Activity ID Shift ResponsibleWork
Order
Activity Name Original
Duration
Start Finish Critical
TotalTotalTotalTotalTotal 36 08-Sep-14 A 14-Oct-14
*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan 36 08-Sep-14 A 14-Oct-14
Required WorkscopesRequired WorkscopesRequired WorkscopesRequired WorkscopesRequired Workscopes 36 08-Sep-14 A 14-Oct-14
Area 0: Not ApplicableArea 0: Not ApplicableArea 0: Not ApplicableArea 0: Not ApplicableArea 0: Not Applicable 36 09-Sep-14 A 14-Oct-14
N3010 D TBC SCORE - PSV Calibrations Platform and Drilling 21 09-Sep-14 A 02-Oct-14 CRITCAL
N4582 D 913864 Management Visit - William Watson (Drilling Equipment Condition Audits) 5 12-Sep-14 A 16-Sep-14 A
N3020 D TBC Hang Block (Drill Crew) 1 16-Sep-14 16-Sep-14
N4572 D Management Visit - Chris Stopper and Gavin Morrice (KCAD) 3 16-Sep-14* 18-Sep-14
N1120 CNR Platform Shutdown 18/09/14 to 14/10/14 27 18-Sep-14* 14-Oct-14
N2720 D KCAD Drilling Shutdown - KCAD Electrical PM's - x2 Elect 22 19-Sep-14 10-Oct-14
N2050 D KCAD Drilling Shutdown - KCAD Offshore Supervision - x1 Rig Super, x2 Snr Elect, x1 FMS, x1 Motorman 22 19-Sep-14 10-Oct-14
N3460 N KCAD Drilling Shutdown (Night) - KCAD Workforce - x3 RAT, x1 Driller, x2 R/Neck 22 19-Sep-14 10-Oct-14
N3462 N KCAD Drilling Shutdown (Night) - KCAD Offshore Supervision - x1 Rig Super, x1 Snr Mech, x1 Snr Elect, x1 FMS, x1 Motorman22 19-Sep-14 10-Oct-14
N3050 D TBC Run Up Drawworks 3 08-Oct-14 10-Oct-14
N3070 D TBC Run Up Top Drive (mark up IBOPS' and saver sub) 3 08-Oct-14 10-Oct-14
N3080 D TBC For all equipment removed check wirelock and bolt tension 3 08-Oct-14 10-Oct-14
N3090 D TBC Overall Function tests of all drilling equipment 3 08-Oct-14 10-Oct-14
N3060 D TBC Unhang Blocks 3 08-Oct-14 10-Oct-14
N3454 D TBC Comissioning and Restart 3 08-Oct-14 10-Oct-14
Area 1: DerrickArea 1: DerrickArea 1: DerrickArea 1: DerrickArea 1: Derrick 19 11-Sep-14 A 07-Oct-14
N4612 KCAD Load Path RAT Preparation 1 11-Sep-14 A 19-Sep-14
N3432 D KCAD 913864 Crown Block Inspection APM 1 19-Sep-14* 19-Sep-14 CRITCAL
N3444 D KCAD 986329 Crown Block 12 Monthly 1 19-Sep-14 19-Sep-14 CRITCAL
N2690 D KCAD 986334 Torque Tube Yearly Inspection PM - (25% Bolt changeout) 2 30-Sep-14* 01-Oct-14 CRITCAL
N3270 D KCAD 986334 Change out Sheaves in Crown 1 05-Oct-14 05-Oct-14
N3280 D KCAD Derrick Safety Sweep 2 06-Oct-14 07-Oct-14
Area 1: Drill FloorArea 1: Drill FloorArea 1: Drill FloorArea 1: Drill FloorArea 1: Drill Floor 20 08-Sep-14 A 08-Oct-14
N4622 KCAD Remove Iron Roughneck from Drill floor 1 08-Sep-14 A 08-Sep-14 A
N3300 D KCAD 986326 Iron Roughneck 12 Monthly 2 11-Sep-14 A 21-Sep-14
N4580 D KCAD 986683 Shaker Discharge modification 15 19-Sep-14* 03-Oct-14 CRITCAL
N3450 D KCAD Gauge Calibrations 7 19-Sep-14 25-Sep-14 CRITCAL
N4606 D KCAD 986337 Hook - 12 Monthly 1 20-Sep-14* 20-Sep-14 CRITCAL
N3412 D KCAD 945271 Hook - Annual Inspection 1 20-Sep-14 20-Sep-14 CRITCAL
N3402 D KCAD 931259 Travelling Block - 12 Monthly 2 21-Sep-14 22-Sep-14 CRITCAL
N3200 D KCAD 986340 Travelling Block Maintenance PM 1 21-Sep-14 21-Sep-14 CRITCAL
N4634 D KCAD Install TDS Link Tilt Adaptor 2 24-Sep-14* 25-Sep-14 CRITCAL
N3373 D KCAD 986664 Top Drive - Critical Load Path Inspection 2 26-Sep-14 27-Sep-14 CRITCAL
N3352 D KCAD 986554 ? Top Drive - 12 Monthly 1 28-Sep-14 28-Sep-14
N3286 D KCAD 986675 Top Drive HP Flexible Hoses - 12 Monthly 1 28-Sep-14 28-Sep-14
N3328 D KCAD 986660 Drawworks - 12 Monthly 3 29-Sep-14* 01-Oct-14 CRITCAL
N3332 D KCAD 951933 Drawworks Annual Inspection 2 29-Sep-14 30-Sep-14 CRITCAL
N3316 D KCAD 986666 Deadline Anchor 1 02-Oct-14 02-Oct-14 CRITCAL
N3324 D KCAD 986670 Deadline Anchor - 12 Monthly 1 02-Oct-14 02-Oct-14 CRITCAL
N3312 D KCAD 986668 Deadline Achor Weight Indicator 1 03-Oct-14 03-Oct-14 CRITCAL
N2980 D KCAD E&M0563 TDS Roller Inspection/Carriage Bulletin 1 04-Oct-14 04-Oct-14 CRITCAL
N3350 D KCAD 985299 Drawworks - Crown-O-Matic 1 08-Oct-14 08-Oct-14 CRITCAL
Area 3: B.O.P. DeckArea 3: B.O.P. DeckArea 3: B.O.P. DeckArea 3: B.O.P. DeckArea 3: B.O.P. Deck 23 12-Sep-14 04-Oct-14
N4604 KCAD Prepare BOP for 1 Year inspection 4 12-Sep-14 15-Sep-14
N4610 D KCAD 1009514 Single BOP Maintenance - 12 Monthly 7 19-Sep-14 25-Sep-14 CRITCAL
N4608 D KCAD 1009516 Double BOP Maintenance - 12 Monthly 7 26-Sep-14* 02-Oct-14 CRITCAL
N4618 KCAD Reassemble BOP 3 02-Oct-14* 04-Oct-14
N3422 D KCAD 949552 BOP Trolley Maintenance - 12 Monthly 1 03-Oct-14* 03-Oct-14
Area 10: Skid Deck AreaArea 10: Skid Deck AreaArea 10: Skid Deck AreaArea 10: Skid Deck AreaArea 10: Skid Deck Area 27 10-Sep-14 A 08-Oct-14
N4620 KCAD Skid Rig 2 10-Sep-14 A 11-Sep-14 A
N4602 KCAD Skid Rig 1 08-Oct-14 08-Oct-14
08 15 22 29 06 13 20 27
September October
2014
Ninian North Platform
Drilling Rig & Maintenance Projects
Project: NNP Shutdown
Sorted by Area
Data Date: 12-Sep-14
Date Issued: 12-Sep-14
Actual Level of Effort
Actual Work
Remaining Work
Critical Remai...
Milestone
Page 1 of 2 Layout: NNP - Area
TASK filter: No Milestones.
Date Revision Checked Approved
26-Aug-14 2014 NNP Drilling Shutdown Plan Simon Crook (CNR) Chris Stopper (CNR)
Activity ID Shift ResponsibleWork
Order
Activity Name Original
Duration
Start Finish Critical
Area 11: Drilling Services Switchroom (DSM)Area 11: Drilling Services Switchroom (DSM)Area 11: Drilling Services Switchroom (DSM)Area 11: Drilling Services Switchroom (DSM)Area 11: Drilling Services Switchroom (DSM) 18 08-Sep-14 A 06-Oct-14
N4362 D TBC 986673 Top Drive Yearly Electrical PM 3 08-Sep-14 A 13-Sep-14 CRITCAL
N3992 D TBC 940150 Pipe Deck 460/250V 20 KVA SP02A Annual Fault Protection APM 1 08-Sep-14 A 08-Sep-14 A CRITCAL
N4042 D TBC 940131 Pipe Deck 460/250V 20 KVA SP02B Annual Fault Protection APM 1 08-Sep-14 A 08-Sep-14 A CRITCAL
N3622 D TBC 963764 Feeder No 1 - 48 Monthly 1 19-Sep-14 19-Sep-14
N2810 D TBC 963706 Feeder No 1 - 24 Monthly 1 19-Sep-14 19-Sep-14
N4584 D TBC 963766 Feeder No. 2 - Maintenance 1 20-Sep-14 20-Sep-14
