ISNetworld OQ Report
Kinder Morgan
Project Site: Kinder Morgan - General (JS-239)
Report Date: 9/10/2015 10:54:41 PM
Report Run By: Automatically Generated OQ Report
Form ID: 129470-AO-774FF785
Marshall, Dustin Lee
The Texian Group Inc (ISN-02589319)
Task Qualification Method Type Evaluation Date Expiration Date Class
001.01.01 - Abnormal Operations NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
004.01.01 - Corrosing Monitoring - Atmospheric, External &
Internal: General
(Span of Control: 1 to 1)
NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
004.01.01 - Corrosing Monitoring - Atmospheric, External &
Internal: General
NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V
004.01.03 - Visual Inspection of Buried Pipe and Components
When Exposed
(Span of Control: 1 to 1)
NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V
004.01.03 - Visual Inspection of Buried Pipe and Components
When Exposed
NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
005.01.02 - Cathodic Protection System Maintenance:
Electrical Isolation
(Span of Control: 1 to 1)
NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
005.01.02 - Cathodic Protection System Maintenance:
Electrical Isolation
NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V
005.01.05 - Cathodic Protection System Maintenance: Reverse
Current Switches
(Span of Control: 1 to 1)
NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
005.01.05 - Cathodic Protection System Maintenance: Reverse
Current Switches
NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V
005.03.02 - Cathodic Protection System Testing: Pipe to Soil
(Span of Control: 1 to 1)
NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
005.03.02 - Cathodic Protection System Testing: Pipe to Soil NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V
006.01.01 - Indirect Inspection: Close Interval Survey
(Span of Control: 1 to 1)
NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 4/17/2018 V
006.01.01 - Indirect Inspection: Close Interval Survey NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 4/22/2018 V
008.01.01 - Locating Pipelines
(Span of Control: 1 to 1)
NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
008.01.01 - Locating Pipelines NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
008.02.01 - Damage Prevention During Excavation Activities
(Span of Control: 1 to 1)
NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
008.02.01 - Damage Prevention During Excavation Activities NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
014.02.01 - Backfilling
(Span of Control: 1 to 3)
NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
014.02.01 - Backfilling NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
014.05.01 - Underground Clearances
(Span of Control: 1 to 3)
NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
014.05.01 - Underground Clearances NCCER - 62302-02 - Pipeline Damage Inspection (CT 34, 35) PW 4/17/2015 12/31/2018 V
014.08.01 - Cover - Service Lines, Mains & Transmission Lines
(Span of Control: 1 to 3)
NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
014.08.01 - Cover - Service Lines, Mains & Transmission Lines NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
014.09.01 - Inspection: Compliance with Procedures &
Standards
NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V
Page 1 of 3
(Span of Control: 1 to 2)
014.09.01 - Inspection: Compliance with Procedures &
Standards
NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
014.09.02 - Inspection: Inspection of Materials
(Span of Control: 1 to 2)
NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V
014.09.02 - Inspection: Inspection of Materials NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
014.10.01 - Line Markers
(Span of Control: 1 to 4)
NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V
014.10.01 - Line Markers NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
014.12.01 - Protection from Hazards
(Span of Control: 1 to 3)
NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V
014.12.01 - Protection from Hazards NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
014.12.01 - Protection from Hazards NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
014.13.01 - Protection When Minimum Cover Not Met
(Span of Control: 1 to 3)
NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V
014.13.01 - Protection When Minimum Cover Not Met NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
014.13.01 - Protection When Minimum Cover Not Met NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
024.02.01 - Visual Inspection of Welds
(Span of Control: 1 to 1)
NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V
024.02.01 - Visual Inspection of Welds NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
024.03.01 - Nondestructive Testing of Welds
(Span of Control: 1 to 3)
NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V
024.03.01 - Nondestructive Testing of Welds NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V
101.01 - Abnormal Conditions - Outside Control Room NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
102.03 - Active Corrosion / Microbiological Corrosion (MIC)
Testing
(Span of Control: 1 to 1)
NCCER - 61105-02 - Inspect Buried and Submerged Pipe When Exposed
(CT 5.1, 5.2, 5.3)
PW 4/17/2015 12/31/2018 V
102.03 - Active Corrosion / Microbiological Corrosion (MIC)
Testing
NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
102.06 - Use of current interrupters on rectifiers. CLOSE
INTERVAL SURVEY is not specifically included.
(Span of Control: 1 to 1)
NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
102.06 - Use of current interrupters on rectifiers. CLOSE
INTERVAL SURVEY is not specifically included.
NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V
102.21 - Inspect and perform electrical test of bonds NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
102.21 - Inspect and perform electrical test of bonds NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V
103.09 - Nondestructive Testing of Welds
(Span of Control: 1 to 3)
NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V
103.09 - Nondestructive Testing of Welds NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
103.11 - Damage Prevention During Excavation Activities
(Span of Control: 1 to 1)
NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
103.11 - Damage Prevention During Excavation Activities NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
103.12 ­ Inspection activities – welding on pipeline system
(Span of Control: 1 to 1)
NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V
103.12 ­ Inspection activities – welding on pipeline system NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
103.13 ­ Inspection activities – non­destructive testing
(Span of Control: 1 to 1)
NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V
103.13 ­ Inspection activities – non­destructive testing NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
Page 2 of 3
104.01 - Inspect buried pipe when exposed
(Span of Control: 1 to 1)
NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
104.01 - Inspect buried pipe when exposed NCCER - 61105-02 - Inspect Buried and Submerged Pipe When Exposed
(CT 5.1, 5.2, 5.3)
PW 4/17/2015 12/31/2018 V
104.04 - Place and maintain permanent line markers
(Span of Control: 1 to 4)
NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
104.04 - Place and maintain permanent line markers NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V
104.09 - Inspection of clearance of existing pipe to
underground structures
(Span of Control: 1 to 3)
NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
104.09 - Inspection of clearance of existing pipe to
underground structures
NCCER - 62302-02 - Pipeline Damage Inspection (CT 34, 35) PW 4/17/2015 12/31/2018 V
104.11 - Backfilling an excavation
(Span of Control: 1 to 3)
NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V
104.11 - Backfilling an excavation NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
104.22 - Locate pipeline
(Span of Control: 1 to 1)
NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
104.22 - Locate pipeline NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
104.23 - Temporary marking of pipeline
(Span of Control: 1 to 1)
NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
104.23 - Temporary marking of pipeline NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V
105.01 - Provide security for pipeline facilities
(Span of Control: 1 to 1)
NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V
105.01 - Provide security for pipeline facilities NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
105.02 - Monitor by remote security devices
(Span of Control: 1 to 1)
NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V
105.02 - Monitor by remote security devices NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating
Conditions
A 4/17/2015 12/31/2018 V
Automatically Generated OQ Report
Page 3 of 3

