TO REDUCE SPM LEVEL AT SCREEN
HOUSE AT CHP ASH FREE BATTERY 5,6,7
(COKE PLANT ,TATA STEEL LTD. ,JAMSHEDPUR)
AVISHEK GHOSH
JADAVPUR UNIVERSITY
KOLKATA
1
First and foremost I would like to express sincere gratitude to the project guide,
Mr. Vikash Kumar ,Manager (Mech). I was privileged to experience a sustained
enthusiastic and involved interest from this side. He also made me aware of all
the safety issues and helped me to get equipped with all the personal protective,
thus making me work in safe working conditions.
This fueled my enthusiasm even further and encouraged me to boldly step into
what was totally dark and unexplored expense before me.
I would also like to thank Mr. Mahapatra for helping me with gaining on site
knowledge. And for being ready with a positive comment at all time, whether it
was an off hand comment to encourage me or a constructive piece of criticism.
ACKNOWLEDGEMENT
2
CONTENTS
SL. No. TOPIC Pg. No.
1 ACKNOWLEDGEMENT 1
2 A BRIEF INTRODUCTION TO TATA STEEL 3
3 COKE PLANT 5
4 SYNTHESIS OF COKE FROM COAL 6
5 FUNCTIONAL ELEMENTS OF COKE PLANT 7
6 AN OVERVIEW OF THE COKE PLANT 11
7 PROCESSES IN SCREEN HOUSE 12
8 AN OVERVIEW OF THE SCREEN HOUSE 13
9 MECHANICAL MECHANISM BEHIND VIBRATION 14
10 SECONDARY SCREENING SYSTEM 15
11 WORKING OF CONVEYERS 16
12 TO REDUCE SPM LEVEL AT SCREEN HOUSE AT CHP (COKE HANDLING PLANT) ASH FREE BATTERY
5 6 7 IN COKE PLANT (CASE STUDY OF CHP#3)
17
13 RECOMMENDATIONS 21
14 CASE STUDY OF SCREENING OF COKE FROM CDQ IN CHP#3 22
15 SAFETY PRECAUTIONS TO BE TAKEN IN COKE PLANT 23
3
Established in 1907, Tata Steel is the world’s 6th largest steel company with an existing
annual crude steel capacity of 30 million tones. Asia’s first integrated steel plant and India‘s
largest integrated private sector steel company is now the world’s second most
geographically diversified steel producer, with operations in 26 countries and commercial
presence in over 50 countries.
Tata Steel completed 100 glorious years of existence on august 26, 2007 following the ideals
and philosophy laid down by its founder, Jamshetji Nusserwanji Tata. The first private sector
steel plant which started with a production capacity of 1,00,000 tones has transformed into
a global giant.
A BRIEF INTRODUCTION TO TATA STEEL
4
Tata Steel plan to grow and globalize through organic and inorganic
routes. Its 6.8 million tons per annum (MTPA). Jamshedpur Works
plan to achieve 10MT capacity by 2010. The Company also has three
Greenfield steel projects in the states of Jharkhand, Orissa and
Chhattisgarh proposed steel making facilities in Vietnam.
Tata Steel is a global player with a balance presence in European
developed and fast growing Asian market and with a strong position
in the construction, automotive and packaging markets. It’s
Jamshedpur steel works produce hot and cold rolled coils and sheets,
galvanized sheets, tubes, wire rods, construction rebars.
In an attempt to ‘discommodities’ steel, the Company has introduced
several branded steel products, including Tata Steelium (the world’s
first branded Clod Rolled Steel), Tata Shaktee (Galvanized Corrugated
Sheets), Tata Tiscon (rebars),Tata Pipes, Tata Bearings, Tata
Structural, Tata Agrico (hand tools and implements) and Tata Wiron
(galvanized wire products).Tata Steel’s vision is to be the global steel
industry benchmark for Value Creation and Corporate Citizenship.
TATA STEEL has been ranked as the "World's Best Steel Maker", for
the third time by World Steel Dynamics in its annual listing in
February, 2006. Tata Steel has been conferred the Prime Minister of
India's Trophy for the Best Integrated Steel Plant five times.
5
COKE PLANT
The TATA iron and steel company is responsible for the production of
IRON and STEEL in very huge quantities. The production area is very
large, which comprises of various plants connected in series which
depends on each other for the production. In this process one of the most
important part plays the COKE PLANT, which produces coke(2.3 MT p.a)
after processing raw coal (pyrolysis). This produced coke is sent further
for heating the blast furnace and hence the process continues. The
processing of coal into coke, happens at various stages starting right
from the SCP machine which charges raw coal into hot ovens where the
coal gets carbonized at very high temperatures of 950-1200c for about
20 hrs. CO and BF gases are used for heating the oven. The heated coal
looses its moisture content and gets converted into coke. This heated
coke is then removed from the oven by a PUSHER RAM of SCP machine
which is guided into a loco vehicle. This vehicle carries the hot coke for
further cooling into a CDQ(coke dry quenching) chamber where cooling is
done by the supply of nitrogen in the absence of air. After this process
the coke is further supplied to screening and crushing, after the coke is
ready to be supplied further in different plants (BLAST FURNANCE).
6
SYNTHESIS OF COKE FROM COAL
7
SERVICE
BUNKER
SCP
MACHINE
BATTERYS
(5,6&7)
CGC CAR
DOOR
EXTRACTOR
LOCO AND
QUENCHING
UNITS (COLD
DRY & WET)
SCREENING
UNIT
COAL
SEARCH
BUNKER
Coke to the
Blast Furnace
NUT
COKE
BREEZE
COKE
PEARL
COKE
Coke separated
according to size
COAL TRANSFORMATION OF COAL TO COKE COKE
FLOW CHART SHOWING TRANSFORMATION OF COKE FROM COAL
Coal unloaded by wagon tippler
and transported via conveyers
FUNCTIONAL ELEMENTS OF COKE PLANT
Coal Bunker: Coal is fed to the Service Bunker 3 & 4 through an
arrangement of conveyor belts. There are two sides in each bunker North and
South. Each side is having 4 pockets in order to have uniform filling of coal.
SCP Machines: SCP (Stamping-Charging-Pushing) machine is one of the
most vital equipment in the coke plant, which covers up most important
operations in this plant. This machine is very large weighing about 700tons
and is able to move on 16 wheels with 8 drives on a track longitudinally with
a precise positioning arrangement. There are 3 SCP machines provided in the
coke plant (mc#0, mc#1, mc#2). There is a PLC room provided which contains
all the electrical drives in it & is responsible for controlling all the electrical
inputs at various locations in the machine
Charging gas cleaning car: It is a car which is used to clean the charging
gas before emitting it into the atmosphere. Its operation area is at the roof
of battery and it can travel from north to south along the battery.
Coal Bunker
SCP Machine
*Actual SCP Machine at Tata Steel (Manufactured by TRF Limited.)
Charging gas cleaning car8
Batteries: Coal cake from SCP machine is charged into Batteries 5,6 & 7.
There are three batteries in operation with a total of 144 nos. Stamp
Charged ovens (size of each oven- 13.760m X .460m X 4.570m).
