SlideShare a Scribd company logo
1 of 7
CURRICULAM VITAE
VINEETH RAVI
Email:vineethrav@gmail.com,vineethravi@yahoo.com
Mobile#: +91-8139804177.
CAREER OBJECTIVE:
As an Electrical Engineering graduate, I aspire to build a career in desired
department where my qualities and abilities are best utilized towards creating
lasting value to organizations I serve, while ensuring continuous learning, self
development and skill enhancement.
QUALIFICATION:
 Bachelor of Engineering (Electrical & Electronics) from Anjuman
Engineering College under Visveswariah Technological University in 2008.
WORK EXPERIENCE:
1) Working as Lead Electrical Engineer in Nabors Drilling Int’l on Oman
operations from April, 2012 to till date.
2) Worked as Electrical Technical Officer in Great Ship, MSV-DP 2 vessel
from November, 2011 March, 2012.
3) Worked as an Electrical Engineer in Nabors Drilling Int’l on Rig 804,
Singapore for the rigging up from October, 2009 to October, 2011.
4) Worked as Junior Electrical Engineer in Nabors Drilling Int’l on Rig 862,
In Oman, from October 2008, to October, 2009.
5) Worked in 220 KV Transmission Section of Kerala State Electricity Board
from March, 2008 to August, 2008.
JOB DESCRIPTION:
1) Key role person in Installation, controlling & scheduling maintenance of
various rig equipments for the optimized performance for the respective rigs
in charge.
2) Responsible for the technical review of tender documents, their specifications,
drawings & instrument plan/layouts, cable sizing, routings &technical issues
related with engineering discipline & resolving it in a timely manner with entire
project team. Well aware of all the electrical standards & code practices.
3) Part of Commissioning team for MSV DP -2 vessels & sound knowledge in
Power Generation and Distribution Systems, Various navigational
equipment’s like GMDSS , GyroCompass, Kawasaki & Kongsberg Thrusters.
4) Planning & implementation of maintenance programme for Generators,
various Distribution Equipments, and Distribution panels, various Motor
Starter panels, Mud Pump like Continental EMSCO.Operation knowledge on
various HMI panels including OMRON 4x4, SCR house ROSS Hill 1400
Series 5 BAY,IDM Quick Silver 1600 VFD , Gaitronics communication
Systems, Gas detection System (Detcon), EPOCH, CANRIG K-BOX.
5) Schedule switching programmes, Shut down, Planning & Pre-maintenance
work schedules for 220 KV Transmission& Distribution lines. Daily monitoring,
supervising & maintenance of Transformers (100 MVA), SF6 Circuit breakers,
various types of protection Relays like (Earth fault, Over current, Bucholz
Relay for transformers), in the distribution switching yards.
Projects Handled:
Complete rigging up & Installation of Nabors land rigs Rig 804,806,807 from
period of 2013 to 2015 at Saffah oil fields, Oman.
Client: Occidental Oman (OXY).
Introduction:
The PACE M series rigs are equipped with innovative technology & it is a
completely programmable 1000 HP, AC electric rig with PLC controls. The
drillers console allows full control of draw works, top drive, mud pumps & all other
significant equipments from a single location.
The PACE –M series rigs drills in a broad range of depth & in a variety
of geographical & geophysical areas. It has made drilling record wells a habit,
including field record directional & horizontal wells. Its day –versus-depth drilling
record routinely surfpasses the drilling curve established operators.
Specification Include:
1) Draw works:
1000 HP AC draw works featuring regenerative AC braking .Draw works is driven
by 2x800 HP AC motors. Auto drill functionality utilizing AC motors.
2) Power generation:
3x1476 HP Caterpillar 3512 C Engines each driving 1 Kato x1365 KW generator
for a total 4428 HP, AC power generation, VFD & MCC unitized in a single
house.
3) Mast:
Load master 142 Ft Telescopic mast manufactured to API-4F specification. Static
hook load 550,000 lbs on 10 lines. Mast is raised & lowered using Hydraulic
cylinders. Mast top section is scoped utilizing travelling block. Mast is transported
as a single load & has integrated top drive rails (enables top drive to travel in
mast during rig move)
4) Substructure:
Load master hydraulically elevated sub structure with 22Ft floor height & 14”10”
clear height under the rotary beams. Substructure is rated for 550,000 lbs rotary
load simultaneous with 350,000 lbs set back load.
5) Drillers console:
Climate controlled driller’s cabin provides integrated joystick itlizing PLC
technology .Touch screen controls provides state of art monitoring, control of rig
equipments & parameters.
6) Mud Pumps:
2x1600 Hp mud pumps. Each powered by 1500 HP, AC motors, pumps
equipped with hydraulic liner retention & pump rod systems.
7) Mud Tanks:
One tank system total capacity approximately 750bbls:100 bbl trip tank as well.
Two 6”x8” centrifugal pumps powered with 75 HP electric motors .
8) Top drive:
Canrig 6027 AC 275 –ton integrally mounted top drive with torque capacity
30,000 ft Lbs & rotating speed of 105 rpm.
Additional Equipments:
. Dedicated Man rider Winch
. Camera system
. Inter com System
. Automated cat walk/pipe handling system
. Iron rough Neck
. BOP Handling systems
RESPONSIBLITIES OF THE POSITIONS:
1) Management & execution of assigned projects in time, building a
professional working relationship with project manager, designers,
discipline engineering team & with clients as well.
2) Make ensure all documents & drawings are issued on time & site
corrections are captured in as builds.
3) Ensure appropriate engineering methods are applied by the entire project
team to improve their efficiency.
4) Make ensure that all electrical equipments are safe to work, & ensure
compliance with QHSE responsibilities.
5) Erection & testing of HV & LV cable networks for various substations,
MV/LV distribution systems and consistent with company policies and
safety regulations. This position is the highest of a multi-step progression
for a substation Operator.
SAFETY COURSES DONE:
 Training in Fire Fighting& Personal Survival Techniques.
 Training in H2S Course, First Aid CPR.
 Training in Electrical safety rules, Risk Assessment.
 Training on HUET course from Nabors School.
 Training in Confined Space Entry & HSE Induction Programme.
 Training on Rig Management Systems (Module 1 &2) & Safety training on
all rig related equipment’s.
 Training on safety & precautions operation of BOP (Cameron).
 Holder of Indian CDC, MUM169741 & INDOS Number: 09SL2261.
SOFTWARE SKILLS:
 Certification in PLC & SCADA, DCS (ABB) Programming.
 Certification in Electrical Auto CADD(2D/3D).
 Sound knowledge in JAVA, C++, VB, MS-OFFICE.
PERSONAL DETAILS:
Date of Birth 06-Jan-1984
Father’s Name Raveendran. P.E.
Nationality Indian
Marital status Married
Driving license Oman (International License)
DECLARATION:
I hereby declare that the information provided is true to the best of my
knowledge.
Vineeth Ravi
SOFTWARE SKILLS:
 Certification in PLC & SCADA, DCS (ABB) Programming.
 Certification in Electrical Auto CADD(2D/3D).
 Sound knowledge in JAVA, C++, VB, MS-OFFICE.
PERSONAL DETAILS:
Date of Birth 06-Jan-1984
Father’s Name Raveendran. P.E.
Nationality Indian
Marital status Married
Driving license Oman (International License)
DECLARATION:
I hereby declare that the information provided is true to the best of my
knowledge.
Vineeth Ravi

