Taloring A Clouded Data Security Life Cycle Essay
Running Head: TAILORING A CLOUDED DATA SECURITY LIFE CYCLE 1
TAILORING A CLOUDED DATA SECURITY LIFE CYCLE 2
Tailoring a Clouded Data Security Life Cycle
Group 4
Security development life cycle
Security development lifecycle are the steps that software development goes through in a bid to
come up with software that is able to withstand cyber security concerns such as worms and viruses,
cyber–attacks, and loss of data. There are various steps outlined that can assist in the development of
secure software (Dahal, 2012).
(See Appendix for FIGURE 1)
Software development methodologies and selection
Software development methodologies are the protocols embraced in the development of software.
Depending on the preference of ... Show more content on Helpwriting.net ...
Other methods include the waterfall, which is the traditional method and is almost become obsolete.
This is because it was very expensive. It tangles the whole project and the team works in unity to
accomplish the whole project. One mistake can drag the whole team behind, and it is difficult to
debug errors. Feature driven method is another method which is costly because it focuses on
providing the best of every part of the project. Process pride has a negative effect on timing and
cost. Joint application development is the inverse of the agile software development strategy. It takes
the project as a whole and work is assigned progressively without a work breakdown structure. It is
good for very small software projects, but dangerous for lengthy software development projects
(Kaufman, Perlman, & Speciner, 2002).
From the above information the crystal method which is part of the wider agile technology is the
best method in software development. It allows a work breakdown structure that is similar to
Microsoft's security development life cycle. In addition, it allows for changes within the program
since the iterations are assigned to smaller teams and are assessed for compatibility after
submission. It is possible to identify any faults in the network security software and make changes
before the developers go too far (Kaufman, Perlman, & Speciner, 2002).
Critical Infrastructure sectors and control
... Get more on HelpWriting.net ...
Advantages And Disadvantages Of Cinder Model
Disadvantages of the Spiral Model:
1. Cost elaborated in this model is usually very high.
2. This is a complex approach especially for the project for a clear SRS ( Safety Requirement
Specification )
3. The protocols must be followed correctly to effectively apply this model. Through – out the
project life cycle development, it is very hard to follow rules and protocols.
4. It is not suitable with small risk projects.
5. Conference budgetary and scheduling needs are very though with this software development
process.
6. Due to many customizations permitted from the customers, it is very hard to use similar prototype
in rest of projects.
7. It requires broad skill in evaluating reservations of risks related with the project and with their ...
Show more content on Helpwriting.net ...
From sequential, heavy weight methodologies which are more predictive in nature and lengthy in
process, today there is a shifting focus towards simple, light weight methodologies involving
prototyping which provides a part of the final output at every stage of development. Several studies
have reported software project failures due to lack of focus on requirements and the extent of
dynamism involved in business requirement definition (Gasisas, 2009).
AGILE start as a niche concept being used in tiny pockets of the software company and has since
grown to be properly established in many diverse software development contexts. Since it has
grown, it has been modified to set unique requirements of a specific context. For Agile to be well–
known in the medical device software company, guidance is needed to modify it to fit that unique
context.
Agile developed a response to quality and efficiency concerns posed by active method of software
developments. It can bring benefits which are valuable to the medical device software world,
including the
... Get more on HelpWriting.net ...
Different Methodologies Used by Programming Teams
Running Head: APPROACHES IN PROGRAMMING TEAMS Abstract This essay involves the
comparison and contrast of the different methodologies used by programming teams. Among these
methodologies are; System development life cycle (SDLC), Extreme programming and Agile
methodology. Software development methodologies are the frameworks involved to structure, plan
and control the processes used in developing an information system. The system development life
cycle (SDLC) is a conceptual model which is involved in most project management and used for
large scale projects with relatively large number of developers. A good example of SDCL
methodologies includes; waterfall model. The SDCL takes a lot of time to produce complete
products but of high quality. Agile methodology is a conceptual framework used also in project
management and it is designed for small projects with few developers. Extreme programming on the
other hand allow for communication with customers and by doing so it ensures interaction between
developers and consumers in order to change as fast as the customers' needs and desires changes.
Even though there different methodologies, agile methodologies seem to have a lot of advantages
over the Extreme programming and system development life cycle. Since it combines a number of
other methodologies to come up with a better way for developer to produce faster and change to as
customers desires changes. Introduction A group of methodologies are used to come up with project
... Get more on HelpWriting.net ...
Software Development Strategies For Successful Program...
Software Development Strategies Student Name University Affiliation Introduction Our internet
marketing firm's leadership is entertaining the procurement of a major new software development
program to keep track of advertising revenues. The goal is to have a loosely coupled, Java–based
platform to serve this need. To make an educated decision about the development of this software, it
is necessary to understand the current and future state of software development and testing for our
firm. There are several significant challenges that software development program managers face
during the project life cycle. And several methodologies have been developed to provide managers
guidelines for tacking the challenges to successful program development. To ensure program
development goals are achieved with measurable confidence, several testing methods have been
developed and successfully employed. Ethical behavior should guide project managers as they
employ time–tested methodologies to produce the final product, which can be tested by a variety of
tools to ensure customer satisfaction. Challenges of Software Development Software developers and
software engineers face considerable challenges while attempting to plan, design, implement and
complete software development projects. Key challenges facing software development project
leaders and other professionals include coping with increasing diversity, responding to demands for
reduced delivery times and developing software
... Get more on HelpWriting.net ...
Sdlc Essay
Abstract–There are various SDLC models widely accepted and employed for developing software.
SDLC models give a theoretical guide line regarding development of the software. Employing
proper SDLC allows the managers to regulate whole development strategy of the software. Each
SDLC has its advantages and disadvantages making it suitable for use under specific condition and
constraints for specified type of software only. We need to understand which SDLC would generate
most successful result when employed for software development. For this we need some method to
compare SDLC models. Various methods have been suggested which allows comparing SDLC
models. Comparing SLDC models is a complex task as there is no mathematical theorem or physical
device ... Show more content on Helpwriting.net ...
RELATED WORK FOR EXTENDED AGILE El–Sharkawy et.al in [34] suggested a Meta model
implementing 5W1H model for the innovative creativity in requirement engineering. Aggarwal et.
Al in [35] proposed swift tack SDLC under the agile technique to develop any system. . In [36],
Ramadan et.al used GDLC guidelines to develop a game like system with the aim of achieving
goals. A proper selection of SDLC model before its development has been suggested by Khan et. al.
in [37]. In [39], a rule based SDLC recommendations have also been suggested by Kumar et.al. V.
PROPOSED EXTENDED AGILE MODEL In this section we have proposed extended agile SDLC
which includes creativity in the requirement engineering and can develop any project within given
time limit according to the need of the customers or stakeholders. It is observed that innovation and
creativity is required at the time of requirement gathering for the qualitative and compressive
product. In the first step, 5W1H (What, why, when, where and How) model is prepared for every
requirement. Following figure represents an example of
... Get more on HelpWriting.net ...
Application Development Plan For A Company
Game Application Development
Application Development Plan
Table of Content: Page Number
1. Introduction 1
2. Complete Project Plan 1
3. Scope of the project management 4
4. Time factor 5
5. Resource document 6
6. Potential Risks 7
7. Conclusion 9
Introduction:
XYZ Company is game application development Company where they are going to develop games
for the customers in order to provide the better and good challenging games to the customers. And
this game application will be used by the XYZ Company to develop all new games. Currently
because of most competitors in the market now XYZ Company wants to upgrade the software of
this game application so that for ... Show more content on Helpwriting.net ...
As in the current task this XYZ Company wants to do changes in the game application development
for to develop games to the market. This XYZ Company developed previously some games by using
this application for the customers but because of the market changes and competition with the other
game application developer companies this XYZ company want to do the changes which will be not
change for the future also, so that this application will be stand out in the crowd in order to meet
their requirement and for their necessary needs. For XYZ company need to follow the time track
which we have mentioned in the Gnatt chart for the better understanding purpose of how to follow
the life cycle for this development and we mentioned in the Gnatt chart about the completion dates
accordingly. Here this project will be completed by the more than one year with all necessary
changes in the game application software. For this development application it includes most cost
effective one because we developing the game application software with all the future requirement
of customers and this will include all the new application which all related to the customers market
standards. If this current project game application is success then this company will stand out in the
crowd. I mean based on this project game application company profits and share going to be
deciding. If this happen in success then
... Get more on HelpWriting.net ...
Software Development : Developing A New Program
In the world of software development, the term agile typically refers to any approach to project
management that strives to unite teams around the principles of collaboration, flexibility, simplicity,
transparency, and responsiveness to feedback throughout the entire process of developing a new
program or product. And agile testing generally means the practice of testing software for bugs or
performance issues within the context of an agile workflow.
Agile testing is a software testing practice that follows the principles of agile software development.
It follows the rules of the agile manifesto, treating software development as the customer of testing
and thus involves testing from the customer perspective as early as possible, testing early and often
as code becomes available and stable enough from module/unit level testing. Since working
increments of the software is released very often in agile software development there is also a need
to test often. This is often done by using automated acceptance testing. Also since manual testing
alone in agile development would likely result in either buggy software or slipping schedules
because it would most often not be possible to test the whole software manually before every
release.
Agile testing involves all members of a cross–functional agile team, with special expertise
contributed by testers. This is done to ensure the delivery of the business value desired by the
customer at frequent intervals by working at a sustainable
... Get more on HelpWriting.net ...
