This document contains Danilo Pambid's resume summarizing his professional experience and qualifications. It lists his employment history working on various industrial projects in countries like the Philippines, Nigeria, Libya, Saudi Arabia, United Arab Emirates, and New Caledonia. His roles involved electrical commissioning, engineering, and quality assurance/quality control tasks for companies in oil and gas, mining, and petrochemical industries. He has over 30 years of experience commissioning medium and low voltage electrical systems and equipment.
Since last 13.7 years, I have been working electrical fields of industrial experience with GASCO UAE, Shell Pearl GTL Qatar. Aramco KSA, SEWA Sharjah, such 11KV to 400 KV substations, (GIS 33 KV to 220 KV) 5 KVA Upto120 MVA Transformer Erection installation, switch gears & Circuit breaker, as, LV, MV, HV, VCB, ACB, OCB, SF6, to 11 KV, 33 KV, 132 KV, 220 KV, installation Erection. Power & Control Cables termination, Grounding system, pre-commissioning & commissioning testing done other project
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
20 years of Extensive experience in design, Specification preparation, P&ID layout, Testing, installation and commissioning of Electrical and Instrumentation system for offshore/onshore in renewable Ocean energy and desalination applications.
Experienced in onshore and offshore operations and maintenance in addition to the data collection and performance analysis. Projects in which I have experience are listed in CV.
Since last 13.7 years, I have been working electrical fields of industrial experience with GASCO UAE, Shell Pearl GTL Qatar. Aramco KSA, SEWA Sharjah, such 11KV to 400 KV substations, (GIS 33 KV to 220 KV) 5 KVA Upto120 MVA Transformer Erection installation, switch gears & Circuit breaker, as, LV, MV, HV, VCB, ACB, OCB, SF6, to 11 KV, 33 KV, 132 KV, 220 KV, installation Erection. Power & Control Cables termination, Grounding system, pre-commissioning & commissioning testing done other project
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
20 years of Extensive experience in design, Specification preparation, P&ID layout, Testing, installation and commissioning of Electrical and Instrumentation system for offshore/onshore in renewable Ocean energy and desalination applications.
Experienced in onshore and offshore operations and maintenance in addition to the data collection and performance analysis. Projects in which I have experience are listed in CV.
I am working as a Electrical Commissioning Engineer / CompEx Inspector/QAQC Engineer for the 14 years Experience and happy to mention some of my achievements in this role
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
8+ yrs of GCC exp. as electrical engineer with proficiency in testing & commissioning, operation & maintenance @ traction rail industry, oil & gas and in power plants.
Experience in the field of Testing and Commissioning & QA/QC of power system products, look forward for an opportunity to display my skills in the field of Testing, commissioning Operation & Maintenance and Execution of projects related to power systems
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
1. 1 | 5
DANILO D. PAMBID
Home Address
#4C-403, L-3, B-4, Ph-4C Champaca Street
Cainta Greenland Executive Village,
1900 Cainta, Rizal
Philippines
Home Tel. No. (00 632) 248 0219, Mobile No. +639281540754
E-mail
pambidanilod@yahoo.com.ph pambidanilod14@gmail.com
SKYPE ACCOUNT: danilo.pambid2
Electrical Commissioning Engineer
Areas of Specialization
Erection, QA/QC, Pre-Commissioning, Energisation, Start Up &
Commissioning
EMPLOYMENT DETAILS:
COMPANY / ADRESS PERIOD POSITION DURATION
Louis International Services Sarl, New
Caledonia
85 Ave. du Gal de Gaulle, immeuble
carcopino - Quartier Latin - BP2232 - 98846
Nouméa
Aug. 03, 2011 to
Jun. 30, 2014
Electrical
Commissioning
Engineer
2 Yrs. &
10 Mos.
SPIE OIL & Gas Services Middle East LLC
P.O. Box 4899, Abu Dhabi, U.A.E.
Jan. 02, 2010 to
Oct. 31, 2010
Electrical
Engineer
10 Mos.
S. A. Kent Company Limited
P.O. Box 3462, Al-Khobar, 31952, K.S.A.