N3792 D TBC 963766 Feeder No. 2 1 20-Sep-14 20-Sep-14
N3842 D TBC 940124 Mezzanine Level 600/486V - 1500 KVA 02-02A - APM 1 21-Sep-14 21-Sep-14 CRITCAL
N3892 D TBC 940129 Mezzanine Level 600/3465V - 100 KVA 02-01 1 22-Sep-14 22-Sep-14
N3942 D TBC 940138 Mezzanine Level 600/486V - 1500 KVA 02-02B - APM 1 22-Sep-14 22-Sep-14 CRITCAL
N4262 D TBC 940127 Pipe Deck 110/640V - 6150 KVA 02-03A 1 23-Sep-14 23-Sep-14 CRITCAL
N4312 D TBC 940155 Pipe Deck 110/640V - 6150 KVA 02-03B 1 24-Sep-14 24-Sep-14 CRITCAL
N4092 D TBC 980751 Generator No. 3 Circuit Breaker - 24 Montlhy PM 1 25-Sep-14 25-Sep-14
N4152 D TBC 986687 Generator No. 4 Circuit Breaker - 24 Montlhy PM 1 26-Sep-14 26-Sep-14
N2920 D TBC 980686 Brush AC Generator Exciter - 24 Monthly PM 1 27-Sep-14 27-Sep-14
N4232 D TBC 986848 Brush AC Generator Exciter - 24 Monthly PM 1 27-Sep-14 27-Sep-14
N3456 D TBC 970281, 285, 286 & 287Bulk Tank Control and Alarm System - Calibration 3 29-Sep-14* 01-Oct-14 CRITCAL
N4576 D TBC 986673 Install Bell Nipple & Seals 2 05-Oct-14* 06-Oct-14
Fall Back WorkFall Back WorkFall Back WorkFall Back WorkFall Back Work 5 08-Sep-14 A 11-Oct-14
No AreaNo AreaNo AreaNo AreaNo Area 5 08-Sep-14 A 11-Oct-14
N4630 KCAD 987922 Repair Drive Check Casing MP1 5 08-Sep-14 A 14-Sep-14
N4628 KCAD 972126 Install Heater in Doghouse 1 08-Sep-14 A 12-Sep-14
N4632 KCAD 987925 Repair Drive Check Casing MP2 5 08-Sep-14 A 14-Sep-14
N4590 KCAD 954186 Catwalk Winch 1 08-Sep-14 A 08-Sep-14 A
N4592 KCAD 954559 North Substructure BOP Winch - 12 Monthly 1 08-Sep-14 A 08-Sep-14 A
N4594 KCAD 955799 West Fingerbaord Winch - 12 Monthly 1 08-Sep-14 A 08-Sep-14 A
N4596 KCAD 970083 South Substructure BOP Winch - 12 Monthly 1 08-Sep-14 A 08-Sep-14 A
N4598 KCAD 949818 Drill floor Pull Back Winch - 12 Monthly 1 08-Sep-14 A 08-Sep-14 A
N4624 KCAD Remove Corroded Steel Stub on Monkey Board Level (Starnet Ref 1120) 1 11-Oct-14 11-Oct-14
N4626 KCAD 972822 Install Flow Regualtor to the Ezy Torque Ram 1 11-Oct-14 11-Oct-14
N2960 D KCAD Tong Line Counter Balance Remedial Work 1 11-Oct-14 11-Oct-14
08 15 22 29 06 13 20 27
September October
2014
Actual Level of Effort
Actual Work
Remaining Work
Critical Remai...
Milestone
Page 2 of 2 Layout: NNP - Area
TASK filter: No Milestones.
Date Revision Checked Approved
26-Aug-14 2014 NNP Drilling Shutdown Plan Simon Crook (CNR) Chris Stopper (CNR)
Activity ID Shift ResponsibleWork
Order
Activity Name %
Complete
Start Finish Remaining
Duration
Critical
TotalTotalTotalTotalTotal 08-Sep-14 A 14-Oct-14 33
*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan 08-Sep-14 A 14-Oct-14 33
Required WorkscopesRequired WorkscopesRequired WorkscopesRequired WorkscopesRequired Workscopes 08-Sep-14 A 14-Oct-14 33
N4362 D TBC 986673 Top Drive Yearly Electrical PM 55% 08-Sep-14 A 13-Sep-14 1 CRITCAL
N3992 D TBC 940150 Pipe Deck 460/250V 20 KVASP02A Annual Fault Protection APM 100% 08-Sep-14 A 08-Sep-14 A 0 CRITCAL
N4042 D TBC 940131 Pipe Deck 460/250V 20 KVASP02B Annual Fault Protection APM 100% 08-Sep-14 A 08-Sep-14 A 0 CRITCAL
N4622 KCAD Remove Iron Roughneck from Drill floor 100% 08-Sep-14 A 08-Sep-14 A 0
N3010 D TBC SCORE - PSV Calibrations Platform and Drilling 2% 09-Sep-14 A 02-Oct-14 21 CRITCAL
N4620 KCAD Skid Rig 100% 10-Sep-14 A 11-Sep-14 A 0
N4612 KCAD Load Path RAT Preparation 5% 11-Sep-14 A 19-Sep-14 1
N3300 D KCAD 986326 Iron Roughneck 12 Monthly 2% 11-Sep-14 A 21-Sep-14 2
N4604 KCAD Prepare BOP for 1 Year inspection 0% 12-Sep-14 15-Sep-14 4
N4582 D 913864 Management Visit - William Watson (Drilling Equipment Condition Audits) 100% 12-Sep-14 A 16-Sep-14 A 0
N3020 D TBC Hang Block (Drill Crew) 0% 16-Sep-14 16-Sep-14 1
N4572 D Management Visit - Chris Stopper and Gavin Morrice (KCAD) 0% 16-Sep-14* 18-Sep-14 3
N1120 CNR Platform Shutdown 18/09/14 to 14/10/14 0% 18-Sep-14* 14-Oct-14 27
N4610 D KCAD 1009514 Single BOP Maintenance - 12 Monthly 0% 19-Sep-14 25-Sep-14 7 CRITCAL
N3622 D TBC 963764 Feeder No 1 - 48 Monthly 0% 19-Sep-14 19-Sep-14 1
N2810 D TBC 963706 Feeder No 1 - 24 Monthly 0% 19-Sep-14 19-Sep-14 1
N4580 D KCAD 986683 Shaker Discharge modification 0% 19-Sep-14* 03-Oct-14 15 CRITCAL
N3450 D KCAD Gauge Calibrations 0% 19-Sep-14 25-Sep-14 7 CRITCAL
N3432 D KCAD 913864 Crown Block Inspection APM 0% 19-Sep-14* 19-Sep-14 1 CRITCAL
N3444 D KCAD 986329 Crown Block 12 Monthly 0% 19-Sep-14 19-Sep-14 1 CRITCAL
N4584 D TBC 963766 Feeder No. 2 - Maintenance 0% 20-Sep-14 20-Sep-14 1
N3792 D TBC 963766 Feeder No. 2 0% 20-Sep-14 20-Sep-14 1
N4606 D KCAD 986337 Hook - 12 Monthly 0% 20-Sep-14* 20-Sep-14 1 CRITCAL
N3412 D KCAD 945271 Hook - Annual Inspection 0% 20-Sep-14 20-Sep-14 1 CRITCAL
N3842 D TBC 940124 Mezzanine Level 600/486V - 1500 KVA 02-02A - APM 0% 21-Sep-14 21-Sep-14 1 CRITCAL
N3402 D KCAD 931259 Travelling Block - 12 Monthly 0% 21-Sep-14 22-Sep-14 2 CRITCAL
N3200 D KCAD 986340 Travelling Block Maintenance PM 0% 21-Sep-14 21-Sep-14 1 CRITCAL
N3892 D TBC 940129 Mezzanine Level 600/3465V - 100 KVA 02-01 0% 22-Sep-14 22-Sep-14 1
N3942 D TBC 940138 Mezzanine Level 600/486V - 1500 KVA 02-02B - APM 0% 22-Sep-14 22-Sep-14 1 CRITCAL
N4262 D TBC 940127 Pipe Deck 110/640V - 6150 KVA 02-03A 0% 23-Sep-14 23-Sep-14 1 CRITCAL
N4312 D TBC 940155 Pipe Deck 110/640V - 6150 KVA 02-03B 0% 24-Sep-14 24-Sep-14 1 CRITCAL
N4634 D KCAD Install TDS Link Tilt Adaptor 0% 24-Sep-14* 25-Sep-14 2 CRITCAL
N4092 D TBC 980751 Generator No. 3 Circuit Breaker - 24 Montlhy PM 0% 25-Sep-14 25-Sep-14 1
N4608 D KCAD 1009516 Double BOP Maintenance - 12 Monthly 0% 26-Sep-14* 02-Oct-14 7 CRITCAL
N4152 D TBC 986687 Generator No. 4 Circuit Breaker - 24 Montlhy PM 0% 26-Sep-14 26-Sep-14 1
N3373 D KCAD 986664 Top Drive - Critical Load Path Inspection 0% 26-Sep-14 27-Sep-14 2 CRITCAL
N2920 D TBC 980686 Brush AC Generator Exciter - 24 Monthly PM 0% 27-Sep-14 27-Sep-14 1
N4232 D TBC 986848 Brush AC Generator Exciter - 24 Monthly PM 0% 27-Sep-14 27-Sep-14 1
N3352 D KCAD 986554 ? Top Drive - 12 Monthly 0% 28-Sep-14 28-Sep-14 1