An Effective Model Of Process And Best Practices
An Effective Model of Process and Best Practices 1. Introduction This a report of my experiences
and findings during an eight month industrial internship placement (Jan 2014 to August 2014) at
SeisWare International Inc: an "industry leader in the development, sales and support of seismic
interpretation software" [1]. In particular, it is a company that focuses on exploration and production
in the oil and gas industry through the support and development of its software package. Contained
within this package are varied applications which provide the tools and utilities needed to streamline
a geophysicist's workflow. My responsibilities as a junior software developer at SeisWare included
the maintaining of preexisting features, as well as ... Show more content on Helpwriting.net ...
enSeisWare can be taken as an example which advocates for the sharing of certain testing and
coding work tasks by both QA and Development. Both manual testing and the creation of automated
tests are to be shared and completed by both positions. Benefits resulting from this system include
prevention of bottlenecks in certain stages of the software development cycle as well as shared
accountability between team members for the work completed. In the previous example, there might
be a differentiation between QA and Dev testing (ie. QA's might have better black box perspective
to testing) but contrasting feedback is presented. Furthermore, this system allows for team members
to experience all aspects involved in the software development cycle and allows input by everyone.
A cohesive team mentality is encouraged and obstacles inhibiting work are removed. 2.2 Adapting
Process The effectiveness of the agile approach within a company is relative to the ability in which
processes and procedures can be adjusted to better fit its needs. A key factor for adopting successful
agile is through the encouragement of a constantly changing environment where changes can
happen frequently, become accepted as the norm, and be easily integrated into the process. Process
formalities are frequently revised to meet the needs within SeisWare. As a case scenario there was a
point in time dedicated for bug fixing during the release cycle which
... Get more on HelpWriting.net ...
Empirical Differences Between Agile And Devops
Empirical differences between Agile and DevOps
With the increased development of software applications, increased the demand for principles in–
order to maintain quality, flexibility, cost control and maintenance. There are several models of
software development, that describes the approaches to a variety of tasks or activities that takes
place during the development process. In most of the traditional IT process, the collaboration
between the developer teams and the operational teams is minimal and sometimes there would be no
communication, which resulted in various issues like 'system works in test and doesn't work in
production environment'. To overcome this issue, various modern methodologies are developed. In
this paper, comparison of ... Show more content on Helpwriting.net ...
An agile project is developed in iterations, which is reviewed and critiqued by a project team.
Usually, these project teams includes representatives from the client business and the employees of
the organization. Each iteration has a time period defined with a set of goals.
Based on the properties of iteration some organizations term iteration as sprint, all sprints are
iterations but not otherwise. Sprint is a time–boxed i.e., it is finished on the planned date and not
CONJECTURAL DIFFERENCES BETWEEN AGILE AND DEVOPS 5 when it is ready. Sprint
properties can be varied, but likely you'll want to try to find an amount of time that "works well".
Agile software development supports various concrete practices that covers the areas like
requirements, process, design, coding, modeling, testing, project management and quality. These
models promote continuous integration, automatic unit testing, code refactoring and domaindriven
design are often used to improve quality and enhance project agility. Agile is not a solution for all of
the software development challenges, a good project team should always remember that
requirements would change as they design and develop. The team should be clever enough to adopt
the changes with minimum disruption irrespective of which methodology is followed. The project
teams are governed by project management with a set of responsibilities, the below table
... Get more on HelpWriting.net ...
The Planning Of Software Development Project
ABSTRACT In the planning of software development project, a major challenge faced by project
managers is to predict the re–work effort. (re–work effort is the effort require to fix the software
defects identified during system testing). Project manager objective is to deliver the software that
not only meets the time and cost requirements but also the quality requirements given by the client.
To ensure the quality of the software, many testing cycle will be conducted before it is finally
delivered to the client for acceptance. Each testing cycle is a costly affair as it involves running all
possible test scenarios in all possible environments, followed by defect fixing and re–verification of
defects. On average, there are 2–3 testing cycle conducted but this depends on number of defects
identified during testing. Number of defects will depend on the team expertise and whether they
earlier worked on similar projects and technologies. Hence, it becomes critical to predict the number
of defects identified during testing and it is a very challenging task as it requires a good predicting
model to predict the re–work effort. In this paper, we describe the relationship among software size,
no of software defects, productivity and efforts for web–based development projects. This
relationship is established by using the multiple linear regression technique on the benchmarking
data published by International Software Benchmarking Standard Group. Results suggest that web
based projects
... Get more on HelpWriting.net ...
Pros And Cons Of Agile
Agile Methodology There are many different software development methodologies for a software
project to choose from, each of them has their own pros and cons, which one is the right one for
your organization. In this article, we will discuss the different types of project environments that are
available, first we will start with the Agile methodology pros and cons and then we will talk about
the suitability of the method with different project environments. Agile methodology for a typical
software project or any in environment in which the requirements are unknown or change quickly.
Agile focus toward teamwork, constant user feedback, continuous improvement, face–to–face
meetings, constant cooperation, early and continuous delivery of working ... Show more content on
Helpwriting.net ...
Agile is adaptable or highly flexible meaning that is has short development cycles of the interactive
design process that gives the project flexibility to pivot when the need arises. You do not have to
deliver a full project which wastes time and resources on delivering a full project which could be
rejected by the customer. Customer has the ability and satisfaction over the development process
since Agile projects are closely coordinated with the customer so they have a strong impact over the
development project. There is immediate user feedback and interaction among the stakeholders and
emphasis on getting a shippable product into the hands of the user which reduces the risk of building
an application that nobody wants, with the constant interaction with each other and the customer you
increase the best features. With continuous quality assurance and attention to details the quality of
the product with TDD as each iteration leads to fewer bugs and a higher quality releases. Agile has a
solid foundation that leads to quicker, higher quality releases since the development is conducted in
short cycles and with the testing that will run non–stop, it allows the production of a great final
... Get more on HelpWriting.net ...
Software Engineering Frameworks And Methodologies
CIS 4655
Software Engineering
Term Paper on
Software Engineering Frameworks and Methodologies
By
Damancharla Harini
1. Introduction:
Describing software engineering can be a quite challenging task based on the purpose of the
definition and the anticipated beneficiaries. Discussing about frameworks and methodologies in
software engineering can be somewhat difficult under whatever circumstances because of various
ways in which the issues regarding frameworks, processes and methodologies have been handled.
This paper explains software engineering frameworks and methodologies and the topics related to
them. The main purpose of this paper is to add more understanding in the field of software
engineering frameworks and methodologies. ... Show more content on Helpwriting.net ...
Unified Process Framework:
The Unified Process fits the wide–ranging definition of a process. It is nothing but a set of activities
that a software team performs in order to renovate a set of customer requirements into a software
system. Still, the Unified Process is also a generic process framework that people can adapt by
adding and removing activities based on the specific requirements and existing resources for a
project.
3.2. Agile Framework:
Agile software development is a conceptual framework used for undertaking software engineering
projects. There are various agile software development methodologies like Crystal Methods,
Dynamic Systems Development Model (DSDM), and Scrum.
Most of the agile methods try to reduce risk by developing software in short time boxes, known as
iterations, which usually last for one to four weeks. Each iteration is like a mini software project of
its specific, and contains all the tasks required to release the mini–increment of new functionality:
planning, requirements analysis, design, coding, testing, and documentation. Whereas iteration won't
be adding required functionality to permit releasing the product, an agile software project anticipates
to be able to release new software by the end of each iteration. At the end of each iteration, the team
reassesses project
... Get more on HelpWriting.net ...
Advantages And Disadvantages Of Waterfall Management
ISO 9001:2008 Certified Institute Java Institute for Advanced Technology
OBJECT ORIENTED SYSTEMS ANALYSIS AND DESIGN H7DV 04 H7DV 04/AS/01
RUCHINI ERANDATHI SCN NO : 157474812 947814141V
WATERFALL METHODOLOGY
The waterfall model of software engineering for the systems development life cycle model is the
most popular version. Often considered classic approach to life cycle of systems development ,
linear and sequential waterfall model describes the development system. Waterfall development
objectives are different for each stage of a development .Imagine a waterfall on the cliff of an alp.
Water has flowed over the edge of a steep mountain side and has started walking down , it cannot
turn back. It is same as the waterfall development. Once a phase of development is completed, there
is no turning back when the development proceeds to the next phase. ... Show more content on
Helpwriting.net ...
The rigidity of the model is easy to manage – Each stage has a specific distribution and review
process.
In this methodology phases are processed and completed one at a time and phases do not overlap.
Waterfall methodology proceeding well for smaller projects where requirements are very well
understood.
Disadvantages of waterfall methodology
When an application is in the testing stage, it is very hard to turn back and change something, that
was not well–thought out in the concept stage.
No working software is produced until late during the life cycle.
Uncertainty and the risk, very high.
It is not a good methodology for complex and object–oriented
... Get more on HelpWriting.net ...
Application Of A Project Report Essay
Gamecave A PROJECT REPORT Submitted By Dhruv Maradia (130770116022) In fulfillment for
the award of the degree of BACHELOR OF ENGINEERING In Information Technology SILVER
OAK COLLEGE OF ENGINEERING AND TECHNOLOGY OPP. BHAGWAT VIDYAPITH,
NEAR GOTA CROSS ROAD, AHMEDABAD–382481. Candidate's Declaration We hereby declare
that project report titled "Gamecave" submitted towards the completion of project in 7th semester of
bachelor of Information Technology in Silver Oak College Of Engineering & Technology,
Ahmedabad is an authenticate record of our work carried out. We further declare that to the best of
our knowledge the report of I.T. 7th semester. Candidate's signature : First candidates name : Dhruv
Maradia Branch : IT Enrollment Number : 130770116022 Submitted to: Silver Oak College Of
Engineering & Technology, Ahmedabad Affiliated to: Gujarat Technological University Abstract
Gamecave is a website created using PHP. This website will serve as platform for information,
news, updates, release date and walkthroughs for games across all platforms.
... Get more on HelpWriting.net ...
Difference Between Agile And Waterfall Model
White Paper Agile Model and Methodologies November 2015 Table of Contents Abstract 1 1. Agile
Model 1 2. Agile versus Waterfall model 1 3. Agile Testing Methods 4 3.1 Scrum 4 3.2 Crystal
Methodologies 4 3.3 Dynamic Software Development Method(DSDM) 4 3.4 Feature Driven
Development(FDD) 4 3.5 Lean Software Development 4 3.6 eXtreme Programming(XP) 4 4.