Apr. 07, 2003 to
Oct. 15, 2009
Project Electrical
Engineer
6 Yrs. &
6 Mos.
Manila Electric Company (MERALCO)
Manila, Philippines
Jun. 01, 1999 to
Jan. 30, 2003
Field Rep-
Electrical
3 Yrs. &
8 Mos.
T.S.K.J. Nigeria Limited
172A, Aba Road, Port Harcourt, Nigeria
Nov. 15, 1997 to
May 31, 1999
Field Engineer
Electrical
1 Yr. &
6 Mos.
Dong Ah Consortium
P.O. Box 771, S.P.L.A.J., Benghazi, Libya
Sep. 20, 1992 to
May 31, 1997
Electrical
Engineer
4 Yrs. &
5 Mos.
Al-Hussaini Contracting Establishment
P.O. Box 481, Al-Khobar, 31952, K.S.A.
Nov. 03, 1989 to
Jun. 05, 1992
Electrical
Supervisor
2 Yrs. &
7 Mos.
D. M. Consunji, Inc.
P.O. Box 4036, Manila
May 24, 1984 to
Sep. 30, 1986
Electrical
Foreman
2 Yrs. &
4 Mos.
PROFESSIONAL COMPETENCE:
DESCRIPTION ISSUED BY ISSUED DATE CERTIFICATE NO.
Assistant Electrical Engineer P. R. C. 17 Oct 1989 0020295
Registered Electrical Engineer P. R. C. 06 Jun 1997 0010112
EDUCATIONAL ATTAINTMENT
EDUCATION NAME YEAR DEGREE REMARKS
College /
University
Mariano Marcos State
University
1983 -
1988
B. S. Electrical
Engineering
Graduated
Personal Data Sheet Danilo Pambid
2. 2 | 5
EMPLOYMENT HIGHLIGHTS
Company: Louis International Services Sarl, New Caledonia
Project: Koniambo Nickel Mining Project
Client: Koniambo Nickel SAS
Location: Vavouto Site, New Caledonia
Owner: Koniambo Nickel SAS
Position: Electrical Commissioning Engineer (Badge No. 14193)
Dates: Aug. 3, 2011 to Jun. 30, 2014
Role: • Manpower supply thru Koniambo Nickel SAS (Hatch & Tecnip -joint
venture project)
• Undertake plant wide Pre-Ops Testing Commissioning activities
(Hands-on) primarily on Power Distribution And Substation equipments
such as: power transformers, switchgear, UPS and Battery Chargers,
MCC’s, down to field motors, small power & plant lighting, plant earthing.
Testing of circuit breakers, CT/VT's, control schemes and functional
check, all test carried out in accordance with project commissioning test
sheet.
• Undertake the interlock / intertrip test from upstream to downstream
substation. Energising 63kV,33kV, 6.6kV Gear downstream to low
voltage system particularly SIEMENS, SCHNEIDER, ABB, COMECA
brand. Carry out functional; I/O checks, process run bet. field control to
MCC to HMI (DCS).
• Energise and commission substation from upstream to downstream
substation. Energising motors and performs motor runs. Generate
marked up drawings.
• Good troubleshooting ability / knowledge on electrical equipment/
system failures. Medium Voltage and low Voltage electrical equipment,
protection system.
• Relevant skills include Overhead Transmission Lines.
• Aid/ fill pre-ops commissioning check sheets and update progress
through WinPCS, attends to walk down and create punch list.
• Work / assist operation team for mechanical / electrical / instrumentation
works, day/night shift basis at Power Station.
• Ensure that Contractor / subcontractor are conducting Electrical work
safely and in accordance with all Permits to Work and safety practices,
including Lock out Tag Out.
• Follow all Commissioning Safety Rules, understand the Commissioning
Administration Procedures for the project, Execute work in a safe and
efficient manner at all times.
Company: SPIE OIL & Gas Services Middle East LLC
Project: Emal Aluminium Project
Client: SNC Lavallin & Worley Parsons (SLWP)
Location: Al-Taweela, Abu Dhabi, U.A.E.
Owner: Emal (Emal Aluminium)
Position: Electrical Engineer
Dates: Jan. 02, 2010 to Oct. 31, 2010
Role: • Manpower supply thru SNC Lavaliin and Worley Parsons (joint venture
project) at Emal – Emirates Aluminium.
• Electrical Testing Specialist (Direct Hands-on): Commissioning a wide
variety of Plant Electrical Equipments. Continuity and megger test of
cables, point to point and loop check (E & I). Hands-on participation in
critical repairs and plant breakdowns / shutdowns. Experience and
knowledge on High Voltage and low Voltage electrical equipment,
protection system.
