L290-AQ-PLN-10850
Status
LCPL QA (Sub Contractor) Leightons - LCPL (Sub Contractor) JKC (Contractor)
Name: Name: Name:
Date: Date: Date:
Signature: Signature: Signature:
IVB
1.0
1.1 Issued for Construction - IFC Drawings (IFI drawing for temporary works) PE Each activity
L290-AB-PRC-0004_0 Instruction for Vendor
Documentation-Section 6.4
Stamped / Approved Drawings
Stamped Code: A=Approved without Comment B=Approved with minor
Comment N=Not Approved F= Not subject to review
N/A Stamped IFC drawing
1.2 Calibration of Equipment PE
As per equipment calibration
register
L290-AQ-SPC-0009: Quality Control
Requirements for subcontractor
Clause 4.6.3 of L290-AQ-SPC-0009 Documentation sighted, for inclusion into MDR, Approved ITP N/A calibration certificates
1.3 Relevant codes & Specifications sighted / Correct revision PE Each activity
Section H Contract. Contract Exhibit E Drawings
& Specifications
Section H Contract. Contract Exhibit E Drawings &
Specifications
Documents sighted / Approved ITP / Check Sheet SSF01 N/A Approved ITP
1.4 Development and approval of ITP prior to construction activities PE Each activity
L290-AQ-SPC-0009: Quality Control
requirements for Subcontractors
Clause 4.5 of L290-AQ-SPC-0009 Documentation sighted on approved ITP N/A Approved ITP
1.5
Pre-Inspection Meeting Minutes of Meeting (PIM MOM) if required as per the
criticality matrix
QM Each activity as required
L290-AQ-SPC-0009: Quality Control
requirements for Subcontractors, L290- AB-PRC-
0004:INSTRUCTION FOR VENDOR
DOCUMENTATION
Clause 4.4.3 of L290-AQ-SPC-0009, Clause 5.1 of L290-AB-
PRC-0004
MOM Documentation sighted N/A PIM- MOM
1.6 QC Inspector Qualification - Electrical QM Once per person L290-AQ-SPC-0009
L290-AQ-SPC-0009 Section 4.14.1.3: working knowledge os
AS 2381: “Electrical Equipment for Hazardous Areas”,
AS/NZS 60079.17: “Explosive atmospheres –Electrical...,
AS/NZS 60079.18: “Explosive atmospheres – ….
Competencies for working with EEHA shall be relevant to the
type of work undertaken as described in AS/NZS 4761:2008
Sections 3.2
Sighted approval of Inspector document N/A Approval document
1.7 Electrcial Installer Qualifications - Electrical QM Once per person L290-AQ-SPC-0009
L290-AQ-SPC-0009 Section 4.14.1.3: working knowledge os
AS 2381: “Electrical Equipment for Hazardous Areas”,
AS/NZS 60079.17: “Explosive atmospheres –Electrical...,
AS/NZS 60079.18: “Explosive atmospheres –
…,Competencies for working with EEHA shall be relevent to
the type of work undertaken as described in AS/NZS
4761:2008 Sections 3.2
Sighted approval of Installer document N/A Approval document
1.8 Verify SHEWMS available and approved PE Each activity Relevant Specification As Per Schedule Approved SHEWMS N/A Approved SWEHMS
2.0
2.1 Material Certificates received for all components SUP Each Delivery
Contract Exhibit H, L290-AQ-SPC-0010 and AS
60079:14 Clause 4.3
Section 4.11 of Exhibit H, Clause 2.2 for L290-AQ-SPC-0010
and Clause 4.3 for AS 60079:14
Material Register & Material Certificates sighted, for inclusion into MDR N/A material certificates
2.2 Inspection of received goods SUP Each Delivery
L290-AQ-PRC-0008: QUALITY CONTROL
COORDINATION PROCEDURE FOR
SUBCONTRACTOR
Clause 4.5.2 of L290-AQ-PRC-0008 Material Register & Material Certificates sighted, for inclusion into MDR N/A Material inspection report
3.0
3.1 Installations as per gneral arrangement and layouts SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.5.5 of AS 3000: 2007 Inspection Test Record EP08, EP01, EP30 (L290-AR-FRM-10002) N/A ITR EP08, EP01, EP30
3.2 Earthing of intrinsically safe circuits SUP/ENG Each Lot
IFC drawing, AS 3000, AS 60079:2009 Clause
12.4.4, L290-AQ-TAC-0005 (Inspection and Test
Plan for Electrical Works)
Clause 5.5.5 of AS 3000: 2007, Clause 12.4.4 of AS
60079:2009
Inspection Test Record EP08, EP01 (L290-AR-FRM-10002) N/A ITR EP08, EP01, XP03
3.3 Equipment is tagged correctly against drawings and project specification PE Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
IFC Drawings/ Clause 5.5.1.3 of AS 3000:2007 Inspection Test Record EP08, EP01, EP30 (L290-AR-FRM-10002) N/A ITR EP08, EP01, EP30
3.4
Verify Earthing straps and Conductors cross section as per drawings and
specification
SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.3.3 of AS 3000: 2007 Inspection Test Record EP08, EP01,(L290-AR-FRM-10002) N/A ITR EP08, EP01
3.5 Main earthing cable and earthing boss checked SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.3.3.4 of AS 3000: 2007 Inspection Test Record EP01 (L290-AR-FRM-10002) N/A ITR EP01
3.6 Main earthing bar checked SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.3.2.1 of AS 3000:2007 Inspection Test Record EP29 (L290-AR-FRM-10002) N/A ITR EP29
3.7 Main earthing rod checked SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.3.6 of AS 3000:2007 Inspection Test Record EP30 (L290-AR-FRM-10002) N/A ITR EP30
4.0
4.1 Check type of cable tray, conduits, ladders, junction boxes & fittings. SUP/ENG Each Lot
IFC Drawings/ AS 3000:2007 Section 3, AS
60079.14:2009 Clause 9.3, 9.4, 9.5 & 9.6
IFC Drawings/ AS /NZS 3000:2007 Clause 3.8, AS
60079.14:2009 Clause 9.3, 9.4, 9.5 & 9.6
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.2 Check conduit and cable tray size, routing for no obstructions and elevation. SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3, Section 7 IFC Drawings/ AS /NZS 3000:2007 Clause 3.9, 7.4
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.3
Check coupler plates, elbows, dropout tees, conduit fittings and accessories are
properly installed.
SUP/ENG Each Lot
IFC Drawings/ AS 3000:2007 Section 3 , AS
60079.14:2009 Clause 9.3 & 9.4
IFC Drawings/ AS /NZS 3000:2007 Clause 3.9, AS
60079.14:2009 Clause 9.4
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.4
Check tray and conduit supports are correct and tightened using the appropriate
tool ensuring no deflection.
SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3 .9 IFC Drawings/ AS /NZS 3000:2007 Clause 3.9.6
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.5 Check tray covers and protection is provided. SUP/ENG Each Lot IFC Drawings/ AS 3000 Clause 3.2 to 3.4 IFC Drawings/ AS /NZS 3000:2007 Clause 3.3.2.6 Inspection Test Record EP10 (290-AR-FRM-10002) N/A ITR - EP10
4.6 Check pulling guide rope in concealed conduit is installed. SUP/ENG Each Lot AS 3000 Section 3 AS /NZS 3000:2007 Clause 3.9 Field Inspection Check Sheet ELC19 (L290-AR-FRM-10002) N/A FIC- ELC19
4.7 Check all wall penetrations are completely sealed and fire rated. SUP/ENG Each Lot AS 3000 Clause 3.9.9 AS /NZS 3000:2007 Clause 3.9.9.3 Inspection Test Record EP10 (290-AR-FRM-10002) N/A ITR - EP10
4.8 Check tray and conduit sharp edges have been removed. SUP/ENG Each Lot AS 3000 Clause 3.10.1 to 3.10.4 AS /NZS 3000:2007 Clause 3.10.3.5
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.9 Check cable tray, conduits are properly cleaned prior to cable pulling. SUP/ENG Each Lot AS 3000 Clause 3.10 to 3.11 AS /NZS 3000:2007 Clause 3.10.3.5, 3.6
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
H
H
H
H
H
H
H H W
B
H H W R
SH
H
W
H
Contractor Company
APPROVALS AND OTHER PRELIMINARY REQUIREMENTS
LTSC
Required Inspection
S S
H W S S
H W S S
H
W S S
W
S
S
Responsibility
S
MATERIAL RECEIVING/DOCUMENT INSPECTION
H W S
H W
H
Quality Verification Activity/Stage Reference ProcedureFrequency
Independent Verification Body (IVB)
W S S
W S S
SR S
H
W S S S
W S
H
H H
W
SSW
CABLEWAYS & CONDUITS
W S S S
Acceptance Criteria/Specification Verifying Documents