Conclusion 4 5. References 5 6. About the Authors 5 Abstract AGILE is a methodology that
promotes continuous iteration of development and testing throughout the software development life
cycle of the project. Both development and testing activities are concurrent unlike the Waterfall
model This white paper describes the Agile Model ... Show more content on Helpwriting.net ...
Early delivery 5. Empowering the team 6. Building Integrity 7. Optimize the whole 3.6eXtreme
Programming (XP): Extreme Programming technique is very helpful when there is constantly
changing demands or requirements from the customers or when they are not sure about the
functionality of the system. It advocates frequent "releases" of the product in short development
cycles, which inherently improves the productivity of the system and also introduces a checkpoint
where any customer requirements can be easily implemented. The XP develops software keeping
customer in the target. Figure 4:QA Development cycle of Extreme Programming(XP) Business
requirements are gathered in terms of stories. All those stories are stored in a place called the
parking lot. In this type of methodology, releases are based on the shorter cycles called Iterations
with span of 14 days time period. Each iteration includes phases like coding, unit testing and system
testing where at each phase some minor or major functionality will be built in the application.
Phases of eXtreme programming: There are 6 phases available in Agile XP method, and those are
explained as follows: Planning Identification of stakeholders and sponsors Infrastructure
... Get more on HelpWriting.net ...
Disadvantages Of Software Development Life Cycle
Part B (1.1) Introduction A software development process, also known as a software development
life cycle (SDLC) can be explained as a structure, imposed on the development of a software
product. The software development life cycle (SDLC) is an umbrella term for the overall process of
developing, implementing, and retiring information systems through a multiple step process from
initiation, training, documentation , design, analysis, maintenance, and consulting. Software
development life cycle (SDLC) can be termed as a process of bringing ideas to reality in the creation
of a software product with in the software industry. Types of Software Developing Life Cycles
(SDLC)
1. Waterfall Model.
2. Prototype ... Show more content on Helpwriting.net ...
When in use, prototype model may increases the complexity of the system will scope of the system
expanding beyond.
Doesn't work well for smaller projects.
Leads to implementing and then repairing way of building systems.
Online systems, web interfaces have a very high amount of interaction with end users, are best
suited for Prototype model.
It might take a while for a system to be built that allows ease of use and needs minimal training for
the end user.
3. Spiral Model. As a result of these weaknesses of the waterfall model, the spiral model was
developed which emphasizes iterations of the phases with each phase producing on early Prototype
representing a part of the overall system. This helps in demonstrating a proof of concept early in
development. This model is similar to the incremental model, but with more emphasis placed on risk
analysis. A software project repeatedly passes through these phases in iterations (called spirals in
this model). The baseline spiral, starting in the planning phase, requirements are gathered and risk is
assessed. Each subsequent spirals builds on the baseline spiral.
Planning Phase – The project is reviewed and a decision is made whether to continue with a further
loop of the
... Get more on HelpWriting.net ...
Pros And Cons Of Agile Software Development
Agile Methodology Agile software development is a conceptual framework for software engineering
that promotes development iterations throughout the life–cycle of the project. It provides
opportunities to assess the direction of a project throughout the development lifecycle. Its objectives
are as it focuses on customer value. It creates a flow of value to customers by "chunking" feature
delivery into small increments. Software developed during one unit of time is referred to as an
iteration, which may last from one to four weeks. Agile model believes that every project needs to
be handled differently and the existing methods need to be suitable for the project requirements. In
... Show more content on Helpwriting.net ...
As it is a very realistic approach to software development. It promotes teamwork and cross training.
Functionality in it can be developed rapidly and demonstrated . Resource requirements are minimum
in it. It is suitable for fixed or changing requirements. It delivers early partial working solutions. It is
a good model for environments that change steadily. Documentation easily employed in it. It enables
concurrent development and delivery within an overall planned context. It is easy to manage and
gives flexibility to developers. But instead of these many difficulties are also there. As it is not
suitable for handling complex dependencies. More risk of sustainability, maintainability and
extensibility is in it. There are strict delivery management that dictates the scope, functionality to be
delivered, and adjustments to meet the deadlines. It depends heavily on customer interaction, so if
customer is not clear, team can be driven in the wrong direction. There is very high individual
dependency, since there is minimum documentation generated. Transfer of technology to new team
members may be quite challenging due to lack of
... Get more on HelpWriting.net ...
What Are The Advantages And Disadvantages Of The Software...
Abstract
The success of a software development project greatly depends upon which process model is
used.This paper presents a description of various software engineering process models. It
emphasizes on the need of using appropriate model as per the application to be developed.In the
paper description of following seven models are given namely Waterfall,Prototype,Rapid application
development,Incremental,spiral, Buid and fix and V–shaped. Advantages and disadvantages of these
models have been given in this paper. our aim is to create a reliable and cost effective software and
these models provides us a way to develop them.In the paper a comparative study of various models
have been made along with their defects and features.
(1)Introduction ... Show more content on Helpwriting.net ...
2 User get a view of his product.
Disadvantages
1The factor of software quality is ignored to some extent.
2 In a rush of making prototype working,implementation mistake can occur.
(c) Rapid Application Development model
RAD means Rapid Application Development.RAD model is a high speed adaption of Waterfall
model.This model can be implemented if a developer knows the requirements of customer in
advance and here the development cycle is extremely small. User or customer involvement is there
in every stage of RAD model. This model has four phases Reqirement planning,User
description,Construction,Cutover. A number of teams work on a single function and then it is
integrated to form a whole software. diagram Advantages
1Customer satisfaction is there as customer is involved in every stage of the model.
2 Development time is extremely small.
3 Feedback from customer is available at initial stages.
Disadvantages
1For large projects, RAD model require the size of team to be large and hence a significant human
resource is needed.
2Team members must work in close association with users/customers to complete the project in
time.
3 RAD model is not appropriate for all kinds
... Get more on HelpWriting.net ...
Essay on The Development Stage in Cornella Brothers Inc
The development stage in instructional design is an extremely important stage. Without a proper
development plan put in place instructional designers can become easily frustrated and expending
additional hours to do research to put the course in place. This is the stage where the content is not
only written or developed but the content is also organized (University of Idaho, n.d.). It is
imperative that this stage is done correctly so as to deliver information to students that will help
them learn to the fullest and really grasp the information. The following will discuss what happens
in the development stage at Cornella Brothers Inc. when developing a safety meeting.
Authoring Content The person who authors the content for safety ... Show more content on
Helpwriting.net ...
When deciding on a safety meeting, managers need to decide what the company needs to address
with their employees and then the Safety Officer at Cornella will create a Power Point or show
pictures of the violations (Work Place Safety Experts, 2010).
Inputting Technology Cornella Brothers is a medium sized family business. The organization is
nowhere near being large enough to have an IT Department. Due to this managers and the safety
officer hold many hats in the organization. The Safety Officer or one of the managers will input the
information into technology. It would be nice to have an IT Department or even an accountant to do
the billing but these tasks falls upon the managers.
Beta Testing There really is no beta test involved in the safety classes. Employees are expected to
follow the guidelines put in place at these classes. Managers will ensure that the employees are
following government regulations and the company's regulations. A part of their employment
obligation is following the safety rules and managers do enforce this. During the classes there is a
discussion period in which employees have the opportunity to voice their concerns or ask questions;
in this way managers can be sure the employees understand what is expected of them and can
respond immediately or discuss pertinent matter further.
Conclusion
At Cornella Brothers, the subject matter experts are the ones who author the
... Get more on HelpWriting.net ...
Report of Software Maintence
INTRODUCTION Software Engineering is an engineering discipline which is concerned with all
aspect of software production. It also concerned with all aspects of computer–based systems
development including hardware, software, and process engineering. SOFTWARE
MAINTENANCE Software development efforts result in the delivery of a software product that
satisfies user requirements. Accordingly, the software product must change or evolve. Once in
operation, defects are uncovered, operating environments change, and new user requirements
surface. The maintenance phase of the life cycle begins following a warranty period or post
implementation support delivery, but maintenance activities occur much earlier. Software
maintenance is an ... Show more content on Helpwriting.net ...
Five key characteristics comprise the maintainer's activities: Maintaining control over the software's
day to–day functions Maintaining control over software modification Perfecting existing functions
Identifying security threats and fixing security vulnerabilities Preventing software performance from
degrading to unacceptable levels Majority of Maintenance Costs Maintenance consumes a major
share of the financial resources in a software life cycle. A common perception of software
maintenance is that it merely fixes faults. However, studies and surveys over the years have
indicated that the majority, over 80 percent, of software maintenance is used for non–corrective
actions Grouping enhancements and corrections togetherin management reports contributes to some
misconceptions regarding the high cost of corrections. Understanding the categories of software
maintenance helps to understand the structure of software maintenance costs. Also, understanding
the factors that influence the maintainability of software can help to contain costs. Some
environmental factors and their relationship to software Maintenance costs include the following:
Operating environment refers to hardware and software. Organizational environment refers to
policies, competition, process, product, and personnel. Evolution of
... Get more on HelpWriting.net ...
The Systems Development Life Cycle Essay
The systems development life cycle (SDLC), also referred to as the application development life–
cycle, is a term used in systems engineering, information systems and software engineering to
describe a process for planning, creating, testing, and deploying an information system. The systems
development life–cycle concept applies to a range of hardware and software configurations, as a
system can be composed of hardware only, software only, or a combination of both. PHASES: o 1
System investigation o 2 System analysis o 3 Design o 4 Environments o 5 Testing o 6 Training and
transition o 7 Operations and maintenance o 8 Evaluation The system development life cycle
framework provides a sequence of activities for system designers and developers to follow. It
consists of a set of steps or phases in which each phase of the SDLC uses the results of the previous
one. The SDLC adheres to important phases that are essential for developers, such as planning,
analysis, design, and implementation, and are explained in the section below. It includes evaluation
of present system, information gathering, feasibility and request approval. A number of SDLC
models have been created: waterfall, fountain, spiral build and fix, rapid prototyping, incremental,
and synchronize and stabilize. The oldest of these, and the best known, is the waterfall model: a
sequence of stages in which the output of each stage becomes the input for the next. These stages
can be characterized and divided up in
... Get more on HelpWriting.net ...
