REYNALDO CARLOS P.DUYANEN JR
No.354 Purok-7 Sta Rita Lubao, Pampanga
Mobile: +639475099605 /+639284962527
E-mail: rcj_duyanen@yahoo.com
POSITION: Sr.Electrical Technician
CAREER OBJECTIVES:
Seeking challenging career as Technical professional in the field of Construction,Installations,
Pre-Com,Commissioning,Maintenance and Quality Inspection of Electrical System for
stimulation and ambience conductive to career advancement and professional growth where.
I can enhance my experience and utilize my skills for timely and successful project completion.
Knowledge,Skills & other Abilities:
• Fully aware of applicable engineering specifications,standard requirements and Saudi
Aramco inspection procedures.
o CODE AWARENESS
• NEC-National Electric Code
• SAES-P-104-Wiring Methods and Materials
• SAES-P-111-Grounding/Lightning Protection
• SAES-P-123-Lighting/Power
• SAES-B068 Electrical Area Classification
• NETA-National Electric Testing Association
• Ability to handle and resolve work related problems.
• Ability to establish priorities,work independently,and proceed with objectives.
• Progressively responsible experience in Electrical construction & inspection.
• Commissioning and Maintenance support Team (Saudi Aramco) Community Projects
Thuwal,Jeddah KSA,KAUST as a Proponent through Al-Hugayet General Contracting
Company as an Electrical Commissioning &System Inspector.
• Computer literate.
GENERAL WORK EXPERIENCES:
Company : Al-Hugayet General Contracting Company
Address : P.O.Box 2756,Dammam 31461 K.S.A.
Job Location : King Abdullah University of Science & Technology
Thuwal P.O.Box 55455,Jeddah 21534 K.S.A
Department : Kaust-Turn Over & Commissioning Department
(Cx Commissioning Team)
Position : Sr.Electrical Technician
Start Date : March 31,2009
End Date : March 31,2016
Client : KAUST Proponent
PMT : Saudi Aramco
Job Description:
 Work as an Electrical Inspector in various areas of responsibility as follows:
• KAUST(Kaust Research Park Support Facilities,Kaust Research Park Infastraction
Projects,Administration Building,Maintenance &Service Building.)
• KAUST(Town Center,School Buildings,Researce Park All Zones)
• KAUST(Public Buildings,Residential Buildings,Areas & Community Facilities)
 Reviews and studies of approved drawings to specify what is workable at site.
 Coordinate with the main contractor concerning work priority in conjunction to project
work planning scheduled regarding the testing of Switchgear,Variable Frequency Drive
(VFD) Motor Control Center(MCC) Swicth Board & Panel Distribution Board.
 Pre-Commissioning test of MV/LV Cables ,Switch Board,MCC Panel,ATS,3Phase Dry
Type Tranformer & Distribution panels.
 Witnessing the contractor’s,Pre Commissioning Test MV/LV Cables such as, Insulation
Resistance test,Contact resistance,Phasing Sequence,Continuity test,Hi- Potential
test,Primary Current Injecion test,Secondary Current Injection.
 Witnessing Primary Current Injection,IR test,Contact Resistance test of ,Molded-Case
Cicuit Breakers,Air Circuit Breakers, Insulated Circuit Breakers,Thermal-Magnetic
Circuit Breakers,Break Circuit Breakers and Disribution Breakers.
 Witnessing the Meggering Test of Main and Branch Cables & wires.
 Monitored daily basis rectified Exception Item List (EIL)by coordinating to the
contractor and Project Inspection Department(PID) in closing the item.
 Generated reports and electronic mails to all concerned for proper communication and
understanding on the status of the project.
 Witnessing actual site testing by the third party to ensure proper test and procedure has
emplement.
 Asssist commissioning Eng’r in finding technical deficiences in site execution of the
contractor.
 Conduct site inspection to ensure superior quality and workmanship has implemented
on the site.
 Attended walkthroughs of the buildings and generated exception item list(EIL)to be
submitted to the contractor throu project management for rectification.
 Report directly to commissioning Eng’r for deviation found during construction to
menimize reworks and other incoming issues.