Package Name: EPC BUILDING WORKS (P-31D-BLD-1), Subcontractor's Document Number: Q1447-CS-PCP-6104
ITP Title: INSPECTION AND TEST PLAN - ELECTRICAL - HAZARDOUS AREA INSTALLATION - EPC BUILDING WORKS
ITP Number: L290-AQ-PLN-11363 Contractor's Number: V-31D1-BLD-1-Z40206
H
H H W S
Lower Tier Sub Contractor (LTSC)
Name:ITP Accepted:
No.
W S
Name:
H H S S
BUILDING EARTHING
Date:
Signature:
Record Remarks
Subcontractor
H
W
W
H H R S
W
H
H H H W
Date:
Signature:
H W
W S S
W
S
S
S
S
S
Q1447-CS-PCP-6104-A.xlsx:Page 1/2
L290-AQ-PLN-10850
Status
LCPL QA (Sub Contractor) Leightons - LCPL (Sub Contractor) JKC (Contractor)
Name: Name: Name:
Date: Date: Date:
Signature: Signature: Signature:
IVB
B
Contractor CompanyLTSC
Required Inspection
ResponsibilityQuality Verification Activity/Stage Reference ProcedureFrequency
Independent Verification Body (IVB)
Acceptance Criteria/Specification Verifying Documents
Package Name: EPC BUILDING WORKS (P-31D-BLD-1), Subcontractor's Document Number: Q1447-CS-PCP-6104
ITP Title: INSPECTION AND TEST PLAN - ELECTRICAL - HAZARDOUS AREA INSTALLATION - EPC BUILDING WORKS
ITP Number: L290-AQ-PLN-11363 Contractor's Number: V-31D1-BLD-1-Z40206
Lower Tier Sub Contractor (LTSC)
Name:ITP Accepted:
No.
Name:
Date:
Signature:
Record Remarks
Subcontractor
Date:
Signature:
4.10 Verify complete cable tray installation against drawings and specifications SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3 IFC Drawings/ AS 3000:2007 Section 3
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - XP03
5.0
5.1 Visual inspection of cable type, size & tag no. SUP/ENG Each Lot
AS 3000 Clause 8.2, 60079.14:2009 Clause 9.3,
AS 60079.17 Clause 4.3 & 4.12
AS /NZS 3000:2007 Clause 8.2.1, 8.2.2(d), AS
60079.14:2009 Clause 9.3, AS 6007.17 Clause 4.12
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
5.2 Visually inspect the cable is not damaged or snagged during cable pulling. SUP/ENG Each Lot
AS 3000 Section 3, AS 60079.14:2009 Clause
9.3.9, 11.2 & 12.2.2
AS /NZS 3000:2007 Clause 3.3.2.7, 3.3.2.8, AS
60079.14:2009 Clause 9.3.9, 11.2 & 12.2.2.5
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
5.3 Check cable-bending radius according to specifications. SUP/ENG Each Lot AS 3000:2007 Clause 3.9 AS /NZS 3000:2007 Clause 3.9.6
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
5.4 Check cable segregation as per drawings SUP/ENG Each Lot
IFC drawing /AS 3000 Section 3.9, AS
60079.14:2009 Clause 12.2.2.5
AS /NZS 3000:2007 Clause 3.9.8.3, AS 60079.14:2009
Clause 12.2.2.5, IFC drawings
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
5.5 Check cable fixing on tray properly installed. SUP/ENG Each Lot AS 3000 Clause 3.3 AS /NZS 3000:2007 Clause 3.3.2.6
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
5.6 Check wiring above ceiling is properly installed. SUP/ENG Each Lot
AS 3000 Section 3.9, AS 60079.14:2009 Clause
9.3.2 & 11.2 & 12.2.2.5
AS /NZS 3000:2007 Clause 3.9.3.2 AS 60079.14:2009
Clause 12.2.2.5
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
5.7 Check cable ID tag no. Is properly installed. SUP/ENG Each Lot AS 3000 section 3 AS /NZS 3000:2007 Clause 3.9
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
5.8 Check cable continuity and megger test after pulling. SUP/ENG Each Lot AS 3000 Clause 3.10 AS /NZS 3000:2007 Clause 3.10.3.3
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
5.9 Check protection of cable ends after megger test. SUP/ENG Each Lot AS 3000 Clause 3.10 AS /NZS 3000:2007 Clause 3.10.3.5
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
6.0
6.1 Check general arrangement of installation meets drawings and specifications. SUP/ENG Each Lot
IFC Drawing/ AS 3000 Clause 4.3, AS 60079.14
Clause 4.1, 5.3 & 5.4, AS 60079.17 Clause 4.3
IFC Drawing/ AS/NZS 3000: 2007 Clause 4.3.3, AS 6007.14
Clause 9.3
Inspection Test Record EP05,EP07, EP14, EP37, 42 (290-AR-FRM-
10002)
N/A
ITR - EP05,EP07, EP14,
EP37, EP41
6.2
Check Socket Outlet/ Junction Boxes/ Isolators are correct alligned, leveled,
ridget and secured with correct fixings.
SUP/ENG Each Lot
AS 3000 Clause 4.4 & 7.7.2.4,
AS60079.14:2009 Clause 4.1, 9.3, 11.2 & 12.2
AS/NZS 3000 : 2007 Clause 4.4.2 & 7.7.2.4, AS
60079.14:2009 Clause 9.3, 11.2 & 12.2
Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42
6.3 Check earthing and bonding of sockets outlets against drawings. SUP/ENG Each Lot IFC Drawing/ AS 3000 Clause 4.4 IFC Drawing/ AS/NZS 3000: 2007 Clause 4.4.3 Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42
6.4
Check Socket Outlet/ Junction Boxes/ Isolators is clean and free from
dust/debris, internal internals.
SUP/ENG Each Lot AS 3000 Clause 4.4 AS/NZS 3000 : 2007 Clause 4.4.2.2(a) Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42
6.5
Check all terminals and connections are tight, correctly made and identified as
per drawings.
SUP/ENG Each Lot AS 3000 Clause 4.4 AS/NZS 3000 : 2007 Clause 4.4.2.2© Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42
6.6 Perform insulation resistance test. Each phase to earth. SUP/ENG Each Lot AS 3000 Clause 4.4 AS/NZS 3000 : 2007 Clause 8.3.6 Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42
6.7 Conduct Earth loop impedance test. SUP/ENG Each Lot AS 3000 Clause 8.3 AS/NZS 3000: 2007 Clause 8.3.9 Inspection Test Record EP44 (290-AR-FRM-10002) N/A ITR - EP44
6.8 Conduct Pre-commissioning checks SUP/ENG Each Lot
IFC Drawings/AS 3000 Section 4, 60079.14:2009
Sections 9, 11 & 12
AS/NZS 3000: 2007 Section 4 AS 60079.14:2009 Sections
9, 11 & 12
Inspection Test Record EP44 (290-AR-FRM-10002) N/A ITR - XP03
7.0
7.1 Verify sign-off of all Inspection and Test documentation ENG Each Lot ITP/ FICs Signed off ITP/ FICs Completed ITP checklist N/A ITP, FICs
7.2 Verify all drawings 'As built' status PE/QM Each drawing
IFC Drawing/ As Built drawing, Contract exhibit
H
IFC Drawing/ As Built drawing Completed As-built drawings N/A respective drawing
7.3 Completion and handover/delivery of relevant QA documentation to MDR
PE/QM
Each lot/Activity
Collate records as perL290-AQ-SPC-0001, L290-
AQ-SPC-0010, Exhbit H applicable sections, AS
3000 and IFC drawings and FICS, test reports,
material certificates, certificates of conformity to
AS 60079:14 Clause 4.3 and all other relevant
records
Collate records as perL290-AQ-SPC-0001, L290-AQ-SPC-
0010, Exhbit H applicable sections, As 3000 and IFC
drawings and FIC's/ ITR's, test reports, material certificates,
certificates of conformity and all other relevant records
IFC drawings, signed off FIC's/ ITR's, test reports, material
certificates, inspection reports, survey reports and all other relevant
records of ITP
N/A Partial MDR
H - Hold Point SUP Supervisor LTSC PIM
W - Witness Point ENG LCPL Engineer LCPL MOM
IW - Initial Witness PE LCPL Project Engineer JKC QA
S - Surveillance JKC JKC Representative INPEX FICS
R - Record Review SHEWMS
Safety,Health and Environmental
Work Method Statement N/A MDR
OR - Official Record IVB IFC
IR - Internal Record Document Number: L290-AQ-PLN-11363 IFI
RH H
H
H
H
W
W
S
S
S
S
Issued for information
Minutes of Meeting
Quality Assuarance
Field Inspection Check Sheet
Manufacturers' Data record
Pre Inspection Meeting
S
S
H
W
W
S
H/R
S
S
S
S
W S
H W W S
Issued for construction
S
S
S
S
W
H
H
W
H
H
S
R
W
S
S
Independent Verification Body
Low Tier Subcontractor
H
H H
S S
H
S
W
W
S
W
R
W
S
S
W
S
Subcontractor
Contractor
ABOVE GROUND CABLING
S
W R S
W S
COMPLETION AND HANDOVER / DELIVERY
Company
Not Applicable
H
H H W S
W S
S
W
LIGHT FIITTING/SOCKET OUTLET/ JUNCTION BOX/ ISOLATOR
S
H W R S
SW S
Q1447-CS-PCP-6104-A.xlsx:Page 2/2