Advantages Of Agile Software Development
1. Introduction Agile software development is a conceptual framework for software engineering that
promotes development iterations throughout the life–cycle of the project. There are many agile
development methods; most minimize risk by developing software in short amounts of time.
Software developed during one unit of time is referred to as an iteration, which may last from one to
four weeks. Each iteration is an entire software project: including planning, requirements analysis,
design, coding, testing, and documentation. An iteration may not add enough functionality to
warrant releasing the product to market but the goal is to have an available release (without bugs) at
the end of each iteration. At the end of each iteration, the team re–evaluates project priorities. Agile
methods emphasize face–to–face communication over written documents. Most agile teams are
located in a single open office sometimes referred to as a bullpen. At a minimum, this includes
programmers and their "customers" (customers define the product; they may be product managers,
business analysts, or the clients). The office may include testers, ... Show more content on
Helpwriting.net ...
The suitability of agile methods in general can be examined from multiple perspectives. From a
product perspective, agile methods are more suitable when requirements are emergent and rapidly
changing; they are less suitable for systems that have high criticality, reliability and safety
requirements, though there is no complete consensus on this point. From an organizational
perspective, the suitability can be assessed by examining three key dimensions of an organization:
culture, people, and communication. In relation to these areas a number of key success factors have
been identified (Cohen et al.,
... Get more on HelpWriting.net ...
Disadvantages Of Software Development Methodology
The methodology is actually defines the workflows, processes and responsibilities which are
necessary for project's aims and goals. So, we can say that software development methodology is a
set of best practice to control the complete software development process. The development process
of any project has specific phases which are known as project life cycle. Usually each project has
five phases which are named as: 1– Analysis 2– Coding or Development 3– Testing or Validation 4–
Deployment and Integration, 5–Maintenance. There are several software development
methodologies are available and each of them has its own strengths and weaknesses. Not all
methodologies could be appropriate for all projects. Each method is best known for certain ... Show
more content on Helpwriting.net ...
This will be helpful in customer satisfaction. This model delivers face–to–face conversion between
the development team and customers which surely help to minimize risk and enhance overall
product planning. The continuous attention to a good design and technical excellence makes this
model flexible. Disadvantages Only high skilled and expert programmers are required for this
model. In this model, there is lack of emphasis on all essential documentation and designing. This
model is also not suitable to handle complex projects. 6– Spiral Model The spiral model is
somewhat similar to the incremental model. This model requires four phases which are: Planning,
Risk Analysis, Engineering and Evaluation. The spiral model focuses on early identification and
reduction of project risks as well. It is mostly used for large projects. Also used when cost and risk
evaluation is so important. Advantages One great advantage of this model is there is high amount of
risk analysis required so the avoidance of risk is enhanced. This model is flexible as it allows any
changes to be implemented at several stages of the
... Get more on HelpWriting.net ...
Developing An Information System Development
A software development methodology or system development methodology in software engineering
is a framework that is used to structure, plan, and control the process of developing an information
system.
In software engineering, a software development methodology (also known as a system
development methodology, software development life cycle, software development process,
software process) is a splitting of software development work into distinct phases (or stages)
containing activities with the intent of better planning and management. It is often considered a
subset of the systems development life cycle. The methodology may include the pre–definition of
specific deliverables and artifacts that are created and completed by a project team to develop or
maintain an application.
There are following methodologies:
Agile Software Development Crystal Methods Dynamic Systems Development Model (DSDM)
Extreme Programming (XP) Feature Driven Development (FDD) Joint Application Development
(JAD) Lean Development (LD) Rapid Application Development (RAD) Rational Unified Process
(RUP) Scrum Spiral Systems Development Life Cycle (SDLC) Waterfall (a.k.a. Traditional)
Based on the meed amd the compny 's view various companies uses different mothedologies to
achieve success. It even changes with the human point of view that supports the system.
As said if I were the Director of Application Development I would implement the Agile
... Get more on HelpWriting.net ...
Software Houses Use Agile Development
Most of software houses use agile development methodologies such as XP and scrum to enhance its
product quality, increase communication between teams, release products in short time and to
participate its clients in software development life cycle. There are many problems usually occur,
first problem the time spent between development of the software and to make it operational.
Second problem is the difference between environments. There are two different environments;
development environment is the first environment which is used to develop, build and deploy the
software in development life cycle. This environment has no constrains. On the other hand,
operation environment, which is usually called production environment. In operation ... Show more
content on Helpwriting.net ...
These enhancements aim to decrease time of software life cycle. Additionally, it aims to increase
productivity and quality of software. Moreover, some researches introduce the idea of mixing two or
three approaches together to enhance software lifecycle.
Recently, a new approach called "DevOps" appeared in software engineering field. DevOps derived
from Development and Operations. The main objective of DevOps is to resolve conflicts between
teams and reduce time between software development and software delivery to customer. But there
are differences between development environment and operation environment. Development
environments are business driven, responsive to change and constantly updated. On the other hand,
operation environment is procedure driven, controlled environment and stable. [1]
DevOps challenge is to map between development and operation. The main challenge her is both of
development and operation have a different environment. Whereas Development environment is
changing environment, production environment is stable. The major challenge here is to deliver
changes in stable environment without any kind of interruption. The key solution for this challenge
is continuous integration [2].
DevOps is considered as an extension to agile methodologies [2]. Another view is that it is a
separated method [1]. Table 1 shows the evolution of development methodologies and IT
... Get more on HelpWriting.net ...
What The Software Design Life Cycle?
Assignment 2 P5
To achieve P5, learners are expected to:
a) Describe and explain what the Software Design Life Cycle is
The SDLC Software design life cycle is used for the design and development stage of a software
system. It's the structure for design and development the life cycle has multiple stages, there are 9 in
total. Requirements, Specification, Design, implementation, testing and debugging, deployment,
maintenance and post mortem. All of these stages are part of the software design life cycle. The
reason they use the SDLC is to see if the software there producing is up to standards meets their
desire of design.
b) Describe and explain the nine necessary stages of the life cycle:
Requirements
This is the first step of the ... Show more content on Helpwriting.net ...
Specification
This is the second step of SDLC it's called Specification in this stage both developers and clients are
deciding on who their going to realise the software for the age audience. The hardware and software
requirements to make sure its compatible with the users for example if their making it for Mac or
Windows they need to make it compatible for that OS. Other specification the input and output of
the data and what's needed to show the user. So the main specification to cover is the function of the
software and hardware but also the security system logging in and out.
Design
Design is the third stage of the SDLC. This is thinking more into the visual side of the process by
planning the code and design for the software, by designing the GUI/user interface. Creating
diagrams for the visual look doing a flow diagram and the step of that process. Once the developers
have decided on the design of the software such as the interface and creating the diagrams they
would then move on to the fourth stage of SDLC
Implementation
This is the fourth stage of SDLC, the implementation is putting the physical code design that was
created from the design stage and making it. This part of the process can slow the project down even
though you have planned it you can still run into problems and errors this could delay the process.
The developers that have built the software they then need to move
... Get more on HelpWriting.net ...
Advantages Of Offshore Product Development
Offshore Product Development – Competitive Advantage
Offshore Product Development:
Offshore product development is a strategic concept. Offshore product development allows software
companies and enterprises to lower their development costs substantially and focus
comprehensively strategic initiatives such as marketing products and developing next generation
products. Companies opting for OPD can release their products faster than their competitors taking
benefit of time zone difference and 24 hours development leading to competitive advantage.
Competitive Advantage:
Globalization, increasing cost pressures, changing market dynamics, the need for fast time to market
and many other factors has led many product companies to opt for offshore product development.
The situation is so acute that an approximately 500+ releases a year of various software products are
happening from India. ... Show more content on Helpwriting.net ...
Offshore software vendor should have history of proven track record and expertise to improve your
business performance.
Offshore Product Development vendor should provide its services across the entire life cycle to
global ISVs and enterprises. They should be in a position to provide innovative solutions to complex
product development situations by combining technical expertise, domain experience and process
maturity. This enables clients to gain competitive advantage by surpassing competitors and generate
new revenue streams.
Their product development services should rank high on performance, security, maintainability and
scalability and span across relevant verticals such as Insurance, Human Resource & Recruitment
Services, Finance and Banking, Education, Travel and Hospitality, Printing, Audit &
... Get more on HelpWriting.net ...
Software Development Life Cycle Throughout The Project
Name: P.Srikumar Student id: 700606641 Introduction: Agile is a methodology that which enables
the continuous iteration of development and testing in the software development life cycle
throughout the project. Iteration is defined as a basic or initial part of the software to release. Agile
Testing process starts at the beginning of the project with high integration between development and
testing teams. In agile testing, the testers will simultaneously work with the development team and
testing is done in parallel at the each phase of code or piece of code that has been developed. There
will be Daily team meetings, Client meetings and discussions is an essential part of agile projects. It
... Show more content on Helpwriting.net ...
The highest priority of the agile process is to satisfy the customer and continuous delivery of the
software based on the scheduled time. It helps in saving the time and money. Customers, developers,
tester's plays a major role in the whole project they get interact with each other time to time.
Working builds is delivered based on the client's requirements whether it may in weekly or monthly.
Interaction between team members is very important. We can respond to the change requests based
on client requirements rather than following the planned approach and can eliminate most of the
defects and crashes at the initial stage by resolving the top most reported bugs. Collecting the
requirements from client and then analyze the requirements then design the document and prototype
and then to the development of the code after that it releases to the Quality Assurance to identify the
defects and then resolve the defects or bugs by the development team and retest by the Quality
Assurance and then submit the process to the client and then to the user for collecting the feedback
and enhancement from the customer then if necessary changes are again made by the development
team which is again processed to the quality assurance team to identify bugs then the bugs should be
resolved and retest by the QA team if the client is satisfied with the process that can be released to
the market and we can eliminate most of the defects at the initial stage. Test approach Agile way:
... Get more on HelpWriting.net ...