Using ENCODER, SCP machine locates the OVEN in which the cake is to be
charged . The Door of the Oven is opened by SCP machine and held. Cake is
then fed into the Oven and then Door is closed. The gases used in the oven
for heating purpose are CO & BF gases. Temperatures in the oven ranges
between 950-1200c. The inner surface of the oven are made of some
refractory materials. CGC car is used in order to clean the extra coke oven
gas before discharging the gas into the Atmosphere. There is also a door
cleaning section in each battery where the door of the oven are cleaned by
water jet.
Ovens in a Battery
Battery
Door Extractor: Door extractor acts as a buffer between battery Oven and
Loco. It opens the coke side door and reposition itself to place the coke
guide car in front of that Oven. It helps the Quenching Loco to collect all the
hot coke from the oven through Pushing. LPR is used for the positioning of
the Door extractor.
Door Extractor
9
Loco: Loco is an electrical machine which is connected
to the quenching container. It contains a drive which is
electrically driven to which electrical power is delivered
through power rails on which it runs.
Quenching Car: It collects hot coke pushed out of the
oven and takes it to the quenching stations (either wet
or dry). It also brings back the quenched coke and drops
it in the appropriate location of the Wharf from where
the coke is taken on conveyor with the help of plough-
cutter.
Quenching Unit: Quenching is the process of cooling
the hot coke collected from the oven either by spraying
water or blowing the air(nitrogen) through coke. There
are two types of Quenching.
Wet Quenching: Water is used for quenching of coke.
Dry Quenching (CDQ): Nitrogen is blown through the
hot coke. Cold gas is blown into the chamber containing
the hot coke and hot gas is collected and chilled using
heat sinker. Again this gas is used for cooling operation.
The process is repeated in a cyclic manner and is
controlled using PLC. Wet Quenching Dry Quenching
Loco with Quenching Car Quenching Car
10
Screening Unit: In screening unit, coke graded according
to sizes. Then the different sizes of coke are separated and
transported to different areas as per the requirement.
Coke sizes
BF COKE - + 30 MM TO - 80 MM
NUT COKE - + 15 MM TO - 30 MM
PEARL COKE - + 8 MM TO - 15 MM
COKE BREEZE - - 8 MM
Components of Screen House:
• Primary screening system (Directs the Coke from
Conveyers to the screens)
•Secondary screening system (Separates Blast furnace
Coke from smaller Coke)
•Grading system (Separates Nut , Pearl & Breeze Coke)
•Storage system (Stores different category of Coke)
Primary screening unit in a
Screen House
11
Bunker SCP
Battery(5,6,7)
with Ovens
Wet
Quenching
Cold Dry
Quenching
Wharf 6
Plough
Cutter
Wharf 7
K01
K03
K1A
K02
LOCO
Screen
House
KC1
G Blast
Furnace
Search
Bunker
K5 High
Bunkers
For Boom
Loading
Nut
Coke
Breeze
Coke
Pearl
Coke
Q. Car
B.F. Coke
Coke
Coke
Coke
Coke
Hot Coke
Coal Coal Cake
BF Coke
BF Coke
BF Coke
AN OVERVIEW OF THE COKE PLANT
12
PROCESSES IN SCREEN HOUSE
•Coke enters the Screen house via K03 & K1A Conveyer Belts and are send to the top of the Screen
House.
•The top of the Screen House is the Primary System and K2 & K2A belt receives the coke from K03 & K1A.
•The Coke in K2 & K2A are fed into Secondary Screening System A & B , which has a vibrating system
mounted on springs which runs on motor and has screens of 30 MM dia. The coke of Size +30 MM (BF
Coke ) are screened off from the rest of the coke and collected into a bunker (Search Bunker) with the
help of a Chute.
•The rest of the coke (-30 MM) are then supplied into Grading System (A1,A2) & (B1,B2) which has
screens of 10MM dia and separates the coke into Nut , Pearl & Breeze Coke which are collected in
separate bunkers .The Grading system uses eccentric shafts for vibration of the screens.
•From the Search bunker the BF coke is transported to G-Blast Furnace with the help of KC belt , sent to
high bunker by K5 belt from where it is transported to other Blast Furnace or the BF coke is boom
loaded.
•The separated Nut Pearl and Breeze coke are transported to other places using Dumpers and either
sold off or used to make Stinger and Pallets.
13
K03
K1A
K2
K2A
A
B
A1 A2
B1 B2
Coke from Wet
Quenching
Coke from Dry
Quenching B.F. Coke is separated Nut ,Pearl & Breeze Coke
are separated
Conveyer System Primary Screening
System
Secondary
Screening System
Grading System
Conveyers that bring
Coke from the
Quenching stations to
the top of the
screening house
(Primary Screening
System).
Receives the coke
from K03 &K1A and
gives the coke to the
Secondary Screening
System . It has two
conveyers K2 & K2A.
It has 32MM dia.
screens mounted on
springs which uses an
eccentric shaft rotated
by a motor to produce
the vibration . This
separates the Blast
Furnace Coke.
It has 10MM dia. screens in
series which are made to
vibrate by an eccentric shafts
rotated by a motors. This
separates the Coke into Nut
Pearl and Breeze according to
the size and collects them in
different location.
AN OVERVIEW OF THE SCREEN HOUSE
14
Axis of Rotation
ECCENTRIC SHAFT
• The shaft is made to rotate about the axis of rotation by a Heavy Duty Motor by the help of belts
connected to the motor and the shaft.
• Links are connected to the Eccentric portion of the shafts allow free rotation of the shaft within it.
• As the shaft rotates the links are set into regular vibratory motion (To and Fro).
• These links are connected to the screens which are mounted on Heavy Duty Springs.
• The To and Fro motion is transmitted to the screens by the connecting links which makes the screens
to vibrate and helps in separating different components of Coke.
MECHANICAL MECHANISM BEHIND VIBRATION
15
Eccentric Shaft
(32MM dia)
Screen
Dry Fog
to reduce
Dust
Motor Drive to rotate the
Eccentric Shaft
Springs on which the
Screen is mounted
Coke
B.F.
Coke
Chute to the
Search Bunker
SECONDARY SCREENING SYSTEM
16
Conveyer system
WORKING OF CONVEYERS
Conveyers are belts of rubber whose motion is governed by the rotational motion of the head end and tail end
idler. The idlers are large rotating cylinders which has grooves cut on them which helps it to grip tightly on the
idler. External torque for the belt motion is provided by either the head end or the tail end idler or both.
• Weight pulley are used to provide tension and to start the motion of the conveyers.
• Traffic Idler helps to maintain the U or V shape of the conveyers and helps it to carry the Coke.
• Traffic Training Idler are used chance direction of motion of the conveyers.
• Compact Idler has annular rubber bands attached to it and acts as shock absorber.
• Return Idler prevents the conveyers from slacking.