Personal Data Sheet Danilo Pambid
3. 3 | 5
• Commissioning of substation equipments such as simulation test all the
alarms, and trips indication i.e. switchgear and MCC. Functional test for
ATS / bus tie operation. Check all feedback to the annunciator panel.
• Energizes substation equipments; power transformers, low voltage
switchgears, MCC, plant lighting and small power. Conduct
measurements i.e. voltages, current &phase rotation.
• Coordinates and work together with vendors checking the I/O’s in the
PLC, simulation test from the device instruments to PLC.
• Conduct the motor functional test (LCS-MCC-PLC) and motor solo run of
all field motors rated up to 6.6 kV.
• Prepares As-Built Drawings as per actual installation
• Attends to walk down and punch listing activity.
Company: Saudi Arabian Kentz Company Limited
Project: Saudi Kayan Polycarbonate Project
Client: Saudi Kayan Petrochemical Company (PMT)
Location: Jubail Industrial City, K. S. A.
Owner: Saudi Kayan Petrochemical Company (SABIC)
Position: Electrical Engineer (Badge No. 7726238)
Employer: Saudi Kayan Petrochemical Company (POLYCARBONATE PROJECT)
Dates: Jul. 08, 2009 – Oct. 15, 2009
Role: With Saudi Kayan Polycarbonate Project as Electrical Engineer (PMT)
• Review and Approved Job Quality Plan, ITP, Check List and other
related Procedures submitted by Contractors. Ensuring that all incoming
materials are inspected and conforming to specifications. Ensure all
material submittal in compliance with project specifications. Ensure that
all works are carried out as per approved method statements and
drawings. Attending request of inspection of all ongoing activities by
contractors regarding Electrical Installation check of equipments.
• Conduct testing & commissioning of all electrical installations & to
ensure test reports are verified to meet the contract specifications.
• Witness commissioning & testing of substation equipments like MV/LV
Switchgear, power transformers, LV panel boards & distribution boards,
motor control centres, capacitor banks, ATS, UPS system, relay panels,
annunciator panels. Ensure that all the protection relays are totally
functioned. Simulation tests all the indication like trouble, alarms and
trips. Witness commissioning of MV/LV cables. All above test criteria
are carried out in accordance with Sabic Engineering Standards (SES).
• Review and sign site acceptance test (SATs) carried by all
commissioning contractor.
• Carry out daily Q Round at site, walk down and punch listing works.
Company: Saudi Arabian Kentz Company Limited
Project: Project 611 Rabigh – UOU Foster Wheeler (Saudi ARAMCO)
Client/Owner PETRO Rabigh PMT
Location: Rabigh, K. S. A.
Owner: PETRO Rabigh
Position: QA/QC (E&I Engineer) ARAMCO Badge No. 8751245 (PETRO Rabigh Badge
No. C-177929)
Employer: Foster Wheeler Arabian Limited (EPC)
Dates: 0ct. 28, 2006 – May 27, 2009
Role: With UOU Foster Wheeler Arabia Ltd. (Saudi ARAMCO) as QA/QC
Engineer (EPC)
• Review and Approved Job Quality Plan, ITP, Check List and other
related Procedures submitted by Sub Contractors. Ensuring that all
incoming materials are inspected and conforming to specifications.
Ensure all material submittal in compliance with project specifications.
Personal Data Sheet Danilo Pambid
4. 4 | 5
Ensure that all works are carried out as per approved method
statements and drawings. Attending request of inspection of all ongoing
activities by contractors regarding Electrical Installation check of
equipments.
• Conduct testing & commissioning of all electrical installations & to
ensure test reports are verified to meet the contract specifications.
• Witness commissioning & testing of substation equipments like Gas
Insulated Switchgear (34.5kV down to 0.48kV), power transformers
(110kV down to 0.48kV), capacitor banks (13.8 & 4.16kV), LV panel
boards & distribution boards, motor control centres, ATS, UPS system,
relay panels, annunciator panels. Ensure that all the protection relays
are totally functioned. Simulation tests all the indication like trouble,
alarms and trips. Witnesses commissioning of MV/LV cables. All above
test criteria are carried out in accordance with Saudi ARAMCO
Engineering Standards (SAES).
• Review and sign site acceptance test (SATs) carried by all
commissioning contractor.
• Participate and witness the Low Voltage Injection Test, inter-trip or
interlock test between upstream to downstream substation and
Energization of Substation.