My Company With A Crm Implementation
INTRODUCTION This case study that I am discussing is about my earlier company in India which
was in the Telecom industry. Since there was an extremely stiff competition in the telecom industry,
companies in the telecom business were adopting to new technological imperatives in order to
outperform their competitors. Hence my company also chose to implement CRM solution which
will connect all business users, stakeholders, inter–departmental executives so that all business
processes are automated and the efficiency of operations is improved. CRM signified identifying the
needs of the customers and stretching out ways and means to satisfy them. In this perspective CRM
was not merely treated as a technology, it also had implications in the ... Show more content on
Helpwriting.net ...
AGILE WAY OF WORKING The consultant followed Agile processes to deliver efficient and
effective solutions 1. User stories 2. Release & Iteration planning 3. Refactoring 4. Continuous
integration 5. Collective ownership APPROACH OVERVIEW 1. Discussions happened with CXO,
Managers, Senior developers, testers to understand pain points, challenges, issues and wish lists 2.
Analyzed, segregated and prioritized improvement areas 3. To achieve all objectives, it was decided
that the consultant will coach on Agile practices with some more value adding practices 4. Defined
product development life cycle: Product Roadmap definition –> Requirements & Architecture –>
Test Scenarios & Test Cases Definition –> Implementation & Verification –> Validation –>
Maintenance & Support –> Product Retirement 5. Conducted Orientation session for teams
implementing agile. Held session on review process, static code analysis, build and release process,
Test Driven Development, Unit testing Participation in a few review meetings, initial demos and
retrospection meetings 6. Survey was launched with all the Product Owners/Managers, team
members 7. Everybody agreed that there was significant improvement that they could feel compared
to how it was before the launch of this project ADOPTED MODEL My organization used Agile
model defined on objective based improvements. The various stages of the model are: – Discussions
with CXO/Managers/Stakeholders – Initial Analysis & Report –
... Get more on HelpWriting.net ...
Agile And Agile Software Development
Agile Agile software development refers to a group of software development methodologies e.g.
Dynamics System Development Model, Crystal Methods and Extreme programming (XP
methodology). Agile methods attempt to minimise the risk in software in short time boxes called
iterations. Every iteration includes all the tasks necessary to release the mini increment of new
functionality: planning, requirements analysis, design coding, testing and documentation. At the end
of every iteration the priorities will be evaluated. Agile methods emphasise real time
communication, preferably face to face instead of written documents. Agile methods also emphasise
working software as the primary measure of progress. Agile methods produce very little
documentation compared to other methods. Most Agile teams are located in a bullpen and include
all the people necessary to finish the software. (1) (3) Crystal Methodology Crystal Methodology is
one of the most lightweight and adaptable approaches to software development which focuses on
people, interaction, community, skills and talents and communications. Crystal is actually made up
of a family of agile methodologies such as Crystal Clear, Crystal Yellow, Crystal Orange and others.
This refers to the underlining core which represents values and principals. The principal is that each
team has a different set of talents and skills and each team should use a process uniquely tailored to
it. (1) Dynamic Systems Development Model
... Get more on HelpWriting.net ...
Compare Waterfall And Spiral Life Cycle Model
CTEC2121 Organisations, Project Management & Research Deferred/Referred Assignment 2013/14
Student id: P11242166 Tutor: Richard Smith Date: Aug 2014 Compare the waterfall and spiral
lifecycle models discussing when it is appropriate to use the model. In this article we are going to
discuss the software development life–cycles. But first lets break down the software development
part and the life–cycle part. Software development– Software development is the whole combined
process which involves the documentation, the software programming and the fixing & testing of
the bugs that come across while building and during the maintenance of the software. Software
development life–cycle– A software development life–cycle is made up ... Show more content on
Helpwriting.net ...
If a product that is required for constructing the system but for some reason it is not available or not
known, then it can be added to the system in the later stages whenever it is sourced. This makes the
system more flexible in terms of designing and modifying. This model consists of a vast utilisation
of prototypes. Multiple versions of the same system are released along the different stages of the
spiral which makes it easy to maintain and ensures a exponential growth in the quality of the
product. Since there are a lot of stages involved in the spiral model, there is a lot of documentation
to be done at each spiral of every phase. This makes it easy to understand and implement the
requirements which leads to a successful final product. Once a concept model is complete after the
first spiral, the customers get to use the software for review purposes. This happens at a very early
stage. The work of the project can be divided into small sections(units). The Units that are classified
as high risk can be dealt earlier on in the project so that the team is ensured of minimum risk in the
later stages of the project.
... Get more on HelpWriting.net ...
Case Study Of Avast
2.1. Product life cycle The product life cycle consists of six stages, these stages are; planning,
defining, designing, building, testing and deployment. Planning: In the planning stage the
requirements for the product are analysed. This is mostly seen as the most important part of the
cycle, since it is use to research the needs and viability of the product and is therefore mostly done
by senior employees who have the most experience. They usually do market surveys and look at the
comments made by customers and the sales department. Furthermore it is a good idea to look at an
industry expert. With this information a plan is made for the economic and technical and operation
parts of the product Part of the planning ... Show more content on Helpwriting.net ...
Positioning strategy The advantages that Avast has compared to the competition are that they were
the first to market. Avast was the first since they anticipated the need of the product. Avast was the
one company to do research about privacy regarding mobile phones and when to found out that
there was room for improvement, they came to public with their findings and created the need for a
better way to remove data from mobile phones. Avast had anticipated this and soon came with a
product to fulfil this need. When looking what kind of strategy is best suited for Avast Anti–Theft. It
is best to focus on the product leadership and the customer intimacy. Avast is the biggest Company
to market anti–theft software after the release of the previously mentioned research, also it is a
company know by a lot of people that already use a product made by Avast. In order to keep their
product leadership it is important that Avast keeps track on the responses of the product users. It is
suggested that Avast asks product users about their expectations and they functioning of the product
regarding their expectations. It is important to create and maintaining a user base using the fact that
they are the first to actually market the product. Making sure that current users are happy will ensure
the usage of the product in the
... Get more on HelpWriting.net ...
Disadvantages Of Incremental Model
4. INCREMENTAL MODEL. This model involves continues user feedback and interactions
resulting in a product that is much closer to user expectations. The development is built up from an
initial Prototype that is continuously being developed and tested. The requirements of the
incremental model is divided into various builds where multiple development cycles take place. This
creates a "multi–waterfall" cycle and the cycles are divided up into smaller, more easily managed
modules. Each module passes through the requirements, design, implementation and testing phases.
A working version of software is produced during the first module, so you have working software
early on during the software life cycle. Each subsequent release of the module adds ... Show more
content on Helpwriting.net ...
Increased reusability of components. Integration from very beginning solves a lot of integration
issues. Disadvantages of RAD MODEL. Depends on strong team and individual performances for
identifying business requirements. If the system cannot be properly modularized, building the
components necessary for RAD will be problematic. High dependency on modelling skills. When to
use RAD MODEL. RAD should be used when there is a need to create a system that can be
modularized in 2–3 months of time. It should be used if there's high availability of designers for
modelling and the budget is high enough to afford their cost along with cost of automated code
generating tools. 6. AGILE MODEL. Agile Development Model is also a type of incremental model
with focus on process adaptability and customer satisfaction by rapid delivery of working software
product. Agile methods break the product into small incremental releases with each release building
on previous functionality. Each release is thoroughly tested to ensure software quality is maintained.
It is used for time critical applications. Extreme Programming (XP) is currently one of the most well
know agile development life cycle
... Get more on HelpWriting.net ...
Extreme Programming : A Successful Customer Satisfactions...
Introduction
Extreme Programming is one of the popular agile processes (Wells) and is about social changes
(Beck and Andres). XP has been proven as one of the successful customer satisfactions since it
delivers potential software that can be used, as the customer needs it. It continues to empower
developers as it focus on developing excellent programing techniques and communication (Beck
and Andres). Extreme programming includes collaborative teams in order to accomplish and solve
problems as efficient as possible (Wells). Extreme programming hav five essential ways to improve
software projects such: communication skills, simplicity, require feedback, respect and courage
(Wells). An XP programmer requires maintaining communication with customers and colleague, and
sustaining their design simple and clean (Wells). Programmers are to get feedback by testing the
software, and delivering end system product to the customers as early s possible (Wells). Lastly,
programmers respect their colleagues as they, together, courageously respond to the changing and
evolving technology (Wells).
In addition, XP has its own twelve simple rules these rules are: planning, building blocks or small
releases, standardized naming schemes, collective ownership, coding standard, simple design,
refactoring, testing, pair programming continuous integration, 40–hour workweek and on–site
customer (Hutagalung). Although XP is an improved process, more efficient and predictable, it has
its own weakness
... Get more on HelpWriting.net ...
Advantages And Limitations Of Agile Software Development...
Agile software development methodology
Agile development is a term used in software development to describe incremental software
development methodologies. It is a type of incremental model because, in incremental model the
whole requirement is separated into many separated builds. Here, the software is developed in
incremental, rapid cycles resulting in small incremental releases with each release building on its
former functionality. Each release is critically tested to make sure that the software quality is
maintained.
The phrase agile refers to a software development methodology which promotes a project
environment for adaptation, rapid delivery and client focus, self–organization and team work. Agile
software development methodology is a conceptual framework for ... Show more content on
Helpwriting.net ...
Whereas if a plan were there to be followed, a single area of code is expected to be written once.
 Can increase the risk of scope creep due to the lack of detailed requirements documentation
Advantages of Agile software development method
 Able to gain customer satisfaction by rapid, continuous delivery of useful software.
 More focused on people and interactions between people rather than process and tools.
Customers, developers and testers constantly interact with each other.
 Working software is delivered quickly and more often (weeks rather than months).
 Using Face–to–face conversation as the best way of
... Get more on HelpWriting.net ...