 Verifying actual installation on site for its completeness as per project specification and
applicable standard.
 Submit weekly highlight progress report of Pre-commissioning,Commissioning and
energization status.
 Undertake visits in support of ongoing Commissioning activities.
 Supervised the Pre-commissioning activities of the contractor together with the
Project Inspection Division (PID) as,Grounding works, Cable Terminations,Cable
Torquing,Splicing ,Laying of MV and LV Cables.
 Monitoring and checking sub contractors rectifying remaining exception item list(EIL)to
conform as per SPECS,SAES and NEC standard.
 Closing exception item list(EIL)along with the QC/QA contractor’s.
 Conduct final commissioning of entire system & equipment at facilities related in
electrical activities at the site.
Commissioning:
 Commissioning of electrical system and equipments.
 Each completed system within the installation shall be tested as a whole under
normal site operating conditions to ensure that each component function correctly
in conjunction with the rest of the system.
 Checking (visual) of entire System, Equipments and Apparatus.
 Checking of Medium and Low voltage Switchboard and Transformer
 Checking for missing parts
 Checking for damaged.
 Check for parts that sub standards.
 Check for parts that under rated and under sized.
 Check for damage cables and control wirings.
 Check for missing link
 Checking of breakers.
 Checking of cables.
 Check and reviewed the single line diagram and IFC(issued for construction) drawings
GENERAL WORK EXPERIENCES:
Company : Samama Company for Operation & Management
Address : P.O.Box 2781,Riyadh 11461 K.S.A.
Job Location : King Saud Hospital
Unayzah,Al-Qassim K.S.A.
Department : Engineering Maintenance Department
Position : Electrical Technician
Start Date : November 19,1999
End Date : January 27,2002
Job Description:
 Performed troubleshooting and maintenance of all related electrical jobs according plans
and specification of all data equipments.
 Procedures of routinary and periodic checking,cleansing,testing and recording the
operation of electrical equipments.
 Check up for normal sounds,vibrations and temperature of motor and load make clean
the
fan motor louver.
 Conduct testing of new work methods and procedure including newly delivered
machine
parts and accessories.
 Fault rectification work associated/tripping of circuit breakers including good attention
to
Engineer request and order.
 Routine check-up the sub-station,monitoring switchgear including circuit breakers on all
mounting electrical distribution panels.
 Doing routine check-up on all units and building facilities .
 Preventive maintenance once a month ,check the person on duty by using gauge if there
is a leakage and also checking the power supply.Especially the phase supply,check the
phasing sometimes not equal load because of power malfunction.
 Assist the maintenance personel,technician in the operation,repair and maintenance of all
electrical equipments and components system.
 Perform the other duties as may be assigned by the supervising Eng’r from time to time.
 Received instruction from the supervising Electrical Engineer to perform duties and
responsibilities professionally.
 Make service report and give it to Elec’l Eng’r for future maintenance task schedule.
 Visual inspection of the system to check on corrosion and loose mounting .
 Check up and fell the normal sound operating temperature of all main to branch circuits
 Ensures safety precautions and measures at all time
 Overall coordination of all maintenance activities geared towards maintening the long
arability and good working condition of all equipments in the plant.
 Daily routine inspections of all designated machineries and equipments in the plant to
mentain good condition and make service report for the damaged equipments.
 Trace the control circuits and rectify the electrical problem arising in pumps motors,
kitchen equipments and etc.
 Attained all the maintenance and service call complaints work in the hospital and
buildings.
 Prepares evaluates and submits technical reports on status of plant equipments and
others related routine preventive maintenance.
 Attend repair jobs on housing appliances.
 Inspections of the wiring system and to maintend in good conditions of the following
flourescent lamps,ballast,power outlets,distribution panels and etc.
 Conduct weekly test run the emergency generator.
 Repair window type and sevicing.
 Preparing check-up the cable damage and re-wiring new cables and checking water
heaters and laundry washing machine.
 Maintenance & repair electrical equipments and trouble shooting of construction
machine power tools using at site.
 Attend toolbox meeting and executes task given from time to time.
