1. NAVEED AKHTAR
Electrical Engineer (Power System)
Flat No#704 Mena Tower Salam Street Mena Road Abu Dhabi, U.A.E
Email:naveedakhtar07@gmail.com
Mob: +971-507242365 Home: +92-321-3210680
CareerObjective
An enthusiastic self-starter with strong communications skills. Proven academic and curricular
achievements, and possess the right technical and soft skills required to propel the organization
achieving its goals and objectives.
I am looking for a position, where I can learn and improve my engineering knowledge and
where I can utilize my engineering, electrical, power, communication skills and interpersonal
skills for the growth of my company and career.
Education
B.Sc. Electrical Engineering (Power System) 2011 1stDiv
The Islamia University of Bahawalpur Pakistan
Diploma Associate Engineering (Electrical) 2007 1stDiv
PBTE Lahore Pakistan
Matriculation (Science) 2004 1stDiv
Board of Intermediate and Secondary Education Lahore Pakistan.
Membership
Pakistan Engineering Council (PEC) Membership No. 34499
NACE (National Association of Corrosion Engineers USA) Membership No. 564518
International Association of Engineers (IAENG) Membership No. 121073
IEEE (Institute of Electrical and Electronics Engineers)
Certifications & Awards
Cathodic Protection Tester Certification (CP Level 1) By NACE USA
Abu Dhabi Company For Onshore Oil Operation (ADCO) PTW(Permit To Work)
Permit To Work Certification For Takreer Abu Dhabi Oil Refinery(PTW Takreer)
First Aid And Fire Fighting
H2s Breathing Apparatus Training
Best Job Performer Award From Emdad LLC
Technical & Other Software skills
Etap Electrical
Software
AutoCAD (Electrical) Electronic Work Bench Primavera P6
Microsoft Office Microsoft Visio Microsoft Project Maximo7.5
2. Work Experience
Etisalat Facilities Management LLC 03-Augest-2014 to Till Now
Working As Team Leader Electrical Power Plant Etisalat Facilities Management LLC
Maintenance of UPS, Inverters, MV, LV Switch gear, Batteries & Generator Set.
Generator Load and Functional Test & PM, CM.
Maintenance of Data Center Equipment In Etisalat
Maintenance of Fire Alarm system Like Hollown ,FM200.
Batteries Load Test and Installation.
Load Shifting, Connection to New Customer Load, Changeover of Rectifier & UPS.
Responding appropriately to tenant’s emergencies or urgent issues as they arise.
Coordinating and leading a team or team’s staff to cover various areas.
Responsible for site maintenance like: HVAC, Electrical Lighting work .
Supervising The Generators Maintenance of Etisalat Exchange’s and GSM Towers
Introduced changes in existing projects without disturbing the ongoing process, thus
increasing output and reducing operating costs.
Planning maintenance and Corrective Maintenance programs, as managers have to be
able to see the wider picture and priorities work within a schedule.
Raising method statements and issuing permits to work on site.
Communication at all levels, verbally and in written form, with other managers,
suppliers, vendors, etc.
Emdad LLC Abu Dhabi U.A.E 12-May- 2013 to 30-July-2014
Working As Electrical Engineer in Emdad LLC
Responsibilities:
Generally responsible for implementations and monitoring of all electrical related
works at site.
All Activities of E&I Construction/ Errection works like Cable tray routings/Ways,
Cable Laying, Panel side & Field Cable termination, Cable Splicing,
Panels/Transformer Installation, Earthing & Lighting works In CDS And RDS of
ADCO .
Carried-out electrical installations including HT/LT switch-gears, power transformers,
diesel generator, bus tie- ducts, distribution networks, HT/LT cables laying.
Carry out the monitoring& maintenance, fault rectification & Troubleshooting, testing
and commissioning for Solar panel &Transformer Rectifiers.
Supervise the installation of Solar Control Box & Transformer Rectifiers.
Termination (XLPE, PVC and Control Cables) & Jointing, Splicing.
Installation of field mounted CP (Cathodic Protection) Equipment for Oil Well Head.
Electrical Continuity Test FromOil Well Casing to Ground Bed Conductor.