N3286 D KCAD 986675 Top Drive HPFlexible Hoses - 12 Monthly 0% 28-Sep-14 28-Sep-14 1
N3456 D TBC 970281, 285, 286 & 287Bulk Tank Control and Alarm System - Calibration 0% 29-Sep-14* 01-Oct-14 3 CRITCAL
N3328 D KCAD 986660 Drawworks - 12 Monthly 0% 29-Sep-14* 01-Oct-14 3 CRITCAL
N3332 D KCAD 951933 Drawworks Annual Inspection 0% 29-Sep-14 30-Sep-14 2 CRITCAL
N2690 D KCAD 986334 Torque Tube Yearly Inspection PM - (25% Bolt changeout) 0% 30-Sep-14* 01-Oct-14 2 CRITCAL
N4618 KCAD Reassemble BOP 0% 02-Oct-14* 04-Oct-14 3
N3316 D KCAD 986666 Deadline Anchor 0% 02-Oct-14 02-Oct-14 1 CRITCAL
N3324 D KCAD 986670 Deadline Anchor - 12 Monthly 0% 02-Oct-14 02-Oct-14 1 CRITCAL
N3422 D KCAD 949552 BOP Trolley Maintenance - 12 Monthly 0% 03-Oct-14* 03-Oct-14 1
N3312 D KCAD 986668 Deadline Achor Weight Indicator 0% 03-Oct-14 03-Oct-14 1 CRITCAL
N2980 D KCAD E&M0563 TDS Roller Inspection/Carriage Bulletin 0% 04-Oct-14 04-Oct-14 1 CRITCAL
N4576 D TBC 986673 Install Bell Nipple & Seals 0% 05-Oct-14* 06-Oct-14 2
N3270 D KCAD 986334 Change out Sheaves in Crown 0% 05-Oct-14 05-Oct-14 1
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
Sep 01 Sep 08 Sep 15 Sep 22 Sep 29 Oct 06 Oct 13 Oct 20 Oct 27
2014
Ninian North Platform
Drilling Rig & Maintenance Projects
Project: Multi Projects
Sorted by WBS
Data Date: 12-Sep-14
Date Issued: 12-Sep-14
Actual Level of Effort
Actual Work
Remaining Work
% Complete
Critical Remai...
Milestone
Page 1 of 2 Layout: NNP - WBS - Staircase
TASK filters: NO LOE's, No Milestones.
Date Revision Checked Approved
26/08/2014 2014 NNP Drilling Shutdown Plan Simon Crook (CNR) Chris Stopper (CNR)
Activity ID Shift ResponsibleWork
Order
Activity Name %
Complete
Start Finish Remaining
Duration
Critical
N3280 D KCAD Derrick Safety Sweep 0% 06-Oct-14 07-Oct-14 2
N4602 KCAD Skid Rig 0% 08-Oct-14 08-Oct-14 1
N3050 D TBC Run Up Drawworks 0% 08-Oct-14 10-Oct-14 3
N3070 D TBC Run Up Top Drive (mark up IBOPS' and saver sub) 0% 08-Oct-14 10-Oct-14 3
N3080 D TBC For all equipment removed check wirelock and bolt tension 0% 08-Oct-14 10-Oct-14 3
N3090 D TBC Overall Function tests of all drilling equipment 0% 08-Oct-14 10-Oct-14 3
N3060 D TBC Unhang Blocks 0% 08-Oct-14 10-Oct-14 3
N3350 D KCAD 985299 Drawworks - Crown-O-Matic 0% 08-Oct-14 08-Oct-14 1 CRITCAL
Fall Back WorkFall Back WorkFall Back WorkFall Back WorkFall Back Work 08-Sep-14 A 11-Oct-14 30
N4630 KCAD 987922 Repair Drive Check Casing MP1 50% 08-Sep-14 A 14-Sep-14 3
N4628 KCAD 972126 Install Heater in Doghouse 50% 08-Sep-14 A 12-Sep-14 1
N4632 KCAD 987925 Repair Drive Check Casing MP2 50% 08-Sep-14 A 14-Sep-14 3
N4590 KCAD 954186 Catwalk Winch 100% 08-Sep-14 A 08-Sep-14 A 0
N4592 KCAD 954559 North Substructure BOP Winch - 12 Monthly 100% 08-Sep-14 A 08-Sep-14 A 0
N4594 KCAD 955799 West Fingerbaord Winch - 12 Monthly 100% 08-Sep-14 A 08-Sep-14 A 0
N4596 KCAD 970083 South Substructure BOP Winch - 12 Monthly 100% 08-Sep-14 A 08-Sep-14 A 0
N4598 KCAD 949818 Drill floor Pull Back Winch - 12 Monthly 100% 08-Sep-14 A 08-Sep-14 A 0
N4624 KCAD Remove Corroded Steel Stub on Monkey Board Level (Starnet Ref 1120) 0% 11-Oct-14 11-Oct-14 1
N4626 KCAD 972822 Install Flow Regualtor to the Ezy Torque Ram 0% 11-Oct-14 11-Oct-14 1
N2960 D KCAD Tong Line Counter Balance Remedial Work 0% 11-Oct-14 11-Oct-14 1
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
Sep 01 Sep 08 Sep 15 Sep 22 Sep 29 Oct 06 Oct 13 Oct 20 Oct 27
2014
Actual Level of Effort
Actual Work
Remaining Work
% Complete
Critical Remai...
Milestone
Page 2 of 2 Layout: NNP - WBS - Staircase
TASK filters: NO LOE's, No Milestones.
Date Revision Checked Approved
26/08/2014 2014 NNP Drilling Shutdown Plan Simon Crook (CNR) Chris Stopper (CNR)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
110%
Baseline Forecast (Baseline) Actual (Baseline)
CNR International
Ninian South Platform
Combined Project S-Curve
Rig Maintenance Campaign 2013
Data Date = 08-Oct-14
Date Printed = 08-Oct-14
CNR International
Ninian North Platform
Project S-Curve
Shutdown Campaign 2014
Current Schedule
Planned Start
18-09-2014
Planned Finish
09-Oct-2014
Actual Start
08-09-2014
Forecast Finish
09-Oct-2014
Variance
0
Overall
Planned %
96.9%
Overall
Actual %
99.1%
Weekly
Planned %
40.6%
Weekly
Actual %
24.8%
Schedule Change
10th October finish date
due to...
Additional jobs added to
the plan:
Installation of TDS
rotating link adaptor +
associated scaffolding.
and
Install Bell Nipple Seal
Weekly - Reporting Date Range: 25th Sept to 2nd Oct
1st & 2nd October
Platform power generation issues
affected seawater cooling supply:-
281 associated NPT hours.
Implementation of additional work in
progress, e.g. installing TDS rotating link tilt
adaptor and Bell nipple seal.
(Associated 232 hours were not allowed for
within the original baseline)
Ninian North - Summer Shutdown - Drilling NPT Graph for 5th September to 8th October 2014
NPT Category
NPT
Hours
NPT %
A - Crew Change Delays 174 27%
B - Platform Assistance Support 12 2%
C - Platform Technical Issues 291 45%
D - Project Technical Issues 60 9%
E - SIM/OPS
F - Town Hall / Safety Meetings 39 6%
G - Waiting on Boat Freight
H - Waiting on Cranes 9 1%
I - Waiting on Heli-Freight
J - Waiting on Permits
K - Waiting on Scaffold
L - Waiting on Weather 65 10%
M - Work Site Access
Total NPT Hours 650 100%
Note: 1st & 2nd October: 281 NPT hours C - Platform Technical Issues Power generation issues affecting seawater cooling
A - Crew Change Delays
27%
B - Platform Assistance Support
2%
C - Platform Technical Issues
45%
D - Project Technical Issues
9%
F - Town Hall / Safety Meetings
6%
H - Waiting on Cranes
1%
L - Waiting on Weather
10%
A - Crew Change Delays B - Platform Assistance Support C - Platform Technical Issues D - Project Technical Issues E - SIM/OPS
F - Town Hall / Safety Meetings G - Waiting on Boat Freight H - Waiting on Cranes I - Waiting on Heli-Freight J - Waiting on Permits
K - Waiting on Scaffold L - Waiting on Weather M - Work Site Access