More Related Content

What's hot

Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Gensol Engineering Limited
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Lloyd's Register Energy
 
P&ID Symbols | Gaurav Singh Rajput
P&ID Symbols | Gaurav Singh Rajput P&ID Symbols | Gaurav Singh Rajput
P&ID Symbols | Gaurav Singh Rajput Gaurav Singh Rajput
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingAbhijeet Nagle
 
Pipe hangers
Pipe hangersPipe hangers
Pipe hangersWanechan
 
EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions LLP
 
Vibrating Tuning Fork Level Switch
Vibrating Tuning Fork Level SwitchVibrating Tuning Fork Level Switch
Vibrating Tuning Fork Level SwitchCTi Controltech
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and detailsMahesh Sontyal
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CoursepetroEDGE
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HVNexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HVThorne & Derrick International
 
manual stress analysis
manual stress analysismanual stress analysis
manual stress analysisBHARAT BELLAD
 
Panduit EMEA SI Webinar 9
Panduit EMEA SI Webinar 9Panduit EMEA SI Webinar 9
Panduit EMEA SI Webinar 9Panduit
 
Artificial lift engineer achievements
Artificial lift engineer achievementsArtificial lift engineer achievements
Artificial lift engineer achievementsJoseph Bracic
 
Corrosion under insulation
Corrosion under insulationCorrosion under insulation
Corrosion under insulationpatiphon
 
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHLIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHBimal Chandra Das
 

What's hot (20)

Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com...
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
 
S81-HS Panel Presentation
S81-HS Panel PresentationS81-HS Panel Presentation
S81-HS Panel Presentation
 