More Related Content

What's hot

PP10 startup manual (Unofficial as Requested)
PP10 startup manual (Unofficial as Requested)PP10 startup manual (Unofficial as Requested)
PP10 startup manual (Unofficial as Requested)Muhammad Gulzar
 
Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Mike Beck
 
Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Mike Beck
 
George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16Bert Yates
 
Icota 8th seminar well intervention (2)
Icota 8th seminar well intervention (2)Icota 8th seminar well intervention (2)
Icota 8th seminar well intervention (2)Clement Laplane
 
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Gary Hayes
 
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...Gary Hayes
 
Safety Council of Western New England 2011
Safety Council of Western New England 2011Safety Council of Western New England 2011
Safety Council of Western New England 2011David Horowitz
 
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Gary Hayes
 
Special Seismic certification for ME Systems for OSHPD Projects
Special Seismic certification for ME Systems for OSHPD ProjectsSpecial Seismic certification for ME Systems for OSHPD Projects
Special Seismic certification for ME Systems for OSHPD Projectsmichaeljmack
 
General Pulse Structural Monitoring
General Pulse Structural MonitoringGeneral Pulse Structural Monitoring
General Pulse Structural MonitoringBoQan
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...hydrologyproject001
 
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid PipelinesPresentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid PipelinesAudubon Engineering Company
 
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion  Field Testing - Where, When & HowPipeline Operations & Maintenance Corrosion  Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & HowAudubon Engineering Company
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviihydrologyproject001
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksSajid Ali
 

What's hot (19)

EESS 2018 Day 2 - Mark Spinks
EESS 2018 Day 2 - Mark SpinksEESS 2018 Day 2 - Mark Spinks
EESS 2018 Day 2 - Mark Spinks
 
Onr nr-ar-17-021
Onr nr-ar-17-021Onr nr-ar-17-021
Onr nr-ar-17-021
 
PP10 startup manual (Unofficial as Requested)
PP10 startup manual (Unofficial as Requested)PP10 startup manual (Unofficial as Requested)
PP10 startup manual (Unofficial as Requested)
 
1 80 fineshed
1 80 fineshed1 80 fineshed
1 80 fineshed
 
Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013Surface casing vent testing nov 13-2013
Surface casing vent testing nov 13-2013
 
Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.Surface Casing Vent Testing - Surface Solutions Inc.
Surface Casing Vent Testing - Surface Solutions Inc.
 
