CARRICULAM VITAE
Sudheesh karuvath
sudheeshkaruvath@gmail.com
APPLICATION FOR THE POST OF INSTRUMENT TECHNICIAN/SUPERVISOR
OBJECTIVE
A challenging carrier to utilize my skills and ability in the Instrumentation Industry that offers professional
growth and scope for widening the spectrum of my knowledge.
EXPERENCE
10 Years of Experience as an Instrument technician in Offshore And Onshore in India and Middle East ,in Oil &
Gas industries specific in Process Control Instrumentation Offshore platforms, LNG, GTL, Petrochemical, Power
generation and Chemical plants. For Preventive Maintenance & Non sensitive Shut Down, Commissioning activities etc
.
ACADEMIC PROFILE
Educational Qualification
S.S.L.C : From Board of Public Examination, Kerala
+2 : From Board of Higher secondary examination, Kerala
Professional Qualification
ITI in INSTRUMENTATION ( NCVT CERTIFIED )
APPRENTICESHIP IN INSTRUMENTATION ( NCVT CERTIFIED )
Computer Knowledge
Experience in Windows &Dos Platform, MS Office, C, C++, VB, HTML
Additional Qualification
Permit holder Qatar petroleum NGL operation
Permit holder Ras Gas (Signatory &JSA)
Permit holder Qatar Gas
Permit holder QCHEM
Permit holder QP OFFSHORE
Helicopter Under Water Escape Training & Sea Survival
H2S/Breathing Apparatus Awareness (QP, RAS GAS ,QATAR GAS)
SKILLS
• Leading a team consists of instrument Technicians, Instrument fitters & Electrician for installation,
commissioning and maintenance of process control instrumentation field.
• Having good knowledge of plant safety rules & regulations.
• Good knowledge about Permit to work systems (PTW).
• Familiarity about several kind of Perilous involved in work area and essential safety measure to be done for the
safe work.
• Capacity to do job alone by following Safety rules & regulations.
• Good Experience in the Plant Maintenance and Commissions.
• Sound knowledge and good experienced in the management Plant Instrument Maintenance.
• Well-known with the Plant Running, Predictive, Preventive, Breakdown and Corrective Maintenance.
• Specialist in Installation & Calibration of different types of the Modern Smart Electronics & Pneumatic
instrument.
• Effective knowledge of the Lock out Tag out Processes.
• Operational knowledge in a Fire and Gas Systems like ,H2S Detectors, Smoke Detectors, Flammable ,toxic gas
Detectors Etc.
• Sound skills of all kind of Rotating Equipments Maintenance, Gas Turbines, Compressors etc.
• Sound knowledge of the Bentley Nevada Vibration Monitor system.
• Able to do a job independently.
• Skilled to read Engineering Drawings, Loop Diagrams, P&ID Drawings, Logic Diagram & Hook up drawings
also.
FUNCTIONAL SUMMARY
My Industrial life I have hands on experience of Carries out preventive and breakdown maintenance and, Calibration,
Commissioning and Loop Testing of various following types of field and control room instruments, as under:
• Experience in calibration and trouble shooting of RTD, TC of Rosemount, Foxboro, and thermo electric.
• Control Valves, Damper and Positioners, Motorized Operated Valves, Solenoid Valves etc.
• Electro-Pneumatic & Electro-Hydraulic Converters, Load Cells.
• Transducers and Sensors (DP, Magnetic, Ultrasonic, Proximity and Floating type).
• Pneumatic Pressure Regulator Switches.
• Smart, Foundation Field Bus Series Transmitters (Pressure, Level, Flow and Temperature).
• Recorders and Local Indicators, Gauges.
• Handled Calibrators, (Rosemount 275, 375,), F.F Communicator (Rosemount 375&475).
• Fluke and other applicable test equipments such as Temperature baths, Test kit (TK3-2E), Dead weight etc.
Also carries out routine/preventive maintenance of analyzers, fire and safety equipment such as H2S gas detectors .
Having good knowledge in HART, SMART, Foundation Field bus and Fire & Gas Instruments.
Strength:
• Working as a Construction Instrument Supervisor with integrity, trust and leadership skills over 10 years in
Oil and Gas Industries.
• Coordinating craft needs for both construction and commissioning to complete projects on schedule and
within budget.
• Ability to multi-task in a demanding engineering environment.
• A strong track record in delivering projects on time.
• Able to ensure that all Health & Safety procedures are met and maintained.