More Related Content

What's hot (19)

Cost Forecast Report
Cost Forecast ReportCost Forecast Report
Cost Forecast Report
 
Ka Brodmeeting 110509
Ka  Brodmeeting 110509Ka  Brodmeeting 110509
Ka Brodmeeting 110509
 
Productos k tek 1
Productos k tek 1Productos k tek 1
Productos k tek 1
 
GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015
 
LeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicLeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPic
 
PG Thesis Presentation
PG Thesis PresentationPG Thesis Presentation
PG Thesis Presentation
 
ROSS DUGAS OQReport_28716500
ROSS DUGAS OQReport_28716500ROSS DUGAS OQReport_28716500
ROSS DUGAS OQReport_28716500
 
Severance package min 200k package and sweeteners.pdf
Severance package   min 200k package and sweeteners.pdfSeverance package   min 200k package and sweeteners.pdf
Severance package min 200k package and sweeteners.pdf
 
ERUP WBS
ERUP WBSERUP WBS
ERUP WBS
 
Lee Gallivan
Lee GallivanLee Gallivan
Lee Gallivan
 
Baterias cat ultimo.
Baterias  cat    ultimo.Baterias  cat    ultimo.
Baterias cat ultimo.
 
Productivity improvement & waste reduction
Productivity improvement & waste reductionProductivity improvement & waste reduction
Productivity improvement & waste reduction
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Tri tech prevetative
Tri tech prevetativeTri tech prevetative
Tri tech prevetative
 
CPM
CPMCPM
CPM
 
Manish Engineering Works
Manish Engineering WorksManish Engineering Works
Manish Engineering Works
 
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
 
SPC Project_Discharging Time 2016
SPC Project_Discharging Time 2016SPC Project_Discharging Time 2016
SPC Project_Discharging Time 2016
 
SPICE Model of Capacitor and Inductor(DEC2009)
SPICE Model of Capacitor and Inductor(DEC2009)SPICE Model of Capacitor and Inductor(DEC2009)
SPICE Model of Capacitor and Inductor(DEC2009)
 

Similar to NNP Shutdown 2014 Plans - Scurve and npt graph

Update Data of APR2014 in SPICEPARK
Update Data of APR2014 in SPICEPARK Update Data of APR2014 in SPICEPARK
Update Data of APR2014 in SPICEPARK Tsuyoshi Horigome
 
Update Data of SEP2014 in SPICEPARK
Update Data of SEP2014 in SPICEPARKUpdate Data of SEP2014 in SPICEPARK
Update Data of SEP2014 in SPICEPARKTsuyoshi Horigome
 
2014年11月度のアップデート(スパイス・パーク)
2014年11月度のアップデート(スパイス・パーク)2014年11月度のアップデート(スパイス・パーク)
2014年11月度のアップデート(スパイス・パーク)Tsuyoshi Horigome
 
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityHSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityRoumik Mukherjee
 
Cube test report..xlsx
Cube test report..xlsxCube test report..xlsx
Cube test report..xlsxjimit langalia
 
Update 10 models in SPICE PARK(MAR2019)
Update 10 models in SPICE PARK(MAR2019) Update 10 models in SPICE PARK(MAR2019)
Update 10 models in SPICE PARK(MAR2019) Tsuyoshi Horigome
 
Update 12 models in SPICE PARK(APR2019)
Update 12 models in SPICE PARK(APR2019) Update 12 models in SPICE PARK(APR2019)
Update 12 models in SPICE PARK(APR2019) Tsuyoshi Horigome
 
TL Group Fatehpur.pptx
TL Group Fatehpur.pptxTL Group Fatehpur.pptx
TL Group Fatehpur.pptxabhishek357916
 
Update Data MAY2015 (22 Models) in SPICE PARK
Update Data MAY2015 (22 Models) in SPICE PARKUpdate Data MAY2015 (22 Models) in SPICE PARK
Update Data MAY2015 (22 Models) in SPICE PARKTsuyoshi Horigome
 
Ujaas Energy - Rooftop PPT AURAIYA
Ujaas Energy - Rooftop PPT AURAIYAUjaas Energy - Rooftop PPT AURAIYA
Ujaas Energy - Rooftop PPT AURAIYASWAPNIL K0TWAL
 
Spice park May2015 22pcs (update)
Spice park May2015 22pcs (update)Spice park May2015 22pcs (update)
Spice park May2015 22pcs (update)Tsuyoshi Horigome
 