Agile Methodologies For Software Development
Agile Methodologies for Software Development
Introduction:
In agile development model, the development of software is in incremental, rapid cycles. It is
building new features on previous functionality with each small incremental release. The software
quality is maintained by rigorously testing each release. It is useful for time critical applications. The
most well–known current agile development life cycle model is Extreme Programming (XP).
Why Agile model:
The freedom that agile gives when new changes are needed to be implemented is very important.
New changes can be implemented at very little cost because of the incremental releases. Even late
changes in requirements are welcomed
Unlike the waterfall model in agile model very limited planning is required to get started with the
project. Agile assumes that the end users' needs are ever changing in a dynamic business and IT
world. Changes can be discussed and features can be newly effected or removed based on feedback.
This effectively gives the customer the finished system they want or need. Face–to–face
conversation is the best form of communication.
In order to implement a new feature the developers need to lose only the work of a few days, or
even only hours, to roll back and implement it. Close, daily cooperation between business people
and developers. Regular adaptation to changing circumstances.
There is customer satisfaction by rapid, continuous delivery of useful software.
People and interactions are
... Get more on HelpWriting.net ...
Management Of Incremental Software Development Across...
Agile is the management of incremental software development across cross functional teams.
Learned from years of successes and failures, the agile philosophy centers on software development
with an importance with self–organization, motivation, in addition to daily team interaction. It
means being able to present working software instead of slides and documentation. Agile
encourages customer collaboration throughout the entire process to allow developers to respond to
change in a timely manner. The agile development process can be implemented by different
developmental processes and is comprised of several key principles. With personal experience of the
outcome of correct agile implementation; agile can have the opposite effect without ... Show more
content on Helpwriting.net ...
Each increment includes a planning phase where high level requirements are defined. These
requirements are bundled into delivery cycles and at the end of each delivery cycle a working
functionality is delivered to the customer. Iterative life cycles are scalable and can be used for large
or small projects. They are also useful when projects have predefined schedule constraints. Other
types of life cycles are sequential life cycles and prototyping life cycles. Sequential life cycles
include models such as the Pure Waterfall Method, differ from agile because the product is not
delivered until the end of the project. The waterfall method however, implements phases such as the
agile method but, these phases produce documentation not working deliverables to the customer.
The waterfall method works well for projects with customers that know what they want and are fully
committed to the project. Prototype life cycle models are particularly unique. A prototype life cycle
model, such as the rapid prototyping model, is commonly utilized as a visual tool than an entire
standalone process. Rapid prototyping is designed to model a piece of software and product with
limited functionality. The rapid prototyping model is usually incorporated into the waterfall method
during the concept definition phase to provide a visual aid to the customers, since no working
... Get more on HelpWriting.net ...
My Company With A Crm Implementation
INTRODUCTION
This case study that I am discussing is about my earlier company in India which was in the Telecom
industry. Since there was an extremely stiff competition in the telecom industry, companies in the
telecom business were adopting to new technological imperatives in order to outperform their
competitors. Hence my company also chose to implement CRM solution which will connect all
business users, stakeholders, inter–departmental executives so that all business processes are
automated and the efficiency of operations is improved. CRM signified identifying the needs of the
customers and stretching out ways and means to satisfy them. In this perspective CRM was not
merely treated as a technology, it also had implications in the strategy formulation for the
organization.
OVERVIEW
My organization partnered with a CRM implementation company to develop and implement
customizable solution for us which will help us improve upon the operational efficiency and
effectiveness . After careful study of our company's existing processes and discussions with key
stakeholders, the consulting company advised us to follow agile practices. The other software
development models and methods are listed here below : 1. Waterfall model
2. V model
3. Incremental model 4. RAD model 5. Agile model
6. Iterative model
7. Spiral model During the three month assignment, the consultant had multiple sessions, formed
logical teams, participated in meetings and shared information with each
... Get more on HelpWriting.net ...
The 7 Steps Of Software Development Essay
Tata Consultancy Services (TCS) is an Indian multinational information technology (IT) service,
consulting and business solutions company. TCS provide a wide range of information technology–
related products and services including application development, business process outsourcing,
consulting, enterprise software, hardware sizing, payment processing, software management and
technology education services.
TCS uses Software Development Life Cycle [SDLC] process consisting of a series of planned
activities to develop or alter the software products. These processes are normally oriented toward
either sequential software development processes, such as the Waterfall model, or Agile software
development processes, such as the Scrum model.
The 7 Steps of Software Development are:
1. Preliminary Investigation or Analysis – This is the task of extracting the requirements from users
and gauging the feasibility of the project. Project sponsors usually know what they want but often
have incomplete, ambiguous or contradictory requirements. It is the job of software developers and
project managers to steer them in the right direction and to clarify the requirements. Upper
management, both in IT and the sponsoring department, should determine if the project has business
value to the organization and if there are sufficient resources to complete the project as requested.
2. Specification and Requirement Analysis – This step can vary a lot depending on the formality,
size, and scope of the
... Get more on HelpWriting.net ...

Taloring A Clouded Data Security Life Cycle Essay

  • 1.
    Taloring A CloudedData Security Life Cycle Essay Running Head: TAILORING A CLOUDED DATA SECURITY LIFE CYCLE 1 TAILORING A CLOUDED DATA SECURITY LIFE CYCLE 2 Tailoring a Clouded Data Security Life Cycle Group 4 Security development life cycle Security development lifecycle are the steps that software development goes through in a bid to come up with software that is able to withstand cyber security concerns such as worms and viruses, cyber–attacks, and loss of data. There are various steps outlined that can assist in the development of secure software (Dahal, 2012). (See Appendix for FIGURE 1) Software development methodologies and selection Software development methodologies are the protocols embraced in the development of software. Depending on the preference of ... Show more content on Helpwriting.net ... Other methods include the waterfall, which is the traditional method and is almost become obsolete. This is because it was very expensive. It tangles the whole project and the team works in unity to accomplish the whole project. One mistake can drag the whole team behind, and it is difficult to debug errors. Feature driven method is another method which is costly because it focuses on providing the best of every part of the project. Process pride has a negative effect on timing and cost. Joint application development is the inverse of the agile software development strategy. It takes the project as a whole and work is assigned progressively without a work breakdown structure. It is good for very small software projects, but dangerous for lengthy software development projects (Kaufman, Perlman, & Speciner, 2002). From the above information the crystal method which is part of the wider agile technology is the best method in software development. It allows a work breakdown structure that is similar to Microsoft's security development life cycle. In addition, it allows for changes within the program since the iterations are assigned to smaller teams and are assessed for compatibility after submission. It is possible to identify any faults in the network security software and make changes before the developers go too far (Kaufman, Perlman, & Speciner, 2002). Critical Infrastructure sectors and control ... Get more on HelpWriting.net ...
  • 3.
    Advantages And DisadvantagesOf Cinder Model Disadvantages of the Spiral Model: 1. Cost elaborated in this model is usually very high. 2. This is a complex approach especially for the project for a clear SRS ( Safety Requirement Specification ) 3. The protocols must be followed correctly to effectively apply this model. Through – out the project life cycle development, it is very hard to follow rules and protocols. 4. It is not suitable with small risk projects. 5. Conference budgetary and scheduling needs are very though with this software development process. 6. Due to many customizations permitted from the customers, it is very hard to use similar prototype in rest of projects. 7. It requires broad skill in evaluating reservations of risks related with the project and with their ... Show more content on Helpwriting.net ... From sequential, heavy weight methodologies which are more predictive in nature and lengthy in process, today there is a shifting focus towards simple, light weight methodologies involving prototyping which provides a part of the final output at every stage of development. Several studies have reported software project failures due to lack of focus on requirements and the extent of dynamism involved in business requirement definition (Gasisas, 2009). AGILE start as a niche concept being used in tiny pockets of the software company and has since grown to be properly established in many diverse software development contexts. Since it has grown, it has been modified to set unique requirements of a specific context. For Agile to be well– known in the medical device software company, guidance is needed to modify it to fit that unique context. Agile developed a response to quality and efficiency concerns posed by active method of software developments. It can bring benefits which are valuable to the medical device software world, including the ... Get more on HelpWriting.net ...
  • 5.
    Different Methodologies Usedby Programming Teams Running Head: APPROACHES IN PROGRAMMING TEAMS Abstract This essay involves the comparison and contrast of the different methodologies used by programming teams. Among these methodologies are; System development life cycle (SDLC), Extreme programming and Agile methodology. Software development methodologies are the frameworks involved to structure, plan and control the processes used in developing an information system. The system development life cycle (SDLC) is a conceptual model which is involved in most project management and used for large scale projects with relatively large number of developers. A good example of SDCL methodologies includes; waterfall model. The SDCL takes a lot of time to produce complete products but of high quality. Agile methodology is a conceptual framework used also in project management and it is designed for small projects with few developers. Extreme programming on the other hand allow for communication with customers and by doing so it ensures interaction between developers and consumers in order to change as fast as the customers' needs and desires changes. Even though there different methodologies, agile methodologies seem to have a lot of advantages over the Extreme programming and system development life cycle. Since it combines a number of other methodologies to come up with a better way for developer to produce faster and change to as customers desires changes. Introduction A group of methodologies are used to come up with project ... Get more on HelpWriting.net ...
  • 7.
    Software Development StrategiesFor Successful Program... Software Development Strategies Student Name University Affiliation Introduction Our internet marketing firm's leadership is entertaining the procurement of a major new software development program to keep track of advertising revenues. The goal is to have a loosely coupled, Java–based platform to serve this need. To make an educated decision about the development of this software, it is necessary to understand the current and future state of software development and testing for our firm. There are several significant challenges that software development program managers face during the project life cycle. And several methodologies have been developed to provide managers guidelines for tacking the challenges to successful program development. To ensure program development goals are achieved with measurable confidence, several testing methods have been developed and successfully employed. Ethical behavior should guide project managers as they employ time–tested methodologies to produce the final product, which can be tested by a variety of tools to ensure customer satisfaction. Challenges of Software Development Software developers and software engineers face considerable challenges while attempting to plan, design, implement and complete software development projects. Key challenges facing software development project leaders and other professionals include coping with increasing diversity, responding to demands for reduced delivery times and developing software ... Get more on HelpWriting.net ...