More Related Content

What's hot

ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance TechnicianMohammad Azim uddin
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CVYousif Alanazi
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeBokam Divakar
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 

What's hot (20)

ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance Technician
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CV
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 

Viewers also liked

Sample CV for Electronics & Communications Student
Sample CV for Electronics & Communications StudentSample CV for Electronics & Communications Student
Sample CV for Electronics & Communications StudentHussain Shah
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cvsaryhasabadly
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
Top 8 electronic engineer resume samples
Top 8 electronic engineer resume samplesTop 8 electronic engineer resume samples
Top 8 electronic engineer resume samplesgedihutes
 
Sample network engineer resume
Sample network engineer resumeSample network engineer resume
Sample network engineer resumeAmbuj Rai
 

Viewers also liked (7)

Sample CV for Electronics & Communications Student
Sample CV for Electronics & Communications StudentSample CV for Electronics & Communications Student
Sample CV for Electronics & Communications Student
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
My Resume
My ResumeMy Resume
My Resume
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Top 8 electronic engineer resume samples
Top 8 electronic engineer resume samplesTop 8 electronic engineer resume samples
Top 8 electronic engineer resume samples
 
Sample network engineer resume
Sample network engineer resumeSample network engineer resume
Sample network engineer resume
 

Similar to Resume- Electrical Engineer-project descripition

Similar to Resume- Electrical Engineer-project descripition (20)