Update Data of AUG2014 in SPICEPARK
Update Data of AUG2014 in SPICEPARKUpdate Data of AUG2014 in SPICEPARK
Update Data of AUG2014 in SPICEPARKTsuyoshi Horigome
 
Update 21 models in SPICE PARK(JUN2019)
Update 21 models in SPICE PARK(JUN2019) Update 21 models in SPICE PARK(JUN2019)
Update 21 models in SPICE PARK(JUN2019) Tsuyoshi Horigome
 
Update 21 models in SPICE PARK(MAY2019)
Update 21 models in SPICE PARK(MAY2019)Update 21 models in SPICE PARK(MAY2019)
Update 21 models in SPICE PARK(MAY2019)Tsuyoshi Horigome
 
Copy of 4th & 1 Plays '09-'11
Copy of 4th & 1 Plays '09-'11Copy of 4th & 1 Plays '09-'11
Copy of 4th & 1 Plays '09-'11Dajuan Brown
 
Equipment Arrival Status.pptx
Equipment Arrival Status.pptxEquipment Arrival Status.pptx
Equipment Arrival Status.pptxMehmanNasibov1
 

Similar to NNP Shutdown 2014 Plans - Scurve and npt graph (20)

Update Data of APR2014 in SPICEPARK
Update Data of APR2014 in SPICEPARK Update Data of APR2014 in SPICEPARK
Update Data of APR2014 in SPICEPARK
 
Update Data of SEP2014 in SPICEPARK
Update Data of SEP2014 in SPICEPARKUpdate Data of SEP2014 in SPICEPARK
Update Data of SEP2014 in SPICEPARK
 
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme -  Rev 0001. P269 - Project Implementation Programme -  Rev 00
01. P269 - Project Implementation Programme - Rev 00
 
Lista solin pintado todo
Lista solin pintado todoLista solin pintado todo
Lista solin pintado todo
 
2014年11月度のアップデート(スパイス・パーク)
2014年11月度のアップデート(スパイス・パーク)2014年11月度のアップデート(スパイス・パーク)
2014年11月度のアップデート(スパイス・パーク)
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Notam
NotamNotam
Notam
 
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityHSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activity
 
Cube test report..xlsx
Cube test report..xlsxCube test report..xlsx
Cube test report..xlsx
 
Update 10 models in SPICE PARK(MAR2019)
Update 10 models in SPICE PARK(MAR2019) Update 10 models in SPICE PARK(MAR2019)
Update 10 models in SPICE PARK(MAR2019)
 
Update 12 models in SPICE PARK(APR2019)
Update 12 models in SPICE PARK(APR2019) Update 12 models in SPICE PARK(APR2019)
Update 12 models in SPICE PARK(APR2019)
 
TL Group Fatehpur.pptx
TL Group Fatehpur.pptxTL Group Fatehpur.pptx
TL Group Fatehpur.pptx
 
Update Data MAY2015 (22 Models) in SPICE PARK
Update Data MAY2015 (22 Models) in SPICE PARKUpdate Data MAY2015 (22 Models) in SPICE PARK
Update Data MAY2015 (22 Models) in SPICE PARK
 
Ujaas Energy - Rooftop PPT AURAIYA
Ujaas Energy - Rooftop PPT AURAIYAUjaas Energy - Rooftop PPT AURAIYA
Ujaas Energy - Rooftop PPT AURAIYA
 
Spice park May2015 22pcs (update)
Spice park May2015 22pcs (update)Spice park May2015 22pcs (update)
Spice park May2015 22pcs (update)
 
Update Data of AUG2014 in SPICEPARK
Update Data of AUG2014 in SPICEPARKUpdate Data of AUG2014 in SPICEPARK
Update Data of AUG2014 in SPICEPARK
 
Update 21 models in SPICE PARK(JUN2019)
Update 21 models in SPICE PARK(JUN2019) Update 21 models in SPICE PARK(JUN2019)
Update 21 models in SPICE PARK(JUN2019)
 
Update 21 models in SPICE PARK(MAY2019)
Update 21 models in SPICE PARK(MAY2019)Update 21 models in SPICE PARK(MAY2019)
Update 21 models in SPICE PARK(MAY2019)
 
Copy of 4th & 1 Plays '09-'11
Copy of 4th & 1 Plays '09-'11Copy of 4th & 1 Plays '09-'11
Copy of 4th & 1 Plays '09-'11
 
Equipment Arrival Status.pptx
Equipment Arrival Status.pptxEquipment Arrival Status.pptx
Equipment Arrival Status.pptx
 