  • 9.
    Sdlc Essay Abstract–There arevarious SDLC models widely accepted and employed for developing software. SDLC models give a theoretical guide line regarding development of the software. Employing proper SDLC allows the managers to regulate whole development strategy of the software. Each SDLC has its advantages and disadvantages making it suitable for use under specific condition and constraints for specified type of software only. We need to understand which SDLC would generate most successful result when employed for software development. For this we need some method to compare SDLC models. Various methods have been suggested which allows comparing SDLC models. Comparing SLDC models is a complex task as there is no mathematical theorem or physical device ... Show more content on Helpwriting.net ... RELATED WORK FOR EXTENDED AGILE El–Sharkawy et.al in [34] suggested a Meta model implementing 5W1H model for the innovative creativity in requirement engineering. Aggarwal et. Al in [35] proposed swift tack SDLC under the agile technique to develop any system. . In [36], Ramadan et.al used GDLC guidelines to develop a game like system with the aim of achieving goals. A proper selection of SDLC model before its development has been suggested by Khan et. al. in [37]. In [39], a rule based SDLC recommendations have also been suggested by Kumar et.al. V. PROPOSED EXTENDED AGILE MODEL In this section we have proposed extended agile SDLC which includes creativity in the requirement engineering and can develop any project within given time limit according to the need of the customers or stakeholders. It is observed that innovation and creativity is required at the time of requirement gathering for the qualitative and compressive product. In the first step, 5W1H (What, why, when, where and How) model is prepared for every requirement. Following figure represents an example of ... Get more on HelpWriting.net ...
  • 11.
    Application Development PlanFor A Company Game Application Development Application Development Plan Table of Content: Page Number 1. Introduction 1 2. Complete Project Plan 1 3. Scope of the project management 4 4. Time factor 5 5. Resource document 6 6. Potential Risks 7 7. Conclusion 9 Introduction: XYZ Company is game application development Company where they are going to develop games for the customers in order to provide the better and good challenging games to the customers. And this game application will be used by the XYZ Company to develop all new games. Currently because of most competitors in the market now XYZ Company wants to upgrade the software of this game application so that for ... Show more content on Helpwriting.net ... As in the current task this XYZ Company wants to do changes in the game application development for to develop games to the market. This XYZ Company developed previously some games by using this application for the customers but because of the market changes and competition with the other game application developer companies this XYZ company want to do the changes which will be not change for the future also, so that this application will be stand out in the crowd in order to meet their requirement and for their necessary needs. For XYZ company need to follow the time track which we have mentioned in the Gnatt chart for the better understanding purpose of how to follow the life cycle for this development and we mentioned in the Gnatt chart about the completion dates accordingly. Here this project will be completed by the more than one year with all necessary changes in the game application software. For this development application it includes most cost effective one because we developing the game application software with all the future requirement of customers and this will include all the new application which all related to the customers market standards. If this current project game application is success then this company will stand out in the crowd. I mean based on this project game application company profits and share going to be deciding. If this happen in success then
  • 12.
    ... Get moreon HelpWriting.net ...
  • 14.
    Software Development :Developing A New Program In the world of software development, the term agile typically refers to any approach to project management that strives to unite teams around the principles of collaboration, flexibility, simplicity, transparency, and responsiveness to feedback throughout the entire process of developing a new program or product. And agile testing generally means the practice of testing software for bugs or performance issues within the context of an agile workflow. Agile testing is a software testing practice that follows the principles of agile software development. It follows the rules of the agile manifesto, treating software development as the customer of testing and thus involves testing from the customer perspective as early as possible, testing early and often as code becomes available and stable enough from module/unit level testing. Since working increments of the software is released very often in agile software development there is also a need to test often. This is often done by using automated acceptance testing. Also since manual testing alone in agile development would likely result in either buggy software or slipping schedules because it would most often not be possible to test the whole software manually before every release. Agile testing involves all members of a cross–functional agile team, with special expertise contributed by testers. This is done to ensure the delivery of the business value desired by the customer at frequent intervals by working at a sustainable ... Get more on HelpWriting.net ...
  • 16.
    An Effective ModelOf Process And Best Practices An Effective Model of Process and Best Practices 1. Introduction This a report of my experiences and findings during an eight month industrial internship placement (Jan 2014 to August 2014) at SeisWare International Inc: an "industry leader in the development, sales and support of seismic interpretation software" [1]. In particular, it is a company that focuses on exploration and production in the oil and gas industry through the support and development of its software package. Contained within this package are varied applications which provide the tools and utilities needed to streamline a geophysicist's workflow. My responsibilities as a junior software developer at SeisWare included the maintaining of preexisting features, as well as ... Show more content on Helpwriting.net ... enSeisWare can be taken as an example which advocates for the sharing of certain testing and coding work tasks by both QA and Development. Both manual testing and the creation of automated tests are to be shared and completed by both positions. Benefits resulting from this system include prevention of bottlenecks in certain stages of the software development cycle as well as shared accountability between team members for the work completed. In the previous example, there might be a differentiation between QA and Dev testing (ie. QA's might have better black box perspective to testing) but contrasting feedback is presented. Furthermore, this system allows for team members to experience all aspects involved in the software development cycle and allows input by everyone. A cohesive team mentality is encouraged and obstacles inhibiting work are removed. 2.2 Adapting Process The effectiveness of the agile approach within a company is relative to the ability in which processes and procedures can be adjusted to better fit its needs. A key factor for adopting successful agile is through the encouragement of a constantly changing environment where changes can happen frequently, become accepted as the norm, and be easily integrated into the process. Process formalities are frequently revised to meet the needs within SeisWare. As a case scenario there was a point in time dedicated for bug fixing during the release cycle which ... Get more on HelpWriting.net ...
  • 18.
    Empirical Differences BetweenAgile And Devops Empirical differences between Agile and DevOps With the increased development of software applications, increased the demand for principles in– order to maintain quality, flexibility, cost control and maintenance. There are several models of software development, that describes the approaches to a variety of tasks or activities that takes place during the development process. In most of the traditional IT process, the collaboration between the developer teams and the operational teams is minimal and sometimes there would be no communication, which resulted in various issues like 'system works in test and doesn't work in production environment'. To overcome this issue, various modern methodologies are developed. In this paper, comparison of ... Show more content on Helpwriting.net ... An agile project is developed in iterations, which is reviewed and critiqued by a project team. Usually, these project teams includes representatives from the client business and the employees of the organization. Each iteration has a time period defined with a set of goals. Based on the properties of iteration some organizations term iteration as sprint, all sprints are iterations but not otherwise. Sprint is a time–boxed i.e., it is finished on the planned date and not CONJECTURAL DIFFERENCES BETWEEN AGILE AND DEVOPS 5 when it is ready. Sprint properties can be varied, but likely you'll want to try to find an amount of time that "works well". Agile software development supports various concrete practices that covers the areas like requirements, process, design, coding, modeling, testing, project management and quality. These models promote continuous integration, automatic unit testing, code refactoring and domaindriven design are often used to improve quality and enhance project agility. Agile is not a solution for all of the software development challenges, a good project team should always remember that requirements would change as they design and develop. The team should be clever enough to adopt the changes with minimum disruption irrespective of which methodology is followed. The project teams are governed by project management with a set of responsibilities, the below table ... Get more on HelpWriting.net ...
  • 20.
    The Planning OfSoftware Development Project ABSTRACT In the planning of software development project, a major challenge faced by project managers is to predict the re–work effort. (re–work effort is the effort require to fix the software defects identified during system testing). Project manager objective is to deliver the software that not only meets the time and cost requirements but also the quality requirements given by the client. To ensure the quality of the software, many testing cycle will be conducted before it is finally delivered to the client for acceptance. Each testing cycle is a costly affair as it involves running all possible test scenarios in all possible environments, followed by defect fixing and re–verification of defects. On average, there are 2–3 testing cycle conducted but this depends on number of defects identified during testing. Number of defects will depend on the team expertise and whether they earlier worked on similar projects and technologies. Hence, it becomes critical to predict the number of defects identified during testing and it is a very challenging task as it requires a good predicting model to predict the re–work effort. In this paper, we describe the relationship among software size, no of software defects, productivity and efforts for web–based development projects. This relationship is established by using the multiple linear regression technique on the benchmarking data published by International Software Benchmarking Standard Group. Results suggest that web based projects ... Get more on HelpWriting.net ...
  • 22.
    Pros And ConsOf Agile Agile Methodology There are many different software development methodologies for a software project to choose from, each of them has their own pros and cons, which one is the right one for your organization. In this article, we will discuss the different types of project environments that are available, first we will start with the Agile methodology pros and cons and then we will talk about the suitability of the method with different project environments. Agile methodology for a typical software project or any in environment in which the requirements are unknown or change quickly. Agile focus toward teamwork, constant user feedback, continuous improvement, face–to–face meetings, constant cooperation, early and continuous delivery of working ... Show more content on Helpwriting.net ... Agile is adaptable or highly flexible meaning that is has short development cycles of the interactive design process that gives the project flexibility to pivot when the need arises. You do not have to deliver a full project which wastes time and resources on delivering a full project which could be rejected by the customer. Customer has the ability and satisfaction over the development process since Agile projects are closely coordinated with the customer so they have a strong impact over the development project. There is immediate user feedback and interaction among the stakeholders and emphasis on getting a shippable product into the hands of the user which reduces the risk of building an application that nobody wants, with the constant interaction with each other and the customer you increase the best features. With continuous quality assurance and attention to details the quality of the product with TDD as each iteration leads to fewer bugs and a higher quality releases. Agile has a solid foundation that leads to quicker, higher quality releases since the development is conducted in short cycles and with the testing that will run non–stop, it allows the production of a great final ... Get more on HelpWriting.net ...