• Return Training Idler prevents the conveyers from slacking as well as changes the direction of motion.
17
TO REDUCE SPM LEVEL AT SCREEN HOUSE AT CHP (COKE
HANDLING PLANT) ASH FREE BATTERY 5 6 7 IN COKE PLANT
(CASE STUDY OF CHP#3)
The Screen House in the Coke Plant has a very high Dust and SPM level (with a min value of 8 to 9 mg
per cubic meter of air.
This makes the environment very hazardous for the workers to work inside it.
The safe value of SPM in air is 3 mg per cubic meter of air.
PROBLEMS:
• Large quantity of dust and SPM (Suspended Particulate Matter) is generated
in the screen house during screening particularly during screening operation.
• More dust is generated during Screening of coke from CDQ (Cold Dry
Quenching).
• Dust is particularly high in the Primary and Secondary Screening Unit.
• Dust is generated when ever the Coke transferred from one conveyer to other
or from a conveyer to the screen.
• Dust is also high where the coke made to fall freely without channeling.
18
SOLUTIONS:
1. The most obvious solution is to use Dry Fog device.
This device uses nozzle which sprays a mixture of compressed air and
water vapor. The quantity of air is more so that the mixture spreads well.
It is always used in the tail end from where the coke falls. This is a good
means of preventing dust and can successfully control dust for Wet
Quenching. In screening Wet Quenched Coke the SPM level can be
maintained around 5. Installation of more Dry Fog devices and their
proper maintenance can reduce the SPM level to safe value.
2. Use of Scrappers in the Head End of the Conveyers.
These are metal latches which are attached to the Head End of the
conveyers. These are particularly very effective for Wet Quenching where
the Coke remains moist and the much of the Coke Dust remains attached
to the conveyers. The Scrappers Scrapes off these moist Coke Dust and
prevents it from mixing with air and cause the SPM level to increase.
These are generally fitted in the back of the Head End to prevent
intermixing of Coke and Dust Particles. Proper maintenance and regular
cleaning of the Scrappers can reduce the SPM level effectively in case of
Wet Quenched Coke.
Dry Fog device
19
3. Use of Electrically operated Dust Catcher.
This device employ concepts of static electricity to separate dust. In this
process the dust is first ionized by using Corona discharge in the location
where it is generated. A oppositely charged plate is fit in the way of the
dust particles where they are adsorbed by the plate. The motion of the
ionized dust particles can be controlled forcefully by using forced air by
draught fans. This is a very efficient way but its very costly so may not be
a proper way for a old plant. But this can be used where ever there is a
new set up of a screen house.
4. Covering the regions of Dust Generation by Cloth or Rubber
Sheet or Metal Sheet.
In this process the regions of major dust generation are identified and
then the region is covered by either Cloth or Rubber Sheet or Metal sheet.
This prevents the generated dust from coming out of the system and so
dose not pollute the environment by increasing the SPM level. The
covering must be flexible enough to let the Coke laden Conveyer to pass
through easily.
Sheet to prevent dust from
coming out of the system
20
5. Use of large Draught Fans to direct the air flow
In this process large Heavy Duty Draught Fans are employed in specific
directions. The SPM are carried by air and gets mixed with it to make the
environment polluted and hazardous. Now by directing the air flow by using
the draught fans we can govern the nature of mixing of dust and SPM with
air and thus can control the SPM level in air.
6. Use of Binder or Oil
Binders and oils has a nature of bindings materials together so can be used in
binding or clustering particles together. If binders are used in Coke they can
bind them together and can reduce dust but in the CHP the Coke remains hot
(300 degree centigrade) and binder and oils has low ignition temperature
and can catch fire causing accident. This can only be used when the Coke is
Quenched to much lower temperature. Which may not be economical.
21
RECOMMENDATIONS
• More dry fog to be installed and the existing to be well maintained.
• More scrappers to be used and should be kept under proper supervision.
• Dust Catchers to be used if possible.
• Covering should be used where ever possible.
• More Draught fans to be installed and used when the dust production is more.
22
CASE STUDY OF SCREENING OF COKE FROM CDQ IN
CHP#3
Background: The dry coke quenched from CDQ is supplied to G Blast Furnace after screening for right sizing. Since
moisture content of dry coke is less than 0.5% which generates more dust during screening.
Current Situation: The CDQ coke is only handled in belt conveyor # K1A and its has several discharge points till it reaches
the KC1 belt of G Furnace. During this entire process lot of dust is emitted at all transfer points which makes the environment
hazardous.
Goal: To reduce the SPM level of screen house building below 5 mg/ m 3 .
Analysis: The main cause for fugitive emission in coke handling is due to the moisture content , the lesser the moisture
content the higher is the dust formation.
The CDQ coke contains very fine coke particles in the form of very fine dust, which causes dust emission at every discharge
point while handling.
Recommendations: To cover all the discharge points of the conveyor system handling dry (CDQ) coke. To increase the
number of dry fog dust suppression system (DFDS) .
Covering of primary and secondary screen’s with installation of new dry fog dust suppression system (DFDS).
Covering of grading screen’s with installation of new dry fog dust suppression system (DFDS).
Result: After installation of new dust suppression system at recommended points and covering of the discharge points dust
has got reduced to below 7 mg/ m 3.
23
SAFETY PRECAUTIONS TO BE TAKEN IN COKE PLANT
• Always wear PPE like helmet, safety shoes, goggles, fire retardant cloths, gas detectors and dust masks.
• Do not go close to the moving vehicles including loco, conveyer, SCP mc and other rotating machines.
• Do not touch any part of the oven and stay away from open ovens.
• Never cross the SCP track area.
• Do not try to walk close to the railway wagon and bench rope near the tippler.
• Do not touch any Conveyers or any pulley in the conveyer system.
• Don’t go very close to the screening unit or touch any part of the screening unit even if it is not working.
• Always wear mask inside the screen house.
• Be careful about hanging objects.
• Don’t go very close to the loading dumpers or the dozers.
• After work wash your hands and face thoroughly with soap.
24

