Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
TTS - Adar PrTTS - Adar Project The tendering time schedule for Adar ... 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16
TTS-Adar ProTTS-Adar Project The tendering time schedule for Adar Prod... 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16
TTS-Adar ProjecTTS-Adar Project.1 Milestone 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16
TTS-Adar ProjectTTS-Adar Project.1.1 Contract Effective Date 427 7-9-14 7-11-15 7-9-14 7-11-15 7-9-14 7-11-15
TTS-Adar ProjecTTS-Adar Project.1.1.1 Instructions To Proceed 427 7-9-14 7-11-15 7-9-14 7-11-15 7-9-14 7-11-15
A1000 Contract effective date 0 7-9-14* 7-9-14 7-9-14
A10001 The complete date of project for provisional acceptance session 0 7-11-15* 7-11-15 7-11-15
TTS-Adar ProjectTTS-Adar Project.1.2 Mechanical Completion Date 93 2-8-15 3-11-15 2-8-15 3-11-15 31-8-15 7-11-15
TTS-Adar ProjecTTS-Adar Project.1.2.1 Civil engineering 0 2-8-15 2-8-15 2-8-15 2-8-15 31-8-15 31-8-15
A1010 The Completion Date of Civil engineering session 0 2-8-15* 2-8-15 31-8-15
TTS-Adar ProjecTTS-Adar Project.1.2.2 Mechanical 0 12-10-15 12-10-15 12-10-15 12-10-15 7-11-15 7-11-15
A1020 The Completion Date of Mechanical session 0 12-10-15* 12-10-15 7-11-15
TTS-Adar ProjecTTS-Adar Project.1.2.3 Electrical 0 3-11-15 3-11-15 3-11-15 3-11-15 7-11-15 7-11-15
A1030 The Completion Date of Electrical session 0 3-11-15* 3-11-15 7-11-15
TTS-Adar ProjecTTS-Adar Project.1.2.4 Instrument 0 3-11-15 3-11-15 3-11-15 3-11-15 7-11-15 7-11-15
A1040 The Completion Date of Instrumentl session 0 3-11-15* 3-11-15 7-11-15
TTS-Adar ProjecTTS-Adar Project.1.2.5 Piping & Pipeline 0 30-10-15 30-10-15 30-10-15 30-10-15 7-11-15 7-11-15
A1050 The Completion Date of Piping & Pipeline session 0 30-10-15* 30-10-15 7-11-15
TTS-Adar ProjectTTS-Adar Project.1.3 Provisional Acceptance Date 9 27-10-15 5-11-15 27-10-15 5-11-15 5-11-15 5-11-15
TTS-Adar ProjecTTS-Adar Project.1.3.1 Mechanical 0 27-10-15 27-10-15 27-10-15 27-10-15 5-11-15 5-11-15
A1060 The Provisinal Acceptance Date of Mechanical session 0 27-10-15* 27-10-15 5-11-15
TTS-Adar ProjecTTS-Adar Project.1.3.2 Electrical 0 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15
A1070 The Provisinal Acceptance Date of Electrical session 0 5-11-15* 5-11-15 5-11-15
TTS-Adar ProjecTTS-Adar Project.1.3.3 Instrument 0 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15
A1080 The Provisinal Acceptance Date of Instrument session 0 5-11-15* 5-11-15 5-11-15
TTS-Adar ProjectTTS-Adar Project.1.4 Final Aceeptance Date 9 26-10-16 4-11-16 26-10-16 4-11-16 4-11-16 4-11-16
TTS-Adar ProjecTTS-Adar Project.1.4.1 Mechanical 0 26-10-16 26-10-16 26-10-16 26-10-16 4-11-16 4-11-16
A1090 The Final Aceeptance Date of Mechanical session 0 26-10-16* 26-10-16 4-11-16
TTS-Adar ProjecTTS-Adar Project.1.4.2 Electrical 0 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16
A1100 The Final Aceeptance Date of Electrical session 0 4-11-16* 4-11-16 4-11-16
TTS-Adar ProjecTTS-Adar Project.1.4.3 Instrument 0 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16
A8470 The Final Aceeptance Date of Instrument session 0 4-11-16* 4-11-16 4-11-16
TTS-Adar ProjecTTS-Adar Project.2 Engineering 92 7-9-14 7-12-14 7-9-14 7-12-14 7-9-14 7-12-14
A16030 The milestone of Process session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14
A16040 The milestone of Mechanical session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14
A16050 The milestone of Electrical session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14
A16060 The milestone of Instrument session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14
A16070 The milestone of Piping & Pipeline session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
4-11
4-11
4-11
7-11-15, TTS-Adar Proj
7-11-15, TTS-Adar Proj
Contract effective date
The complete date of p
3-11-15, TTS-Adar Proj
2-8-15, TTS-Adar Project.1.2
The Completion Date of Civi
12-10-15, TTS-Adar Proj
The Completion Date of
3-11-15, TTS-Adar Proj
The Completion Date o
3-11-15, TTS-Adar Proj
The Completion Date o
30-10-15, TTS-Adar Pro
The Completion Date of
5-11-15, TTS-Adar Proj
27-10-15, TTS-Adar Pro
The Provisinal Acceptan
5-11-15, TTS-Adar Proj
The Provisinal Acceptan
5-11-15, TTS-Adar Proj
The Provisinal Acceptan
4-11
26-1
The
4-11
The
4-11
The
7-12-14, TTS-Adar Project.2 Engineering
The milestone of Process session and HA
The milestone of Mechanical session and
The milestone of Electrical session and H
The milestone of Instrument session and
The milestone of Piping & Pipeline sessio
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 1 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A16080 The milestone of civil engineering session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14
TTS-Adar ProjectTTS-Adar Project.2.1 Process 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.1 Induced Gas Flotation (IGF) 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A1110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A1120 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A1130 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A1140 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A1150 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A1160 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A1180 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A1170 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.2 Centrifugal Transfer Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A1190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A1200 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14
A1210 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14
A1220 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A1230 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A1240 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14
A1260 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A1250 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.3 Filter feed pump 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A1270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A1280 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A1290 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A1300 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A1310 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A1320 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A1340 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A1330 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.4 Nutshell Filter Vessel 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A1350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A1360 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14
A1370 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14
A1380 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A1390 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A1400 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14
A1420 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A1410 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.5 Media Scrub Pump 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
The milestone of civil engineering sessio
17-11-14, TTS-Adar Project.2.1 Process
23-10-14, TTS-Adar Project.2.1.1 Induced
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.1.2 Centrifug
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.3 Filter fee
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.1.4 Nutshell
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.5 Media Sc
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 2 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A1430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A1440 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A1450 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A1460 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A1470 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A1480 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A1500 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A1490 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.6 Booster Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A1510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A1520 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14
A1530 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14
A1540 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A1550 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A1560 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14
A1580 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A1570 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.7 Injection Pumps 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A1590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A1600 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A1610 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A1620 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A1630 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A1640 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A1660 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A1650 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.8 Produced Water Skim Tank with internals 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A1670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A1680 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14
A1690 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14
A1700 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A1710 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A1720 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14
A1740 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A1730 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.9 Solids Hydro-transporting Units and ancillaries for the ski... 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A1750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A1760 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A1770 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
J A J A J J A J A J A J
14 2015 2016 17
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.1.6 Booster
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.7 Injection
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.1.8 Produce
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.9 Solids Hy
Client input
Data sheet design
Detailed drawings Rev.A
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 3 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A1780 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A1790 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A1800 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A1820 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A1810 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.10 Break Tank 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A1830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A1840 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14
A1850 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14
A1860 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A1870 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A1880 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14
A1900 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A1890 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.11 Solids Hydro-transporting Units for Break Tank 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A1910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A1920 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A1930 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A1940 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A1950 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A1960 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A1980 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A1970 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.12 Buffer Tank. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14
A1990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14
A2000 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14
A2010 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14
A2020 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14
A2030 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14
A2040 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
A2060 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14
A2050 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.13 Solids Hydro-transporting Units for Buffer Tank 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14
A2070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14
A2080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14
A2090 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14
A2100 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14
A2110 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14
A2120 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.1.10 Break T
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.11 Solids H
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
2-11-14, TTS-Adar Project.2.1.12 Buffer Ta
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
2-11-14, TTS-Adar Project.2.1.13 Solids H
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 4 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A2140 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14
A2130 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.14 Recovered Oil Tank. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14
A2150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14
A2160 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14
A2170 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14
A2180 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14
A2190 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14
A2200 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
A2220 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14
A2210 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.15 Recovered Oil Pumps. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14
A2230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14
A2240 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14
A2250 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14
A2260 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14
A2270 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14
A2280 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
A2300 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14
A2290 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.16 Backwash heat exchanger for the Nutshell Filters. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A2310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A2320 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14
A2330 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14
A2340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A2350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A2360 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
A2380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A2370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.17 Backwash Clarifiers 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A2390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A2400 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14
A2410 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14
A2420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A2430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A2440 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
A2460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A2450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.18 Centrifugal Backwash Supply Pumps for the Nutshell Filt... 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
2-11-14, TTS-Adar Project.2.1.14 Recover
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
2-11-14, TTS-Adar Project.2.1.15 Recover
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.1.16 Backwa
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.1.17 Backwa
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
23-10-14, TTS-Adar Project.2.1.18 Centrifu
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 5 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A2470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A2480 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A2490 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A2500 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A2510 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A2520 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A2540 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A2530 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.19 Water Pumps associated with the backwash clarifiers. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A2550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A2560 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A2570 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A2580 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A2590 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A2600 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A2620 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A2610 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.20 Drain Pumps 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A2630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A2640 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A2650 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A2660 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A2670 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A2680 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A2700 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A2690 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.21 Sludge Pumps. 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A2710 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A2720 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14
A2730 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14
A2740 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A2750 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A2760 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
A2780 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A2770 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.22 Disposal Water Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A2790 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A2800 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14
A2810 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14
J A J A J J A J A J A J
14 2015 2016 17
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.19 Water P
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.20 Drain P
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
