SlideShare a Scribd company logo
1 of 3
ATTEEQUE UR REHMAN
(Mechanical Supervisor)
Mobile: +971-56-2026172 (UAE), +92-937576307, +92-333-7145178, +92-313-3214888 (Pak)
 E-Mail: atteeque.rehman@gmail.com
VISIONARY TECHNOLOGY PROFESSIONAL
 A s s e m b l y a n d I n s t a l l a t i o nA s s e m b l y a n d I n s t a l l a t i o n  L e v e l l i n g / A l i g n m e n tL e v e l l i n g / A l i g n m e n t
 C e n t r i n g / S e t t i n g t o E l e v a t i o nC e n t r i n g / S e t t i n g t o E l e v a t i o n
 P u m p s / C o m p r e s s o r sP u m p s / C o m p r e s s o r s  V i b r a t i o n A n a l y s i sV i b r a t i o n A n a l y s i s  S t a r t - u p a n d T e s t i n gS t a r t - u p a n d T e s t i n g
 S h u t d o w n O p e r a t i o n sS h u t d o w n O p e r a t i o n s  C u s t o m P a r t s F a b r i c a t i o n / M a c h i n i n gC u s t o m P a r t s F a b r i c a t i o n / M a c h i n i n g
 H y d r a u l i c a n d P n e u m a t i c S y s t e m sH y d r a u l i c a n d P n e u m a t i c S y s t e m s  F a n s / B l o w e rF a n s / B l o w e r  A d j u s t m e n t sA d j u s t m e n t s
 T r o u b l e s h o o t i n gT r o u b l e s h o o t i n g  B e a r i n g , S e a l s a n d P a c k i n gB e a r i n g , S e a l s a n d P a c k i n g
AN OVERVIEW
 Offering 06 years of rich experience in, Mechanical Field (Static & Rotary
Equipment Erection, Alignment, Maintenance, Installation, Services, Structural Erection
& Fabrication),
 A keen strategist & implementer aiming at achieving timely project completion, profit
and business growth objectives & turnaround for increase in top line and bottom line in
rapid change environments.
 Demonstrated abilities in managing various operations as per the set parameters &
standards;
 Fully experienced in managing quality, inspection activities training, performing
inspections, etc.
 Well conversant with International Codes and Standards such as API & ASME Sections.
 Possess excellent analytical and planning skills with abilities in leading and team
management.
CURRENT ORGANISATIONAL SCAN
Descon Engineering UAE is a business area of Descon Engineering Limited Pakistan and it was established in 1983. Descon in
UAE has executed many Construction/ Maintenance projects in U.A.E. in the Oil and Gas sector with ADNOC group of
companies. Currently Descon is emerging as an EPC contractor in the region.
Professional Experience
Since 14 July 2012 to 05 August 2014: Descon Engineering Limited Abu Dahbi Takree Oil
Refinary UAE
AS a Mechanical supervisor
•• Installation of different types of pumps ,centrifugal and reciprocatingInstallation of different types of pumps ,centrifugal and reciprocating
•• Erection of vertical pumps and also alignment of pumpsErection of vertical pumps and also alignment of pumps
•• Erections of drums and vesselsErections of drums and vessels
PagePage 11 ofof 33
ATTEQUE UR REHMAN RESUMEATTEQUE UR REHMAN RESUME
SKILL SET
Static & Rotary Equipment
Erection, Alignment,
Maintenance, Installation,
Services
Structural Erection
&Fabrication
Auditing
Quality Management
Technical Support
Documentation
Team Management
•• Alignment of rotary equipments by different methodsAlignment of rotary equipments by different methods
Dec 10/08/2009 to 10/02/2010 100 MW Combined Cycle Power Plant GUDDU
AS a Mechanical supervisor
•• Worked as Mechanical Supervisor on 100 MW Gas Turbine overhauling and upgrading at Wapda ThermalWorked as Mechanical Supervisor on 100 MW Gas Turbine overhauling and upgrading at Wapda Thermal
Power Station Guddu.Power Station Guddu.
•• Changing liners of gas turbineChanging liners of gas turbine
26/07/2010 to 16/10/2011 BHP Billiton Zamzama Gas Plant FEC Project Dadu
AS a Mechanical supervisor
•• Worked on Bhp Billiton Zamzama Gas Plant as Mechanical Supervisor.Worked on Bhp Billiton Zamzama Gas Plant as Mechanical Supervisor.
•• Installation of GE Gas Turbines (28 MW), GE Compressors and many other equipment like Slug Catcher, TestInstallation of GE Gas Turbines (28 MW), GE Compressors and many other equipment like Slug Catcher, Test
Separator, Solar Power Turbine, Inlet Coolers, Trim Coolers etc.Separator, Solar Power Turbine, Inlet Coolers, Trim Coolers etc.
•• Alignment of GE Gas Turbines and Compressors.Alignment of GE Gas Turbines and Compressors.
•• Commissioning of GE Gas Turbines, Compressors and Lube Oil Coolers.Commissioning of GE Gas Turbines, Compressors and Lube Oil Coolers.
•• Trouble shooting GE Gas turbines , Compressors and lube oil coolersTrouble shooting GE Gas turbines , Compressors and lube oil coolers
05/11/2011 to 17/05/2012: 48 MW Lottee Co-generation Power Project
AS a Mechanical supervisor
•• Worked as a Site Supervisor on 48 MW Lottee Co-generation Power Project.Worked as a Site Supervisor on 48 MW Lottee Co-generation Power Project.
•• Gas Turbine Erection (Model LM6000), Gas Turbine generator Erection, Filter House installation and structureGas Turbine Erection (Model LM6000), Gas Turbine generator Erection, Filter House installation and structure
Erection.Erection.
•• Initial and final alignment.Initial and final alignment.
•• Installation of natural Gas boosts up compressor erection.Installation of natural Gas boosts up compressor erection.
•• Erection of auxiliaries skid.Erection of auxiliaries skid.
•• Steel structure erection (9m height x 30m length).Steel structure erection (9m height x 30m length).
•• Overhead crane installation and pre-commissioning of GT LM 6000.Overhead crane installation and pre-commissioning of GT LM 6000.
01/09/2014to present: BOROUGE PO Flare Gas Recovery Ruwais Abu Dhabi
AS a Mechanical site Engineer