P&ID Symbols | Gaurav Singh Rajput
P&ID Symbols | Gaurav Singh Rajput P&ID Symbols | Gaurav Singh Rajput
P&ID Symbols | Gaurav Singh Rajput
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / Hydrotesting
 
Pipe hangers
Pipe hangersPipe hangers
Pipe hangers
 
EPC Solutions - All About Substation
EPC Solutions - All About Substation EPC Solutions - All About Substation
EPC Solutions - All About Substation
 
Vibrating Tuning Fork Level Switch
Vibrating Tuning Fork Level SwitchVibrating Tuning Fork Level Switch
Vibrating Tuning Fork Level Switch
 
Plumbing training
Plumbing training Plumbing training
Plumbing training
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory Course
 
adw2q2qsad
adw2q2qsadadw2q2qsad
adw2q2qsad
 
Busduct catalogue
Busduct catalogueBusduct catalogue
Busduct catalogue
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HVNexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
Nexans Euromold Connectors 400 Series Interface C Compact Cable Connectors HV
 
manual stress analysis
manual stress analysismanual stress analysis
manual stress analysis
 
Panduit EMEA SI Webinar 9
Panduit EMEA SI Webinar 9Panduit EMEA SI Webinar 9
Panduit EMEA SI Webinar 9
 
Artificial lift engineer achievements
Artificial lift engineer achievementsArtificial lift engineer achievements
Artificial lift engineer achievements
 
Corrosion under insulation
Corrosion under insulationCorrosion under insulation
Corrosion under insulation
 
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHLIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
 

Viewers also liked

Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Gary Hayes
 
Small Projects - PAWA
Small Projects - PAWASmall Projects - PAWA
Small Projects - PAWAGary Hayes
 
Small Projects - Kestral Coal Mine
Small Projects - Kestral Coal MineSmall Projects - Kestral Coal Mine
Small Projects - Kestral Coal MineGary Hayes
 
275kV Feeder - Ross Substation Automation Project - Powerlink-2
275kV Feeder - Ross Substation Automation Project - Powerlink-2275kV Feeder - Ross Substation Automation Project - Powerlink-2
275kV Feeder - Ross Substation Automation Project - Powerlink-2Gary Hayes
 
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Gary Hayes
 
Quality capability roadmap
Quality capability roadmapQuality capability roadmap
Quality capability roadmapAnand Iyer
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklistimaduddin91
 

Viewers also liked (7)

Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
 
Small Projects - PAWA
Small Projects - PAWASmall Projects - PAWA
Small Projects - PAWA
 
Small Projects - Kestral Coal Mine
Small Projects - Kestral Coal MineSmall Projects - Kestral Coal Mine
Small Projects - Kestral Coal Mine
 
275kV Feeder - Ross Substation Automation Project - Powerlink-2
275kV Feeder - Ross Substation Automation Project - Powerlink-2275kV Feeder - Ross Substation Automation Project - Powerlink-2
275kV Feeder - Ross Substation Automation Project - Powerlink-2
 
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
 
Quality capability roadmap
Quality capability roadmapQuality capability roadmap
Quality capability roadmap
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
 

Similar to Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-PCP-6104

STC_WebList EASA (1).pdf documentacion para hacer certificar
STC_WebList EASA (1).pdf documentacion para hacer certificarSTC_WebList EASA (1).pdf documentacion para hacer certificar
STC_WebList EASA (1).pdf documentacion para hacer certificardianavg9319
 
550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev AStephen Stuart
 
Booster fan cr1 fn02 platform & duct support calculation note
Booster fan cr1 fn02 platform & duct support calculation noteBooster fan cr1 fn02 platform & duct support calculation note
Booster fan cr1 fn02 platform & duct support calculation noteAli Elkashef
 
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...ClarenceLoganathan1
 
Cube test report..xlsx
Cube test report..xlsxCube test report..xlsx
Cube test report..xlsxjimit langalia
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATSMary Calkins
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007Tonni Bruce
 
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-102015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10Carl S. Johnson II - ACE
 
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdfDatasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdfEngrMuhammadArslan4
 
Original Transistor PNP TIP36C TIP36 TO-247 25A 100V New ST
Original Transistor PNP TIP36C TIP36 TO-247 25A 100V New STOriginal Transistor PNP TIP36C TIP36 TO-247 25A 100V New ST
Original Transistor PNP TIP36C TIP36 TO-247 25A 100V New STauthelectroniccom
 
Original Opto PC900V PC900 900 DIP-6 New SHARP
Original Opto PC900V PC900 900 DIP-6 New SHARPOriginal Opto PC900V PC900 900 DIP-6 New SHARP
Original Opto PC900V PC900 900 DIP-6 New SHARPAUTHELECTRONIC
 

Similar to Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-PCP-6104 (20)

Bid document bhel
Bid document bhelBid document bhel
Bid document bhel
 
testing formats
testing formatstesting formats
testing formats
 
STC_WebList EASA (1).pdf documentacion para hacer certificar
STC_WebList EASA (1).pdf documentacion para hacer certificarSTC_WebList EASA (1).pdf documentacion para hacer certificar
STC_WebList EASA (1).pdf documentacion para hacer certificar
 
18rf 31170-ts-002 (flange)
18rf 31170-ts-002 (flange)18rf 31170-ts-002 (flange)
18rf 31170-ts-002 (flange)
 
550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A
 
Booster fan cr1 fn02 platform & duct support calculation note
Booster fan cr1 fn02 platform & duct support calculation noteBooster fan cr1 fn02 platform & duct support calculation note
Booster fan cr1 fn02 platform & duct support calculation note
 
Svr part 4_e
Svr part 4_eSvr part 4_e
Svr part 4_e
 
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
 
C.q.e catalogo ipc
C.q.e   catalogo ipcC.q.e   catalogo ipc
C.q.e catalogo ipc
 
Cube test report..xlsx
Cube test report..xlsxCube test report..xlsx
Cube test report..xlsx
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
 
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-102015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
 
List of EN1317 Compliant RRS January 2015
List of EN1317 Compliant RRS January 2015 List of EN1317 Compliant RRS January 2015
List of EN1317 Compliant RRS January 2015
 
14 mq11 02-te-0000-ee0012-0
14 mq11 02-te-0000-ee0012-014 mq11 02-te-0000-ee0012-0
14 mq11 02-te-0000-ee0012-0
 
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdfDatasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
 
Original Transistor PNP TIP36C TIP36 TO-247 25A 100V New ST
Original Transistor PNP TIP36C TIP36 TO-247 25A 100V New STOriginal Transistor PNP TIP36C TIP36 TO-247 25A 100V New ST
Original Transistor PNP TIP36C TIP36 TO-247 25A 100V New ST
 