• Witness motor solo runs and motor functional test activity.
• Conduct illumination test for plant lighting.
• Notify client representative for walk down and punch listing activity.
Company: Saudi Arabian Kentz Company Limited
Project: Project 603 (SAFCO IV) Saudi Arabian Basic Industrial Company
Client: UHDE Arabia Limited
Location: Jubail Industrial City, K. S. A.
Owner: Saudi Arabian Fertilizer Company IV (SAFCO IV)
Position: Project Electrical Engineer
Dates: Apr. 07, 2005 – Aug. 31, 2006
Role: With Saudi Arabian Fertilizer Company IV (SAFCO IV) as QA/QC
Engineer (Contractor side).
• Attending request of inspection of all ongoing activities by construction
department regarding Electrical Installation check of equipments.
• Notify client representative and witness commissioning & testing of
substation equipments like MV/LV Switchgear, power transformers, LV
panel boards & distribution boards, motor control centres, capacitor
banks, ATS, UPS system, relay panels, annunciator panels. Ensure that
all the protection relays are totally functioned. Simulation tests all the
indication like trouble, alarms and trips. Witness commissioning of
MV/LV cables. All above test criteria are carried out in accordance with
Sabic Engineering Standards (SES).
• Notify client representative for motor functional test activity and motor
solo runs.
• Conduct MC Check of all fields of electrical i.e. motors, small power
outlet, plant lightings and plant earthing. Signed off and forward to client
for acceptance.
• Invite client representative for walk down and punch listing activity.
Company: Manila Electric Company
Location: Manila, Philippines
Position: Field Rep-Electrical
Dates: Jun. 01, 1999 – Jan. 30, 2003
Role: • Field Monitoring responsibilities; supervise / lead trouble shooting repair
of power breakdowns. Field survey on Overhead Electrical lines, report
any unusual possible cause of failure.
Personal Data Sheet Danilo Pambid
5. 5 | 5
• Supervise installation of new additional power transformers.
Company: T.S.K.J. Nigeria Limited (Tecnip Snamprogetty Kellogg Japan)
Project: Liquefied Natural Gas Project
Client/Owner L. N. G.
Location: Bonny Island, Nigeria
Position: Field Electrical Engineer
Dates: Nov. 15, 1997 - May 31, 1999
Role: • Directs and supervise the execution of electrical power generation
equipment process/utility and HV/LV distribution network. Work scope
includes general off sites, common facility including LNG train areas.
Plant lighting and small power installation, heat tracing, cathodic
protection, plant earthing. Ensure that all works are carried out as per
approved method statements and drawings.
• Review modification documents and specifications and participate in the
commissioning activities. Notify LNG representative and witness
commissioning & testing of substation equipments like MV/LV
Switchgear, power transformers, LV panel boards & distribution boards,
motor control centres, capacitor banks, ATS, UPS system, relay panels,
annunciator panels. Ensure that all the protection relays are totally
functioned. Simulation tests all the indication like trouble, alarms and
trips. Witness commissioning of MV/LV cables. All above test
procedures are carried out in accordance with Company Electrical
Procedures and Shell Standards.
• Conduct the Low Voltage Injection Test and inter-trip or interlock test
between upstream substations to downstream substation.
• Conduct the motor functional test (LCS-MCC-PLC) and motor solo run of
all field motors rated up to 6.6 kV.
• Energizes substation equipments; power transformers, low voltage
switchgears, MCC, power distribution panels, plant lighting and small
power. Conduct measurements i.e. voltages, current &phase rotation.
• Hands on troubleshooting ability / knowledge on electrical equipment/
system failures. experience and knowledge on High Voltage and low
Voltage electrical equipment, protection system.
Company: Dong Ah Consortium
Project: Libya (Great Man-Made River Project)
Client/Owner Brown and Root
Location: P.O. Box 771, S.P.L.A.J., Benghazi, Libya
Position: Electrical Engineer
Dates: Sep. 20, 1992 - May 31, 1997
Role: • Supervise preventive maintenance and routine maintenance activity on
a wide variety of Bregga plant electrical equipments follow the PM
Schedule (daily, weekly, monthly, quarterly & yearly). Coordinate with
other field engineers for the PM schedules to avoid delay of operation.
• Obtain work permit and comply safety requirements for any isolation
works before commencing the jobs.
• Reporting to Chief Engineer for any abnormal noise, smell, heat and
vibration found during the routine inspection.