 Ensures safety precautions & measures at all.
WORK EXPERIENCE:
Company : CEEMM Construction Corporation
Address : 2259-F Pres.Quirino Ave.Metro Manila
Job Location : Lung Center of the Philippines
Quezon Ave.Quezon City
Department : Electrical Department
Position : Electrician (Hands-on)
Start Date : August 8,1992
End Date : May 12,1998
Job Description:
 Installing Electrical wirings and connect it to the main fuse or source of electricity.
 Building installation of power and lighting system.
 PVC,RGS conduiting for power,lighting and control panel.
 Inspect the wiring and electrical status.
 Communicate with the client on the kind & style of electrical installation that they want.
 Communicate with Engineers or Architech on the electrical positioning.
 Inspect the electrical instrument to be used.
 Advice good and appropriate installation and the kind of instrument or product to be
use.
 Medium voltage and Low voltage cable pulling and Layout.
 Installations of Main & Distribution Circuit Breakers in Sub-Station,MDP,DP,Sub Panel
and all branch breaker.
 Installation,Terminations & Toquing of Main Power cables and distribution cables.
 Installation of conduit pipes,cable ladders,cable trays,conduit race ways,pvc
pipes,including supports like,c-clamp,unistrat channel,hanging rods and etc.
 Cable dressing of cables,cable termination,cable cladding,cable ofset,loop checking.
 Wiring and cabling works on power supply and lighting fixtures in the buildings.
 Installations of emergency generator,submersible pumps,exhaust fan unit,accu unit,fire
alarm system,&etc.
 Pulling under ground or direct buried cable.
 Splicing cable or joint cable using 3M marine splicing kit,Raychem Heat Shrink &
chemical compound.
 Bending of conduit pipes like (RGS,RSC,EMT,PVC pipes).
 Grounding installations inside the Electrical room and around the buildings.
(120mm/70mm)bare tinn copper wire.
 Installation of main grounding Bus bars.
 Installations of Equipment grounding & bonding.
 Installation of grounding rod 3 mtrs long./19mm dia.
 Installation of Lightning Arrester (50cm/15mm dia.)
 Installation of grounding system use tinn copper insulated wire.
 Installed deffirent size of Cable Glands and use tubine compressor for electrical to main
building,transformers,sub-station,&termination of power supply.
 PVC,RGS,RSC,EMT, conduiting for lightings,power, fire alarm system.control panel
and etc.
 Installation and lay-outing of main Homerun Cable for external lightings ,Perimeter
lights and Street lightings.
 Pre-commissioning of all electrical facilities.
 Ensures safety precautions and measures of all times.
PERSONAL DATA:
 Present Address : No.354 Purok 7 Sta Rita
Lubao,Pampanga Philippines
 Date of Birth : May 13,1965
 Place of Birth : Manaoag,Pangasinan
 Civil Status : Married
 Nationality : Filipino
 Sex : Male
 Religion : Christian/Catholic
 Language Spoken : English,Tagalog,Ilocano
 Passport # : EB8837277
 Passport Issue : Aug.01,2013
 Passport Expired : July 31,2018
 SSS# : 03-8633721-9
Personal Refferences
 Bandar Ashrour Commissioning Manager
Kaust-Cx-PMO
+966544700315
 Eng’r.Arturo Lucas Team Leader ,Commissioning Engineer
Kaust,Commissioning Department(Cx Team)
Thuwal,Jeddah 21534 KSA
+966548240328
 Eng’r Rogelio Mendola Group Leader, Commissioning Engineer
Kaust Commissioning Deprtment
Thuwal,Jeddah 21534 KSA
+966567541955
Education Attainment:
 College : Luzon Colleges(Dagupan City)
Degree : Electrical Engineering(Undergrad)
 Technical Degree : Practical Electricity(Diploma)
Manantan Technical School
Urdaneta,Pangasinan
 Eng’r Rogelio Mendola Group Leader, Commissioning Engineer
Kaust Commissioning Deprtment
Thuwal,Jeddah 21534 KSA
+966567541955
Education Attainment:
 College : Luzon Colleges(Dagupan City)
Degree : Electrical Engineering(Undergrad)
 Technical Degree : Practical Electricity(Diploma)
Manantan Technical School
Urdaneta,Pangasinan

CV Electrical Technician

  • 1.