12-11-14, TTS-Adar Project.2.1.21 Sludge
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.1.22 Dispos
Client input
Data sheet design
Detailed drawings Rev.A
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 6 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A2820 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A2830 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A2840 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
A2860 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A2850 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.23 Motive Water Pumps. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A2870 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A2880 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A2890 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A2900 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A2910 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A2920 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A2940 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A2930 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.24 Chemical Injection Skids. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A2950 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A2960 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A2970 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A2980 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A2990 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A3000 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A3020 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A3010 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.25 Instrument Air System 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A3030 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A3040 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A3050 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A3060 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A3070 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A3080 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A3100 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A3090 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.26 Nitrogen Generator package 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3120 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14
A3130 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14
A3140 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3150 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3160 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
23-10-14, TTS-Adar Project.2.1.23 Motive W
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.24 Chemic
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.1.25 Instrum
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
12-11-14, TTS-Adar Project.2.1.26 Nitroge
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 7 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A3180 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3170 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.1.27 Firefighting system 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14
A3190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14
A3200 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14
A3210 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14
A3220 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14
A3230 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14
A3240 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
A3260 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14
A3250 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14
TTS-Adar ProjectTTS-Adar Project.2.2 Mechanical 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.1 Induced Gas Flotation (IGF) 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3280 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A3290 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3300 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3310 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3320 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3340 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3330 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.2 Centrifugal Transfer Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3360 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A3370 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3380 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3390 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3400 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3420 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3410 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.3 Filter feed pump 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3440 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A3450 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3460 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3470 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3480 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3500 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3490 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
17-11-14, TTS-Adar Project.2.1.27 Firefig
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2 Mechanic
12-11-14, TTS-Adar Project.2.2.1 Induced
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2.2 Centrifu
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2.3 Filter fe
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 8 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
TTS-Adar ProjecTTS-Adar Project.2.2.4 Nutshell Filter Vessel 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3520 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A3530 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3540 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3550 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3560 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3580 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3570 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.5 Media Scrub Pump 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3600 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A3610 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3620 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3630 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3640 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3660 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3650 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.6 Booster Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3680 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A3690 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3700 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3710 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3720 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3740 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3730 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.7 Injection Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3760 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A3770 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3780 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3790 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3800 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3820 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3810 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.8 Produced Water Skim Tank with internals 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3840 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
J A J A J J A J A J A J
14 2015 2016 17
12-11-14, TTS-Adar Project.2.2.4 Nutshel
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2.5 Media S
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2.6 Booster
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2.7 Injection
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2.8 Produce
Client input
Data sheet design
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 9 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A3850 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3860 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3870 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3880 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3900 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3890 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.9 Solids Hydro-transporting Units and ancillaries for the ski... 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A3920 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A3930 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A3940 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A3950 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A3960 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A3980 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A3970 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.10 Break Tank 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A3990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A4000 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14
A4010 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14
A4020 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A4030 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A4040 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14
A4060 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A4050 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.11 Solids Hydro-transporting Units for Break Tank 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4090 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4100 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4110 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4120 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4140 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4130 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.12 Buffer Tank. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4160 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4170 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4180 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4190 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
J A J A J J A J A J A J
14 2015 2016 17
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2.9 Solids H
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.2.10 Break
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.11 Solids H
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.12 Buffer T
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 10 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A4200 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4220 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4210 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.13 Solids Hydro-transporting Units for Buffer Tank 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4240 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4250 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4260 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4270 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4280 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4300 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4290 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.14 Recovered Oil Tank. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4320 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4330 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4360 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.15 Recovered Oil Pumps. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4400 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4410 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4440 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.16 Backwash heat exchanger for the Nutshell Filters. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4480 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4490 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4500 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4510 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4520 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4540 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4530 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.13 Solids H
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.14 Recover
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.15 Recover
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.16 Backwa
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 11 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
TTS-Adar ProjecTTS-Adar Project.2.2.17 Backwash Clarifiers 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4560 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4570 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4580 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4590 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4600 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4620 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4610 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.18 Centrifugal Backwash Supply Pumps for the Nutshell Filt... 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4640 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4650 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4660 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4670 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4680 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4700 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4690 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.19 Water Pumps associated with the backwash clarifiers. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4710 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4720 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4730 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4740 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4750 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4760 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4780 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4770 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.20 Drain Pumps 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A4790 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A4800 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14
A4810 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14
A4820 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A4830 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A4840 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14
A4860 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A4850 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.21 Sludge Pumps. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A4870 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A4880 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14
J A J A J J A J A J A J
14 2015 2016 17
7-11-14, TTS-Adar Project.2.2.17 Backwa
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.18 Centrifu
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.19 Water P
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.2.20 Drain Pu
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
28-10-14, TTS-Adar Project.2.2.21 Sludge
Client input
Data sheet design
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 12 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A4890 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14
A4900 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A4910 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A4920 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14
A4940 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A4930 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.22 Disposal Water Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A4950 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A4960 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14
A4970 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14
A4980 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A4990 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A5000 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14
A5020 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A5010 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.23 Motive Water Pumps. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A5030 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A5040 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14
A5050 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14
A5060 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A5070 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A5080 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14
A5100 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A5090 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.24 Chemical Injection Skids. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A5110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A5120 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14
A5130 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14
A5140 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A5150 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A5160 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14
A5180 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A5170 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.25 Instrument Air System 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A5190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A5200 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14
A5210 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14
A5220 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A5230 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
J A J A J J A J A J A J
14 2015 2016 17
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.2.22 Disposa
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.2.23 Motive
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.2.24 Chemic
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.2.25 Instrum
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 13 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A5240 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14
A5260 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A5250 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.26 Nitrogen Generator package 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A5270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A5280 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14
A5290 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14