More Related Content

What's hot

𝐕𝐑𝐌 𝐓𝐫𝐨𝐮𝐛𝐥𝐞𝐬𝐡𝐨𝐨𝐭𝐢𝐧𝐠 𝐍𝐨𝐭𝐞𝐬.(LOESCHE).pdf
𝐕𝐑𝐌 𝐓𝐫𝐨𝐮𝐛𝐥𝐞𝐬𝐡𝐨𝐨𝐭𝐢𝐧𝐠 𝐍𝐨𝐭𝐞𝐬.(LOESCHE).pdf𝐕𝐑𝐌 𝐓𝐫𝐨𝐮𝐛𝐥𝐞𝐬𝐡𝐨𝐨𝐭𝐢𝐧𝐠 𝐍𝐨𝐭𝐞𝐬.(LOESCHE).pdf
𝐕𝐑𝐌 𝐓𝐫𝐨𝐮𝐛𝐥𝐞𝐬𝐡𝐨𝐨𝐭𝐢𝐧𝐠 𝐍𝐨𝐭𝐞𝐬.(LOESCHE).pdf
RAM PRAKASH PATEL
 
Sintering plant at a glance
Sintering plant at a glanceSintering plant at a glance
Sintering plant at a glance
Sajan Agrawal
 
Sintering plant
Sintering plantSintering plant
Sintering plant
Aidin Sadeghianpour
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
Aree Salah
 
Mill Lubrication System
Mill Lubrication SystemMill Lubrication System
Mill Lubrication System
Aljon Altiche
 
A review on stamped charging of coals
A review on stamped charging of coalsA review on stamped charging of coals
A review on stamped charging of coals
Jorge Madias
 
Industrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceIndustrial Training Report on Blast Furnace
Industrial Training Report on Blast Furnace
Shani Kumar Singh
 
Iron making - Palletization process- Types of palletizers
Iron making - Palletization process- Types of palletizers Iron making - Palletization process- Types of palletizers
Iron making - Palletization process- Types of palletizers
utkarshprajapati3
 
Pelletizing Process.pdf
Pelletizing Process.pdfPelletizing Process.pdf
Industrial Training Report on Rolling Mill
Industrial Training Report on Rolling MillIndustrial Training Report on Rolling Mill
Industrial Training Report on Rolling Mill
Shani Kumar Singh
 
Non recovery-heat recovery cokemaking - a review of recent developments
Non recovery-heat recovery cokemaking - a review of recent developmentsNon recovery-heat recovery cokemaking - a review of recent developments
Non recovery-heat recovery cokemaking - a review of recent developments
Jorge Madias
 
Maximum Shell Temp Ok
Maximum Shell Temp OkMaximum Shell Temp Ok
Maximum Shell Temp OkRicardoMosci
 
Emission Free Coke Oven Doors
Emission Free Coke Oven Doors Emission Free Coke Oven Doors
Emission Free Coke Oven Doors
SimplexCastings
 
Ppt on bokaro steel plant
Ppt on bokaro steel plantPpt on bokaro steel plant
Ppt on bokaro steel plant
Prashant Kumar
 
Coke Dry Quenching.ppt
Coke Dry Quenching.pptCoke Dry Quenching.ppt
Coke Dry Quenching.ppt
Praveen Kumar
 
SAIL ROURKELA SINTER PLANT
SAIL ROURKELA SINTER PLANTSAIL ROURKELA SINTER PLANT
SAIL ROURKELA SINTER PLANT
Ashish Kholia
 
Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )SHRIKANT KHATING
 
FINAL project report submision
FINAL project report submisionFINAL project report submision
FINAL project report submisionTirth Upadhyay
 
Power Point Presentation on training in bhushan steel private ltd
Power Point Presentation on training in bhushan steel private ltdPower Point Presentation on training in bhushan steel private ltd
Power Point Presentation on training in bhushan steel private ltd
Ankit Gupta
 

What's hot (20)

𝐕𝐑𝐌 𝐓𝐫𝐨𝐮𝐛𝐥𝐞𝐬𝐡𝐨𝐨𝐭𝐢𝐧𝐠 𝐍𝐨𝐭𝐞𝐬.(LOESCHE).pdf
𝐕𝐑𝐌 𝐓𝐫𝐨𝐮𝐛𝐥𝐞𝐬𝐡𝐨𝐨𝐭𝐢𝐧𝐠 𝐍𝐨𝐭𝐞𝐬.(LOESCHE).pdf𝐕𝐑𝐌 𝐓𝐫𝐨𝐮𝐛𝐥𝐞𝐬𝐡𝐨𝐨𝐭𝐢𝐧𝐠 𝐍𝐨𝐭𝐞𝐬.(LOESCHE).pdf
𝐕𝐑𝐌 𝐓𝐫𝐨𝐮𝐛𝐥𝐞𝐬𝐡𝐨𝐨𝐭𝐢𝐧𝐠 𝐍𝐨𝐭𝐞𝐬.(LOESCHE).pdf
 
Sintering plant at a glance
Sintering plant at a glanceSintering plant at a glance
Sintering plant at a glance
 
Sintering plant
Sintering plantSintering plant
Sintering plant
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
Mill Lubrication System
Mill Lubrication SystemMill Lubrication System
Mill Lubrication System
 
project report
project reportproject report
project report
 
A review on stamped charging of coals
A review on stamped charging of coalsA review on stamped charging of coals
A review on stamped charging of coals
 
Industrial Training Report on Blast Furnace
Industrial Training Report on Blast FurnaceIndustrial Training Report on Blast Furnace
Industrial Training Report on Blast Furnace
 
Iron making - Palletization process- Types of palletizers
Iron making - Palletization process- Types of palletizers Iron making - Palletization process- Types of palletizers
Iron making - Palletization process- Types of palletizers
 
Pelletizing Process.pdf
Pelletizing Process.pdfPelletizing Process.pdf
Pelletizing Process.pdf
 
Industrial Training Report on Rolling Mill
Industrial Training Report on Rolling MillIndustrial Training Report on Rolling Mill
Industrial Training Report on Rolling Mill
 
Non recovery-heat recovery cokemaking - a review of recent developments
Non recovery-heat recovery cokemaking - a review of recent developmentsNon recovery-heat recovery cokemaking - a review of recent developments
Non recovery-heat recovery cokemaking - a review of recent developments
 
Maximum Shell Temp Ok
Maximum Shell Temp OkMaximum Shell Temp Ok
Maximum Shell Temp Ok
 
Emission Free Coke Oven Doors
Emission Free Coke Oven Doors Emission Free Coke Oven Doors
Emission Free Coke Oven Doors
 
Ppt on bokaro steel plant
Ppt on bokaro steel plantPpt on bokaro steel plant
Ppt on bokaro steel plant
 
Coke Dry Quenching.ppt
Coke Dry Quenching.pptCoke Dry Quenching.ppt
Coke Dry Quenching.ppt
 
SAIL ROURKELA SINTER PLANT
SAIL ROURKELA SINTER PLANTSAIL ROURKELA SINTER PLANT
SAIL ROURKELA SINTER PLANT
 
Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )
 
FINAL project report submision
FINAL project report submisionFINAL project report submision
FINAL project report submision
 
Power Point Presentation on training in bhushan steel private ltd
Power Point Presentation on training in bhushan steel private ltdPower Point Presentation on training in bhushan steel private ltd
Power Point Presentation on training in bhushan steel private ltd
 

Viewers also liked

The Necessity of Network Modernization (Federal) - Full White Paper
The Necessity of Network Modernization (Federal) - Full White Paper The Necessity of Network Modernization (Federal) - Full White Paper
The Necessity of Network Modernization (Federal) - Full White Paper Sean Leslie
 
Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
 Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only) Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
Midwest Energy Efficiency Alliance
 
Environmental Management Practices in a Super Thermal Power Plant.
Environmental Management Practices in a Super Thermal Power Plant.Environmental Management Practices in a Super Thermal Power Plant.
Environmental Management Practices in a Super Thermal Power Plant.
Debasis Ray
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
Sachin Verma
 