George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16
 
Icota 8th seminar well intervention (2)
Icota 8th seminar well intervention (2)Icota 8th seminar well intervention (2)
Icota 8th seminar well intervention (2)
 
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
 
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
Inspection & Test Plan -Electrical - Hazardous Area Installation - Q1447-CS-P...
 
Safety Council of Western New England 2011
Safety Council of Western New England 2011Safety Council of Western New England 2011
Safety Council of Western New England 2011
 
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
 
Special Seismic certification for ME Systems for OSHPD Projects
Special Seismic certification for ME Systems for OSHPD ProjectsSpecial Seismic certification for ME Systems for OSHPD Projects
Special Seismic certification for ME Systems for OSHPD Projects
 
General Pulse Structural Monitoring
General Pulse Structural MonitoringGeneral Pulse Structural Monitoring
General Pulse Structural Monitoring
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid PipelinesPresentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Hazardous Liquid Pipelines
 
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion  Field Testing - Where, When & HowPipeline Operations & Maintenance Corrosion  Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe Works
 

Similar to Dustin Marshall OQ Report (NCCER)

ROSS DUGAS OQReport_28716500
ROSS DUGAS OQReport_28716500ROSS DUGAS OQReport_28716500
ROSS DUGAS OQReport_28716500Ross Dugas
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
Aproved QCP.pdf
Aproved QCP.pdfAproved QCP.pdf
Aproved QCP.pdfhyperm2m
 
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...ClarenceLoganathan1
 
NEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTNEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTArkady Mitnik
 
Hydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsHydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsGustavo Ariza Trelles
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)Mohd Zaini Baharum
 
SEPARADOR GLCC 1.pdf
SEPARADOR GLCC 1.pdfSEPARADOR GLCC 1.pdf
SEPARADOR GLCC 1.pdfssusere5fdba
 
Guidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanksGuidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanksOsama Lari
 
final-herbst-ogp-05-01-14.pptx
final-herbst-ogp-05-01-14.pptxfinal-herbst-ogp-05-01-14.pptx
final-herbst-ogp-05-01-14.pptxAnithaDas6
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATSMary Calkins
 

Similar to Dustin Marshall OQ Report (NCCER) (20)

ROSS DUGAS OQReport_28716500
ROSS DUGAS OQReport_28716500ROSS DUGAS OQReport_28716500
ROSS DUGAS OQReport_28716500
 
OQReport_34647213
OQReport_34647213OQReport_34647213
OQReport_34647213
 
testing formats
testing formatstesting formats
testing formats
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
ANSI C12.1 Overview
ANSI C12.1 OverviewANSI C12.1 Overview
ANSI C12.1 Overview
 
Aproved QCP.pdf
Aproved QCP.pdfAproved QCP.pdf
Aproved QCP.pdf
 
ANSI C12.1 Standards Update
ANSI C12.1 Standards UpdateANSI C12.1 Standards Update
ANSI C12.1 Standards Update
 
ANSI C12.1 Overview and Current Events
ANSI C12.1 Overview and Current EventsANSI C12.1 Overview and Current Events
ANSI C12.1 Overview and Current Events
 
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
toaz.info-s-4-safety-critical-elements-for-presentation-pr_15dbc53a10039dbf18...
 
NEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTNEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORT
 
ANSI C12.1 and NY State PSC Part 92
ANSI C12.1 and NY State PSC Part 92ANSI C12.1 and NY State PSC Part 92
ANSI C12.1 and NY State PSC Part 92
 
ANSI C12.1 Overview and Current Events
ANSI C12.1 Overview and Current EventsANSI C12.1 Overview and Current Events
ANSI C12.1 Overview and Current Events
 
Hydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsHydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control Channels
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
 
SEPARADOR GLCC 1.pdf
SEPARADOR GLCC 1.pdfSEPARADOR GLCC 1.pdf
SEPARADOR GLCC 1.pdf
 
Guidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanksGuidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanks
 
final-herbst-ogp-05-01-14.pptx
final-herbst-ogp-05-01-14.pptxfinal-herbst-ogp-05-01-14.pptx
final-herbst-ogp-05-01-14.pptx
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
Inspection of-pressure-vessels
Inspection of-pressure-vesselsInspection of-pressure-vessels
Inspection of-pressure-vessels
 

Recently uploaded

Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxGry Tina Tinde
 
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一A SSS
 
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsNiya Khan
 
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdfobuhobo
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一Fs sss
 