A5300 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A5310 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A5320 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14
A5340 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A5330 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.2.27 Firefighting system 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14
A5350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14
A5360 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14
A5370 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14
A5380 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14
A5390 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14
A5400 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14
A5420 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14
A5410 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
TTS-Adar ProjectTTS-Adar Project.2.3 Electrical 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.1 33kV cables 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A5430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A5440 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A5450 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A5460 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A5470 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A5480 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A5500 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A5490 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.2 33kV/6.9kV step-down transformer 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A5510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A5520 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A5530 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A5540 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A5550 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A5560 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A5580 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.2.26 Nitroge
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
28-10-14, TTS-Adar Project.2.2.27 Firefigh
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
17-11-14, TTS-Adar Project.2.3 Electrical
23-10-14, TTS-Adar Project.2.3.1 33kV cab
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.3.2 33kV/6.9
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 14 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A5570 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.3 6.6kV/0.42kV step-down transformer 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A5590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A5600 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A5610 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A5620 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A5630 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A5640 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A5660 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A5650 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.4 6.6kV switchgear and EICS 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14
A5670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14
A5680 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14
A5690 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14
A5700 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14
A5710 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14
A5720 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14
A5740 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14
A5730 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.5 400V motor control center and EICS and distribution boar... 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14
A5750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14
A5760 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14
A5770 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14
A5780 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14
A5790 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14
A5800 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14
A5820 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14
A5810 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.6 Motor starters for all pumps. 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14
A5830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14
A5840 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14
A5850 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14
A5860 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14
A5870 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14
A5880 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14
A5900 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14
A5890 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.7 EICS panel with power systems 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14
A5910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14
J A J A J J A J A J A J
14 2015 2016 17
Detailed Specifications, Reports and Proced
23-10-14, TTS-Adar Project.2.3.3 6.6kV/0.4
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
30-10-14, TTS-Adar Project.2.3.4 6.6kV sw
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
30-10-14, TTS-Adar Project.2.3.5 400V mo
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
30-10-14, TTS-Adar Project.2.3.6 Motor st
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
2-11-14, TTS-Adar Project.2.3.7 EICS pan
Client input
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 15 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A5920 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14
A5930 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14
A5940 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14
A5950 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14
A5960 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
A5980 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14
A5970 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.8 Variable Frequency Driver(VFD) 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14
A5990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14
A6000 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14
A6010 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14
A6020 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14
A6030 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14
A6040 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
A6060 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14
A6050 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.9 Power and control cables. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14
A6070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14
A6080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14
A6090 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14
A6100 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14
A6110 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14
A6120 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
A6140 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14
A6130 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.10 Neutral earthing resistors. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A6150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A6160 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14
A6170 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14
A6180 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A6190 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A6200 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
A6220 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A6210 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.11 Cabling, glanding and associated materials 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A6230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A6240 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14
A6250 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14
A6260 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
J A J A J J A J A J A J
14 2015 2016 17
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
2-11-14, TTS-Adar Project.2.3.8 Variable F
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
2-11-14, TTS-Adar Project.2.3.9 Power an
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.3.10 Neutral
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.3.11 Cabling,
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 16 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A6270 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A6280 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
A6300 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A6290 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.12 Small power and lighting system 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A6310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A6320 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14
A6330 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14
A6340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A6350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A6360 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
A6380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A6370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.13 Uninterrupted Power Supply (UPS) 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14
A6390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14
A6400 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14
A6410 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14
A6420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14
A6430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14
A6440 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14
A6460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14
A6450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.14 Electrical Heat Tracing System. 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A6470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A6480 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14
A6490 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14
A6500 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A6510 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A6520 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
A6540 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
A6530 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.15 Earthing and lightning protection system 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14
A6550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14
A6560 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14
A6570 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14
A6580 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14
A6590 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14
A6600 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
A6620 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.3.12 Small po
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
7-11-14, TTS-Adar Project.2.3.13 Uninterr
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.3.14 Electri
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
12-11-14, TTS-Adar Project.2.3.15 Earthin
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 17 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A6610 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.16 Cathodic protection system up to the plant battery limit i... 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14
A6630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14
A6640 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14
A6650 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14
A6660 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14
A6670 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14
A6680 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
A6700 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14
A6690 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.3.17 Electrical bulks/ materials 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14
A6710 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14
A6720 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14
A6730 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14
A6740 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14
A6750 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14
A6760 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
A6780 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14
A6770 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14
TTS-Adar ProjectTTS-Adar Project.2.4 Instrument 77 7-9-14 22-11-14 7-9-14 22-11-14 22-9-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.4.1 Control equipments and Field Instrumentation 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14
A6790 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14
A6800 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14
A6810 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14
A6820 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14
A6830 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14
A6840 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14
A6860 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14
A6850 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.4.2 All associated instrumentation and controls system mater... 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14
A6870 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14
A6880 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14
A6890 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14
A6900 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14
A6910 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14
A6920 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14
A6940 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14
A6930 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.4.3 Cabling, glanding, tubing and associated required materials. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14
J A J A J J A J A J A J
14 2015 2016 17
Detailed Specifications, Reports and Proce
17-11-14, TTS-Adar Project.2.3.16 Cathod
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
17-11-14, TTS-Adar Project.2.3.17 Electri
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
22-11-14, TTS-Adar Project.2.4 Instrume
23-10-14, TTS-Adar Project.2.4.1 Control e
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proced
30-10-14, TTS-Adar Project.2.4.2 All assoc
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
2-11-14, TTS-Adar Project.2.4.3 Cabling, g
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 18 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
Activity ID Activity Name Original
Duration
Start Finish Early Start Early Finish Late Start Late Finish
A6950 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14
A6960 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14
A6970 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14
A6980 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14
A6990 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14
A7000 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14
A7020 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14
A7010 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.4.4 Field Instrument junction boxes 61 7-9-14 6-11-14 7-9-14 6-11-14 8-10-14 7-12-14
A7030 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 8-10-14 17-10-14
A7040 Data sheet design 7 1-10-14 7-10-14 1-10-14 7-10-14 1-11-14 7-11-14
A7050 Detailed drawings Rev.A 10 8-10-14 17-10-14 8-10-14 17-10-14 8-11-14 17-11-14
A7060 Detailed Specifications, Reports and Procedures Rev.A 10 18-10-14 27-10-14 18-10-14 27-10-14 18-11-14 27-11-14
A7070 Bill of Materials Rev.A 7 18-10-14 24-10-14 18-10-14 24-10-14 24-11-14 30-11-14
A7080 Detailed drawings Rev.B 10 18-10-14 27-10-14 18-10-14 27-10-14 28-11-14 7-12-14
A7100 Bill of Materials Rev.B 7 25-10-14 31-10-14 25-10-14 31-10-14 1-12-14 7-12-14
A7090 Detailed Specifications, Reports and Procedures Rev.B 10 28-10-14 6-11-14 28-10-14 6-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.4.5 New distributed Control System (DCS). 68 7-9-14 13-11-14 7-9-14 13-11-14 1-10-14 7-12-14
A7110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 1-10-14 10-10-14
A7120 Data sheet design 7 8-10-14 14-10-14 8-10-14 14-10-14 1-11-14 7-11-14
A7130 Detailed drawings Rev.A 10 15-10-14 24-10-14 15-10-14 24-10-14 8-11-14 17-11-14
A7140 Detailed Specifications, Reports and Procedures Rev.A 10 25-10-14 3-11-14 25-10-14 3-11-14 18-11-14 27-11-14
A7150 Bill of Materials Rev.A 7 25-10-14 31-10-14 25-10-14 31-10-14 24-11-14 30-11-14
A7160 Detailed drawings Rev.B 10 25-10-14 3-11-14 25-10-14 3-11-14 28-11-14 7-12-14
A7180 Bill of Materials Rev.B 7 1-11-14 7-11-14 1-11-14 7-11-14 1-12-14 7-12-14
A7170 Detailed Specifications, Reports and Procedures Rev.B 10 4-11-14 13-11-14 4-11-14 13-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.4.6 Emergency Shutdown (ESD) Systems 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14
A7190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14
A7200 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14
A7210 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14
A7220 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14
A7230 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14
A7240 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14
A7260 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14
A7250 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14
TTS-Adar ProjecTTS-Adar Project.2.4.7 Plant Fire & Gas (F&G) Detection System 77 7-9-14 22-11-14 7-9-14 22-11-14 22-9-14 7-12-14
A7270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-9-14 1-10-14
A7280 Data sheet design 7 17-10-14 23-10-14 17-10-14 23-10-14 1-11-14 7-11-14
A7290 Detailed drawings Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 8-11-14 17-11-14
J A J A J J A J A J A J
14 2015 2016 17
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
6-11-14, TTS-Adar Project.2.4.4 Field Inst
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proced
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
13-11-14, TTS-Adar Project.2.4.5 New dis
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
17-11-14, TTS-Adar Project.2.4.6 Emerge
Client input
Data sheet design
Detailed drawings Rev.A
Detailed Specifications, Reports and Proce
Bill of Materials Rev.A
Detailed drawings Rev.B
Bill of Materials Rev.B
Detailed Specifications, Reports and Proce
22-11-14, TTS-Adar Project.2.4.7 Plant F
Client input
Data sheet design
Detailed drawings Rev.A
The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART
Project Baseline Bar
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Milestone
Summary
Page 19 of 45 The TTS for Adar Produced Water Re-injection Plant
Date Revision Checked Approved
19-6-14 Rev.1
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injection Plant