Thermal power plant environmental solutions
Thermal power plant environmental solutionsThermal power plant environmental solutions
Thermal power plant environmental solutions
Sajid Sohail
 
Advanced electical machines
Advanced electical machinesAdvanced electical machines
Advanced electical machines
Santhosh D S
 
Blast furnace presentation
Blast furnace presentation Blast furnace presentation
Blast furnace presentation
Muzzamil Eatoo
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
Abhishek Awasthi
 
Practical Boiler Control & Instrumentation for Engineers & Technicians
Practical Boiler Control & Instrumentation for Engineers & TechniciansPractical Boiler Control & Instrumentation for Engineers & Technicians
Practical Boiler Control & Instrumentation for Engineers & TechniciansLiving Online
 
Emerson Power plant applications
Emerson Power plant applicationsEmerson Power plant applications
Emerson Power plant applications
mirfanm
 
Power plant technology (lecture notes)
Power plant technology (lecture notes)Power plant technology (lecture notes)
Power plant technology (lecture notes)Yuri Melliza
 
Steam turbine Working
Steam turbine WorkingSteam turbine Working
Steam turbine Working
Chaudhry Hassan Ali
 
Power plant Engineering ppt
Power plant Engineering ppt Power plant Engineering ppt
Power plant Engineering ppt
Prabhat Kumar
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantSHIVAJI CHOUDHURY
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and control
Shilpa Shukla
 
Types of turbine & thier application
Types of turbine & thier applicationTypes of turbine & thier application
Types of turbine & thier application
daudsangeenkhan
 
Pollution in the sponge iron industry
Pollution in the sponge iron industryPollution in the sponge iron industry
Pollution in the sponge iron industry
Susmita Dasgupta
 
Basics of pump
Basics of pump Basics of pump
Basics of pump
Hammad Akber
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
Ronak Thakare
 

Viewers also liked (19)

The Necessity of Network Modernization (Federal) - Full White Paper
The Necessity of Network Modernization (Federal) - Full White Paper The Necessity of Network Modernization (Federal) - Full White Paper
The Necessity of Network Modernization (Federal) - Full White Paper
 
Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
 Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only) Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
Combined Heat and Power as a Boiler MACT Compliance Strategy (Slides only)
 
Environmental Management Practices in a Super Thermal Power Plant.
Environmental Management Practices in a Super Thermal Power Plant.Environmental Management Practices in a Super Thermal Power Plant.
Environmental Management Practices in a Super Thermal Power Plant.
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
Thermal power plant environmental solutions
Thermal power plant environmental solutionsThermal power plant environmental solutions
Thermal power plant environmental solutions
 
Advanced electical machines
Advanced electical machinesAdvanced electical machines
Advanced electical machines
 
Blast furnace presentation
Blast furnace presentation Blast furnace presentation
Blast furnace presentation
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
 
Practical Boiler Control & Instrumentation for Engineers & Technicians
Practical Boiler Control & Instrumentation for Engineers & TechniciansPractical Boiler Control & Instrumentation for Engineers & Technicians
Practical Boiler Control & Instrumentation for Engineers & Technicians
 
Emerson Power plant applications
Emerson Power plant applicationsEmerson Power plant applications
Emerson Power plant applications
 
Power plant technology (lecture notes)
Power plant technology (lecture notes)Power plant technology (lecture notes)
Power plant technology (lecture notes)
 
Steam turbine Working
Steam turbine WorkingSteam turbine Working
Steam turbine Working
 
Power plant Engineering ppt
Power plant Engineering ppt Power plant Engineering ppt
Power plant Engineering ppt
 
Instrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power PlantInstrumentation & Control For Thermal Power Plant
Instrumentation & Control For Thermal Power Plant
 
Thermal plant instrumentation and control
Thermal plant instrumentation and controlThermal plant instrumentation and control
Thermal plant instrumentation and control
 
Types of turbine & thier application
Types of turbine & thier applicationTypes of turbine & thier application
Types of turbine & thier application
 
Pollution in the sponge iron industry
Pollution in the sponge iron industryPollution in the sponge iron industry
Pollution in the sponge iron industry
 
Basics of pump
Basics of pump Basics of pump
Basics of pump
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 

Similar to TATA STEEL_TO REDUCE SPM LEVEL AT SCREEN HOUSE

OCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUROCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPURSudhanshu Shekhar
 
My report on bhushan power plant orisa
My report on bhushan power plant orisaMy report on bhushan power plant orisa
My report on bhushan power plant orisa
tidke123
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
Venkata Swamy
 
Industrial Training Report on Plate Mill
Industrial Training Report on Plate MillIndustrial Training Report on Plate Mill
Industrial Training Report on Plate Mill
Shani Kumar Singh
 
Untitled presentation-steelplant information
Untitled presentation-steelplant informationUntitled presentation-steelplant information
Untitled presentation-steelplant information
santoshadd82
 
What i learnt as an intern by Ihsan Wassan
What i learnt as an intern by Ihsan Wassan What i learnt as an intern by Ihsan Wassan
What i learnt as an intern by Ihsan Wassan
Ihsan Wassan
 
78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project
Bruno Mileto Dias de Assunção
 
C1072024
C1072024C1072024
C1072024
IJERD Editor
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor
 
CEMNAT MANUFACTRING
CEMNAT MANUFACTRINGCEMNAT MANUFACTRING
CEMNAT MANUFACTRING
Prashant Dhakar
 
A VOCATIONAL TRAINNING REPORT_aman
A  VOCATIONAL TRAINNING REPORT_amanA  VOCATIONAL TRAINNING REPORT_aman
A VOCATIONAL TRAINNING REPORT_amanAMAN KESARI
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
Kumar Saurabh
 
InternshipReport.pdf fffffffffffffffffffff
InternshipReport.pdf fffffffffffffffffffffInternshipReport.pdf fffffffffffffffffffff
InternshipReport.pdf fffffffffffffffffffff
thewebseries17th
 
Internship report Of Pakistan Steel Mill
Internship report Of Pakistan Steel MillInternship report Of Pakistan Steel Mill
Internship report Of Pakistan Steel Mill
Syed Ghufran Hassan
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
Sourish Bhattacharya
 
Sourish bhattacharyya
Sourish bhattacharyyaSourish bhattacharyya
Sourish bhattacharyya
Sourish Bhattacharya
 
Amit
AmitAmit
Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants
Arnab Nandi
 

Similar to TATA STEEL_TO REDUCE SPM LEVEL AT SCREEN HOUSE (20)

OCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUROCL INDIA LIMITED, RAJGANGPUR
OCL INDIA LIMITED, RAJGANGPUR
 
My report on bhushan power plant orisa
My report on bhushan power plant orisaMy report on bhushan power plant orisa
My report on bhushan power plant orisa
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
 
Industrial Training Report on Plate Mill
Industrial Training Report on Plate MillIndustrial Training Report on Plate Mill
Industrial Training Report on Plate Mill
 