•• Installation of gas blower discharge drumInstallation of gas blower discharge drum
•• Installation of K O drums ON 35M Height structureInstallation of K O drums ON 35M Height structure
•• Installation of condensate tanks on structureInstallation of condensate tanks on structure
•• Installation of gas boost compressorsInstallation of gas boost compressors
•• Installation of column 35m heightInstallation of column 35m height
•• Installation of different types of pumpsInstallation of different types of pumps
•• Alignment of rotary equipments by different methodsAlignment of rotary equipments by different methods
•• Erection of 400 ton steel structure in Membrane Hc recovery Area Brouj.Erection of 400 ton steel structure in Membrane Hc recovery Area Brouj.
KEY ACCOUNTABILITIES:
•• Preparation/coordination in getting approval of daily inspections from the client.Preparation/coordination in getting approval of daily inspections from the client.
PagePage 22 ofof 33
ATTEQUE UR REHMAN RESUMEATTEQUE UR REHMAN RESUME
•• Responsible for modification works such as RMP,FUP,Chemical and API-CPI separator in existing areas (InsideResponsible for modification works such as RMP,FUP,Chemical and API-CPI separator in existing areas (Inside
refinery)refinery)
•• Execute and submit inspection documentation works for static and rotating equipment’s to assure that the required formsExecute and submit inspection documentation works for static and rotating equipment’s to assure that the required forms
used in testing submitted are approved by client representative as per ITP such as Installation checklist for static/rotatingused in testing submitted are approved by client representative as per ITP such as Installation checklist for static/rotating
equipment’s-Leveling/alignment recording forms for horizontal and vertical package type Axial/radial, soft footequipment’s-Leveling/alignment recording forms for horizontal and vertical package type Axial/radial, soft foot
parallelism forms for pumps and compressors.parallelism forms for pumps and compressors.
•• Responsible for erection of equipment’s such as pumps, vessels, tanks and compressors and other equipment’s as per theResponsible for erection of equipment’s such as pumps, vessels, tanks and compressors and other equipment’s as per the
approved method statementapproved method statement
•• Check equipment orientation before and after erectionCheck equipment orientation before and after erection
•• Check the shimming requirements for static and rotating equipment’s.Check the shimming requirements for static and rotating equipment’s.
•• Check the condition of pump alignment (axial/radial) without piping prior for preparation for piping installation.Check the condition of pump alignment (axial/radial) without piping prior for preparation for piping installation.
•• After getting clearance note of civil about foundation ready preparation for alignment and leveling and checked setting ofAfter getting clearance note of civil about foundation ready preparation for alignment and leveling and checked setting of
padding platespadding plates
•• Good knowledge in permit to work system.Good knowledge in permit to work system.
•• Responsible for installation of static equipment’s like pressure vessels, effluent and trim coolers.Responsible for installation of static equipment’s like pressure vessels, effluent and trim coolers.
•• Responsible for installations of rotating equipment’s like centrifugal horizontal and vertical pumps.Responsible for installations of rotating equipment’s like centrifugal horizontal and vertical pumps.
•• Inspect the condition of rotating parts namely shaft, sleeve, impeller, coupling and stationary parts such as casing,Inspect the condition of rotating parts namely shaft, sleeve, impeller, coupling and stationary parts such as casing,
stuffing box, distance piece, and bearing housing.stuffing box, distance piece, and bearing housing.
•• Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage.Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage.
•• Check the physical condition of anchor bolts and leveling of foundations before erectionof equipment’s.Check the physical condition of anchor bolts and leveling of foundations before erectionof equipment’s.
•• Check preservation status of equipment’s at siteCheck preservation status of equipment’s at site
•• Ensure to have a preservation log for all the equipment’s checked and monitored daily weekly for easily tracking theEnsure to have a preservation log for all the equipment’s checked and monitored daily weekly for easily tracking the
status.status.
•• Obtaining a complete check list of the assembling equipment and keep a record of a sameObtaining a complete check list of the assembling equipment and keep a record of a same
KNOWLEDGE PURVIEW
• Theodolite, Total Station, Dumpy Level, Inside and Outside Micrometer, Dial Indicator, Precision Level, Vernier Calliper,
etc.
EDUCATION & CREDENTIALS
Diploma of Associate Engineer (D.A.E.) in Mechanical Technology from Government Collage of Technology ,Khairpur,
Pakistan. (With A grade)
F.Sc (Pre-Engineering) from the Wapda Degree College Guddu PAKISTAN.
S.S.C. with Science from Lahore Board of Intermediate & secondary Education Larkan. Pakistan.
IT FORTE:
• Conversant with Microsoft Access. MS Office, AutoCAD, Navisworks freedom
PERSONAL SNIPPETS
Father’s Name : ABDUL REHMAN
Date of birth : 04 Sep 1987
Nationality : Pakistani
Permanent Address : Mardan , Pakistan.
Passport No. : AN1460521
Marital Status : Married
Language : English-Urdu
Current location : Abu Dhabi Ruwais UAE
PagePage 33 ofof 33
ATTEQUE UR REHMAN RESUMEATTEQUE UR REHMAN RESUME