More Related Content

What's hot

Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technicianchandrabhushan rao
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Rahman
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument TechnicianPANDI MUTHU
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance newNoel Roque
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...ATIF HUSSAIN
 
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...ATIF HUSSAIN
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guidelineEaswaran Kanason
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Jr. Vacaro
 
Target committee review meeting
Target committee review meetingTarget committee review meeting
Target committee review meetingmallareddy1975
 
Vivek - Instrumentation engineer
Vivek - Instrumentation engineerVivek - Instrumentation engineer
Vivek - Instrumentation engineerVivek Nair
 

What's hot (20)

CV TemplateREV [1]
CV TemplateREV [1]CV TemplateREV [1]
CV TemplateREV [1]
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technician
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
Instrument Technician
Instrument TechnicianInstrument Technician
Instrument Technician
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument Technician
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance new
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Dustin Marshall OQ Report (NCCER)
Dustin Marshall OQ Report (NCCER)Dustin Marshall OQ Report (NCCER)
Dustin Marshall OQ Report (NCCER)
 
JG Smit - CV
JG Smit - CVJG Smit - CV
JG Smit - CV
 
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
 
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
SUDHEESH CV .
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guideline
 
ATTEEQUE CV
ATTEEQUE CVATTEEQUE CV
ATTEEQUE CV
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)
 
Target committee review meeting
Target committee review meetingTarget committee review meeting
Target committee review meeting
 
Vivek - Instrumentation engineer
Vivek - Instrumentation engineerVivek - Instrumentation engineer
Vivek - Instrumentation engineer
 
Instrument Technician
Instrument  TechnicianInstrument  Technician
Instrument Technician
 

Viewers also liked

PM scheduling techniques
PM scheduling techniquesPM scheduling techniques
PM scheduling techniquesNazish khalid
 
Operational research- main techniques PERT and CPM
Operational research- main techniques PERT and CPMOperational research- main techniques PERT and CPM
Operational research- main techniques PERT and CPMvckg1987
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingHariasha
 
Pert- program evaluation and review technique
Pert- program evaluation and review techniquePert- program evaluation and review technique
Pert- program evaluation and review techniqueVinci Viveka
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pertAbu Bashar
 
Pert, cpm and other tools of project management for intrapreneurs
Pert, cpm and other tools of project management for  intrapreneurs  Pert, cpm and other tools of project management for  intrapreneurs
Pert, cpm and other tools of project management for intrapreneurs Dr. Trilok Kumar Jain
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applicationsAmrit Mty
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt ChartNicola2903
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTsalsa moyara
 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertRaj J Das
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectWanBK Leo
 
Project Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartProject Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartVinay Prajapati
 

Viewers also liked (20)

Ali Pert
Ali PertAli Pert
Ali Pert
 
Project management
Project managementProject management
Project management
 
PM scheduling techniques
PM scheduling techniquesPM scheduling techniques
PM scheduling techniques
 
Gantt pert
Gantt pertGantt pert
Gantt pert
 
Operational research- main techniques PERT and CPM
Operational research- main techniques PERT and CPMOperational research- main techniques PERT and CPM
Operational research- main techniques PERT and CPM
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
Pert- program evaluation and review technique
Pert- program evaluation and review techniquePert- program evaluation and review technique
Pert- program evaluation and review technique
 
Pert Analysis in Projects
Pert Analysis in ProjectsPert Analysis in Projects
Pert Analysis in Projects
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
Pert, cpm and other tools of project management for intrapreneurs
Pert, cpm and other tools of project management for  intrapreneurs  Pert, cpm and other tools of project management for  intrapreneurs
Pert, cpm and other tools of project management for intrapreneurs
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applications
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gert
 
Gantt
GanttGantt
Gantt
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
 
Gantt chart
Gantt chartGantt chart
Gantt chart
 
S pert cpm
S pert cpmS pert cpm
S pert cpm
 
Project Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartProject Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert Chart
 

Similar to -The PERT Chart-The tendering time schedule for Adar Produced Water Re-injection Plant

SeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule finalSeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule finalAhmed Mehrem
 
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityHSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityRoumik Mukherjee
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...Rodger McKinley
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6MUHAMMAD SALEEM
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)Mohd Zaini Baharum
 
Water Source HP Loop_Controls
Water Source HP Loop_ControlsWater Source HP Loop_Controls
Water Source HP Loop_ControlsElenzer Datu
 
020-IRC-CS Pipes-the Bengal mill
020-IRC-CS Pipes-the Bengal mill020-IRC-CS Pipes-the Bengal mill
020-IRC-CS Pipes-the Bengal millRamesh Menariai
 
ABC_2nd Progress Mtg Briefing_011214_final.ppt
ABC_2nd Progress Mtg Briefing_011214_final.pptABC_2nd Progress Mtg Briefing_011214_final.ppt
ABC_2nd Progress Mtg Briefing_011214_final.pptKingHaroldDeLeon
 
26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for ca...
26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for ca...26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for ca...
26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for ca...musslih yulianto
 
Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-Nixzalis Bourdier
 
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...Gary Hayes
 
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfZewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfAhmed Mehrem
 

Similar to -The PERT Chart-The tendering time schedule for Adar Produced Water Re-injection Plant (20)

10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
 
NNP Shutdown 2014 Plans - Scurve and npt graph
NNP Shutdown 2014 Plans - Scurve and npt graphNNP Shutdown 2014 Plans - Scurve and npt graph
NNP Shutdown 2014 Plans - Scurve and npt graph
 
SeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule finalSeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule final
 
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityHSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activity
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
 
Project Schedule - Level IV Schedule
Project Schedule - Level IV ScheduleProject Schedule - Level IV Schedule
Project Schedule - Level IV Schedule
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
 
Water Source HP Loop_Controls
Water Source HP Loop_ControlsWater Source HP Loop_Controls
Water Source HP Loop_Controls
 
020-IRC-CS Pipes-the Bengal mill
020-IRC-CS Pipes-the Bengal mill020-IRC-CS Pipes-the Bengal mill
020-IRC-CS Pipes-the Bengal mill
 
ABC_2nd Progress Mtg Briefing_011214_final.ppt
ABC_2nd Progress Mtg Briefing_011214_final.pptABC_2nd Progress Mtg Briefing_011214_final.ppt
ABC_2nd Progress Mtg Briefing_011214_final.ppt
 
26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for ca...
26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for ca...26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for ca...
26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for ca...
 