    REYNALDO CARLOS P.DUYANENJR No.354 Purok-7 Sta Rita Lubao, Pampanga Mobile: +639475099605 /+639284962527 E-mail: rcj_duyanen@yahoo.com POSITION: Sr.Electrical Technician CAREER OBJECTIVES: Seeking challenging career as Technical professional in the field of Construction,Installations, Pre-Com,Commissioning,Maintenance and Quality Inspection of Electrical System for stimulation and ambience conductive to career advancement and professional growth where. I can enhance my experience and utilize my skills for timely and successful project completion. Knowledge,Skills & other Abilities: • Fully aware of applicable engineering specifications,standard requirements and Saudi Aramco inspection procedures. o CODE AWARENESS • NEC-National Electric Code • SAES-P-104-Wiring Methods and Materials • SAES-P-111-Grounding/Lightning Protection • SAES-P-123-Lighting/Power • SAES-B068 Electrical Area Classification • NETA-National Electric Testing Association • Ability to handle and resolve work related problems. • Ability to establish priorities,work independently,and proceed with objectives. • Progressively responsible experience in Electrical construction & inspection. • Commissioning and Maintenance support Team (Saudi Aramco) Community Projects Thuwal,Jeddah KSA,KAUST as a Proponent through Al-Hugayet General Contracting Company as an Electrical Commissioning &System Inspector. • Computer literate.
  • 2.
    GENERAL WORK EXPERIENCES: Company: Al-Hugayet General Contracting Company Address : P.O.Box 2756,Dammam 31461 K.S.A. Job Location : King Abdullah University of Science & Technology Thuwal P.O.Box 55455,Jeddah 21534 K.S.A Department : Kaust-Turn Over & Commissioning Department (Cx Commissioning Team) Position : Sr.Electrical Technician Start Date : March 31,2009 End Date : March 31,2016 Client : KAUST Proponent PMT : Saudi Aramco Job Description:  Work as an Electrical Inspector in various areas of responsibility as follows: • KAUST(Kaust Research Park Support Facilities,Kaust Research Park Infastraction Projects,Administration Building,Maintenance &Service Building.) • KAUST(Town Center,School Buildings,Researce Park All Zones) • KAUST(Public Buildings,Residential Buildings,Areas & Community Facilities)  Reviews and studies of approved drawings to specify what is workable at site.  Coordinate with the main contractor concerning work priority in conjunction to project work planning scheduled regarding the testing of Switchgear,Variable Frequency Drive (VFD) Motor Control Center(MCC) Swicth Board & Panel Distribution Board.  Pre-Commissioning test of MV/LV Cables ,Switch Board,MCC Panel,ATS,3Phase Dry Type Tranformer & Distribution panels.  Witnessing the contractor’s,Pre Commissioning Test MV/LV Cables such as, Insulation Resistance test,Contact resistance,Phasing Sequence,Continuity test,Hi- Potential test,Primary Current Injecion test,Secondary Current Injection.  Witnessing Primary Current Injection,IR test,Contact Resistance test of ,Molded-Case Cicuit Breakers,Air Circuit Breakers, Insulated Circuit Breakers,Thermal-Magnetic Circuit Breakers,Break Circuit Breakers and Disribution Breakers.  Witnessing the Meggering Test of Main and Branch Cables & wires.  Monitored daily basis rectified Exception Item List (EIL)by coordinating to the contractor and Project Inspection Department(PID) in closing the item.  Generated reports and electronic mails to all concerned for proper communication and understanding on the status of the project.
  • 3.