More Related Content

What's hot (20)

CV EZ Feb 2016
CV EZ Feb 2016CV EZ Feb 2016
CV EZ Feb 2016
 
Understanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyUnderstanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard Chitty
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
BKP Resume
BKP  ResumeBKP  Resume
BKP Resume
 
PEACEFUL JUDE OBASOGIE
PEACEFUL JUDE OBASOGIEPEACEFUL JUDE OBASOGIE
PEACEFUL JUDE OBASOGIE
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
Resume Wayne Olson Mar 2015
Resume  Wayne Olson  Mar 2015Resume  Wayne Olson  Mar 2015
Resume Wayne Olson Mar 2015
 
Plant view pig launcher trap_pll-le-001_rev 00 (1)
Plant view pig launcher trap_pll-le-001_rev 00 (1)Plant view pig launcher trap_pll-le-001_rev 00 (1)
Plant view pig launcher trap_pll-le-001_rev 00 (1)
 
Quang Do's cv
Quang Do's cvQuang Do's cv
Quang Do's cv
 
julian sharman CV 2016
julian sharman CV 2016julian sharman CV 2016
julian sharman CV 2016
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and Piping
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
biodata%252520giman
biodata%252520gimanbiodata%252520giman
biodata%252520giman
 
Farhad SL CV
Farhad SL CVFarhad SL CV
Farhad SL CV
 
DSV RESUME (5)
DSV RESUME (5)DSV RESUME (5)
DSV RESUME (5)
 
Alzagon engineering solutions 1
Alzagon engineering solutions 1Alzagon engineering solutions 1
Alzagon engineering solutions 1
 
-The PERT Chart-The tendering time schedule for Adar Produced Water Re-injec...
-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injec...-The PERT Chart-The tendering time schedule for Adar Produced  Water Re-injec...
-The PERT Chart-The tendering time schedule for Adar Produced Water Re-injec...
 