Untitled presentation-steelplant information
Untitled presentation-steelplant informationUntitled presentation-steelplant information
Untitled presentation-steelplant information
 
What i learnt as an intern by Ihsan Wassan
What i learnt as an intern by Ihsan Wassan What i learnt as an intern by Ihsan Wassan
What i learnt as an intern by Ihsan Wassan
 
RWFfinal
RWFfinalRWFfinal
RWFfinal
 
78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project
 
C1072024
C1072024C1072024
C1072024
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
CEMNAT MANUFACTRING
CEMNAT MANUFACTRINGCEMNAT MANUFACTRING
CEMNAT MANUFACTRING
 
A VOCATIONAL TRAINNING REPORT_aman
A  VOCATIONAL TRAINNING REPORT_amanA  VOCATIONAL TRAINNING REPORT_aman
A VOCATIONAL TRAINNING REPORT_aman
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
InternshipReport.pdf fffffffffffffffffffff
InternshipReport.pdf fffffffffffffffffffffInternshipReport.pdf fffffffffffffffffffff
InternshipReport.pdf fffffffffffffffffffff
 
final_report
final_reportfinal_report
final_report
 
Internship report Of Pakistan Steel Mill
Internship report Of Pakistan Steel MillInternship report Of Pakistan Steel Mill
Internship report Of Pakistan Steel Mill
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Sourish bhattacharyya
Sourish bhattacharyyaSourish bhattacharyya
Sourish bhattacharyya
 