ERUP WBS
ERUP WBSERUP WBS
ERUP WBS
 
Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-Nbourdier-lab2-gantt chart with activities-
Nbourdier-lab2-gantt chart with activities-
 
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
 
ARB JANADREA 25.01.16 UPDATE PM
ARB JANADREA 25.01.16 UPDATE  PMARB JANADREA 25.01.16 UPDATE  PM
ARB JANADREA 25.01.16 UPDATE PM
 
Weekly report no 19
Weekly report no 19Weekly report no 19
Weekly report no 19
 
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfZewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdf
 

-The PERT Chart-The tendering time schedule for Adar Produced Water Re-injection Plant

  • 1. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish TTS - Adar PrTTS - Adar Project The tendering time schedule for Adar ... 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16 TTS-Adar ProTTS-Adar Project The tendering time schedule for Adar Prod... 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16 TTS-Adar ProjecTTS-Adar Project.1 Milestone 790 7-9-14 4-11-16 7-9-14 4-11-16 7-9-14 4-11-16 TTS-Adar ProjectTTS-Adar Project.1.1 Contract Effective Date 427 7-9-14 7-11-15 7-9-14 7-11-15 7-9-14 7-11-15 TTS-Adar ProjecTTS-Adar Project.1.1.1 Instructions To Proceed 427 7-9-14 7-11-15 7-9-14 7-11-15 7-9-14 7-11-15 A1000 Contract effective date 0 7-9-14* 7-9-14 7-9-14 A10001 The complete date of project for provisional acceptance session 0 7-11-15* 7-11-15 7-11-15 TTS-Adar ProjectTTS-Adar Project.1.2 Mechanical Completion Date 93 2-8-15 3-11-15 2-8-15 3-11-15 31-8-15 7-11-15 TTS-Adar ProjecTTS-Adar Project.1.2.1 Civil engineering 0 2-8-15 2-8-15 2-8-15 2-8-15 31-8-15 31-8-15 A1010 The Completion Date of Civil engineering session 0 2-8-15* 2-8-15 31-8-15 TTS-Adar ProjecTTS-Adar Project.1.2.2 Mechanical 0 12-10-15 12-10-15 12-10-15 12-10-15 7-11-15 7-11-15 A1020 The Completion Date of Mechanical session 0 12-10-15* 12-10-15 7-11-15 TTS-Adar ProjecTTS-Adar Project.1.2.3 Electrical 0 3-11-15 3-11-15 3-11-15 3-11-15 7-11-15 7-11-15 A1030 The Completion Date of Electrical session 0 3-11-15* 3-11-15 7-11-15 TTS-Adar ProjecTTS-Adar Project.1.2.4 Instrument 0 3-11-15 3-11-15 3-11-15 3-11-15 7-11-15 7-11-15 A1040 The Completion Date of Instrumentl session 0 3-11-15* 3-11-15 7-11-15 TTS-Adar ProjecTTS-Adar Project.1.2.5 Piping & Pipeline 0 30-10-15 30-10-15 30-10-15 30-10-15 7-11-15 7-11-15 A1050 The Completion Date of Piping & Pipeline session 0 30-10-15* 30-10-15 7-11-15 TTS-Adar ProjectTTS-Adar Project.1.3 Provisional Acceptance Date 9 27-10-15 5-11-15 27-10-15 5-11-15 5-11-15 5-11-15 TTS-Adar ProjecTTS-Adar Project.1.3.1 Mechanical 0 27-10-15 27-10-15 27-10-15 27-10-15 5-11-15 5-11-15 A1060 The Provisinal Acceptance Date of Mechanical session 0 27-10-15* 27-10-15 5-11-15 TTS-Adar ProjecTTS-Adar Project.1.3.2 Electrical 0 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 A1070 The Provisinal Acceptance Date of Electrical session 0 5-11-15* 5-11-15 5-11-15 TTS-Adar ProjecTTS-Adar Project.1.3.3 Instrument 0 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 5-11-15 A1080 The Provisinal Acceptance Date of Instrument session 0 5-11-15* 5-11-15 5-11-15 TTS-Adar ProjectTTS-Adar Project.1.4 Final Aceeptance Date 9 26-10-16 4-11-16 26-10-16 4-11-16 4-11-16 4-11-16 TTS-Adar ProjecTTS-Adar Project.1.4.1 Mechanical 0 26-10-16 26-10-16 26-10-16 26-10-16 4-11-16 4-11-16 A1090 The Final Aceeptance Date of Mechanical session 0 26-10-16* 26-10-16 4-11-16 TTS-Adar ProjecTTS-Adar Project.1.4.2 Electrical 0 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 A1100 The Final Aceeptance Date of Electrical session 0 4-11-16* 4-11-16 4-11-16 TTS-Adar ProjecTTS-Adar Project.1.4.3 Instrument 0 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 4-11-16 A8470 The Final Aceeptance Date of Instrument session 0 4-11-16* 4-11-16 4-11-16 TTS-Adar ProjecTTS-Adar Project.2 Engineering 92 7-9-14 7-12-14 7-9-14 7-12-14 7-9-14 7-12-14 A16030 The milestone of Process session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 A16040 The milestone of Mechanical session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 A16050 The milestone of Electrical session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 A16060 The milestone of Instrument session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 A16070 The milestone of Piping & Pipeline session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 4-11 4-11 4-11 7-11-15, TTS-Adar Proj 7-11-15, TTS-Adar Proj Contract effective date The complete date of p 3-11-15, TTS-Adar Proj 2-8-15, TTS-Adar Project.1.2 The Completion Date of Civi 12-10-15, TTS-Adar Proj The Completion Date of 3-11-15, TTS-Adar Proj The Completion Date o 3-11-15, TTS-Adar Proj The Completion Date o 30-10-15, TTS-Adar Pro The Completion Date of 5-11-15, TTS-Adar Proj 27-10-15, TTS-Adar Pro The Provisinal Acceptan 5-11-15, TTS-Adar Proj The Provisinal Acceptan 5-11-15, TTS-Adar Proj The Provisinal Acceptan 4-11 26-1 The 4-11 The 4-11 The 7-12-14, TTS-Adar Project.2 Engineering The milestone of Process session and HA The milestone of Mechanical session and The milestone of Electrical session and H The milestone of Instrument session and The milestone of Piping & Pipeline sessio The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 1 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 2. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A16080 The milestone of civil engineering session and HAZOP closed 0 7-12-14* 7-12-14 7-12-14 TTS-Adar ProjectTTS-Adar Project.2.1 Process 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.1 Induced Gas Flotation (IGF) 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A1110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A1120 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A1130 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A1140 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A1150 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A1160 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A1180 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A1170 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.2 Centrifugal Transfer Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A1190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A1200 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14 A1210 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14 A1220 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A1230 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A1240 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14 A1260 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A1250 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.3 Filter feed pump 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A1270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A1280 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A1290 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A1300 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A1310 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A1320 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A1340 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A1330 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.4 Nutshell Filter Vessel 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A1350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A1360 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14 A1370 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14 A1380 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A1390 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A1400 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14 A1420 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A1410 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.5 Media Scrub Pump 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 The milestone of civil engineering sessio 17-11-14, TTS-Adar Project.2.1 Process 23-10-14, TTS-Adar Project.2.1.1 Induced Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.1.2 Centrifug Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.3 Filter fee Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.1.4 Nutshell Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.5 Media Sc The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 2 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 3. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A1430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A1440 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A1450 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A1460 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A1470 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A1480 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A1500 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A1490 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.6 Booster Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A1510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A1520 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14 A1530 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14 A1540 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A1550 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A1560 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14 A1580 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A1570 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.7 Injection Pumps 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A1590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A1600 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A1610 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A1620 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A1630 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A1640 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A1660 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A1650 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.8 Produced Water Skim Tank with internals 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A1670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A1680 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14 A1690 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14 A1700 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A1710 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A1720 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14 A1740 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A1730 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.9 Solids Hydro-transporting Units and ancillaries for the ski... 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A1750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A1760 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A1770 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 J A J A J J A J A J A J 14 2015 2016 17 Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.1.6 Booster Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.7 Injection Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.1.8 Produce Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.9 Solids Hy Client input Data sheet design Detailed drawings Rev.A The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 3 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 4. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A1780 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A1790 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A1800 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A1820 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A1810 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.10 Break Tank 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A1830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A1840 Data sheet design 7 22-9-14 28-9-14 22-9-14 28-9-14 1-11-14 7-11-14 A1850 Detailed drawings Rev.A 10 29-9-14 8-10-14 29-9-14 8-10-14 8-11-14 17-11-14 A1860 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A1870 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A1880 Detailed drawings Rev.B 10 9-10-14 18-10-14 9-10-14 18-10-14 28-11-14 7-12-14 A1900 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A1890 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.11 Solids Hydro-transporting Units for Break Tank 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A1910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A1920 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A1930 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A1940 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A1950 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A1960 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A1980 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A1970 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.12 Buffer Tank. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14 A1990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14 A2000 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14 A2010 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14 A2020 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14 A2030 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14 A2040 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 A2060 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14 A2050 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.13 Solids Hydro-transporting Units for Buffer Tank 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14 A2070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14 A2080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14 A2090 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14 A2100 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14 A2110 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14 A2120 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.1.10 Break T Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.11 Solids H Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 2-11-14, TTS-Adar Project.2.1.12 Buffer Ta Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 2-11-14, TTS-Adar Project.2.1.13 Solids H Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 4 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 5. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A2140 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14 A2130 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.14 Recovered Oil Tank. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14 A2150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14 A2160 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14 A2170 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14 A2180 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14 A2190 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14 A2200 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 A2220 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14 A2210 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.15 Recovered Oil Pumps. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14 A2230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14 A2240 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14 A2250 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14 A2260 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14 A2270 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14 A2280 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 A2300 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14 A2290 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.16 Backwash heat exchanger for the Nutshell Filters. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A2310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A2320 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14 A2330 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14 A2340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A2350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A2360 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 A2380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A2370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.17 Backwash Clarifiers 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A2390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A2400 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14 A2410 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14 A2420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A2430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A2440 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 A2460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A2450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.18 Centrifugal Backwash Supply Pumps for the Nutshell Filt... 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 Bill of Materials Rev.B Detailed Specifications, Reports and Proce 2-11-14, TTS-Adar Project.2.1.14 Recover Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 2-11-14, TTS-Adar Project.2.1.15 Recover Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.1.16 Backwa Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.1.17 Backwa Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 23-10-14, TTS-Adar Project.2.1.18 Centrifu The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 5 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 6. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A2470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A2480 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A2490 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A2500 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A2510 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A2520 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A2540 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A2530 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.19 Water Pumps associated with the backwash clarifiers. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A2550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A2560 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A2570 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A2580 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A2590 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A2600 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A2620 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A2610 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.20 Drain Pumps 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A2630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A2640 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A2650 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A2660 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A2670 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A2680 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A2700 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A2690 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.21 Sludge Pumps. 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A2710 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A2720 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14 A2730 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14 A2740 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A2750 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A2760 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 A2780 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A2770 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.22 Disposal Water Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A2790 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A2800 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14 A2810 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14 J A J A J J A J A J A J 14 2015 2016 17 Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.19 Water P Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.20 Drain P Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 12-11-14, TTS-Adar Project.2.1.21 Sludge Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.1.22 Dispos Client input Data sheet design Detailed drawings Rev.A The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 6 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 7. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A2820 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A2830 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A2840 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 A2860 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A2850 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.23 Motive Water Pumps. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A2870 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A2880 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A2890 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A2900 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A2910 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A2920 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A2940 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A2930 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.24 Chemical Injection Skids. 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A2950 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A2960 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A2970 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A2980 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A2990 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A3000 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A3020 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A3010 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.25 Instrument Air System 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A3030 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A3040 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A3050 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A3060 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A3070 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A3080 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A3100 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A3090 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.26 Nitrogen Generator package 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3120 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14 A3130 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14 A3140 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3150 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3160 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 23-10-14, TTS-Adar Project.2.1.23 Motive W Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.24 Chemic Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.1.25 Instrum Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 12-11-14, TTS-Adar Project.2.1.26 Nitroge Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 7 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 8. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A3180 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3170 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.1.27 Firefighting system 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14 A3190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14 A3200 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14 A3210 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14 A3220 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14 A3230 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14 A3240 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 A3260 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14 A3250 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14 TTS-Adar ProjectTTS-Adar Project.2.2 Mechanical 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.1 Induced Gas Flotation (IGF) 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3280 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A3290 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3300 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3310 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3320 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3340 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3330 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.2 Centrifugal Transfer Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3360 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A3370 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3380 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3390 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3400 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3420 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3410 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.3 Filter feed pump 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3440 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A3450 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3460 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3470 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3480 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3500 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3490 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 Bill of Materials Rev.B Detailed Specifications, Reports and Proce 17-11-14, TTS-Adar Project.2.1.27 Firefig Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2 Mechanic 12-11-14, TTS-Adar Project.2.2.1 Induced Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2.2 Centrifu Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2.3 Filter fe Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 8 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 9. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish TTS-Adar ProjecTTS-Adar Project.2.2.4 Nutshell Filter Vessel 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3520 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A3530 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3540 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3550 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3560 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3580 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3570 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.5 Media Scrub Pump 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3600 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A3610 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3620 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3630 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3640 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3660 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3650 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.6 Booster Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3680 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A3690 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3700 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3710 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3720 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3740 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3730 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.7 Injection Pumps 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3760 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A3770 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3780 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3790 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3800 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3820 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3810 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.8 Produced Water Skim Tank with internals 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3840 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 J A J A J J A J A J A J 14 2015 2016 17 12-11-14, TTS-Adar Project.2.2.4 Nutshel Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2.5 Media S Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2.6 Booster Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2.7 Injection Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2.8 Produce Client input Data sheet design The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 9 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 10. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A3850 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3860 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3870 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3880 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3900 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3890 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.9 Solids Hydro-transporting Units and ancillaries for the ski... 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A3920 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A3930 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A3940 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A3950 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A3960 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A3980 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A3970 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.10 Break Tank 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A3990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A4000 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 27-10-14 2-11-14 A4010 Detailed drawings Rev.A 15 9-10-14 23-10-14 9-10-14 23-10-14 3-11-14 17-11-14 A4020 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A4030 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A4040 Detailed drawings Rev.B 15 24-10-14 7-11-14 24-10-14 7-11-14 23-11-14 7-12-14 A4060 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A4050 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.11 Solids Hydro-transporting Units for Break Tank 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4090 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4100 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4110 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4120 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4140 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4130 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.12 Buffer Tank. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4160 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4170 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4180 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4190 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 J A J A J J A J A J A J 14 2015 2016 17 Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2.9 Solids H Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.2.10 Break Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.11 Solids H Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.12 Buffer T Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 10 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 11. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A4200 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4220 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4210 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.13 Solids Hydro-transporting Units for Buffer Tank 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4240 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4250 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4260 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4270 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4280 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4300 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4290 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.14 Recovered Oil Tank. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4320 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4330 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4360 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.15 Recovered Oil Pumps. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4400 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4410 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4440 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.16 Backwash heat exchanger for the Nutshell Filters. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4480 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4490 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4500 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4510 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4520 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4540 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4530 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.13 Solids H Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.14 Recover Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.15 Recover Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.16 Backwa Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 11 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 12. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish TTS-Adar ProjecTTS-Adar Project.2.2.17 Backwash Clarifiers 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4560 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4570 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4580 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4590 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4600 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4620 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4610 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.18 Centrifugal Backwash Supply Pumps for the Nutshell Filt... 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4640 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4650 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4660 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4670 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4680 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4700 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4690 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.19 Water Pumps associated with the backwash clarifiers. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4710 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4720 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4730 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4740 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4750 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4760 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4780 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4770 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.20 Drain Pumps 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A4790 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A4800 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 27-10-14 2-11-14 A4810 Detailed drawings Rev.A 15 4-10-14 18-10-14 4-10-14 18-10-14 3-11-14 17-11-14 A4820 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A4830 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A4840 Detailed drawings Rev.B 15 19-10-14 2-11-14 19-10-14 2-11-14 23-11-14 7-12-14 A4860 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A4850 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.21 Sludge Pumps. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A4870 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A4880 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14 J A J A J J A J A J A J 14 2015 2016 17 7-11-14, TTS-Adar Project.2.2.17 Backwa Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.18 Centrifu Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.19 Water P Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.2.20 Drain Pu Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 28-10-14, TTS-Adar Project.2.2.21 Sludge Client input Data sheet design The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 12 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 13. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A4890 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14 A4900 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A4910 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A4920 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14 A4940 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A4930 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.22 Disposal Water Pumps 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A4950 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A4960 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14 A4970 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14 A4980 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A4990 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A5000 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14 A5020 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A5010 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.23 Motive Water Pumps. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A5030 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A5040 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14 A5050 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14 A5060 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A5070 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A5080 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14 A5100 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A5090 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.24 Chemical Injection Skids. 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A5110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A5120 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14 A5130 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14 A5140 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A5150 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A5160 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14 A5180 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A5170 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.25 Instrument Air System 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A5190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A5200 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14 A5210 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14 A5220 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A5230 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 J A J A J J A J A J A J 14 2015 2016 17 Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.2.22 Disposa Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.2.23 Motive Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.2.24 Chemic Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.2.25 Instrum Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 13 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 14. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A5240 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14 A5260 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A5250 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.26 Nitrogen Generator package 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A5270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A5280 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14 A5290 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14 A5300 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A5310 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A5320 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14 A5340 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A5330 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.2.27 Firefighting system 52 7-9-14 28-10-14 7-9-14 28-10-14 17-10-14 7-12-14 A5350 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 17-10-14 26-10-14 A5360 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 27-10-14 2-11-14 A5370 Detailed drawings Rev.A 15 24-9-14 8-10-14 24-9-14 8-10-14 3-11-14 17-11-14 A5380 Detailed Specifications, Reports and Procedures Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 18-11-14 27-11-14 A5390 Bill of Materials Rev.A 7 9-10-14 15-10-14 9-10-14 15-10-14 24-11-14 30-11-14 A5400 Detailed drawings Rev.B 15 9-10-14 23-10-14 9-10-14 23-10-14 23-11-14 7-12-14 A5420 Bill of Materials Rev.B 7 16-10-14 22-10-14 16-10-14 22-10-14 1-12-14 7-12-14 A5410 Detailed Specifications, Reports and Procedures Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 TTS-Adar ProjectTTS-Adar Project.2.3 Electrical 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.1 33kV cables 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A5430 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A5440 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A5450 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A5460 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A5470 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A5480 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A5500 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A5490 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.2 33kV/6.9kV step-down transformer 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A5510 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A5520 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A5530 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A5540 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A5550 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A5560 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A5580 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.2.26 Nitroge Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 28-10-14, TTS-Adar Project.2.2.27 Firefigh Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 17-11-14, TTS-Adar Project.2.3 Electrical 23-10-14, TTS-Adar Project.2.3.1 33kV cab Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.3.2 33kV/6.9 Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 14 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 15. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A5570 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.3 6.6kV/0.42kV step-down transformer 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A5590 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A5600 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A5610 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A5620 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A5630 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A5640 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A5660 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A5650 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.4 6.6kV switchgear and EICS 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14 A5670 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14 A5680 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14 A5690 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14 A5700 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14 A5710 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14 A5720 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14 A5740 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14 A5730 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.5 400V motor control center and EICS and distribution boar... 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14 A5750 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14 A5760 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14 A5770 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14 A5780 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14 A5790 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14 A5800 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14 A5820 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14 A5810 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.6 Motor starters for all pumps. 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14 A5830 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14 A5840 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14 A5850 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14 A5860 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14 A5870 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14 A5880 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14 A5900 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14 A5890 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.7 EICS panel with power systems 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14 A5910 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14 J A J A J J A J A J A J 14 2015 2016 17 Detailed Specifications, Reports and Proced 23-10-14, TTS-Adar Project.2.3.3 6.6kV/0.4 Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 30-10-14, TTS-Adar Project.2.3.4 6.6kV sw Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 30-10-14, TTS-Adar Project.2.3.5 400V mo Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 30-10-14, TTS-Adar Project.2.3.6 Motor st Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 2-11-14, TTS-Adar Project.2.3.7 EICS pan Client input The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 15 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 16. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A5920 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14 A5930 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14 A5940 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14 A5950 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14 A5960 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 A5980 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14 A5970 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.8 Variable Frequency Driver(VFD) 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14 A5990 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14 A6000 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14 A6010 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14 A6020 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14 A6030 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14 A6040 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 A6060 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14 A6050 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.9 Power and control cables. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14 A6070 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14 A6080 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14 A6090 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14 A6100 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14 A6110 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14 A6120 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 A6140 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14 A6130 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.10 Neutral earthing resistors. 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A6150 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A6160 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14 A6170 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14 A6180 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A6190 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A6200 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 A6220 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A6210 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.11 Cabling, glanding and associated materials 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A6230 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A6240 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14 A6250 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14 A6260 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 J A J A J J A J A J A J 14 2015 2016 17 Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 2-11-14, TTS-Adar Project.2.3.8 Variable F Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 2-11-14, TTS-Adar Project.2.3.9 Power an Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.3.10 Neutral Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.3.11 Cabling, Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 16 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 17. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A6270 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A6280 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 A6300 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A6290 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.12 Small power and lighting system 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A6310 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A6320 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14 A6330 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14 A6340 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A6350 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A6360 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 A6380 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A6370 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.13 Uninterrupted Power Supply (UPS) 62 7-9-14 7-11-14 7-9-14 7-11-14 7-10-14 7-12-14 A6390 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 7-10-14 16-10-14 A6400 Data sheet design 7 2-10-14 8-10-14 2-10-14 8-10-14 1-11-14 7-11-14 A6410 Detailed drawings Rev.A 10 9-10-14 18-10-14 9-10-14 18-10-14 8-11-14 17-11-14 A6420 Detailed Specifications, Reports and Procedures Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 18-11-14 27-11-14 A6430 Bill of Materials Rev.A 7 19-10-14 25-10-14 19-10-14 25-10-14 24-11-14 30-11-14 A6440 Detailed drawings Rev.B 10 19-10-14 28-10-14 19-10-14 28-10-14 28-11-14 7-12-14 A6460 Bill of Materials Rev.B 7 26-10-14 1-11-14 26-10-14 1-11-14 1-12-14 7-12-14 A6450 Detailed Specifications, Reports and Procedures Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.14 Electrical Heat Tracing System. 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A6470 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A6480 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14 A6490 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14 A6500 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A6510 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A6520 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 A6540 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 A6530 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.15 Earthing and lightning protection system 67 7-9-14 12-11-14 7-9-14 12-11-14 2-10-14 7-12-14 A6550 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 2-10-14 11-10-14 A6560 Data sheet design 7 7-10-14 13-10-14 7-10-14 13-10-14 1-11-14 7-11-14 A6570 Detailed drawings Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 8-11-14 17-11-14 A6580 Detailed Specifications, Reports and Procedures Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 18-11-14 27-11-14 A6590 Bill of Materials Rev.A 7 24-10-14 30-10-14 24-10-14 30-10-14 24-11-14 30-11-14 A6600 Detailed drawings Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 A6620 Bill of Materials Rev.B 7 31-10-14 6-11-14 31-10-14 6-11-14 1-12-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.3.12 Small po Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 7-11-14, TTS-Adar Project.2.3.13 Uninterr Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.3.14 Electri Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 12-11-14, TTS-Adar Project.2.3.15 Earthin Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 17 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 18. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A6610 Detailed Specifications, Reports and Procedures Rev.B 10 3-11-14 12-11-14 3-11-14 12-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.16 Cathodic protection system up to the plant battery limit i... 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14 A6630 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14 A6640 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14 A6650 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14 A6660 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14 A6670 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14 A6680 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 A6700 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14 A6690 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.3.17 Electrical bulks/ materials 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14 A6710 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14 A6720 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14 A6730 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14 A6740 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14 A6750 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14 A6760 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 A6780 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14 A6770 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14 TTS-Adar ProjectTTS-Adar Project.2.4 Instrument 77 7-9-14 22-11-14 7-9-14 22-11-14 22-9-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.4.1 Control equipments and Field Instrumentation 47 7-9-14 23-10-14 7-9-14 23-10-14 22-10-14 7-12-14 A6790 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-10-14 31-10-14 A6800 Data sheet design 7 17-9-14 23-9-14 17-9-14 23-9-14 1-11-14 7-11-14 A6810 Detailed drawings Rev.A 10 24-9-14 3-10-14 24-9-14 3-10-14 8-11-14 17-11-14 A6820 Detailed Specifications, Reports and Procedures Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 18-11-14 27-11-14 A6830 Bill of Materials Rev.A 7 4-10-14 10-10-14 4-10-14 10-10-14 24-11-14 30-11-14 A6840 Detailed drawings Rev.B 10 4-10-14 13-10-14 4-10-14 13-10-14 28-11-14 7-12-14 A6860 Bill of Materials Rev.B 7 11-10-14 17-10-14 11-10-14 17-10-14 1-12-14 7-12-14 A6850 Detailed Specifications, Reports and Procedures Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.4.2 All associated instrumentation and controls system mater... 54 7-9-14 30-10-14 7-9-14 30-10-14 15-10-14 7-12-14 A6870 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 15-10-14 24-10-14 A6880 Data sheet design 7 24-9-14 30-9-14 24-9-14 30-9-14 1-11-14 7-11-14 A6890 Detailed drawings Rev.A 10 1-10-14 10-10-14 1-10-14 10-10-14 8-11-14 17-11-14 A6900 Detailed Specifications, Reports and Procedures Rev.A 10 11-10-14 20-10-14 11-10-14 20-10-14 18-11-14 27-11-14 A6910 Bill of Materials Rev.A 7 11-10-14 17-10-14 11-10-14 17-10-14 24-11-14 30-11-14 A6920 Detailed drawings Rev.B 10 11-10-14 20-10-14 11-10-14 20-10-14 28-11-14 7-12-14 A6940 Bill of Materials Rev.B 7 18-10-14 24-10-14 18-10-14 24-10-14 1-12-14 7-12-14 A6930 Detailed Specifications, Reports and Procedures Rev.B 10 21-10-14 30-10-14 21-10-14 30-10-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.4.3 Cabling, glanding, tubing and associated required materials. 57 7-9-14 2-11-14 7-9-14 2-11-14 12-10-14 7-12-14 J A J A J J A J A J A J 14 2015 2016 17 Detailed Specifications, Reports and Proce 17-11-14, TTS-Adar Project.2.3.16 Cathod Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 17-11-14, TTS-Adar Project.2.3.17 Electri Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 22-11-14, TTS-Adar Project.2.4 Instrume 23-10-14, TTS-Adar Project.2.4.1 Control e Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proced 30-10-14, TTS-Adar Project.2.4.2 All assoc Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 2-11-14, TTS-Adar Project.2.4.3 Cabling, g The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 18 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1
  • 19. Activity ID Activity Name Original Duration Start Finish Early Start Early Finish Late Start Late Finish A6950 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 12-10-14 21-10-14 A6960 Data sheet design 7 27-9-14 3-10-14 27-9-14 3-10-14 1-11-14 7-11-14 A6970 Detailed drawings Rev.A 10 4-10-14 13-10-14 4-10-14 13-10-14 8-11-14 17-11-14 A6980 Detailed Specifications, Reports and Procedures Rev.A 10 14-10-14 23-10-14 14-10-14 23-10-14 18-11-14 27-11-14 A6990 Bill of Materials Rev.A 7 14-10-14 20-10-14 14-10-14 20-10-14 24-11-14 30-11-14 A7000 Detailed drawings Rev.B 10 14-10-14 23-10-14 14-10-14 23-10-14 28-11-14 7-12-14 A7020 Bill of Materials Rev.B 7 21-10-14 27-10-14 21-10-14 27-10-14 1-12-14 7-12-14 A7010 Detailed Specifications, Reports and Procedures Rev.B 10 24-10-14 2-11-14 24-10-14 2-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.4.4 Field Instrument junction boxes 61 7-9-14 6-11-14 7-9-14 6-11-14 8-10-14 7-12-14 A7030 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 8-10-14 17-10-14 A7040 Data sheet design 7 1-10-14 7-10-14 1-10-14 7-10-14 1-11-14 7-11-14 A7050 Detailed drawings Rev.A 10 8-10-14 17-10-14 8-10-14 17-10-14 8-11-14 17-11-14 A7060 Detailed Specifications, Reports and Procedures Rev.A 10 18-10-14 27-10-14 18-10-14 27-10-14 18-11-14 27-11-14 A7070 Bill of Materials Rev.A 7 18-10-14 24-10-14 18-10-14 24-10-14 24-11-14 30-11-14 A7080 Detailed drawings Rev.B 10 18-10-14 27-10-14 18-10-14 27-10-14 28-11-14 7-12-14 A7100 Bill of Materials Rev.B 7 25-10-14 31-10-14 25-10-14 31-10-14 1-12-14 7-12-14 A7090 Detailed Specifications, Reports and Procedures Rev.B 10 28-10-14 6-11-14 28-10-14 6-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.4.5 New distributed Control System (DCS). 68 7-9-14 13-11-14 7-9-14 13-11-14 1-10-14 7-12-14 A7110 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 1-10-14 10-10-14 A7120 Data sheet design 7 8-10-14 14-10-14 8-10-14 14-10-14 1-11-14 7-11-14 A7130 Detailed drawings Rev.A 10 15-10-14 24-10-14 15-10-14 24-10-14 8-11-14 17-11-14 A7140 Detailed Specifications, Reports and Procedures Rev.A 10 25-10-14 3-11-14 25-10-14 3-11-14 18-11-14 27-11-14 A7150 Bill of Materials Rev.A 7 25-10-14 31-10-14 25-10-14 31-10-14 24-11-14 30-11-14 A7160 Detailed drawings Rev.B 10 25-10-14 3-11-14 25-10-14 3-11-14 28-11-14 7-12-14 A7180 Bill of Materials Rev.B 7 1-11-14 7-11-14 1-11-14 7-11-14 1-12-14 7-12-14 A7170 Detailed Specifications, Reports and Procedures Rev.B 10 4-11-14 13-11-14 4-11-14 13-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.4.6 Emergency Shutdown (ESD) Systems 72 7-9-14 17-11-14 7-9-14 17-11-14 27-9-14 7-12-14 A7190 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 27-9-14 6-10-14 A7200 Data sheet design 7 12-10-14 18-10-14 12-10-14 18-10-14 1-11-14 7-11-14 A7210 Detailed drawings Rev.A 10 19-10-14 28-10-14 19-10-14 28-10-14 8-11-14 17-11-14 A7220 Detailed Specifications, Reports and Procedures Rev.A 10 29-10-14 7-11-14 29-10-14 7-11-14 18-11-14 27-11-14 A7230 Bill of Materials Rev.A 7 29-10-14 4-11-14 29-10-14 4-11-14 24-11-14 30-11-14 A7240 Detailed drawings Rev.B 10 29-10-14 7-11-14 29-10-14 7-11-14 28-11-14 7-12-14 A7260 Bill of Materials Rev.B 7 5-11-14 11-11-14 5-11-14 11-11-14 1-12-14 7-12-14 A7250 Detailed Specifications, Reports and Procedures Rev.B 10 8-11-14 17-11-14 8-11-14 17-11-14 28-11-14 7-12-14 TTS-Adar ProjecTTS-Adar Project.2.4.7 Plant Fire & Gas (F&G) Detection System 77 7-9-14 22-11-14 7-9-14 22-11-14 22-9-14 7-12-14 A7270 Client input 10 7-9-14 16-9-14 7-9-14 16-9-14 22-9-14 1-10-14 A7280 Data sheet design 7 17-10-14 23-10-14 17-10-14 23-10-14 1-11-14 7-11-14 A7290 Detailed drawings Rev.A 10 24-10-14 2-11-14 24-10-14 2-11-14 8-11-14 17-11-14 J A J A J J A J A J A J 14 2015 2016 17 Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 6-11-14, TTS-Adar Project.2.4.4 Field Inst Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proced Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 13-11-14, TTS-Adar Project.2.4.5 New dis Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 17-11-14, TTS-Adar Project.2.4.6 Emerge Client input Data sheet design Detailed drawings Rev.A Detailed Specifications, Reports and Proce Bill of Materials Rev.A Detailed drawings Rev.B Bill of Materials Rev.B Detailed Specifications, Reports and Proce 22-11-14, TTS-Adar Project.2.4.7 Plant F Client input Data sheet design Detailed drawings Rev.A The tendering time schedule for Adar Produced Water Re-injection Plant-PERT CHART Project Baseline Bar Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone Summary Page 19 of 45 The TTS for Adar Produced Water Re-injection Plant Date Revision Checked Approved 19-6-14 Rev.1