SUSHIL (2)
SUSHIL (2)SUSHIL (2)
SUSHIL (2)
 
Michael McIntosh New CV 2
Michael McIntosh New CV 2Michael McIntosh New CV 2
Michael McIntosh New CV 2
 

Similar to ATTEEQUE CV

Similar to ATTEEQUE CV (20)

Aamir C.V (1)
Aamir C.V (1)Aamir C.V (1)
Aamir C.V (1)
 
Selvan CM Technician CV
Selvan CM Technician CVSelvan CM Technician CV
Selvan CM Technician CV
 
SAID SAAD ALY CV
SAID SAAD ALY CVSAID SAAD ALY CV
SAID SAAD ALY CV
 
Asirvatharavi Mech
Asirvatharavi MechAsirvatharavi Mech
Asirvatharavi Mech
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
seddaoui cv
seddaoui cvseddaoui cv
seddaoui cv
 
Abhishek
AbhishekAbhishek
Abhishek
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
KOC
KOCKOC
KOC
 
KOC
KOCKOC
KOC
 
Kamal resume
Kamal resumeKamal resume
Kamal resume
 
Sr Mechanical Technician
Sr Mechanical Technician Sr Mechanical Technician
Sr Mechanical Technician
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
m.bendris
m.bendrism.bendris
m.bendris
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
SCMS Africa Company Profile (REV6)
SCMS Africa Company Profile (REV6)SCMS Africa Company Profile (REV6)
SCMS Africa Company Profile (REV6)
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
 