1 n4001 d
1 n4001 d1 n4001 d
1 n4001 d
 
Original Opto PC900V PC900 900 DIP-6 New SHARP
Original Opto PC900V PC900 900 DIP-6 New SHARPOriginal Opto PC900V PC900 900 DIP-6 New SHARP
Original Opto PC900V PC900 900 DIP-6 New SHARP
 
Av25ls
Av25lsAv25ls
Av25ls
 

More from Gary Hayes

275kV Feeder - Ross Substation Automation Project - Powerlink-1
275kV Feeder - Ross Substation Automation Project - Powerlink-1275kV Feeder - Ross Substation Automation Project - Powerlink-1
275kV Feeder - Ross Substation Automation Project - Powerlink-1Gary Hayes
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3e
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3eCSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3e
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3eGary Hayes
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3c
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3cCSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3c
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3cGary Hayes
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3a
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3aCSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3a
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3aGary Hayes
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 1
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 1Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 1
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 1Gary Hayes
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 2
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 2CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 2
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 2Gary Hayes
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 1
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 1CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 1
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 1Gary Hayes
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 2
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 2Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 2
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 2Gary Hayes
 
132-110kV Cabolture Substation - Primary Plant 2- Energex
132-110kV Cabolture Substation - Primary Plant 2- Energex132-110kV Cabolture Substation - Primary Plant 2- Energex
132-110kV Cabolture Substation - Primary Plant 2- EnergexGary Hayes
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 6
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 6Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 6
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 6Gary Hayes
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 5
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 5Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 5
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 5Gary Hayes
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 4
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 4Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 4
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 4Gary Hayes
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 3
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 3Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 3
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 3Gary Hayes
 
1332-110kV Cabolture Substation - Primary Plant - Energex
1332-110kV Cabolture Substation - Primary Plant - Energex1332-110kV Cabolture Substation - Primary Plant - Energex
1332-110kV Cabolture Substation - Primary Plant - EnergexGary Hayes
 
Redbank Plaza Upgrade - Street Lighting
Redbank Plaza Upgrade - Street LightingRedbank Plaza Upgrade - Street Lighting
Redbank Plaza Upgrade - Street LightingGary Hayes
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design - Cable Block...
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design - Cable Block...CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design - Cable Block...
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design - Cable Block...Gary Hayes
 
Gallipoli Barracks Enhanced Land Force Stage 2B - HV Distribution
Gallipoli Barracks Enhanced Land Force Stage 2B - HV DistributionGallipoli Barracks Enhanced Land Force Stage 2B - HV Distribution
Gallipoli Barracks Enhanced Land Force Stage 2B - HV DistributionGary Hayes
 
Gallipoli Barracks Enhanced Land Force Stage 2B - 11kV Protection Logic Diagrams
Gallipoli Barracks Enhanced Land Force Stage 2B - 11kV Protection Logic DiagramsGallipoli Barracks Enhanced Land Force Stage 2B - 11kV Protection Logic Diagrams
Gallipoli Barracks Enhanced Land Force Stage 2B - 11kV Protection Logic DiagramsGary Hayes
 
11kV Panels - Snell Street Substation - PAWA
11kV Panels - Snell Street Substation - PAWA11kV Panels - Snell Street Substation - PAWA
11kV Panels - Snell Street Substation - PAWAGary Hayes
 
132-66 kV - ISIS T131 Substation - Ergon
132-66 kV - ISIS T131 Substation - Ergon132-66 kV - ISIS T131 Substation - Ergon
132-66 kV - ISIS T131 Substation - ErgonGary Hayes
 

More from Gary Hayes (20)

275kV Feeder - Ross Substation Automation Project - Powerlink-1
275kV Feeder - Ross Substation Automation Project - Powerlink-1275kV Feeder - Ross Substation Automation Project - Powerlink-1
275kV Feeder - Ross Substation Automation Project - Powerlink-1
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3e
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3eCSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3e
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3e
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3c
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3cCSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3c
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3c
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3a
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3aCSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3a
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 3a
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 1
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 1Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 1
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 1
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 2
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 2CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 2
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 2
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 1
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 1CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 1
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design 1
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 2
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 2Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 2
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 2
 
132-110kV Cabolture Substation - Primary Plant 2- Energex
132-110kV Cabolture Substation - Primary Plant 2- Energex132-110kV Cabolture Substation - Primary Plant 2- Energex
132-110kV Cabolture Substation - Primary Plant 2- Energex
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 6
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 6Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 6
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 6
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 5
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 5Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 5
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 5
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 4
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 4Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 4
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 4
 
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 3
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 3Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 3
Ipswich Motorway Upgrade-Intelligent Transport Systems (ITS) Layouts 3
 
1332-110kV Cabolture Substation - Primary Plant - Energex
1332-110kV Cabolture Substation - Primary Plant - Energex1332-110kV Cabolture Substation - Primary Plant - Energex
1332-110kV Cabolture Substation - Primary Plant - Energex
 
Redbank Plaza Upgrade - Street Lighting
Redbank Plaza Upgrade - Street LightingRedbank Plaza Upgrade - Street Lighting
Redbank Plaza Upgrade - Street Lighting
 
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design - Cable Block...
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design - Cable Block...CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design - Cable Block...
CSR Sugar Mill Upgrade -Ayer QLD - Instrumentation & PLC Design - Cable Block...
 
Gallipoli Barracks Enhanced Land Force Stage 2B - HV Distribution
Gallipoli Barracks Enhanced Land Force Stage 2B - HV DistributionGallipoli Barracks Enhanced Land Force Stage 2B - HV Distribution
Gallipoli Barracks Enhanced Land Force Stage 2B - HV Distribution
 
Gallipoli Barracks Enhanced Land Force Stage 2B - 11kV Protection Logic Diagrams
Gallipoli Barracks Enhanced Land Force Stage 2B - 11kV Protection Logic DiagramsGallipoli Barracks Enhanced Land Force Stage 2B - 11kV Protection Logic Diagrams
Gallipoli Barracks Enhanced Land Force Stage 2B - 11kV Protection Logic Diagrams
 
11kV Panels - Snell Street Substation - PAWA
11kV Panels - Snell Street Substation - PAWA11kV Panels - Snell Street Substation - PAWA
11kV Panels - Snell Street Substation - PAWA
 
132-66 kV - ISIS T131 Substation - Ergon
132-66 kV - ISIS T131 Substation - Ergon132-66 kV - ISIS T131 Substation - Ergon
132-66 kV - ISIS T131 Substation - Ergon
 

Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-PCP-6104

  • 1. L290-AQ-PLN-10850 Status LCPL QA (Sub Contractor) Leightons - LCPL (Sub Contractor) JKC (Contractor) Name: Name: Name: Date: Date: Date: Signature: Signature: Signature: IVB 1.0 1.1 Issued for Construction - IFC Drawings (IFI drawing for temporary works) PE Each activity L290-AB-PRC-0004_0 Instruction for Vendor Documentation-Section 6.4 Stamped / Approved Drawings Stamped Code: A=Approved without Comment B=Approved with minor Comment N=Not Approved F= Not subject to review N/A Stamped IFC drawing 1.2 Calibration of Equipment PE As per equipment calibration register L290-AQ-SPC-0009: Quality Control Requirements for subcontractor Clause 4.6.3 of L290-AQ-SPC-0009 Documentation sighted, for inclusion into MDR, Approved ITP N/A calibration certificates 1.3 Relevant codes & Specifications sighted / Correct revision PE Each activity Section H Contract. Contract Exhibit E Drawings & Specifications Section H Contract. Contract Exhibit E Drawings & Specifications Documents sighted / Approved ITP / Check Sheet SSF01 N/A Approved ITP 1.4 Development and approval of ITP prior to construction activities PE Each activity L290-AQ-SPC-0009: Quality Control requirements for Subcontractors Clause 4.5 of L290-AQ-SPC-0009 Documentation sighted on approved ITP N/A Approved ITP 1.5 Pre-Inspection Meeting Minutes of Meeting (PIM MOM) if required as per the criticality matrix QM Each activity as required L290-AQ-SPC-0009: Quality Control requirements for Subcontractors, L290- AB-PRC- 0004:INSTRUCTION FOR VENDOR DOCUMENTATION Clause 4.4.3 of L290-AQ-SPC-0009, Clause 5.1 of L290-AB- PRC-0004 MOM Documentation sighted N/A PIM- MOM 1.6 QC Inspector Qualification - Electrical QM Once per person L290-AQ-SPC-0009 L290-AQ-SPC-0009 Section 4.14.1.3: working knowledge os AS 2381: “Electrical Equipment for Hazardous Areas”, AS/NZS 60079.17: “Explosive atmospheres –Electrical..., AS/NZS 60079.18: “Explosive atmospheres – …. Competencies for working with EEHA shall be relevant to the type of work undertaken as described in AS/NZS 4761:2008 Sections 3.2 Sighted approval of Inspector document N/A Approval document 1.7 Electrcial Installer Qualifications - Electrical QM Once per person L290-AQ-SPC-0009 L290-AQ-SPC-0009 Section 4.14.1.3: working knowledge os AS 2381: “Electrical Equipment for Hazardous Areas”, AS/NZS 60079.17: “Explosive atmospheres –Electrical..., AS/NZS 60079.18: “Explosive atmospheres – …,Competencies for working with EEHA shall be relevent to the type of work undertaken as described in AS/NZS 4761:2008 Sections 3.2 Sighted approval of Installer document N/A Approval document 1.8 Verify SHEWMS available and approved PE Each activity Relevant Specification As Per Schedule Approved SHEWMS N/A Approved SWEHMS 2.0 2.1 Material Certificates received for all components SUP Each Delivery Contract Exhibit H, L290-AQ-SPC-0010 and AS 60079:14 Clause 4.3 Section 4.11 of Exhibit H, Clause 2.2 for L290-AQ-SPC-0010 and Clause 4.3 for AS 60079:14 Material Register & Material Certificates sighted, for inclusion into MDR N/A material certificates 2.2 Inspection of received goods SUP Each Delivery L290-AQ-PRC-0008: QUALITY CONTROL COORDINATION PROCEDURE FOR SUBCONTRACTOR Clause 4.5.2 of L290-AQ-PRC-0008 Material Register & Material Certificates sighted, for inclusion into MDR N/A Material inspection report 3.0 3.1 Installations as per gneral arrangement and layouts SUP/ENG Each Lot IFC drawing, AS 3000, L290-AQ-TAC-0005 (Inspection and Test Plan for Electrical Works) Clause 5.5.5 of AS 3000: 2007 Inspection Test Record EP08, EP01, EP30 (L290-AR-FRM-10002) N/A ITR EP08, EP01, EP30 3.2 Earthing of intrinsically safe circuits SUP/ENG Each Lot IFC drawing, AS 3000, AS 60079:2009 Clause 12.4.4, L290-AQ-TAC-0005 (Inspection and Test Plan for Electrical Works) Clause 5.5.5 of AS 3000: 2007, Clause 12.4.4 of AS 60079:2009 Inspection Test Record EP08, EP01 (L290-AR-FRM-10002) N/A ITR EP08, EP01, XP03 3.3 Equipment is tagged correctly against drawings and project specification PE Each Lot IFC drawing, AS 3000, L290-AQ-TAC-0005 (Inspection and Test Plan for Electrical Works) IFC Drawings/ Clause 5.5.1.3 of AS 3000:2007 Inspection Test Record EP08, EP01, EP30 (L290-AR-FRM-10002) N/A ITR EP08, EP01, EP30 3.4 Verify Earthing straps and Conductors cross section as per drawings and specification SUP/ENG Each Lot IFC drawing, AS 3000, L290-AQ-TAC-0005 (Inspection and Test Plan for Electrical Works) Clause 5.3.3 of AS 3000: 2007 Inspection Test Record EP08, EP01,(L290-AR-FRM-10002) N/A ITR EP08, EP01 3.5 Main earthing cable and earthing boss checked SUP/ENG Each Lot IFC drawing, AS 3000, L290-AQ-TAC-0005 (Inspection and Test Plan for Electrical Works) Clause 5.3.3.4 of AS 3000: 2007 Inspection Test Record EP01 (L290-AR-FRM-10002) N/A ITR EP01 3.6 Main earthing bar checked SUP/ENG Each Lot IFC drawing, AS 3000, L290-AQ-TAC-0005 (Inspection and Test Plan for Electrical Works) Clause 5.3.2.1 of AS 3000:2007 Inspection Test Record EP29 (L290-AR-FRM-10002) N/A ITR EP29 3.7 Main earthing rod checked SUP/ENG Each Lot IFC drawing, AS 3000, L290-AQ-TAC-0005 (Inspection and Test Plan for Electrical Works) Clause 5.3.6 of AS 3000:2007 Inspection Test Record EP30 (L290-AR-FRM-10002) N/A ITR EP30 4.0 4.1 Check type of cable