1. P.O. No.-0814-B104-PO-0150-001-00-003 Dtd. 13-12-2013
JBFPL/MNG/OS/DG/13-14/M71
Supplier’s PO No.- HSC/4583/579/2014
THE HERE AFTER DESIGNATED MATERIAL £ SEE ATTACHMENT £
R HAS BEEN INSPECTED ON Dtd. 25.05.2015 £ INSPECTION HAS BEEN WAIVED
MATERIAL REQUISITION NO. - 0814-13104-MR-0310-00 Rev .-00
A
1 20 NB SCH XXS 2
2 25 NB SCH XXS 48
3 25 NB SCH 160 240
4 40 NB SCH XXS 6
5 50 NB SCH XXS 78
6 50 NB SCH 80 84
7 80 NB SCH 160 6
8 100 NB SCH 40 72
9 150 NB SCH 20 36
10 200 NB SCH 20 102
11 250 NB SCH 20 6
12 300 NB SCH 20 60
13 350 NB SCH 20 160
14 400 NB SCH 20 72
15 600 NB SCH 20 72
THE EQUIPMENT DELIVERY IS T PARTIALLY DONE R COMPLETED
REMARKS:
1. QCP No.-QAP-BMSSCO-HSC-001_0-Code-3– Technip Approved
2.
3. FOR DETAILS REFER INSPECTION REPORT
4. IDENTIFICATION -Pipes have been hard stamped as "
Supplier confirms that :
All NCR’s issued, have been solved and close-out reports issued
No NCR’s remain outstanding
All requirements of the PO/Requisition have been met
All documentation (drawings, calculation notes, welding books ....) has reached « No comment » status
Manufacturer’s data report is complete
We are following M/s. Technip procedure of IRC, we hope this will facilitated smooth invoicing & payment for the supply items
SR.
No.
DESCRIPTION
CLIENT :
PROJECT :
INSPECTION RELEASE CERTIFICATE - IRC
PROJECT NO.
0830
IRC No. - HSC/0830/JBFPL/OSBL/003/020
SUPPLIER - (NAME & ADDRESS)
The Bengal Mill Stores Supply Co.
JBF Petrochemicals Limited
Mangalore PTA Plant - OSBL
Issuance of IRC does not disengage the Vendor from his responsibility
THE ABOVE ITEMS HAVE BEEN INSPECTED IN ACCORDANCE WITH SPECIFICATIONS & PURCHASE ORDER REQUIREMENTS
FOUND SATISFACTORILY AND RELEASED.
TobefilledinbytheSupplier
SUPPLIER, STAMP / NAME / SIGNATURE AND
DATE- 25/05/2015
Technip
HAMON, STAMP / NAME / SIGNATURE AND
DATE- 25/05/2015
HSCPL
Mr. Ramesh Menaria
TECHNIP INDIA’S REPRESENTATIVE NAME, SIGN. & DT.
B1179
MSL/IBR/0238/13/2012
MSL/IBR/0912A/1&2/2014
MSL/IBR/3116/4/2012
MSL/IBR/0031/1&2/2015
MSL/IBR/2117/3 to 5/2014
MSL/IBR/0966/1&2/2013
MSL/IBR/1292/1/2011
MSL/IBR/1119/3 to 6,8 &11/2012
JSL/Q/110/907187A/J
Carbon steel seamless pipe ASME
B36.1, ASTM A106 Gr.B Bevelled end
MSL/IBR/4320/4/2012
MSL/IBR/1356/20/2013
QTY.
in Mtr.
Manufacturer's TC
No.
Remark
MSL/IBR/0756/3&4/2011
JSL/Q/114&115/2014005662-09
MSL/IBR/0801/3&4/2014
HAMON SHRIRAM COTTRELL PVT. LTD. 3A-8A, Main Frame, Royal palms Complex, Nr. Aarey Milk Colony, Goregaon East, Mumbai, Maharashtra – 400065. Tel. : +91 22 61506700 - Fax : +91 22 61506800