• Resolving complex technical issues and coming up with fast efficient solutions.
• Ability to assess the financial feasibility and impact of proposed budget items and also alternatives.
• Good communication and organization skills.
• Ability to lead a Team as well as be an active Team Contributor.
• Site survey and details verification and to prepare technical documents.
• Performed modifications work, checking design and as built drawings, review, preparation of work
schedule, periodical progress report, preparation of material specifications, and adherence to stringent
inspections, quality control and testing procedures as per the company /client standards.
• Confident to handle the construction and quality control activities as specified in the Drawings and
applicable standards and specifications.
Professional Experience
Designation : Instrument Technician (Worksite supervisor)
Organization : Trading and Agency Services, Doha, Qatar.
OFFSHORE : QP OFFSORE,RAS GAS OFFSHORE , (Maintenance, construction work)
ONSHORE : Dukhan Onshore Oil Production Station (QP), Oryx (GTL), RAS GAS (LNG)
QChem. Ethylene derivative project (Vendor Technimont)
: RAS GAS BGDS Project
: RLOC,Flare Measurement Enhancement project
: RAS GAS Commissioning, maintenance activities in RGX6,AKG2
: QP ,NGL Plant maintanace Activities
Q CHEM : WORKED AS AN INSTRUMENT SUPERVISOR FOR VARIOUS TWR PROJECTS
PRESENTLY WORKING IN QP TANK FARM REHABILITATION WORK AS AN INSTRUMENT SUPERVISOR
Previous Work Experience:
Organization : FERTILIZERS AND CHEMICHALS TRAVANCORE LTD (ONE YEAR)
Organization : GLOBAL TOTAL INSTRUMENTATION, COCHIN. (2 YEAR)
Personnel Details.
Full Name. SUDHEESH KARUVATH
Permanent Address.
KUNDUMKARA HOUSE
MANANTHERI PO
KANNUR (DT)
KERALA.
Passport Details. G 5237545
QID Details. 28535613927
Languages Known. ENGLISH,HINDI,MALAYALAM,TAMIL
Mobile No. 0097433603041
Email ID. sudheeshkaruvath@gmail.com
Driving Licence Details. NIL
Declaration.
I hereby declare that all the information given above is true to the best of my knowledge and belief.
Name:
Date :
Name:
Date :

SUDHEESH CV .

  • 1.
    CARRICULAM VITAE Sudheesh karuvath sudheeshkaruvath@gmail.com APPLICATIONFOR THE POST OF INSTRUMENT TECHNICIAN/SUPERVISOR OBJECTIVE A challenging carrier to utilize my skills and ability in the Instrumentation Industry that offers professional growth and scope for widening the spectrum of my knowledge. EXPERENCE 10 Years of Experience as an Instrument technician in Offshore And Onshore in India and Middle East ,in Oil & Gas industries specific in Process Control Instrumentation Offshore platforms, LNG, GTL, Petrochemical, Power generation and Chemical plants. For Preventive Maintenance & Non sensitive Shut Down, Commissioning activities etc . ACADEMIC PROFILE Educational Qualification S.S.L.C : From Board of Public Examination, Kerala +2 : From Board of Higher secondary examination, Kerala Professional Qualification ITI in INSTRUMENTATION ( NCVT CERTIFIED ) APPRENTICESHIP IN INSTRUMENTATION ( NCVT CERTIFIED ) Computer Knowledge Experience in Windows &Dos Platform, MS Office, C, C++, VB, HTML Additional Qualification Permit holder Qatar petroleum NGL operation Permit holder Ras Gas (Signatory &JSA) Permit holder Qatar Gas Permit holder QCHEM Permit holder QP OFFSHORE Helicopter Under Water Escape Training & Sea Survival H2S/Breathing Apparatus Awareness (QP, RAS GAS ,QATAR GAS)
  • 2.