ATTEEQUE CV

  • 1. ATTEEQUE UR REHMAN (Mechanical Supervisor) Mobile: +971-56-2026172 (UAE), +92-937576307, +92-333-7145178, +92-313-3214888 (Pak)  E-Mail: atteeque.rehman@gmail.com VISIONARY TECHNOLOGY PROFESSIONAL  A s s e m b l y a n d I n s t a l l a t i o nA s s e m b l y a n d I n s t a l l a t i o n  L e v e l l i n g / A l i g n m e n tL e v e l l i n g / A l i g n m e n t  C e n t r i n g / S e t t i n g t o E l e v a t i o nC e n t r i n g / S e t t i n g t o E l e v a t i o n  P u m p s / C o m p r e s s o r sP u m p s / C o m p r e s s o r s  V i b r a t i o n A n a l y s i sV i b r a t i o n A n a l y s i s  S t a r t - u p a n d T e s t i n gS t a r t - u p a n d T e s t i n g  S h u t d o w n O p e r a t i o n sS h u t d o w n O p e r a t i o n s  C u s t o m P a r t s F a b r i c a t i o n / M a c h i n i n gC u s t o m P a r t s F a b r i c a t i o n / M a c h i n i n g  H y d r a u l i c a n d P n e u m a t i c S y s t e m sH y d r a u l i c a n d P n e u m a t i c S y s t e m s  F a n s / B l o w e rF a n s / B l o w e r  A d j u s t m e n t sA d j u s t m e n t s  T r o u b l e s h o o t i n gT r o u b l e s h o o t i n g  B e a r i n g , S e a l s a n d P a c k i n gB e a r i n g , S e a l s a n d P a c k i n g AN OVERVIEW  Offering 06 years of rich experience in, Mechanical Field (Static & Rotary Equipment Erection, Alignment, Maintenance, Installation, Services, Structural Erection & Fabrication),  A keen strategist & implementer aiming at achieving timely project completion, profit and business growth objectives & turnaround for increase in top line and bottom line in rapid change environments.  Demonstrated abilities in managing various operations as per the set parameters & standards;  Fully experienced in managing quality, inspection activities training, performing inspections, etc.  Well conversant with International Codes and Standards such as API & ASME Sections.  Possess excellent analytical and planning skills with abilities in leading and team management. CURRENT ORGANISATIONAL SCAN Descon Engineering UAE is a business area of Descon Engineering Limited Pakistan and it was established in 1983. Descon in UAE has executed many Construction/ Maintenance projects in U.A.E. in the Oil and Gas sector with ADNOC group of companies. Currently Descon is emerging as an EPC contractor in the region. Professional Experience Since 14 July 2012 to 05 August 2014: Descon Engineering Limited Abu Dahbi Takree Oil Refinary UAE AS a Mechanical supervisor •• Installation of different types of pumps ,centrifugal and reciprocatingInstallation of different types of pumps ,centrifugal and reciprocating •• Erection of vertical pumps and also alignment of pumpsErection of vertical pumps and also alignment of pumps •• Erections of drums and vesselsErections of drums and vessels PagePage 11 ofof 33 ATTEQUE UR REHMAN RESUMEATTEQUE UR REHMAN RESUME SKILL SET Static & Rotary Equipment Erection, Alignment, Maintenance, Installation, Services Structural Erection &Fabrication Auditing Quality Management Technical Support Documentation Team Management
  • 2. •• Alignment of rotary equipments by different methodsAlignment of rotary equipments by different methods Dec 10/08/2009 to 10/02/2010 100 MW Combined Cycle Power Plant GUDDU AS a Mechanical supervisor •• Worked as Mechanical Supervisor on 100 MW Gas Turbine overhauling and upgrading at Wapda ThermalWorked as Mechanical Supervisor on 100 MW Gas Turbine overhauling and upgrading at Wapda Thermal Power Station Guddu.Power Station Guddu. •• Changing liners of gas turbineChanging liners of gas turbine 26/07/2010 to 16/10/2011 BHP Billiton Zamzama Gas Plant FEC Project Dadu AS a Mechanical supervisor •• Worked on Bhp Billiton Zamzama Gas Plant as Mechanical Supervisor.Worked on Bhp Billiton Zamzama Gas Plant as Mechanical Supervisor. •• Installation of GE Gas Turbines (28 MW), GE Compressors and many other equipment like Slug Catcher, TestInstallation of GE Gas Turbines (28 MW), GE Compressors and many other equipment like Slug Catcher, Test Separator, Solar Power Turbine, Inlet Coolers, Trim Coolers etc.Separator, Solar Power Turbine, Inlet Coolers, Trim Coolers etc. •• Alignment of GE Gas Turbines and Compressors.Alignment of GE Gas Turbines and Compressors. •• Commissioning of GE Gas Turbines, Compressors and Lube Oil Coolers.Commissioning of GE Gas Turbines, Compressors and Lube Oil Coolers. •• Trouble shooting GE Gas turbines , Compressors and lube oil coolersTrouble shooting GE Gas turbines , Compressors and lube oil coolers 05/11/2011 to 17/05/2012: 48 MW Lottee Co-generation Power Project AS a Mechanical supervisor •• Worked as a Site Supervisor on 48 MW Lottee Co-generation Power Project.Worked as a Site Supervisor on 48 MW Lottee Co-generation Power Project. •• Gas Turbine Erection (Model LM6000), Gas Turbine generator Erection, Filter House installation and structureGas Turbine Erection (Model LM6000), Gas Turbine generator Erection, Filter House installation and structure Erection.Erection. •• Initial and final alignment.Initial and final alignment. •• Installation of natural Gas boosts up compressor erection.Installation of natural Gas boosts up compressor erection. •• Erection of auxiliaries skid.Erection of auxiliaries skid. •• Steel structure erection (9m height x 30m length).Steel structure erection (9m height x 30m length). •• Overhead crane installation and pre-commissioning of GT LM 6000.Overhead crane installation and pre-commissioning of GT LM 6000. 