NNP Shutdown 2014 Plans - Scurve and npt graph

  • 1. Activity ID Shift ResponsibleWork Order Activity Name Original Duration Start Finish Critical TotalTotalTotalTotalTotal 36 08-Sep-14 A 14-Oct-14 *2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan 36 08-Sep-14 A 14-Oct-14 Required WorkscopesRequired WorkscopesRequired WorkscopesRequired WorkscopesRequired Workscopes 36 08-Sep-14 A 14-Oct-14 Area 0: Not ApplicableArea 0: Not ApplicableArea 0: Not ApplicableArea 0: Not ApplicableArea 0: Not Applicable 36 09-Sep-14 A 14-Oct-14 N3010 D TBC SCORE - PSV Calibrations Platform and Drilling 21 09-Sep-14 A 02-Oct-14 CRITCAL N4582 D 913864 Management Visit - William Watson (Drilling Equipment Condition Audits) 5 12-Sep-14 A 16-Sep-14 A N3020 D TBC Hang Block (Drill Crew) 1 16-Sep-14 16-Sep-14 N4572 D Management Visit - Chris Stopper and Gavin Morrice (KCAD) 3 16-Sep-14* 18-Sep-14 N1120 CNR Platform Shutdown 18/09/14 to 14/10/14 27 18-Sep-14* 14-Oct-14 N2720 D KCAD Drilling Shutdown - KCAD Electrical PM's - x2 Elect 22 19-Sep-14 10-Oct-14 N2050 D KCAD Drilling Shutdown - KCAD Offshore Supervision - x1 Rig Super, x2 Snr Elect, x1 FMS, x1 Motorman 22 19-Sep-14 10-Oct-14 N3460 N KCAD Drilling Shutdown (Night) - KCAD Workforce - x3 RAT, x1 Driller, x2 R/Neck 22 19-Sep-14 10-Oct-14 N3462 N KCAD Drilling Shutdown (Night) - KCAD Offshore Supervision - x1 Rig Super, x1 Snr Mech, x1 Snr Elect, x1 FMS, x1 Motorman22 19-Sep-14 10-Oct-14 N3050 D TBC Run Up Drawworks 3 08-Oct-14 10-Oct-14 N3070 D TBC Run Up Top Drive (mark up IBOPS' and saver sub) 3 08-Oct-14 10-Oct-14 N3080 D TBC For all equipment removed check wirelock and bolt tension 3 08-Oct-14 10-Oct-14 N3090 D TBC Overall Function tests of all drilling equipment 3 08-Oct-14 10-Oct-14 N3060 D TBC Unhang Blocks 3 08-Oct-14 10-Oct-14 N3454 D TBC Comissioning and Restart 3 08-Oct-14 10-Oct-14 Area 1: DerrickArea 1: DerrickArea 1: DerrickArea 1: DerrickArea 1: Derrick 19 11-Sep-14 A 07-Oct-14 N4612 KCAD Load Path RAT Preparation 1 11-Sep-14 A 19-Sep-14 N3432 D KCAD 913864 Crown Block Inspection APM 1 19-Sep-14* 19-Sep-14 CRITCAL N3444 D KCAD 986329 Crown Block 12 Monthly 1 19-Sep-14 19-Sep-14 CRITCAL N2690 D KCAD 986334 Torque Tube Yearly Inspection PM - (25% Bolt changeout) 2 30-Sep-14* 01-Oct-14 CRITCAL N3270 D KCAD 986334 Change out Sheaves in Crown 1 05-Oct-14 05-Oct-14 N3280 D KCAD Derrick Safety Sweep 2 06-Oct-14 07-Oct-14 Area 1: Drill FloorArea 1: Drill FloorArea 1: Drill FloorArea 1: Drill FloorArea 1: Drill Floor 20 08-Sep-14 A 08-Oct-14 N4622 KCAD Remove Iron Roughneck from Drill floor 1 08-Sep-14 A 08-Sep-14 A N3300 D KCAD 986326 Iron Roughneck 12 Monthly 2 11-Sep-14 A 21-Sep-14 N4580 D KCAD 986683 Shaker Discharge modification 15 19-Sep-14* 03-Oct-14 CRITCAL N3450 D KCAD Gauge Calibrations 7 19-Sep-14 25-Sep-14 CRITCAL N4606 D KCAD 986337 Hook - 12 Monthly 1 20-Sep-14* 20-Sep-14 CRITCAL N3412 D KCAD 945271 Hook - Annual Inspection 1 20-Sep-14 20-Sep-14 CRITCAL N3402 D KCAD 931259 Travelling Block - 12 Monthly 2 21-Sep-14 22-Sep-14 CRITCAL N3200 D KCAD 986340 Travelling Block Maintenance PM 1 21-Sep-14 21-Sep-14 CRITCAL N4634 D KCAD Install TDS Link Tilt Adaptor 2 24-Sep-14* 25-Sep-14 CRITCAL N3373 D KCAD 986664 Top Drive - Critical Load Path Inspection 2 26-Sep-14 27-Sep-14 CRITCAL N3352 D KCAD 986554 ? Top Drive - 12 Monthly 1 28-Sep-14 28-Sep-14 N3286 D KCAD 986675 Top Drive HP Flexible Hoses - 12 Monthly 1 28-Sep-14 28-Sep-14 N3328 D KCAD 986660 Drawworks - 12 Monthly 3 29-Sep-14* 01-Oct-14 CRITCAL N3332 D KCAD 951933 Drawworks Annual Inspection 2 29-Sep-14 30-Sep-14 CRITCAL N3316 D KCAD 986666 Deadline Anchor 1 02-Oct-14 02-Oct-14 CRITCAL N3324 D KCAD 986670 Deadline Anchor - 12 Monthly 1 02-Oct-14 02-Oct-14 CRITCAL N3312 D KCAD 986668 Deadline Achor Weight Indicator 1 03-Oct-14 03-Oct-14 CRITCAL N2980 D KCAD E&M0563 TDS Roller Inspection/Carriage Bulletin 1 04-Oct-14 04-Oct-14 CRITCAL N3350 D KCAD 985299 Drawworks - Crown-O-Matic 1 08-Oct-14 08-Oct-14 CRITCAL Area 3: B.O.P. DeckArea 3: B.O.P. DeckArea 3: B.O.P. DeckArea 3: B.O.P. DeckArea 3: B.O.P. Deck 23 12-Sep-14 04-Oct-14 N4604 KCAD Prepare BOP for 1 Year inspection 4 12-Sep-14 15-Sep-14 N4610 D KCAD 1009514 Single BOP Maintenance - 12 Monthly 7 19-Sep-14 25-Sep-14 CRITCAL N4608 D KCAD 1009516 Double BOP Maintenance - 12 Monthly 7 26-Sep-14* 02-Oct-14 CRITCAL N4618 KCAD Reassemble BOP 3 02-Oct-14* 04-Oct-14 N3422 D KCAD 949552 BOP Trolley Maintenance - 12 Monthly 1 03-Oct-14* 03-Oct-14 Area 10: Skid Deck AreaArea 10: Skid Deck AreaArea 10: Skid Deck AreaArea 10: Skid Deck AreaArea 10: Skid Deck Area 27 10-Sep-14 A 08-Oct-14 N4620 KCAD Skid Rig 2 10-Sep-14 A 11-Sep-14 A N4602 KCAD Skid Rig 1 08-Oct-14 08-Oct-14 08 15 22 29 06 13 20 27 September October 2014 Ninian North Platform Drilling Rig & Maintenance Projects Project: NNP Shutdown Sorted by Area Data Date: 12-Sep-14 Date Issued: 12-Sep-14 Actual Level of Effort Actual Work Remaining Work Critical Remai... Milestone Page 1 of 2 Layout: NNP - Area TASK filter: No Milestones. Date Revision Checked Approved 26-Aug-14 2014 NNP Drilling Shutdown Plan Simon Crook (CNR) Chris Stopper (CNR)