• Carry out trouble shooting repair of any equipment breakdown / failure
during the day by day operation. Find out possible cause of faults,
trouble, alarm & trips. Ensure all equipments are smooth and good
running condition to prevent delay of operation.
• Responsible includes Calibration of Instruments.
• Job scope covers inspection Cathodic Protection along the conveyance
pipeline. Notify owner’s representative to joined/witness any inspection
activity. Ensure zinc ribbon anode laying, test lead connection / test
Personal Data Sheet Danilo Pambid
6. 6 | 5
posts are installed according to correct drawing details and
specification.
Company: Al-Hussaini Contracting Establishment
Location: P. O. 481, Al-Khobar, 31952, K. S. A.
Owner: Saudi ARAMCO
Position: Electrical Supervisor
Dates: Nov. 03, 1989 - Jun. 05, 1992
Role: • Manpower supply thru Saudi ARAMCO CMD, Ras Tanura
• Supervise preventive maintenance and routine maintenance activity on
a wide variety of electrical equipment follow the PM Schedule (daily,
weekly, monthly, quarterly & yearly).
• Obtain work permit and comply safety requirements prior to start any
works.
• Response any trouble activation or shutdown failure occurred within the
day by day basis.
• Reporting to ARAMCO superior for any abnormal noise, smell, heat and
vibration found during the routine inspection.
• Responsible covers housing facility and recreational facility of the plant.
Ensure efficient operation and maintenance of all the fire alarm system,
power & lighting and air conditioning systems. (HVAC).
Company: D.M. Consunji. Inc.
Location: Manila, Philippines
Position: Electrical Foreman
Dates: May 24, 1984 - Sep. 30, 1986
Role: • Scope work for small power and lighting. Panel installation, conduit
installation, cabling and termination works.
• Prepares planning, scheduling, cost estimation, and expedite material
requirements.
PERSONAL SKILLS AND COMPETENCES
• 19 years as overseas employee plus seven (7) years local in the field of Electrical,
particularly on inspection and commissioning works.
• Energise and commission substation from upstream to downstream substation.
• Familiar with final assembly on commissioning data packages for plant acceptance.
• Exposures: Oil and Gas Projects, Petrochemical Plants (SABIC & Saudi ARAMCO
Projects), Industrial and Manufacturing Plants, & Mining Projects. Scope of capacity: 13.8KV
for Above Ground System and 110KV for Under Ground System.
Personal Data Sheet Danilo Pambid
7. 6 | 5
posts are installed according to correct drawing details and
specification.
Company: Al-Hussaini Contracting Establishment
Location: P. O. 481, Al-Khobar, 31952, K. S. A.
Owner: Saudi ARAMCO
Position: Electrical Supervisor
Dates: Nov. 03, 1989 - Jun. 05, 1992
Role: • Manpower supply thru Saudi ARAMCO CMD, Ras Tanura
• Supervise preventive maintenance and routine maintenance activity on
a wide variety of electrical equipment follow the PM Schedule (daily,
weekly, monthly, quarterly & yearly).
• Obtain work permit and comply safety requirements prior to start any
works.
• Response any trouble activation or shutdown failure occurred within the
day by day basis.
• Reporting to ARAMCO superior for any abnormal noise, smell, heat and
vibration found during the routine inspection.
• Responsible covers housing facility and recreational facility of the plant.
Ensure efficient operation and maintenance of all the fire alarm system,
power & lighting and air conditioning systems. (HVAC).
Company: D.M. Consunji. Inc.
Location: Manila, Philippines
Position: Electrical Foreman
Dates: May 24, 1984 - Sep. 30, 1986
Role: • Scope work for small power and lighting. Panel installation, conduit
installation, cabling and termination works.
• Prepares planning, scheduling, cost estimation, and expedite material
requirements.
PERSONAL SKILLS AND COMPETENCES
• 19 years as overseas employee plus seven (7) years local in the field of Electrical,
particularly on inspection and commissioning works.
• Energise and commission substation from upstream to downstream substation.
• Familiar with final assembly on commissioning data packages for plant acceptance.
• Exposures: Oil and Gas Projects, Petrochemical Plants (SABIC & Saudi ARAMCO
Projects), Industrial and Manufacturing Plants, & Mining Projects. Scope of capacity: 13.8KV
for Above Ground System and 110KV for Under Ground System.
Personal Data Sheet Danilo Pambid