Khlau Rev0 150701
Khlau Rev0 150701Khlau Rev0 150701
Khlau Rev0 150701
 
ahmed mohamed diaa_original
ahmed mohamed diaa_originalahmed mohamed diaa_original
ahmed mohamed diaa_original
 
ahmed mohamed diaa C.V
ahmed mohamed diaa C.Vahmed mohamed diaa C.V
ahmed mohamed diaa C.V
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Akram CV- Updated
Akram CV- UpdatedAkram CV- Updated
Akram CV- Updated
 
Asad Ali Shah cv
Asad Ali Shah cvAsad Ali Shah cv
Asad Ali Shah cv
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
Abdelrazek Kamal Ali C.V
Abdelrazek Kamal  Ali C.VAbdelrazek Kamal  Ali C.V
Abdelrazek Kamal Ali C.V
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV Engr.Amr Ayaad_CV
Engr.Amr Ayaad_CV
 
Ahmad Ismail Resume jan2015
Ahmad Ismail Resume jan2015Ahmad Ismail Resume jan2015
Ahmad Ismail Resume jan2015
 
abdelrazek Kamal C.V
abdelrazek Kamal C.Vabdelrazek Kamal C.V
abdelrazek Kamal C.V
 
ansary-cv
ansary-cvansary-cv
ansary-cv
 
Mohamed ElGazzar Egypt
Mohamed ElGazzar EgyptMohamed ElGazzar Egypt
Mohamed ElGazzar Egypt
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Moh cv
Moh cvMoh cv
Moh cv
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc tech
 