Preparing the Inspection & Test Plans.
Preparing Daily Site Construction Report And Submitting To ADCO Client
Preparing the Risk Assessment.
Close interaction with higher management and Technical Staff/Production team to
execute project smoothly.
3. Major Projects:
ADCO (Abu Dhabi Company For Onshore Oil Operations)
ASAB / DABBIYA / RUMAITHA/ Shah / Sahil ADCO Oil Fields
Responsibilities:
Supervise the installation of Solar system, Battery Box, Panel Modules, Cathodic
Protection Modules, Anode Junction Box and Transformer Rectifier.
All Required Wiring & Termination for Solar Power system as per “Wiring Diagram”
and “Single Line Diagram”.
Managing Men power at site & coordinate with ADCO Client /Consultant.
Carry out the testing and commissioning of solar panel and transformer Rectifiers.
Taking Permit to work (PTW) From ADCO.
Provide Technical Support for All the Electrical Work at Site.
Helping in the Technical Drawings for Solar Panel Assembly and Transformer
Rectifier.
Ensure the QA/QC Requirements.
Takreer (Abu Dhabi Oil Refining Company)
Cathodic Protection for New Pipe Line Inside Takreer Plant.
Replacement of New Cathodic Protection MMO Anode Rods.
Replacement and upgrading of Anode Junction Box.
Placement of Sacrificial Anode at jetty.
Cathodic Protection Survey In NEB ( North East Bab ADCO Oil Field )
DABBIYA / RUMAITHA ADCO Fields
Cathodic Protection Survey For Existing Pipe Line
Soil Resistivity Measurement Survey
Potential Measurement Survey
Close Interval Survey
Pre Design Survey
Use of Recording instrument for the study of instable ( stray current ) Condition
Flow Tronix (Pvt)Ltd Pakistan March -2012 to April-2013
Designation: Site Engineer Electrical / Cathodic Protection Engineer
Major Projects:
(IFL)Walcot- III IBRAHIM Fibers Petrochemical plant shahkot Pakistan
Working on Erection Project of Ibrahim Fiber Limited as Electrical Site Engineer.
Responsibilities:
Preparation of Quotations, Technical Proposals and Commercial Proposals.
Carry out Monitoring &Maintenance, fault rectification & troubleshooting.
Supervise the Installations Jobs.
Preparations of the technical reports.
HT , LT Panels Installation , Transformer Termination
Loop Testing And Pre Commissioning of Electrical Motors
4. Progress monitoring of sub-contractors to meet target of project for timely delivery
Managing the full deployment of the Direct and Indirect manpower to achieve the
targets successfully.
Manages directly and provide engineering and technical supports to all the electrical
work groups at site.
Coordinates with Client / Consultant’s representatives for any site instructions and
inspection of works.
Planning-Staffing-Organizing as well as preparation of BOQ.
Submitting daily, weekly Reports to Client and weekly, monthly updated schedule in
MS Project.
M-Tech International L.L.C Dubai U.A.E
Responsibilities:
Management Work.
Handling Proposal and Inquiries.
Planning and Preparation of Construction Schedule of Projects on MS Project software.
Preparation of Low Voltage and Medium Voltage Switchgear Technical Submittal.
Costing of Low Voltage and Medium Voltage Switchgear.
Marketing of Cathodic Protection.
Technical testing of Cathodic Protection (galvanic &impressed current).
Interprets construction drawings and studies the contract documents and applicable
standards or specifications prior to execution of any jobs.
Submits site daily reports, inspection requests, estimates and all applicable monitoring
reports on regular basis or as required.
Final Year Project
Designof 220 KV Sub-station
3D Modeling of 220kv Substation
Detail Study & Construction of 220kv substation
Physical Wooden and Electrical Model Representation
Interests
Internet research, volunteer work, technical magazine reading, and maintenance wizard at
home in spare time.
PersonalInformation
Father’s Name: Akhtar Ali
Date of birth: 03-02-1988
Marital Status: Single
Passport No# HK1340921
Nationality # Pakistani
Languages # Urdu , English , Arabic