01/09/2014to present: BOROUGE PO Flare Gas Recovery Ruwais Abu Dhabi AS a Mechanical site Engineer •• Installation of gas blower discharge drumInstallation of gas blower discharge drum •• Installation of K O drums ON 35M Height structureInstallation of K O drums ON 35M Height structure •• Installation of condensate tanks on structureInstallation of condensate tanks on structure •• Installation of gas boost compressorsInstallation of gas boost compressors •• Installation of column 35m heightInstallation of column 35m height •• Installation of different types of pumpsInstallation of different types of pumps •• Alignment of rotary equipments by different methodsAlignment of rotary equipments by different methods •• Erection of 400 ton steel structure in Membrane Hc recovery Area Brouj.Erection of 400 ton steel structure in Membrane Hc recovery Area Brouj. KEY ACCOUNTABILITIES: •• Preparation/coordination in getting approval of daily inspections from the client.Preparation/coordination in getting approval of daily inspections from the client. PagePage 22 ofof 33 ATTEQUE UR REHMAN RESUMEATTEQUE UR REHMAN RESUME
  • 3. •• Responsible for modification works such as RMP,FUP,Chemical and API-CPI separator in existing areas (InsideResponsible for modification works such as RMP,FUP,Chemical and API-CPI separator in existing areas (Inside refinery)refinery) •• Execute and submit inspection documentation works for static and rotating equipment’s to assure that the required formsExecute and submit inspection documentation works for static and rotating equipment’s to assure that the required forms used in testing submitted are approved by client representative as per ITP such as Installation checklist for static/rotatingused in testing submitted are approved by client representative as per ITP such as Installation checklist for static/rotating equipment’s-Leveling/alignment recording forms for horizontal and vertical package type Axial/radial, soft footequipment’s-Leveling/alignment recording forms for horizontal and vertical package type Axial/radial, soft foot parallelism forms for pumps and compressors.parallelism forms for pumps and compressors. •• Responsible for erection of equipment’s such as pumps, vessels, tanks and compressors and other equipment’s as per theResponsible for erection of equipment’s such as pumps, vessels, tanks and compressors and other equipment’s as per the approved method statementapproved method statement •• Check equipment orientation before and after erectionCheck equipment orientation before and after erection •• Check the shimming requirements for static and rotating equipment’s.Check the shimming requirements for static and rotating equipment’s. •• Check the condition of pump alignment (axial/radial) without piping prior for preparation for piping installation.Check the condition of pump alignment (axial/radial) without piping prior for preparation for piping installation. •• After getting clearance note of civil about foundation ready preparation for alignment and leveling and checked setting ofAfter getting clearance note of civil about foundation ready preparation for alignment and leveling and checked setting of padding platespadding plates •• Good knowledge in permit to work system.Good knowledge in permit to work system. •• Responsible for installation of static equipment’s like pressure vessels, effluent and trim coolers.Responsible for installation of static equipment’s like pressure vessels, effluent and trim coolers. •• Responsible for installations of rotating equipment’s like centrifugal horizontal and vertical pumps.Responsible for installations of rotating equipment’s like centrifugal horizontal and vertical pumps. •• Inspect the condition of rotating parts namely shaft, sleeve, impeller, coupling and stationary parts such as casing,Inspect the condition of rotating parts namely shaft, sleeve, impeller, coupling and stationary parts such as casing, stuffing box, distance piece, and bearing housing.stuffing box, distance piece, and bearing housing. •• Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage.Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage. •• Check the physical condition of anchor bolts and leveling of foundations before erectionof equipment’s.Check the physical condition of anchor bolts and leveling of foundations before erectionof equipment’s. •• Check preservation status of equipment’s at siteCheck preservation status of equipment’s at site •• Ensure to have a preservation log for all the equipment’s checked and monitored daily weekly for easily tracking theEnsure to have a preservation log for all the equipment’s checked and monitored daily weekly for easily tracking the status.status. •• Obtaining a complete check list of the assembling equipment and keep a record of a sameObtaining a complete check list of the assembling equipment and keep a record of a same KNOWLEDGE PURVIEW • Theodolite, Total Station, Dumpy Level, Inside and Outside Micrometer, Dial Indicator, Precision Level, Vernier Calliper, etc. EDUCATION & CREDENTIALS Diploma of Associate Engineer (D.A.E.) in Mechanical Technology from Government Collage of Technology ,Khairpur, Pakistan. (With A grade) F.Sc (Pre-Engineering) from the Wapda Degree College Guddu PAKISTAN. S.S.C. with Science from Lahore Board of Intermediate & secondary Education Larkan. Pakistan. IT FORTE: • Conversant with Microsoft Access. MS Office, AutoCAD, Navisworks freedom PERSONAL SNIPPETS Father’s Name : ABDUL REHMAN Date of birth : 04 Sep 1987 Nationality : Pakistani Permanent Address : Mardan , Pakistan. Passport No. : AN1460521 Marital Status : Married Language : English-Urdu Current location : Abu Dhabi Ruwais UAE PagePage 33 ofof 33 ATTEQUE UR REHMAN RESUMEATTEQUE UR REHMAN RESUME