  • 2. Activity ID Shift ResponsibleWork Order Activity Name Original Duration Start Finish Critical Area 11: Drilling Services Switchroom (DSM)Area 11: Drilling Services Switchroom (DSM)Area 11: Drilling Services Switchroom (DSM)Area 11: Drilling Services Switchroom (DSM)Area 11: Drilling Services Switchroom (DSM) 18 08-Sep-14 A 06-Oct-14 N4362 D TBC 986673 Top Drive Yearly Electrical PM 3 08-Sep-14 A 13-Sep-14 CRITCAL N3992 D TBC 940150 Pipe Deck 460/250V 20 KVA SP02A Annual Fault Protection APM 1 08-Sep-14 A 08-Sep-14 A CRITCAL N4042 D TBC 940131 Pipe Deck 460/250V 20 KVA SP02B Annual Fault Protection APM 1 08-Sep-14 A 08-Sep-14 A CRITCAL N3622 D TBC 963764 Feeder No 1 - 48 Monthly 1 19-Sep-14 19-Sep-14 N2810 D TBC 963706 Feeder No 1 - 24 Monthly 1 19-Sep-14 19-Sep-14 N4584 D TBC 963766 Feeder No. 2 - Maintenance 1 20-Sep-14 20-Sep-14 N3792 D TBC 963766 Feeder No. 2 1 20-Sep-14 20-Sep-14 N3842 D TBC 940124 Mezzanine Level 600/486V - 1500 KVA 02-02A - APM 1 21-Sep-14 21-Sep-14 CRITCAL N3892 D TBC 940129 Mezzanine Level 600/3465V - 100 KVA 02-01 1 22-Sep-14 22-Sep-14 N3942 D TBC 940138 Mezzanine Level 600/486V - 1500 KVA 02-02B - APM 1 22-Sep-14 22-Sep-14 CRITCAL N4262 D TBC 940127 Pipe Deck 110/640V - 6150 KVA 02-03A 1 23-Sep-14 23-Sep-14 CRITCAL N4312 D TBC 940155 Pipe Deck 110/640V - 6150 KVA 02-03B 1 24-Sep-14 24-Sep-14 CRITCAL N4092 D TBC 980751 Generator No. 3 Circuit Breaker - 24 Montlhy PM 1 25-Sep-14 25-Sep-14 N4152 D TBC 986687 Generator No. 4 Circuit Breaker - 24 Montlhy PM 1 26-Sep-14 26-Sep-14 N2920 D TBC 980686 Brush AC Generator Exciter - 24 Monthly PM 1 27-Sep-14 27-Sep-14 N4232 D TBC 986848 Brush AC Generator Exciter - 24 Monthly PM 1 27-Sep-14 27-Sep-14 N3456 D TBC 970281, 285, 286 & 287Bulk Tank Control and Alarm System - Calibration 3 29-Sep-14* 01-Oct-14 CRITCAL N4576 D TBC 986673 Install Bell Nipple & Seals 2 05-Oct-14* 06-Oct-14 Fall Back WorkFall Back WorkFall Back WorkFall Back WorkFall Back Work 5 08-Sep-14 A 11-Oct-14 No AreaNo AreaNo AreaNo AreaNo Area 5 08-Sep-14 A 11-Oct-14 N4630 KCAD 987922 Repair Drive Check Casing MP1 5 08-Sep-14 A 14-Sep-14 N4628 KCAD 972126 Install Heater in Doghouse 1 08-Sep-14 A 12-Sep-14 N4632 KCAD 987925 Repair Drive Check Casing MP2 5 08-Sep-14 A 14-Sep-14 N4590 KCAD 954186 Catwalk Winch 1 08-Sep-14 A 08-Sep-14 A N4592 KCAD 954559 North Substructure BOP Winch - 12 Monthly 1 08-Sep-14 A 08-Sep-14 A N4594 KCAD 955799 West Fingerbaord Winch - 12 Monthly 1 08-Sep-14 A 08-Sep-14 A N4596 KCAD 970083 South Substructure BOP Winch - 12 Monthly 1 08-Sep-14 A 08-Sep-14 A N4598 KCAD 949818 Drill floor Pull Back Winch - 12 Monthly 1 08-Sep-14 A 08-Sep-14 A N4624 KCAD Remove Corroded Steel Stub on Monkey Board Level (Starnet Ref 1120) 1 11-Oct-14 11-Oct-14 N4626 KCAD 972822 Install Flow Regualtor to the Ezy Torque Ram 1 11-Oct-14 11-Oct-14 N2960 D KCAD Tong Line Counter Balance Remedial Work 1 11-Oct-14 11-Oct-14 08 15 22 29 06 13 20 27 September October 2014 Actual Level of Effort Actual Work Remaining Work Critical Remai... Milestone Page 2 of 2 Layout: NNP - Area TASK filter: No Milestones. Date Revision Checked Approved 26-Aug-14 2014 NNP Drilling Shutdown Plan Simon Crook (CNR) Chris Stopper (CNR)
  • 3. Activity ID Shift ResponsibleWork Order Activity Name % Complete Start Finish Remaining Duration Critical TotalTotalTotalTotalTotal 08-Sep-14 A 14-Oct-14 33 *2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan*2014 Ninian North - Shutdown Plan 08-Sep-14 A 14-Oct-14 33 Required WorkscopesRequired WorkscopesRequired WorkscopesRequired WorkscopesRequired Workscopes 08-Sep-14 A 14-Oct-14 33 N4362 D TBC 986673 Top Drive Yearly Electrical PM 55% 08-Sep-14 A 13-Sep-14 1 CRITCAL N3992 D TBC 940150 Pipe Deck 460/250V 20 KVASP02A Annual Fault Protection APM 100% 08-Sep-14 A 08-Sep-14 A 0 CRITCAL N4042 D TBC 940131 Pipe Deck 460/250V 20 KVASP02B Annual Fault Protection APM 100% 08-Sep-14 A 08-Sep-14 A 0 CRITCAL N4622 KCAD Remove Iron Roughneck from Drill floor 100% 08-Sep-14 A 08-Sep-14 A 0 N3010 D TBC SCORE - PSV Calibrations Platform and Drilling 2% 09-Sep-14 A 02-Oct-14 21 CRITCAL N4620 KCAD Skid Rig 100% 10-Sep-14 A 11-Sep-14 A 0 N4612 KCAD Load Path RAT Preparation 5% 11-Sep-14 A 19-Sep-14 1 N3300 D KCAD 986326 Iron Roughneck 12 Monthly 2% 11-Sep-14 A 21-Sep-14 2 N4604 KCAD Prepare BOP for 1 Year inspection 0% 12-Sep-14 15-Sep-14 4 N4582 D 913864 Management Visit - William Watson (Drilling Equipment Condition Audits) 100% 12-Sep-14 A 16-Sep-14 A 0 N3020 D TBC Hang Block (Drill Crew) 0% 16-Sep-14 16-Sep-14 1 N4572 D Management Visit - Chris Stopper and Gavin Morrice (KCAD) 0% 16-Sep-14* 18-Sep-14 3 N1120 CNR Platform Shutdown 18/09/14 to 14/10/14 0% 18-Sep-14* 14-Oct-14 27 N4610 D KCAD 1009514 Single BOP Maintenance - 12 Monthly 0% 19-Sep-14 25-Sep-14 7 CRITCAL N3622 D TBC 963764 Feeder No 1 - 48 Monthly 0% 19-Sep-14 19-Sep-14 1 N2810 D TBC 963706 Feeder No 1 - 24 Monthly 0% 19-Sep-14 19-Sep-14 1 N4580 D KCAD 986683 Shaker Discharge modification 0% 19-Sep-14* 03-Oct-14 15 CRITCAL N3450 D KCAD Gauge Calibrations 0% 19-Sep-14 25-Sep-14 7 CRITCAL N3432 D KCAD 913864 Crown Block Inspection APM 0% 19-Sep-14* 19-Sep-14 1 CRITCAL N3444 D KCAD 986329 Crown Block 12 Monthly 0% 19-Sep-14 19-Sep-14 1 CRITCAL N4584 D TBC 963766 Feeder No. 2 - Maintenance 0% 20-Sep-14 20-Sep-14 1 N3792 D TBC 963766 Feeder No. 2 0% 20-Sep-14 20-Sep-14 1 N4606 D KCAD 986337 Hook - 12 Monthly 0% 20-Sep-14* 20-Sep-14 1 CRITCAL N3412 D KCAD 945271 Hook - Annual Inspection 0% 20-Sep-14 20-Sep-14 1 CRITCAL N3842 D TBC 940124 Mezzanine Level 600/486V - 1500 KVA 02-02A - APM 0% 21-Sep-14 21-Sep-14 1 CRITCAL N3402 D KCAD 931259 Travelling Block - 12 Monthly 0% 21-Sep-14 22-Sep-14 2 CRITCAL N3200 D KCAD 986340 Travelling Block Maintenance PM 0% 21-Sep-14 21-Sep-14 1 CRITCAL N3892 D TBC 940129 Mezzanine Level 600/3465V - 100 KVA 02-01 0% 22-Sep-14 22-Sep-14 1 N3942 D TBC 940138 Mezzanine Level 600/486V - 1500 KVA 02-02B - APM 0% 22-Sep-14 22-Sep-14 1 CRITCAL N4262 D TBC 940127 Pipe Deck 110/640V - 6150 KVA 02-03A 0% 23-Sep-14 23-Sep-14 1 CRITCAL N4312 D TBC 940155 Pipe Deck 110/640V - 6150 KVA 02-03B 0% 24-Sep-14 24-Sep-14 1 CRITCAL N4634 D KCAD Install TDS Link Tilt Adaptor 0% 24-Sep-14* 25-Sep-14 2 CRITCAL N4092 D TBC 980751 Generator No. 3 Circuit Breaker - 24 Montlhy PM 0% 25-Sep-14 25-Sep-14 1 N4608 D KCAD 1009516 Double BOP Maintenance - 12 Monthly 0% 26-Sep-14* 02-Oct-14 7 CRITCAL N4152 D TBC 986687 Generator No. 4 Circuit Breaker - 24 Montlhy PM 0% 26-Sep-14 26-Sep-14 1 N3373 D KCAD 986664 Top Drive - Critical Load Path Inspection 0% 26-Sep-14 27-Sep-14 2 CRITCAL N2920 D TBC 980686 Brush AC Generator Exciter - 24 Monthly PM 0% 27-Sep-14 27-Sep-14 1 N4232 D TBC 986848 Brush AC Generator Exciter - 24 Monthly PM 0% 27-Sep-14 27-Sep-14 1 N3352 D KCAD 986554 ? Top Drive - 12 Monthly 0% 28-Sep-14 28-Sep-14 