    SKILLS • Leading ateam consists of instrument Technicians, Instrument fitters & Electrician for installation, commissioning and maintenance of process control instrumentation field. • Having good knowledge of plant safety rules & regulations. • Good knowledge about Permit to work systems (PTW). • Familiarity about several kind of Perilous involved in work area and essential safety measure to be done for the safe work. • Capacity to do job alone by following Safety rules & regulations. • Good Experience in the Plant Maintenance and Commissions. • Sound knowledge and good experienced in the management Plant Instrument Maintenance. • Well-known with the Plant Running, Predictive, Preventive, Breakdown and Corrective Maintenance. • Specialist in Installation & Calibration of different types of the Modern Smart Electronics & Pneumatic instrument. • Effective knowledge of the Lock out Tag out Processes. • Operational knowledge in a Fire and Gas Systems like ,H2S Detectors, Smoke Detectors, Flammable ,toxic gas Detectors Etc. • Sound skills of all kind of Rotating Equipments Maintenance, Gas Turbines, Compressors etc. • Sound knowledge of the Bentley Nevada Vibration Monitor system. • Able to do a job independently. • Skilled to read Engineering Drawings, Loop Diagrams, P&ID Drawings, Logic Diagram & Hook up drawings also. FUNCTIONAL SUMMARY My Industrial life I have hands on experience of Carries out preventive and breakdown maintenance and, Calibration, Commissioning and Loop Testing of various following types of field and control room instruments, as under: • Experience in calibration and trouble shooting of RTD, TC of Rosemount, Foxboro, and thermo electric. • Control Valves, Damper and Positioners, Motorized Operated Valves, Solenoid Valves etc. • Electro-Pneumatic & Electro-Hydraulic Converters, Load Cells. • Transducers and Sensors (DP, Magnetic, Ultrasonic, Proximity and Floating type).
  • 3.
    • Pneumatic PressureRegulator Switches. • Smart, Foundation Field Bus Series Transmitters (Pressure, Level, Flow and Temperature). • Recorders and Local Indicators, Gauges. • Handled Calibrators, (Rosemount 275, 375,), F.F Communicator (Rosemount 375&475). • Fluke and other applicable test equipments such as Temperature baths, Test kit (TK3-2E), Dead weight etc. Also carries out routine/preventive maintenance of analyzers, fire and safety equipment such as H2S gas detectors . Having good knowledge in HART, SMART, Foundation Field bus and Fire & Gas Instruments. Strength: • Working as a Construction Instrument Supervisor with integrity, trust and leadership skills over 10 years in Oil and Gas Industries. • Coordinating craft needs for both construction and commissioning to complete projects on schedule and within budget. • Ability to multi-task in a demanding engineering environment. • A strong track record in delivering projects on time. • Able to ensure that all Health & Safety procedures are met and maintained. • Resolving complex technical issues and coming up with fast efficient solutions. • Ability to assess the financial feasibility and impact of proposed budget items and also alternatives. • Good communication and organization skills. • Ability to lead a Team as well as be an active Team Contributor. • Site survey and details verification and to prepare technical documents. • Performed modifications work, checking design and as built drawings, review, preparation of work schedule, periodical progress report, preparation of material specifications, and adherence to stringent inspections, quality control and testing procedures as per the company /client standards. • Confident to handle the construction and quality control activities as specified in the Drawings and applicable standards and specifications. Professional Experience Designation : Instrument Technician (Worksite supervisor) Organization : Trading and Agency Services, Doha, Qatar. OFFSHORE : QP OFFSORE,RAS GAS OFFSHORE , (Maintenance, construction work) ONSHORE : Dukhan Onshore Oil Production Station (QP), Oryx (GTL), RAS GAS (LNG)
  • 4.
    QChem. Ethylene derivativeproject (Vendor Technimont) : RAS GAS BGDS Project : RLOC,Flare Measurement Enhancement project : RAS GAS Commissioning, maintenance activities in RGX6,AKG2 : QP ,NGL Plant maintanace Activities Q CHEM : WORKED AS AN INSTRUMENT SUPERVISOR FOR VARIOUS TWR PROJECTS PRESENTLY WORKING IN QP TANK FARM REHABILITATION WORK AS AN INSTRUMENT SUPERVISOR Previous Work Experience: Organization : FERTILIZERS AND CHEMICHALS TRAVANCORE LTD (ONE YEAR) Organization : GLOBAL TOTAL INSTRUMENTATION, COCHIN. (2 YEAR) Personnel Details. Full Name. SUDHEESH KARUVATH Permanent Address. KUNDUMKARA HOUSE MANANTHERI PO KANNUR (DT) KERALA. Passport Details. G 5237545 QID Details. 28535613927 Languages Known. ENGLISH,HINDI,MALAYALAM,TAMIL Mobile No. 0097433603041 Email ID. sudheeshkaruvath@gmail.com Driving Licence Details. NIL Declaration. I hereby declare that all the information given above is true to the best of my knowledge and belief.
  • 5.
  • 6.