     Witnessing actualsite testing by the third party to ensure proper test and procedure has emplement.  Asssist commissioning Eng’r in finding technical deficiences in site execution of the contractor.  Conduct site inspection to ensure superior quality and workmanship has implemented on the site.  Attended walkthroughs of the buildings and generated exception item list(EIL)to be submitted to the contractor throu project management for rectification.  Report directly to commissioning Eng’r for deviation found during construction to menimize reworks and other incoming issues.  Verifying actual installation on site for its completeness as per project specification and applicable standard.  Submit weekly highlight progress report of Pre-commissioning,Commissioning and energization status.  Undertake visits in support of ongoing Commissioning activities.  Supervised the Pre-commissioning activities of the contractor together with the Project Inspection Division (PID) as,Grounding works, Cable Terminations,Cable Torquing,Splicing ,Laying of MV and LV Cables.  Monitoring and checking sub contractors rectifying remaining exception item list(EIL)to conform as per SPECS,SAES and NEC standard.  Closing exception item list(EIL)along with the QC/QA contractor’s.  Conduct final commissioning of entire system & equipment at facilities related in electrical activities at the site. Commissioning:  Commissioning of electrical system and equipments.  Each completed system within the installation shall be tested as a whole under normal site operating conditions to ensure that each component function correctly in conjunction with the rest of the system.  Checking (visual) of entire System, Equipments and Apparatus.  Checking of Medium and Low voltage Switchboard and Transformer  Checking for missing parts  Checking for damaged.  Check for parts that sub standards.  Check for parts that under rated and under sized.  Check for damage cables and control wirings.  Check for missing link  Checking of breakers.
  • 4.
     Checking ofcables.  Check and reviewed the single line diagram and IFC(issued for construction) drawings GENERAL WORK EXPERIENCES: Company : Samama Company for Operation & Management Address : P.O.Box 2781,Riyadh 11461 K.S.A. Job Location : King Saud Hospital Unayzah,Al-Qassim K.S.A. Department : Engineering Maintenance Department Position : Electrical Technician Start Date : November 19,1999 End Date : January 27,2002 Job Description:  Performed troubleshooting and maintenance of all related electrical jobs according plans and specification of all data equipments.  Procedures of routinary and periodic checking,cleansing,testing and recording the operation of electrical equipments.  Check up for normal sounds,vibrations and temperature of motor and load make clean the fan motor louver.  Conduct testing of new work methods and procedure including newly delivered machine parts and accessories.  Fault rectification work associated/tripping of circuit breakers including good attention to Engineer request and order.  Routine check-up the sub-station,monitoring switchgear including circuit breakers on all mounting electrical distribution panels.  Doing routine check-up on all units and building facilities .  Preventive maintenance once a month ,check the person on duty by using gauge if there is a leakage and also checking the power supply.Especially the phase supply,check the phasing sometimes not equal load because of power malfunction.  Assist the maintenance personel,technician in the operation,repair and maintenance of all electrical equipments and components system.  Perform the other duties as may be assigned by the supervising Eng’r from time to time.
  • 5.
     Received instructionfrom the supervising Electrical Engineer to perform duties and responsibilities professionally.  Make service report and give it to Elec’l Eng’r for future maintenance task schedule.  Visual inspection of the system to check on corrosion and loose mounting .  Check up and fell the normal sound operating temperature of all main to branch circuits  Ensures safety precautions and measures at all time  Overall coordination of all maintenance activities geared towards maintening the long arability and good working condition of all equipments in the plant.  Daily routine inspections of all designated machineries and equipments in the plant to mentain good condition and make service report for the damaged equipments.  Trace the control circuits and rectify the electrical problem arising in pumps motors, kitchen equipments and etc.  Attained all the maintenance and service call complaints work in the hospital and buildings.  Prepares evaluates and submits technical reports on status of plant equipments and others related routine preventive maintenance.  Attend repair jobs on housing appliances.  Inspections of the wiring system and to maintend in good conditions of the following flourescent lamps,ballast,power outlets,distribution panels and etc.  Conduct weekly test run the emergency generator.  Repair window type and sevicing.  Preparing check-up the cable damage and re-wiring new cables and checking water heaters and laundry washing machine.  Maintenance & repair electrical equipments and trouble shooting of construction machine power tools using at site.  Attend toolbox meeting and executes task given from time to time.  Ensures safety precautions & measures at all.
  • 6.
