar) Inverter- 990 CP (SMA MAKE),Sunny Tripower string Inverter(SMA MAKE) Transformer- 2 MVA to 12 MVA (SchneiderMake) RMU- Type CCT2 & CT2 (SchneiderMake) Transmission– 33 KV. Structure- Unirack, Nueosol Job Responsibilities in O&M Dept.  Responsible for all technical issuesatSite relatedto3 Phase SolarInverter, Transformer, Switchyard&Control Panel.Maintainingandrepairinginverters/transformers inphotovoltaicplantson-site withthe helpof concerned personof Inverter/TransformerCompany.  Installationof Annemometer,Pyranometer,PT100 Ambienttemperature Sensor& PT 100 Module temperature Sensor.  Conducting seasonal tilting with thin film  Comparison of inverter generation with seasonal tilt & fixed tilt structure and plot grap of both generation  Collecting and monitoring with Sunny Portal (SMA)  Checking of daily, weekly & monthly maintenance schedule  Responsible for scheduling day ahead generation, daily generation & monthly generation to SLDC.  Preparing & sending of daily generation report to HO  Weatherstationandstringcurrent monitoring  Joint Meter Reading of monthly Billing with Government Body
  • 3. AZURE POWER DLF HYDERABAD  Workedas a Site Engineer 518 KW (Multicrystaline, WAREEMAKE) SPVplant, DLF, Hyderabad fromAugust 2014 to October 2014. Technology Used at 518 KW Module - Multicrystaline (WAREEMAKE) Inverter- Sunny Tripower string Inverter(SMAMAKE) Job Responsibilities in O&M Dept.  Responsible for all technical issuesatSite relatedto3 Phase String SolarInverter, LT Panel &Meter Panel. Maintainingandrepairinginverteinphotovoltaicplantson-sitewiththe helpof concernedperson of Inverter Company.  Installationof Annemometer,Pyranometer,PT100 Ambienttemperature Sensor& PT 100 Module temperature Sensor.  Comparison of inverter generation with help of generation graph  Collecting and monitoring with Sunny Portal (SMA)  Checking of daily, weekly & monthly maintenance schedule  Preparing & sending of daily generation report to HO  Weatherstationandstringcurrent monitoring  Joint Meter Reading of monthly Billing with DLF Building Manager Highlights:  Involved in Cable Testing, DC Cable Laying and Termination; pre-generation assessment  Gainedknowledgeof TransformerInstallation, Commissioning and testing, HT Cable Termination and tasks related to Plant Execution  Completed projects on 10 MW Solar Power Project commissioned in Mahoba Uttar Pradesh  518 KW Rooftop solar power Project on DLF building in Hyderabad. TRAINING AND PROJECT UNDERTAKEN  Successfullycompleted one monthin plant training in “Kanti Bijlee Utpadan Nigam Limited” , Muzaffarpur, Bihar ( A joint Organization of NTPC & BSEB) from 1st July’09 to 30th July’09.  Successfullycompleted projecton Construction of 132/33KV Sub-station in “Adhunik Alloys & Power Ltd.” Kandra, Jamshedpur, Jharkhand from 15th Jan’10 to 15th May’10. (4 Months) IT SKILLS  MS Office (Excel, Word, PowerPoint) ACADEMIC DETAILS  Diploma in Electronics and Communication Engineering from T. B. G. Polytechnic, Ambajogai, Maharastra in 2006.  B. Tech. in Electrical and Electronics Engineering from Sikkim Manipal Institute of Technology, Majitar, Sikkim in 2010. PERSONAL DETAILS Date of Birth: 16th Feb 1983 PresentAddress: House No.-113,Maa Bhagwati Nagar, BalsamandRoad,Near BSF gate no.-1, Jodhpur, Rajasthan Permanent Address: At.- Rampurlahi, P.O.- Bathan Parsa, P.S.- Shankarpur, Dist- Madhepura-852128, Bihar Languages Known: English and Hindi Hobbies: Listning to music, travelling, reading books
  • 4. ANNEXURE PREVIOUS EXPERIENCE Oct’12-Feb’14 Anand & Company, New Delhi as Site Supervisor Deputation: Operation & Maintenance of Transformer, Roof top solar system and floor lighting system PREVIOUS EXPERIENCE Mar’14-Jul’14 Rare Engineers, New Delhi as Site Supervisor Deputation: Operation & Maintenance of Transformer and Roof top solar system (AMIT KUMAR) Date:-