Amit
AmitAmit
Amit
 
Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants
 

TATA STEEL_TO REDUCE SPM LEVEL AT SCREEN HOUSE

  • 1. TO REDUCE SPM LEVEL AT SCREEN HOUSE AT CHP ASH FREE BATTERY 5,6,7 (COKE PLANT ,TATA STEEL LTD. ,JAMSHEDPUR) AVISHEK GHOSH JADAVPUR UNIVERSITY KOLKATA 1
  • 2. First and foremost I would like to express sincere gratitude to the project guide, Mr. Vikash Kumar ,Manager (Mech). I was privileged to experience a sustained enthusiastic and involved interest from this side. He also made me aware of all the safety issues and helped me to get equipped with all the personal protective, thus making me work in safe working conditions. This fueled my enthusiasm even further and encouraged me to boldly step into what was totally dark and unexplored expense before me. I would also like to thank Mr. Mahapatra for helping me with gaining on site knowledge. And for being ready with a positive comment at all time, whether it was an off hand comment to encourage me or a constructive piece of criticism. ACKNOWLEDGEMENT 2
  • 3. CONTENTS SL. No. TOPIC Pg. No. 1 ACKNOWLEDGEMENT 1 2 A BRIEF INTRODUCTION TO TATA STEEL 3 3 COKE PLANT 5 4 SYNTHESIS OF COKE FROM COAL 6 5 FUNCTIONAL ELEMENTS OF COKE PLANT 7 6 AN OVERVIEW OF THE COKE PLANT 11 7 PROCESSES IN SCREEN HOUSE 12 8 AN OVERVIEW OF THE SCREEN HOUSE 13 9 MECHANICAL MECHANISM BEHIND VIBRATION 14 10 SECONDARY SCREENING SYSTEM 15 11 WORKING OF CONVEYERS 16 12 TO REDUCE SPM LEVEL AT SCREEN HOUSE AT CHP (COKE HANDLING PLANT) ASH FREE BATTERY 5 6 7 IN COKE PLANT (CASE STUDY OF CHP#3) 17 13 RECOMMENDATIONS 21 14 CASE STUDY OF SCREENING OF COKE FROM CDQ IN CHP#3 22 15 SAFETY PRECAUTIONS TO BE TAKEN IN COKE PLANT 23 3
  • 4. Established in 1907, Tata Steel is the world’s 6th largest steel company with an existing annual crude steel capacity of 30 million tones. Asia’s first integrated steel plant and India‘s largest integrated private sector steel company is now the world’s second most geographically diversified steel producer, with operations in 26 countries and commercial presence in over 50 countries. Tata Steel completed 100 glorious years of existence on august 26, 2007 following the ideals and philosophy laid down by its founder, Jamshetji Nusserwanji Tata. The first private sector steel plant which started with a production capacity of 1,00,000 tones has transformed into a global giant. A BRIEF INTRODUCTION TO TATA STEEL 4
  • 5. Tata Steel plan to grow and globalize through organic and inorganic routes. Its 6.8 million tons per annum (MTPA). Jamshedpur Works plan to achieve 10MT capacity by 2010. The Company also has three Greenfield steel projects in the states of Jharkhand, Orissa and Chhattisgarh proposed steel making facilities in Vietnam. Tata Steel is a global player with a balance presence in European developed and fast growing Asian market and with a strong position in the construction, automotive and packaging markets. It’s Jamshedpur steel works produce hot and cold rolled coils and sheets, galvanized sheets, tubes, wire rods, construction rebars. In an attempt to ‘discommodities’ steel, the Company has introduced several branded steel products, including Tata Steelium (the world’s first branded Clod Rolled Steel), Tata Shaktee (Galvanized Corrugated Sheets), Tata Tiscon (rebars),Tata Pipes, Tata Bearings, Tata Structural, Tata Agrico (hand tools and implements) and Tata Wiron (galvanized wire products).Tata Steel’s vision is to be the global steel industry benchmark for Value Creation and Corporate Citizenship. TATA STEEL has been ranked as the "World's Best Steel Maker", for the third time by World Steel Dynamics in its annual listing in February, 2006. Tata Steel has been conferred the Prime Minister of India's Trophy for the Best Integrated Steel Plant five times. 5
  • 6. COKE PLANT The TATA iron and steel company is responsible for the production of IRON and STEEL in very huge quantities. The production area is very large, which comprises of various plants connected in series which depends on each other for the production. In this process one of the most important part plays the COKE PLANT, which produces coke(2.3 MT p.a) after processing raw coal (pyrolysis). This produced coke is sent further for heating the blast furnace and hence the process continues. The processing of coal into coke, happens at various stages starting right from the SCP machine which charges raw coal into hot ovens where the coal gets carbonized at very high temperatures of 950-1200c for about 20 hrs. CO and BF gases are used for heating the oven. The heated coal looses its moisture content and gets converted into coke. This heated coke is then removed from the oven by a PUSHER RAM of SCP machine which is guided into a loco vehicle. This vehicle carries the hot coke for further cooling into a CDQ(coke dry quenching) chamber where cooling is done by the supply of nitrogen in the absence of air. After this process the coke is further supplied to screening and crushing, after the coke is ready to be supplied further in different plants (BLAST FURNANCE). 6
  • 7. SYNTHESIS OF COKE FROM COAL 7 SERVICE BUNKER SCP MACHINE BATTERYS (5,6&7) CGC CAR DOOR EXTRACTOR LOCO AND QUENCHING UNITS (COLD DRY & WET) SCREENING UNIT COAL SEARCH BUNKER Coke to the Blast Furnace NUT COKE BREEZE COKE PEARL COKE Coke separated according to size COAL TRANSFORMATION OF COAL TO COKE COKE FLOW CHART SHOWING TRANSFORMATION OF COKE FROM COAL Coal unloaded by wagon tippler and transported via conveyers
  • 8. FUNCTIONAL ELEMENTS OF COKE PLANT Coal Bunker: Coal is fed to the Service Bunker 3 & 4 through an arrangement of conveyor belts. There are two sides in each bunker North and South. Each side is having 4 pockets in order to have uniform filling of coal. SCP Machines: SCP (Stamping-Charging-Pushing) machine is one of the most vital equipment in the coke plant, which covers up most important operations in this plant. This machine is very large weighing about 700tons and is able to move on 16 wheels with 8 drives on a track longitudinally with a precise positioning arrangement. There are 3 SCP machines provided in the coke plant (mc#0, mc#1, mc#2). There is a PLC room provided which contains all the electrical drives in it & is responsible for controlling all the electrical inputs at various locations in the machine Charging gas cleaning car: It is a car which is used to clean the charging gas before emitting it into the atmosphere. Its operation area is at the roof of battery and it can travel from north to south along the battery. Coal Bunker SCP Machine *Actual SCP Machine at Tata Steel (Manufactured by TRF Limited.) Charging gas cleaning car8
  • 9. Batteries: Coal cake from SCP machine is charged into Batteries 5,6 & 7. There are three batteries in operation with a total of 144 nos. Stamp Charged ovens (size of each oven- 13.760m X .460m X 4.570m). Using ENCODER, SCP machine locates the OVEN in which the cake is to be charged . The Door of the Oven is opened by SCP machine and held. Cake is then fed into the Oven and then Door is closed. The gases used in the oven for heating purpose are CO & BF gases. Temperatures in the oven ranges between 950-1200c. The inner surface of the oven are made of some refractory materials. CGC car is used in order to clean the extra coke oven gas before discharging the gas into the Atmosphere. There is also a door cleaning section in each battery where the door of the oven are cleaned by water jet. Ovens in a Battery Battery Door Extractor: Door extractor acts as a buffer between battery Oven and Loco. It opens the coke side door and reposition itself to place the coke guide car in front of that Oven. It helps the Quenching Loco to collect all the hot coke from the oven through Pushing. LPR is used for the positioning of the Door extractor. Door Extractor 9
  • 10. Loco: Loco is an electrical machine which is connected to the quenching container. It contains a drive which is electrically driven to which electrical power is delivered through power rails on which it runs. Quenching Car: It collects hot coke pushed out of the oven and takes it to the quenching stations (either wet or dry). It also brings back the quenched coke and drops it in the appropriate location of the Wharf from where the coke is taken on conveyor with the help of plough- cutter. Quenching Unit: Quenching is the process of cooling the hot coke collected from the oven either by spraying water or blowing the air(nitrogen) through coke. There are two types of Quenching. Wet Quenching: Water is used for quenching of coke. Dry Quenching (CDQ): Nitrogen is blown through the hot coke. Cold gas is blown into the chamber containing the hot coke and hot gas is collected and chilled using heat sinker. Again this gas is used for cooling operation. The process is repeated in a cyclic manner and is controlled using PLC. Wet Quenching Dry Quenching Loco with Quenching Car Quenching Car 10
  • 11. Screening Unit: In screening unit, coke graded according to sizes. Then the different sizes of coke are separated and transported to different areas as per the requirement. Coke sizes BF COKE - + 30 MM TO - 80 MM NUT COKE - + 15 MM TO - 30 MM PEARL COKE - + 8 MM TO - 15 MM COKE BREEZE - - 8 MM Components of Screen House: • Primary screening system (Directs the Coke from Conveyers to the screens) •Secondary screening system (Separates Blast furnace Coke from smaller Coke) •Grading system (Separates Nut , Pearl & Breeze Coke) •Storage system (Stores different category of Coke) Primary screening unit in a Screen House 11
  • 12. Bunker SCP Battery(5,6,7) with Ovens Wet Quenching Cold Dry Quenching Wharf 6 Plough Cutter Wharf 7 K01 K03 K1A K02 LOCO Screen House KC1 G Blast Furnace Search Bunker K5 High Bunkers For Boom Loading Nut Coke Breeze Coke Pearl Coke Q. Car B.F. Coke Coke Coke Coke Coke Hot Coke Coal Coal Cake BF Coke BF Coke BF Coke AN OVERVIEW OF THE COKE PLANT 12