1 N3286 D KCAD 986675 Top Drive HPFlexible Hoses - 12 Monthly 0% 28-Sep-14 28-Sep-14 1 N3456 D TBC 970281, 285, 286 & 287Bulk Tank Control and Alarm System - Calibration 0% 29-Sep-14* 01-Oct-14 3 CRITCAL N3328 D KCAD 986660 Drawworks - 12 Monthly 0% 29-Sep-14* 01-Oct-14 3 CRITCAL N3332 D KCAD 951933 Drawworks Annual Inspection 0% 29-Sep-14 30-Sep-14 2 CRITCAL N2690 D KCAD 986334 Torque Tube Yearly Inspection PM - (25% Bolt changeout) 0% 30-Sep-14* 01-Oct-14 2 CRITCAL N4618 KCAD Reassemble BOP 0% 02-Oct-14* 04-Oct-14 3 N3316 D KCAD 986666 Deadline Anchor 0% 02-Oct-14 02-Oct-14 1 CRITCAL N3324 D KCAD 986670 Deadline Anchor - 12 Monthly 0% 02-Oct-14 02-Oct-14 1 CRITCAL N3422 D KCAD 949552 BOP Trolley Maintenance - 12 Monthly 0% 03-Oct-14* 03-Oct-14 1 N3312 D KCAD 986668 Deadline Achor Weight Indicator 0% 03-Oct-14 03-Oct-14 1 CRITCAL N2980 D KCAD E&M0563 TDS Roller Inspection/Carriage Bulletin 0% 04-Oct-14 04-Oct-14 1 CRITCAL N4576 D TBC 986673 Install Bell Nipple & Seals 0% 05-Oct-14* 06-Oct-14 2 N3270 D KCAD 986334 Change out Sheaves in Crown 0% 05-Oct-14 05-Oct-14 1 M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W Sep 01 Sep 08 Sep 15 Sep 22 Sep 29 Oct 06 Oct 13 Oct 20 Oct 27 2014 Ninian North Platform Drilling Rig & Maintenance Projects Project: Multi Projects Sorted by WBS Data Date: 12-Sep-14 Date Issued: 12-Sep-14 Actual Level of Effort Actual Work Remaining Work % Complete Critical Remai... Milestone Page 1 of 2 Layout: NNP - WBS - Staircase TASK filters: NO LOE's, No Milestones. Date Revision Checked Approved 26/08/2014 2014 NNP Drilling Shutdown Plan Simon Crook (CNR) Chris Stopper (CNR)
  • 4. Activity ID Shift ResponsibleWork Order Activity Name % Complete Start Finish Remaining Duration Critical N3280 D KCAD Derrick Safety Sweep 0% 06-Oct-14 07-Oct-14 2 N4602 KCAD Skid Rig 0% 08-Oct-14 08-Oct-14 1 N3050 D TBC Run Up Drawworks 0% 08-Oct-14 10-Oct-14 3 N3070 D TBC Run Up Top Drive (mark up IBOPS' and saver sub) 0% 08-Oct-14 10-Oct-14 3 N3080 D TBC For all equipment removed check wirelock and bolt tension 0% 08-Oct-14 10-Oct-14 3 N3090 D TBC Overall Function tests of all drilling equipment 0% 08-Oct-14 10-Oct-14 3 N3060 D TBC Unhang Blocks 0% 08-Oct-14 10-Oct-14 3 N3350 D KCAD 985299 Drawworks - Crown-O-Matic 0% 08-Oct-14 08-Oct-14 1 CRITCAL Fall Back WorkFall Back WorkFall Back WorkFall Back WorkFall Back Work 08-Sep-14 A 11-Oct-14 30 N4630 KCAD 987922 Repair Drive Check Casing MP1 50% 08-Sep-14 A 14-Sep-14 3 N4628 KCAD 972126 Install Heater in Doghouse 50% 08-Sep-14 A 12-Sep-14 1 N4632 KCAD 987925 Repair Drive Check Casing MP2 50% 08-Sep-14 A 14-Sep-14 3 N4590 KCAD 954186 Catwalk Winch 100% 08-Sep-14 A 08-Sep-14 A 0 N4592 KCAD 954559 North Substructure BOP Winch - 12 Monthly 100% 08-Sep-14 A 08-Sep-14 A 0 N4594 KCAD 955799 West Fingerbaord Winch - 12 Monthly 100% 08-Sep-14 A 08-Sep-14 A 0 N4596 KCAD 970083 South Substructure BOP Winch - 12 Monthly 100% 08-Sep-14 A 08-Sep-14 A 0 N4598 KCAD 949818 Drill floor Pull Back Winch - 12 Monthly 100% 08-Sep-14 A 08-Sep-14 A 0 N4624 KCAD Remove Corroded Steel Stub on Monkey Board Level (Starnet Ref 1120) 0% 11-Oct-14 11-Oct-14 1 N4626 KCAD 972822 Install Flow Regualtor to the Ezy Torque Ram 0% 11-Oct-14 11-Oct-14 1 N2960 D KCAD Tong Line Counter Balance Remedial Work 0% 11-Oct-14 11-Oct-14 1 M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W Sep 01 Sep 08 Sep 15 Sep 22 Sep 29 Oct 06 Oct 13 Oct 20 Oct 27 2014 Actual Level of Effort Actual Work Remaining Work % Complete Critical Remai... Milestone Page 2 of 2 Layout: NNP - WBS - Staircase TASK filters: NO LOE's, No Milestones. Date Revision Checked Approved 26/08/2014 2014 NNP Drilling Shutdown Plan Simon Crook (CNR) Chris Stopper (CNR)
  • 5. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 110% Baseline Forecast (Baseline) Actual (Baseline) CNR International Ninian South Platform Combined Project S-Curve Rig Maintenance Campaign 2013 Data Date = 08-Oct-14 Date Printed = 08-Oct-14 CNR International Ninian North Platform Project S-Curve Shutdown Campaign 2014 Current Schedule Planned Start 18-09-2014 Planned Finish 09-Oct-2014 Actual Start 08-09-2014 Forecast Finish 09-Oct-2014 Variance 0 Overall Planned % 96.9% Overall Actual % 99.1% Weekly Planned % 40.6% Weekly Actual % 24.8% Schedule Change 10th October finish date due to... Additional jobs added to the plan: Installation of TDS rotating link adaptor + associated scaffolding. and Install Bell Nipple Seal Weekly - Reporting Date Range: 25th Sept to 2nd Oct 1st & 2nd October Platform power generation issues affected seawater cooling supply:- 281 associated NPT hours. Implementation of additional work in progress, e.g. installing TDS rotating link tilt adaptor and Bell nipple seal. (Associated 232 hours were not allowed for within the original baseline)
  • 6. Ninian North - Summer Shutdown - Drilling NPT Graph for 5th September to 8th October 2014 NPT Category NPT Hours NPT % A - Crew Change Delays 174 27% B - Platform Assistance Support 12 2% C - Platform Technical Issues 291 45% D - Project Technical Issues 60 9% E - SIM/OPS F - Town Hall / Safety Meetings 39 6% G - Waiting on Boat Freight H - Waiting on Cranes 9 1% I - Waiting on Heli-Freight J - Waiting on Permits K - Waiting on Scaffold L - Waiting on Weather 65 10% M - Work Site Access Total NPT Hours 650 100% Note: 1st & 2nd October: 281 NPT hours C - Platform Technical Issues Power generation issues affecting seawater cooling A - Crew Change Delays 27% B - Platform Assistance Support 2% C - Platform Technical Issues 45% D - Project Technical Issues 9% F - Town Hall / Safety Meetings 6% H - Waiting on Cranes 1% L - Waiting on Weather 10% A - Crew Change Delays B - Platform Assistance Support C - Platform Technical Issues D - Project Technical Issues E - SIM/OPS F - Town Hall / Safety Meetings G - Waiting on Boat Freight H - Waiting on Cranes I - Waiting on Heli-Freight J - Waiting on Permits K - Waiting on Scaffold L - Waiting on Weather M - Work Site Access