Notes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testsNotes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testspriyanshukumar97908
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样umasea
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...Suhani Kapoor
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterHector Del Castillo, CPM, CPMM
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipSoham Mondal
 
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一F La
 
How to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfHow to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfmayank158542
 
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...Suhani Kapoor
 
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012rehmti665
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of JobRemote DBA Services
 
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...shivangimorya083
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfpadillaangelina0023
 
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Suhani Kapoor
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackSuhani Kapoor
 

Recently uploaded (20)

Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptx
 
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
 
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call GirlsSonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
Sonam +91-9537192988-Mind-blowing skills and techniques of Ahmedabad Call Girls
 
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 
Notes of bca Question paper for exams and tests
Notes of bca Question paper for exams and testsNotes of bca Question paper for exams and tests
Notes of bca Question paper for exams and tests
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
 
PM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring ChapterPM Job Search Council Info Session - PMI Silver Spring Chapter
PM Job Search Council Info Session - PMI Silver Spring Chapter
 
Final Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management InternshipFinal Completion Certificate of Marketing Management Internship
Final Completion Certificate of Marketing Management Internship
 
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
 
How to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdfHow to Find the Best NEET Coaching in Indore (2).pdf
How to Find the Best NEET Coaching in Indore (2).pdf
 
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
VIP Russian Call Girls in Amravati Deepika 8250192130 Independent Escort Serv...
 
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
Call Girls Mukherjee Nagar Delhi reach out to us at ☎ 9711199012
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Job
 
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
Delhi Call Girls Preet Vihar 9711199171 ☎✔👌✔ Whatsapp Body to body massage wi...
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdf
 
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
Low Rate Call Girls Gorakhpur Anika 8250192130 Independent Escort Service Gor...
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
 

Dustin Marshall OQ Report (NCCER)