    WORK EXPERIENCE: Company :CEEMM Construction Corporation Address : 2259-F Pres.Quirino Ave.Metro Manila Job Location : Lung Center of the Philippines Quezon Ave.Quezon City Department : Electrical Department Position : Electrician (Hands-on) Start Date : August 8,1992 End Date : May 12,1998 Job Description:  Installing Electrical wirings and connect it to the main fuse or source of electricity.  Building installation of power and lighting system.  PVC,RGS conduiting for power,lighting and control panel.  Inspect the wiring and electrical status.  Communicate with the client on the kind & style of electrical installation that they want.  Communicate with Engineers or Architech on the electrical positioning.  Inspect the electrical instrument to be used.  Advice good and appropriate installation and the kind of instrument or product to be use.  Medium voltage and Low voltage cable pulling and Layout.  Installations of Main & Distribution Circuit Breakers in Sub-Station,MDP,DP,Sub Panel and all branch breaker.  Installation,Terminations & Toquing of Main Power cables and distribution cables.  Installation of conduit pipes,cable ladders,cable trays,conduit race ways,pvc pipes,including supports like,c-clamp,unistrat channel,hanging rods and etc.  Cable dressing of cables,cable termination,cable cladding,cable ofset,loop checking.  Wiring and cabling works on power supply and lighting fixtures in the buildings.
  • 7.
     Installations ofemergency generator,submersible pumps,exhaust fan unit,accu unit,fire alarm system,&etc.  Pulling under ground or direct buried cable.  Splicing cable or joint cable using 3M marine splicing kit,Raychem Heat Shrink & chemical compound.  Bending of conduit pipes like (RGS,RSC,EMT,PVC pipes).  Grounding installations inside the Electrical room and around the buildings. (120mm/70mm)bare tinn copper wire.  Installation of main grounding Bus bars.  Installations of Equipment grounding & bonding.  Installation of grounding rod 3 mtrs long./19mm dia.  Installation of Lightning Arrester (50cm/15mm dia.)  Installation of grounding system use tinn copper insulated wire.  Installed deffirent size of Cable Glands and use tubine compressor for electrical to main building,transformers,sub-station,&termination of power supply.  PVC,RGS,RSC,EMT, conduiting for lightings,power, fire alarm system.control panel and etc.  Installation and lay-outing of main Homerun Cable for external lightings ,Perimeter lights and Street lightings.  Pre-commissioning of all electrical facilities.  Ensures safety precautions and measures of all times.
  • 8.
    PERSONAL DATA:  PresentAddress : No.354 Purok 7 Sta Rita Lubao,Pampanga Philippines  Date of Birth : May 13,1965  Place of Birth : Manaoag,Pangasinan  Civil Status : Married  Nationality : Filipino  Sex : Male  Religion : Christian/Catholic  Language Spoken : English,Tagalog,Ilocano  Passport # : EB8837277  Passport Issue : Aug.01,2013  Passport Expired : July 31,2018  SSS# : 03-8633721-9 Personal Refferences  Bandar Ashrour Commissioning Manager Kaust-Cx-PMO +966544700315  Eng’r.Arturo Lucas Team Leader ,Commissioning Engineer Kaust,Commissioning Department(Cx Team) Thuwal,Jeddah 21534 KSA +966548240328
  • 9.
     Eng’r RogelioMendola Group Leader, Commissioning Engineer Kaust Commissioning Deprtment Thuwal,Jeddah 21534 KSA +966567541955 Education Attainment:  College : Luzon Colleges(Dagupan City) Degree : Electrical Engineering(Undergrad)  Technical Degree : Practical Electricity(Diploma) Manantan Technical School Urdaneta,Pangasinan
  • 10.
     Eng’r RogelioMendola Group Leader, Commissioning Engineer Kaust Commissioning Deprtment Thuwal,Jeddah 21534 KSA +966567541955 Education Attainment:  College : Luzon Colleges(Dagupan City) Degree : Electrical Engineering(Undergrad)  Technical Degree : Practical Electricity(Diploma) Manantan Technical School Urdaneta,Pangasinan