Resume- Electrical Engineer-project descripition

  • 1. CURRICULAM VITAE VINEETH RAVI Email:vineethrav@gmail.com,vineethravi@yahoo.com Mobile#: +91-8139804177. CAREER OBJECTIVE: As an Electrical Engineering graduate, I aspire to build a career in desired department where my qualities and abilities are best utilized towards creating lasting value to organizations I serve, while ensuring continuous learning, self development and skill enhancement. QUALIFICATION:  Bachelor of Engineering (Electrical & Electronics) from Anjuman Engineering College under Visveswariah Technological University in 2008. WORK EXPERIENCE: 1) Working as Lead Electrical Engineer in Nabors Drilling Int’l on Oman operations from April, 2012 to till date. 2) Worked as Electrical Technical Officer in Great Ship, MSV-DP 2 vessel from November, 2011 March, 2012. 3) Worked as an Electrical Engineer in Nabors Drilling Int’l on Rig 804, Singapore for the rigging up from October, 2009 to October, 2011. 4) Worked as Junior Electrical Engineer in Nabors Drilling Int’l on Rig 862, In Oman, from October 2008, to October, 2009. 5) Worked in 220 KV Transmission Section of Kerala State Electricity Board from March, 2008 to August, 2008.
  • 2. JOB DESCRIPTION: 1) Key role person in Installation, controlling & scheduling maintenance of various rig equipments for the optimized performance for the respective rigs in charge. 2) Responsible for the technical review of tender documents, their specifications, drawings & instrument plan/layouts, cable sizing, routings &technical issues related with engineering discipline & resolving it in a timely manner with entire project team. Well aware of all the electrical standards & code practices. 3) Part of Commissioning team for MSV DP -2 vessels & sound knowledge in Power Generation and Distribution Systems, Various navigational equipment’s like GMDSS , GyroCompass, Kawasaki & Kongsberg Thrusters. 4) Planning & implementation of maintenance programme for Generators, various Distribution Equipments, and Distribution panels, various Motor Starter panels, Mud Pump like Continental EMSCO.Operation knowledge on various HMI panels including OMRON 4x4, SCR house ROSS Hill 1400 Series 5 BAY,IDM Quick Silver 1600 VFD , Gaitronics communication Systems, Gas detection System (Detcon), EPOCH, CANRIG K-BOX. 5) Schedule switching programmes, Shut down, Planning & Pre-maintenance work schedules for 220 KV Transmission& Distribution lines. Daily monitoring, supervising & maintenance of Transformers (100 MVA), SF6 Circuit breakers, various types of protection Relays like (Earth fault, Over current, Bucholz Relay for transformers), in the distribution switching yards.
  • 3. Projects Handled: Complete rigging up & Installation of Nabors land rigs Rig 804,806,807 from period of 2013 to 2015 at Saffah oil fields, Oman. Client: Occidental Oman (OXY). Introduction: The PACE M series rigs are equipped with innovative technology & it is a completely programmable 1000 HP, AC electric rig with PLC controls. The drillers console allows full control of draw works, top drive, mud pumps & all other significant equipments from a single location. The PACE –M series rigs drills in a broad range of depth & in a variety of geographical & geophysical areas. It has made drilling record wells a habit, including field record directional & horizontal wells. Its day –versus-depth drilling record routinely surfpasses the drilling curve established operators. Specification Include: 1) Draw works: 1000 HP AC draw works featuring regenerative AC braking .Draw works is driven by 2x800 HP AC motors. Auto drill functionality utilizing AC motors. 2) Power generation: 3x1476 HP Caterpillar 3512 C Engines each driving 1 Kato x1365 KW generator for a total 4428 HP, AC power generation, VFD & MCC unitized in a single house. 3) Mast: Load master 142 Ft Telescopic mast manufactured to API-4F specification. Static hook load 550,000 lbs on 10 lines. Mast is raised & lowered using Hydraulic cylinders. Mast top section is scoped utilizing travelling block. Mast is transported as a single load & has integrated top drive rails (enables top drive to travel in mast during rig move) 4) Substructure: Load master hydraulically elevated sub structure with 22Ft floor height & 14”10” clear height under the rotary beams. Substructure is rated for 550,000 lbs rotary load simultaneous with 350,000 lbs set back load.
  • 4. 5) Drillers console: Climate controlled driller’s cabin provides integrated joystick itlizing PLC technology .Touch screen controls provides state of art monitoring, control of rig equipments & parameters. 6) Mud Pumps: 2x1600 Hp mud pumps. Each powered by 1500 HP, AC motors, pumps equipped with hydraulic liner retention & pump rod systems. 7) Mud Tanks: One tank system total capacity approximately 750bbls:100 bbl trip tank as well. Two 6”x8” centrifugal pumps powered with 75 HP electric motors . 8) Top drive: Canrig 6027 AC 275 –ton integrally mounted top drive with torque capacity 30,000 ft Lbs & rotating speed of 105 rpm. Additional Equipments: . Dedicated Man rider Winch . Camera system . Inter com System . Automated cat walk/pipe handling system . Iron rough Neck . BOP Handling systems
  • 5. RESPONSIBLITIES OF THE POSITIONS: 1) Management & execution of assigned projects in time, building a professional working relationship with project manager, designers, discipline engineering team & with clients as well. 2) Make ensure all documents & drawings are issued on time & site corrections are captured in as builds. 3) Ensure appropriate engineering methods are applied by the entire project team to improve their efficiency. 4) Make ensure that all electrical equipments are safe to work, & ensure compliance with QHSE responsibilities. 5) Erection & testing of HV & LV cable networks for various substations, MV/LV distribution systems and consistent with company policies and safety regulations. This position is the highest of a multi-step progression for a substation Operator. SAFETY COURSES DONE:  Training in Fire Fighting& Personal Survival Techniques.  Training in H2S Course, First Aid CPR.  Training in Electrical safety rules, Risk Assessment.  Training on HUET course from Nabors School.  Training in Confined Space Entry & HSE Induction Programme.  Training on Rig Management Systems (Module 1 &2) & Safety training on all rig related equipment’s.  Training on safety & precautions operation of BOP (Cameron).  Holder of Indian CDC, MUM169741 & INDOS Number: 09SL2261.
  • 6. SOFTWARE SKILLS:  Certification in PLC & SCADA, DCS (ABB) Programming.  Certification in Electrical Auto CADD(2D/3D).  Sound knowledge in JAVA, C++, VB, MS-OFFICE. PERSONAL DETAILS: Date of Birth 06-Jan-1984 Father’s Name Raveendran. P.E. Nationality Indian Marital status Married Driving license Oman (International License) DECLARATION: I hereby declare that the information provided is true to the best of my knowledge. Vineeth Ravi
  • 7. SOFTWARE SKILLS:  Certification in PLC & SCADA, DCS (ABB) Programming.  Certification in Electrical Auto CADD(2D/3D).  Sound knowledge in JAVA, C++, VB, MS-OFFICE. PERSONAL DETAILS: Date of Birth 06-Jan-1984 Father’s Name Raveendran. P.E. Nationality Indian Marital status Married Driving license Oman (International License) DECLARATION: I hereby declare that the information provided is true to the best of my knowledge. Vineeth Ravi