  • 1. ISNetworld OQ Report Kinder Morgan Project Site: Kinder Morgan - General (JS-239) Report Date: 9/10/2015 10:54:41 PM Report Run By: Automatically Generated OQ Report Form ID: 129470-AO-774FF785 Marshall, Dustin Lee The Texian Group Inc (ISN-02589319) Task Qualification Method Type Evaluation Date Expiration Date Class 001.01.01 - Abnormal Operations NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 004.01.01 - Corrosing Monitoring - Atmospheric, External & Internal: General (Span of Control: 1 to 1) NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 004.01.01 - Corrosing Monitoring - Atmospheric, External & Internal: General NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V 004.01.03 - Visual Inspection of Buried Pipe and Components When Exposed (Span of Control: 1 to 1) NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V 004.01.03 - Visual Inspection of Buried Pipe and Components When Exposed NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 005.01.02 - Cathodic Protection System Maintenance: Electrical Isolation (Span of Control: 1 to 1) NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 005.01.02 - Cathodic Protection System Maintenance: Electrical Isolation NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V 005.01.05 - Cathodic Protection System Maintenance: Reverse Current Switches (Span of Control: 1 to 1) NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 005.01.05 - Cathodic Protection System Maintenance: Reverse Current Switches NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V 005.03.02 - Cathodic Protection System Testing: Pipe to Soil (Span of Control: 1 to 1) NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 005.03.02 - Cathodic Protection System Testing: Pipe to Soil NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V 006.01.01 - Indirect Inspection: Close Interval Survey (Span of Control: 1 to 1) NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 4/17/2018 V 006.01.01 - Indirect Inspection: Close Interval Survey NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 4/22/2018 V 008.01.01 - Locating Pipelines (Span of Control: 1 to 1) NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 008.01.01 - Locating Pipelines NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 008.02.01 - Damage Prevention During Excavation Activities (Span of Control: 1 to 1) NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 008.02.01 - Damage Prevention During Excavation Activities NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 014.02.01 - Backfilling (Span of Control: 1 to 3) NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 014.02.01 - Backfilling NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 014.05.01 - Underground Clearances (Span of Control: 1 to 3) NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 014.05.01 - Underground Clearances NCCER - 62302-02 - Pipeline Damage Inspection (CT 34, 35) PW 4/17/2015 12/31/2018 V 014.08.01 - Cover - Service Lines, Mains & Transmission Lines (Span of Control: 1 to 3) NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 014.08.01 - Cover - Service Lines, Mains & Transmission Lines NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 014.09.01 - Inspection: Compliance with Procedures & Standards NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V Page 1 of 3
  • 2. (Span of Control: 1 to 2) 014.09.01 - Inspection: Compliance with Procedures & Standards NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 014.09.02 - Inspection: Inspection of Materials (Span of Control: 1 to 2) NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V 014.09.02 - Inspection: Inspection of Materials NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 014.10.01 - Line Markers (Span of Control: 1 to 4) NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V 014.10.01 - Line Markers NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 014.12.01 - Protection from Hazards (Span of Control: 1 to 3) NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V 014.12.01 - Protection from Hazards NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 014.12.01 - Protection from Hazards NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 014.13.01 - Protection When Minimum Cover Not Met (Span of Control: 1 to 3) NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V 014.13.01 - Protection When Minimum Cover Not Met NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 014.13.01 - Protection When Minimum Cover Not Met NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 024.02.01 - Visual Inspection of Welds (Span of Control: 1 to 1) NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V 024.02.01 - Visual Inspection of Welds NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 024.03.01 - Nondestructive Testing of Welds (Span of Control: 1 to 3) NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V 024.03.01 - Nondestructive Testing of Welds NCCER - 67107-02 - Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 101.01 - Abnormal Conditions - Outside Control Room NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 102.03 - Active Corrosion / Microbiological Corrosion (MIC) Testing (Span of Control: 1 to 1) NCCER - 61105-02 - Inspect Buried and Submerged Pipe When Exposed (CT 5.1, 5.2, 5.3) PW 4/17/2015 12/31/2018 V 102.03 - Active Corrosion / Microbiological Corrosion (MIC) Testing NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 102.06 - Use of current interrupters on rectifiers. CLOSE INTERVAL SURVEY is not specifically included. (Span of Control: 1 to 1) NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 102.06 - Use of current interrupters on rectifiers. CLOSE INTERVAL SURVEY is not specifically included. NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V 102.21 - Inspect and perform electrical test of bonds NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 102.21 - Inspect and perform electrical test of bonds NCCER - 61205-02 - Conduct Close Interval Survey (CT 1.2 & 1.4) PW 4/22/2015 12/31/2018 V 103.09 - Nondestructive Testing of Welds (Span of Control: 1 to 3) NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V 103.09 - Nondestructive Testing of Welds NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 103.11 - Damage Prevention During Excavation Activities (Span of Control: 1 to 1) NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 103.11 - Damage Prevention During Excavation Activities NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 103.12 ­ Inspection activities – welding on pipeline system (Span of Control: 1 to 1) NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V 103.12 ­ Inspection activities – welding on pipeline system NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 103.13 ­ Inspection activities – non­destructive testing (Span of Control: 1 to 1) NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V 103.13 ­ Inspection activities – non­destructive testing NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V Page 2 of 3
  • 3. 104.01 - Inspect buried pipe when exposed (Span of Control: 1 to 1) NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 104.01 - Inspect buried pipe when exposed NCCER - 61105-02 - Inspect Buried and Submerged Pipe When Exposed (CT 5.1, 5.2, 5.3) PW 4/17/2015 12/31/2018 V 104.04 - Place and maintain permanent line markers (Span of Control: 1 to 4) NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 104.04 - Place and maintain permanent line markers NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V 104.09 - Inspection of clearance of existing pipe to underground structures (Span of Control: 1 to 3) NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 104.09 - Inspection of clearance of existing pipe to underground structures NCCER - 62302-02 - Pipeline Damage Inspection (CT 34, 35) PW 4/17/2015 12/31/2018 V 104.11 - Backfilling an excavation (Span of Control: 1 to 3) NCCER - 62205-02 - Pipeline Inspection (CT 38.1, 38.2, 38.3) PW 4/17/2015 12/31/2018 V 104.11 - Backfilling an excavation NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 104.22 - Locate pipeline (Span of Control: 1 to 1) NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 104.22 - Locate pipeline NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 104.23 - Temporary marking of pipeline (Span of Control: 1 to 1) NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 104.23 - Temporary marking of pipeline NCCER - 62107-02 - Excavating and Backfilling (CT 17, 39, 32) PW 4/17/2015 12/31/2018 V 105.01 - Provide security for pipeline facilities (Span of Control: 1 to 1) NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V 105.01 - Provide security for pipeline facilities NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V 105.02 - Monitor by remote security devices (Span of Control: 1 to 1) NCCER - 62106-02 - Preventing Pipeline Damage (CT 14, 28) PW 4/17/2015 12/31/2018 V 105.02 - Monitor by remote security devices NCCER - 66102-02 - Liquid Pipeline General Abnormal Operating Conditions A 4/17/2015 12/31/2018 V Automatically Generated OQ Report Page 3 of 3