tray, conduits, ladders, junction boxes & fittings. SUP/ENG Each Lot IFC Drawings/ AS 3000:2007 Section 3, AS 60079.14:2009 Clause 9.3, 9.4, 9.5 & 9.6 IFC Drawings/ AS /NZS 3000:2007 Clause 3.8, AS 60079.14:2009 Clause 9.3, 9.4, 9.5 & 9.6 Field Inspection Check Sheet ELC19 and Inspection Test Record EP10 (L290-AR-FRM-10002) N/A FIC- ELC19, ITR - EP10 4.2 Check conduit and cable tray size, routing for no obstructions and elevation. SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3, Section 7 IFC Drawings/ AS /NZS 3000:2007 Clause 3.9, 7.4 Field Inspection Check Sheet ELC19 and Inspection Test Record EP10 (L290-AR-FRM-10002) N/A FIC- ELC19, ITR - EP10 4.3 Check coupler plates, elbows, dropout tees, conduit fittings and accessories are properly installed. SUP/ENG Each Lot IFC Drawings/ AS 3000:2007 Section 3 , AS 60079.14:2009 Clause 9.3 & 9.4 IFC Drawings/ AS /NZS 3000:2007 Clause 3.9, AS 60079.14:2009 Clause 9.4 Field Inspection Check Sheet ELC19 and Inspection Test Record EP10 (L290-AR-FRM-10002) N/A FIC- ELC19, ITR - EP10 4.4 Check tray and conduit supports are correct and tightened using the appropriate tool ensuring no deflection. SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3 .9 IFC Drawings/ AS /NZS 3000:2007 Clause 3.9.6 Field Inspection Check Sheet ELC19 and Inspection Test Record EP10 (L290-AR-FRM-10002) N/A FIC- ELC19, ITR - EP10 4.5 Check tray covers and protection is provided. SUP/ENG Each Lot IFC Drawings/ AS 3000 Clause 3.2 to 3.4 IFC Drawings/ AS /NZS 3000:2007 Clause 3.3.2.6 Inspection Test Record EP10 (290-AR-FRM-10002) N/A ITR - EP10 4.6 Check pulling guide rope in concealed conduit is installed. SUP/ENG Each Lot AS 3000 Section 3 AS /NZS 3000:2007 Clause 3.9 Field Inspection Check Sheet ELC19 (L290-AR-FRM-10002) N/A FIC- ELC19 4.7 Check all wall penetrations are completely sealed and fire rated. SUP/ENG Each Lot AS 3000 Clause 3.9.9 AS /NZS 3000:2007 Clause 3.9.9.3 Inspection Test Record EP10 (290-AR-FRM-10002) N/A ITR - EP10 4.8 Check tray and conduit sharp edges have been removed. SUP/ENG Each Lot AS 3000 Clause 3.10.1 to 3.10.4 AS /NZS 3000:2007 Clause 3.10.3.5 Field Inspection Check Sheet ELC19 and Inspection Test Record EP10 (L290-AR-FRM-10002) N/A FIC- ELC19, ITR - EP10 4.9 Check cable tray, conduits are properly cleaned prior to cable pulling. SUP/ENG Each Lot AS 3000 Clause 3.10 to 3.11 AS /NZS 3000:2007 Clause 3.10.3.5, 3.6 Field Inspection Check Sheet ELC19 and Inspection Test Record EP10 (L290-AR-FRM-10002) N/A FIC- ELC19, ITR - EP10 H H H H H H H H W B H H W R SH H W H Contractor Company APPROVALS AND OTHER PRELIMINARY REQUIREMENTS LTSC Required Inspection S S H W S S H W S S H W S S W S S Responsibility S MATERIAL RECEIVING/DOCUMENT INSPECTION H W S H W H Quality Verification Activity/Stage Reference ProcedureFrequency Independent Verification Body (IVB) W S S W S S SR S H W S S S W S H H H W SSW CABLEWAYS & CONDUITS W S S S Acceptance Criteria/Specification Verifying Documents Package Name: EPC BUILDING WORKS (P-31D-BLD-1), Subcontractor's Document Number: Q1447-CS-PCP-6104 ITP Title: INSPECTION AND TEST PLAN - ELECTRICAL - HAZARDOUS AREA INSTALLATION - EPC BUILDING WORKS ITP Number: L290-AQ-PLN-11363 Contractor's Number: V-31D1-BLD-1-Z40206 H H H W S Lower Tier Sub Contractor (LTSC) Name:ITP Accepted: No. W S Name: H H S S BUILDING EARTHING Date: Signature: Record Remarks Subcontractor H W W H H R S W H H H H W Date: Signature: H W W S S W S S S S S Q1447-CS-PCP-6104-A.xlsx:Page 1/2
  • 2. L290-AQ-PLN-10850 Status LCPL QA (Sub Contractor) Leightons - LCPL (Sub Contractor) JKC (Contractor) Name: Name: Name: Date: Date: Date: Signature: Signature: Signature: IVB B Contractor CompanyLTSC Required Inspection ResponsibilityQuality Verification Activity/Stage Reference ProcedureFrequency Independent Verification Body (IVB) Acceptance Criteria/Specification Verifying Documents Package Name: EPC BUILDING WORKS (P-31D-BLD-1), Subcontractor's Document Number: Q1447-CS-PCP-6104 ITP Title: INSPECTION AND TEST PLAN - ELECTRICAL - HAZARDOUS AREA INSTALLATION - EPC BUILDING WORKS ITP Number: L290-AQ-PLN-11363 Contractor's Number: V-31D1-BLD-1-Z40206 Lower Tier Sub Contractor (LTSC) Name:ITP Accepted: No. Name: Date: Signature: Record Remarks Subcontractor Date: Signature: 4.10 Verify complete cable tray installation against drawings and specifications SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3 IFC Drawings/ AS 3000:2007 Section 3 Field Inspection Check Sheet ELC19 and Inspection Test Record EP10 (L290-AR-FRM-10002) N/A FIC- ELC19, ITR - XP03 5.0 5.1 Visual inspection of cable type, size & tag no. SUP/ENG Each Lot AS 3000 Clause 8.2, 60079.14:2009 Clause 9.3, AS 60079.17 Clause 4.3 & 4.12 AS /NZS 3000:2007 Clause 8.2.1, 8.2.2(d), AS 60079.14:2009 Clause 9.3, AS 6007.17 Clause 4.12 Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 5.2 Visually inspect the cable is not damaged or snagged during cable pulling. SUP/ENG Each Lot AS 3000 Section 3, AS 60079.14:2009 Clause 9.3.9, 11.2 & 12.2.2 AS /NZS 3000:2007 Clause 3.3.2.7, 3.3.2.8, AS 60079.14:2009 Clause 9.3.9, 11.2 & 12.2.2.5 Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 5.3 Check cable-bending radius according to specifications. SUP/ENG Each Lot AS 3000:2007 Clause 3.9 AS /NZS 3000:2007 Clause 3.9.6 Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 5.4 Check cable segregation as per drawings SUP/ENG Each Lot IFC drawing /AS 3000 Section 3.9, AS 60079.14:2009 Clause 12.2.2.5 AS /NZS 3000:2007 Clause 3.9.8.3, AS 60079.14:2009 Clause 12.2.2.5, IFC drawings Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 5.5 Check cable fixing on tray properly installed. SUP/ENG Each Lot AS 3000 Clause 3.3 AS /NZS 3000:2007 Clause 3.3.2.6 Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 5.6 Check wiring above ceiling is properly installed. SUP/ENG Each Lot AS 3000 Section 3.9, AS 60079.14:2009 Clause 9.3.2 & 11.2 & 12.2.2.5 AS /NZS 3000:2007 Clause 3.9.3.2 AS 60079.14:2009 Clause 12.2.2.5 Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 5.7 Check cable ID tag no. Is properly installed. SUP/ENG Each Lot AS 3000 section 3 AS /NZS 3000:2007 Clause 3.9 Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 5.8 Check cable continuity and megger test after pulling. SUP/ENG Each Lot AS 3000 Clause 3.10 AS /NZS 3000:2007 Clause 3.10.3.3 Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 5.9 Check protection of cable ends after megger test. SUP/ENG Each Lot AS 3000 Clause 3.10 AS /NZS 3000:2007 Clause 3.10.3.5 Inspection Test Record EP40 and EP01 for single cables only if relevant (L290-AR-FRM-10002) N/A ITR - EP40, EP01 6.0 6.1 Check general arrangement of installation meets drawings and specifications. SUP/ENG Each Lot IFC Drawing/ AS 3000 Clause 4.3, AS 60079.14 Clause 4.1, 5.3 & 5.4, AS 60079.17 Clause 4.3 IFC Drawing/ AS/NZS 3000: 2007 Clause 4.3.3, AS 6007.14 Clause 9.3 Inspection Test Record EP05,EP07, EP14, EP37, 42 (290-AR-FRM- 10002) N/A ITR - EP05,EP07, EP14, EP37, EP41 6.2 Check Socket Outlet/ Junction Boxes/ Isolators are correct alligned, leveled, ridget and secured with correct fixings. SUP/ENG Each Lot AS 3000 Clause 4.4 & 7.7.2.4, AS60079.14:2009 Clause 4.1, 9.3, 11.2 & 12.2 AS/NZS 3000 : 2007 Clause 4.4.2 & 7.7.2.4, AS 60079.14:2009 Clause 9.3, 11.2 & 12.2 Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42 6.3 Check earthing and bonding of sockets outlets against drawings. SUP/ENG Each Lot IFC Drawing/ AS 3000 Clause 4.4 IFC Drawing/ AS/NZS 3000: 2007 Clause 4.4.3 Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42 6.4 Check Socket Outlet/ Junction Boxes/ Isolators is clean and free from dust/debris, internal internals. SUP/ENG Each Lot AS 3000 Clause 4.4 AS/NZS 3000 : 2007 Clause 4.4.2.2(a) Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42 6.5 Check all terminals and connections are tight, correctly made and identified as per drawings. SUP/ENG Each Lot AS 3000 Clause 4.4 AS/NZS 3000 : 2007 Clause 4.4.2.2© Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42 6.6 Perform insulation resistance test. Each phase to earth. SUP/ENG Each Lot AS 3000 Clause 4.4 AS/NZS 3000 : 2007 Clause 8.3.6 Inspection Test Record EP42 (290-AR-FRM-10002) N/A ITR - EP42 6.7 Conduct Earth loop impedance test. SUP/ENG Each Lot AS 3000 Clause 8.3 AS/NZS 3000: 2007 Clause 8.3.9 Inspection Test Record EP44 (290-AR-FRM-10002) N/A ITR - EP44 6.8 Conduct Pre-commissioning checks SUP/ENG Each Lot IFC Drawings/AS 3000 Section 4, 60079.14:2009 Sections 9, 11 & 12 AS/NZS 3000: 2007 Section 4 AS 60079.14:2009 Sections 9, 11 & 12 Inspection Test Record EP44 (290-AR-FRM-10002) N/A ITR - XP03 7.0 7.1 Verify sign-off of all Inspection and Test documentation ENG Each Lot ITP/ FICs Signed off ITP/ FICs Completed ITP checklist N/A ITP, FICs 7.2 Verify all drawings 'As built' status PE/QM Each drawing IFC Drawing/ As Built drawing, Contract exhibit H IFC Drawing/ As Built drawing Completed As-built drawings N/A respective drawing 7.3 Completion and handover/delivery of relevant QA documentation to MDR PE/QM Each lot/Activity Collate records as perL290-AQ-SPC-0001, L290- AQ-SPC-0010, Exhbit H applicable sections, AS 3000 and IFC drawings and FICS, test reports, material certificates, certificates of conformity to AS 60079:14 Clause 4.3 and all other relevant records Collate records as perL290-AQ-SPC-0001, L290-AQ-SPC- 0010, Exhbit H applicable sections, As 3000 and IFC drawings and FIC's/ ITR's, test reports, material certificates, certificates of conformity and all other relevant records IFC drawings, signed off FIC's/ ITR's, test reports, material certificates, inspection reports, survey reports and all other relevant records of ITP N/A Partial MDR H - Hold Point SUP Supervisor LTSC PIM W - Witness Point ENG LCPL Engineer LCPL MOM IW - Initial Witness PE LCPL Project Engineer JKC QA S - Surveillance JKC JKC Representative INPEX FICS R - Record Review SHEWMS Safety,Health and Environmental Work Method Statement N/A MDR OR - Official Record IVB IFC IR - Internal Record Document Number: L290-AQ-PLN-11363 IFI RH H H H H W W S S S S Issued for information Minutes of Meeting Quality Assuarance Field Inspection Check Sheet Manufacturers' Data record Pre Inspection Meeting S S H W W S H/R S S S S W S H W W S Issued for construction S S S S W H H W H H S R W S S Independent Verification Body Low Tier Subcontractor H H H S S H S W W S W R W S S W S Subcontractor Contractor ABOVE GROUND CABLING S W R S W S COMPLETION AND HANDOVER / DELIVERY Company Not Applicable H H H W S W S S W LIGHT FIITTING/SOCKET OUTLET/ JUNCTION BOX/ ISOLATOR S H W R S SW S Q1447-CS-PCP-6104-A.xlsx:Page 2/2