  • 13. PROCESSES IN SCREEN HOUSE •Coke enters the Screen house via K03 & K1A Conveyer Belts and are send to the top of the Screen House. •The top of the Screen House is the Primary System and K2 & K2A belt receives the coke from K03 & K1A. •The Coke in K2 & K2A are fed into Secondary Screening System A & B , which has a vibrating system mounted on springs which runs on motor and has screens of 30 MM dia. The coke of Size +30 MM (BF Coke ) are screened off from the rest of the coke and collected into a bunker (Search Bunker) with the help of a Chute. •The rest of the coke (-30 MM) are then supplied into Grading System (A1,A2) & (B1,B2) which has screens of 10MM dia and separates the coke into Nut , Pearl & Breeze Coke which are collected in separate bunkers .The Grading system uses eccentric shafts for vibration of the screens. •From the Search bunker the BF coke is transported to G-Blast Furnace with the help of KC belt , sent to high bunker by K5 belt from where it is transported to other Blast Furnace or the BF coke is boom loaded. •The separated Nut Pearl and Breeze coke are transported to other places using Dumpers and either sold off or used to make Stinger and Pallets. 13
  • 14. K03 K1A K2 K2A A B A1 A2 B1 B2 Coke from Wet Quenching Coke from Dry Quenching B.F. Coke is separated Nut ,Pearl & Breeze Coke are separated Conveyer System Primary Screening System Secondary Screening System Grading System Conveyers that bring Coke from the Quenching stations to the top of the screening house (Primary Screening System). Receives the coke from K03 &K1A and gives the coke to the Secondary Screening System . It has two conveyers K2 & K2A. It has 32MM dia. screens mounted on springs which uses an eccentric shaft rotated by a motor to produce the vibration . This separates the Blast Furnace Coke. It has 10MM dia. screens in series which are made to vibrate by an eccentric shafts rotated by a motors. This separates the Coke into Nut Pearl and Breeze according to the size and collects them in different location. AN OVERVIEW OF THE SCREEN HOUSE 14
  • 15. Axis of Rotation ECCENTRIC SHAFT • The shaft is made to rotate about the axis of rotation by a Heavy Duty Motor by the help of belts connected to the motor and the shaft. • Links are connected to the Eccentric portion of the shafts allow free rotation of the shaft within it. • As the shaft rotates the links are set into regular vibratory motion (To and Fro). • These links are connected to the screens which are mounted on Heavy Duty Springs. • The To and Fro motion is transmitted to the screens by the connecting links which makes the screens to vibrate and helps in separating different components of Coke. MECHANICAL MECHANISM BEHIND VIBRATION 15
  • 16. Eccentric Shaft (32MM dia) Screen Dry Fog to reduce Dust Motor Drive to rotate the Eccentric Shaft Springs on which the Screen is mounted Coke B.F. Coke Chute to the Search Bunker SECONDARY SCREENING SYSTEM 16
  • 17. Conveyer system WORKING OF CONVEYERS Conveyers are belts of rubber whose motion is governed by the rotational motion of the head end and tail end idler. The idlers are large rotating cylinders which has grooves cut on them which helps it to grip tightly on the idler. External torque for the belt motion is provided by either the head end or the tail end idler or both. • Weight pulley are used to provide tension and to start the motion of the conveyers. • Traffic Idler helps to maintain the U or V shape of the conveyers and helps it to carry the Coke. • Traffic Training Idler are used chance direction of motion of the conveyers. • Compact Idler has annular rubber bands attached to it and acts as shock absorber. • Return Idler prevents the conveyers from slacking. • Return Training Idler prevents the conveyers from slacking as well as changes the direction of motion. 17
  • 18. TO REDUCE SPM LEVEL AT SCREEN HOUSE AT CHP (COKE HANDLING PLANT) ASH FREE BATTERY 5 6 7 IN COKE PLANT (CASE STUDY OF CHP#3) The Screen House in the Coke Plant has a very high Dust and SPM level (with a min value of 8 to 9 mg per cubic meter of air. This makes the environment very hazardous for the workers to work inside it. The safe value of SPM in air is 3 mg per cubic meter of air. PROBLEMS: • Large quantity of dust and SPM (Suspended Particulate Matter) is generated in the screen house during screening particularly during screening operation. • More dust is generated during Screening of coke from CDQ (Cold Dry Quenching). • Dust is particularly high in the Primary and Secondary Screening Unit. • Dust is generated when ever the Coke transferred from one conveyer to other or from a conveyer to the screen. • Dust is also high where the coke made to fall freely without channeling. 18
  • 19. SOLUTIONS: 1. The most obvious solution is to use Dry Fog device. This device uses nozzle which sprays a mixture of compressed air and water vapor. The quantity of air is more so that the mixture spreads well. It is always used in the tail end from where the coke falls. This is a good means of preventing dust and can successfully control dust for Wet Quenching. In screening Wet Quenched Coke the SPM level can be maintained around 5. Installation of more Dry Fog devices and their proper maintenance can reduce the SPM level to safe value. 2. Use of Scrappers in the Head End of the Conveyers. These are metal latches which are attached to the Head End of the conveyers. These are particularly very effective for Wet Quenching where the Coke remains moist and the much of the Coke Dust remains attached to the conveyers. The Scrappers Scrapes off these moist Coke Dust and prevents it from mixing with air and cause the SPM level to increase. These are generally fitted in the back of the Head End to prevent intermixing of Coke and Dust Particles. Proper maintenance and regular cleaning of the Scrappers can reduce the SPM level effectively in case of Wet Quenched Coke. Dry Fog device 19
  • 20. 3. Use of Electrically operated Dust Catcher. This device employ concepts of static electricity to separate dust. In this process the dust is first ionized by using Corona discharge in the location where it is generated. A oppositely charged plate is fit in the way of the dust particles where they are adsorbed by the plate. The motion of the ionized dust particles can be controlled forcefully by using forced air by draught fans. This is a very efficient way but its very costly so may not be a proper way for a old plant. But this can be used where ever there is a new set up of a screen house. 4. Covering the regions of Dust Generation by Cloth or Rubber Sheet or Metal Sheet. In this process the regions of major dust generation are identified and then the region is covered by either Cloth or Rubber Sheet or Metal sheet. This prevents the generated dust from coming out of the system and so dose not pollute the environment by increasing the SPM level. The covering must be flexible enough to let the Coke laden Conveyer to pass through easily. Sheet to prevent dust from coming out of the system 20
  • 21. 5. Use of large Draught Fans to direct the air flow In this process large Heavy Duty Draught Fans are employed in specific directions. The SPM are carried by air and gets mixed with it to make the environment polluted and hazardous. Now by directing the air flow by using the draught fans we can govern the nature of mixing of dust and SPM with air and thus can control the SPM level in air. 6. Use of Binder or Oil Binders and oils has a nature of bindings materials together so can be used in binding or clustering particles together. If binders are used in Coke they can bind them together and can reduce dust but in the CHP the Coke remains hot (300 degree centigrade) and binder and oils has low ignition temperature and can catch fire causing accident. This can only be used when the Coke is Quenched to much lower temperature. Which may not be economical. 21
  • 22. RECOMMENDATIONS • More dry fog to be installed and the existing to be well maintained. • More scrappers to be used and should be kept under proper supervision. • Dust Catchers to be used if possible. • Covering should be used where ever possible. • More Draught fans to be installed and used when the dust production is more. 22
  • 23. CASE STUDY OF SCREENING OF COKE FROM CDQ IN CHP#3 Background: The dry coke quenched from CDQ is supplied to G Blast Furnace after screening for right sizing. Since moisture content of dry coke is less than 0.5% which generates more dust during screening. Current Situation: The CDQ coke is only handled in belt conveyor # K1A and its has several discharge points till it reaches the KC1 belt of G Furnace. During this entire process lot of dust is emitted at all transfer points which makes the environment hazardous. Goal: To reduce the SPM level of screen house building below 5 mg/ m 3 . Analysis: The main cause for fugitive emission in coke handling is due to the moisture content , the lesser the moisture content the higher is the dust formation. The CDQ coke contains very fine coke particles in the form of very fine dust, which causes dust emission at every discharge point while handling. Recommendations: To cover all the discharge points of the conveyor system handling dry (CDQ) coke. To increase the number of dry fog dust suppression system (DFDS) . Covering of primary and secondary screen’s with installation of new dry fog dust suppression system (DFDS). Covering of grading screen’s with installation of new dry fog dust suppression system (DFDS). Result: After installation of new dust suppression system at recommended points and covering of the discharge points dust has got reduced to below 7 mg/ m 3. 23
  • 24. SAFETY PRECAUTIONS TO BE TAKEN IN COKE PLANT • Always wear PPE like helmet, safety shoes, goggles, fire retardant cloths, gas detectors and dust masks. • Do not go close to the moving vehicles including loco, conveyer, SCP mc and other rotating machines. • Do not touch any part of the oven and stay away from open ovens. • Never cross the SCP track area. • Do not try to walk close to the railway wagon and bench rope near the tippler. • Do not touch any Conveyers or any pulley in the conveyer system. • Don’t go very close to the screening unit or touch any part of the screening unit even if it is not working. • Always wear mask inside the screen house. • Be careful about hanging objects. • Don’t go very close to the loading dumpers or the dozers. • After work wash your hands and face thoroughly with soap. 24