  • 24.
    Software Engineering FrameworksAnd Methodologies CIS 4655 Software Engineering Term Paper on Software Engineering Frameworks and Methodologies By Damancharla Harini 1. Introduction: Describing software engineering can be a quite challenging task based on the purpose of the definition and the anticipated beneficiaries. Discussing about frameworks and methodologies in software engineering can be somewhat difficult under whatever circumstances because of various ways in which the issues regarding frameworks, processes and methodologies have been handled. This paper explains software engineering frameworks and methodologies and the topics related to them. The main purpose of this paper is to add more understanding in the field of software engineering frameworks and methodologies. ... Show more content on Helpwriting.net ... Unified Process Framework: The Unified Process fits the wide–ranging definition of a process. It is nothing but a set of activities that a software team performs in order to renovate a set of customer requirements into a software system. Still, the Unified Process is also a generic process framework that people can adapt by adding and removing activities based on the specific requirements and existing resources for a project. 3.2. Agile Framework: Agile software development is a conceptual framework used for undertaking software engineering projects. There are various agile software development methodologies like Crystal Methods, Dynamic Systems Development Model (DSDM), and Scrum. Most of the agile methods try to reduce risk by developing software in short time boxes, known as iterations, which usually last for one to four weeks. Each iteration is like a mini software project of its specific, and contains all the tasks required to release the mini–increment of new functionality: planning, requirements analysis, design, coding, testing, and documentation. Whereas iteration won't be adding required functionality to permit releasing the product, an agile software project anticipates
  • 25.
    to be ableto release new software by the end of each iteration. At the end of each iteration, the team reassesses project ... Get more on HelpWriting.net ...
  • 27.
    Advantages And DisadvantagesOf Waterfall Management ISO 9001:2008 Certified Institute Java Institute for Advanced Technology OBJECT ORIENTED SYSTEMS ANALYSIS AND DESIGN H7DV 04 H7DV 04/AS/01 RUCHINI ERANDATHI SCN NO : 157474812 947814141V WATERFALL METHODOLOGY The waterfall model of software engineering for the systems development life cycle model is the most popular version. Often considered classic approach to life cycle of systems development , linear and sequential waterfall model describes the development system. Waterfall development objectives are different for each stage of a development .Imagine a waterfall on the cliff of an alp. Water has flowed over the edge of a steep mountain side and has started walking down , it cannot turn back. It is same as the waterfall development. Once a phase of development is completed, there is no turning back when the development proceeds to the next phase. ... Show more content on Helpwriting.net ... The rigidity of the model is easy to manage – Each stage has a specific distribution and review process. In this methodology phases are processed and completed one at a time and phases do not overlap. Waterfall methodology proceeding well for smaller projects where requirements are very well understood. Disadvantages of waterfall methodology When an application is in the testing stage, it is very hard to turn back and change something, that was not well–thought out in the concept stage. No working software is produced until late during the life cycle. Uncertainty and the risk, very high. It is not a good methodology for complex and object–oriented ... Get more on HelpWriting.net ...
  • 29.
    Application Of AProject Report Essay Gamecave A PROJECT REPORT Submitted By Dhruv Maradia (130770116022) In fulfillment for the award of the degree of BACHELOR OF ENGINEERING In Information Technology SILVER OAK COLLEGE OF ENGINEERING AND TECHNOLOGY OPP. BHAGWAT VIDYAPITH, NEAR GOTA CROSS ROAD, AHMEDABAD–382481. Candidate's Declaration We hereby declare that project report titled "Gamecave" submitted towards the completion of project in 7th semester of bachelor of Information Technology in Silver Oak College Of Engineering & Technology, Ahmedabad is an authenticate record of our work carried out. We further declare that to the best of our knowledge the report of I.T. 7th semester. Candidate's signature : First candidates name : Dhruv Maradia Branch : IT Enrollment Number : 130770116022 Submitted to: Silver Oak College Of Engineering & Technology, Ahmedabad Affiliated to: Gujarat Technological University Abstract Gamecave is a website created using PHP. This website will serve as platform for information, news, updates, release date and walkthroughs for games across all platforms. ... Get more on HelpWriting.net ...
  • 31.
    Difference Between AgileAnd Waterfall Model White Paper Agile Model and Methodologies November 2015 Table of Contents Abstract 1 1. Agile Model 1 2. Agile versus Waterfall model 1 3. Agile Testing Methods 4 3.1 Scrum 4 3.2 Crystal Methodologies 4 3.3 Dynamic Software Development Method(DSDM) 4 3.4 Feature Driven Development(FDD) 4 3.5 Lean Software Development 4 3.6 eXtreme Programming(XP) 4 4. Conclusion 4 5. References 5 6. About the Authors 5 Abstract AGILE is a methodology that promotes continuous iteration of development and testing throughout the software development life cycle of the project. Both development and testing activities are concurrent unlike the Waterfall model This white paper describes the Agile Model ... Show more content on Helpwriting.net ... Early delivery 5. Empowering the team 6. Building Integrity 7. Optimize the whole 3.6eXtreme Programming (XP): Extreme Programming technique is very helpful when there is constantly changing demands or requirements from the customers or when they are not sure about the functionality of the system. It advocates frequent "releases" of the product in short development cycles, which inherently improves the productivity of the system and also introduces a checkpoint where any customer requirements can be easily implemented. The XP develops software keeping customer in the target. Figure 4:QA Development cycle of Extreme Programming(XP) Business requirements are gathered in terms of stories. All those stories are stored in a place called the parking lot. In this type of methodology, releases are based on the shorter cycles called Iterations with span of 14 days time period. Each iteration includes phases like coding, unit testing and system testing where at each phase some minor or major functionality will be built in the application. Phases of eXtreme programming: There are 6 phases available in Agile XP method, and those are explained as follows: Planning Identification of stakeholders and sponsors Infrastructure ... Get more on HelpWriting.net ...
  • 33.
    Disadvantages Of SoftwareDevelopment Life Cycle Part B (1.1) Introduction A software development process, also known as a software development life cycle (SDLC) can be explained as a structure, imposed on the development of a software product. The software development life cycle (SDLC) is an umbrella term for the overall process of developing, implementing, and retiring information systems through a multiple step process from initiation, training, documentation , design, analysis, maintenance, and consulting. Software development life cycle (SDLC) can be termed as a process of bringing ideas to reality in the creation of a software product with in the software industry. Types of Software Developing Life Cycles (SDLC) 1. Waterfall Model. 2. Prototype ... Show more content on Helpwriting.net ... When in use, prototype model may increases the complexity of the system will scope of the system expanding beyond. Doesn't work well for smaller projects. Leads to implementing and then repairing way of building systems. Online systems, web interfaces have a very high amount of interaction with end users, are best suited for Prototype model. It might take a while for a system to be built that allows ease of use and needs minimal training for the end user. 3. Spiral Model. As a result of these weaknesses of the waterfall model, the spiral model was developed which emphasizes iterations of the phases with each phase producing on early Prototype representing a part of the overall system. This helps in demonstrating a proof of concept early in development. This model is similar to the incremental model, but with more emphasis placed on risk analysis. A software project repeatedly passes through these phases in iterations (called spirals in this model). The baseline spiral, starting in the planning phase, requirements are gathered and risk is assessed. Each subsequent spirals builds on the baseline spiral. Planning Phase – The project is reviewed and a decision is made whether to continue with a further loop of the ... Get more on HelpWriting.net ...
  • 35.
    Pros And ConsOf Agile Software Development Agile Methodology Agile software development is a conceptual framework for software engineering that promotes development iterations throughout the life–cycle of the project. It provides opportunities to assess the direction of a project throughout the development lifecycle. Its objectives are as it focuses on customer value. It creates a flow of value to customers by "chunking" feature delivery into small increments. Software developed during one unit of time is referred to as an iteration, which may last from one to four weeks. Agile model believes that every project needs to be handled differently and the existing methods need to be suitable for the project requirements. In ... Show more content on Helpwriting.net ... As it is a very realistic approach to software development. It promotes teamwork and cross training. Functionality in it can be developed rapidly and demonstrated . Resource requirements are minimum in it. It is suitable for fixed or changing requirements. It delivers early partial working solutions. It is a good model for environments that change steadily. Documentation easily employed in it. It enables concurrent development and delivery within an overall planned context. It is easy to manage and gives flexibility to developers. But instead of these many difficulties are also there. As it is not suitable for handling complex dependencies. More risk of sustainability, maintainability and extensibility is in it. There are strict delivery management that dictates the scope, functionality to be delivered, and adjustments to meet the deadlines. It depends heavily on customer interaction, so if customer is not clear, team can be driven in the wrong direction. There is very high individual dependency, since there is minimum documentation generated. Transfer of technology to new team members may be quite challenging due to lack of ... Get more on HelpWriting.net ...
  • 37.
    What Are TheAdvantages And Disadvantages Of The Software... Abstract The success of a software development project greatly depends upon which process model is used.This paper presents a description of various software engineering process models. It emphasizes on the need of using appropriate model as per the application to be developed.In the paper description of following seven models are given namely Waterfall,Prototype,Rapid application development,Incremental,spiral, Buid and fix and V–shaped. Advantages and disadvantages of these models have been given in this paper. our aim is to create a reliable and cost effective software and these models provides us a way to develop them.In the paper a comparative study of various models have been made along with their defects and features. (1)Introduction ... Show more content on Helpwriting.net ... 2 User get a view of his product. Disadvantages 1The factor of software quality is ignored to some extent. 2 In a rush of making prototype working,implementation mistake can occur. (c) Rapid Application Development model RAD means Rapid Application Development.RAD model is a high speed adaption of Waterfall model.This model can be implemented if a developer knows the requirements of customer in advance and here the development cycle is extremely small. User or customer involvement is there in every stage of RAD model. This model has four phases Reqirement planning,User description,Construction,Cutover. A number of teams work on a single function and then it is integrated to form a whole software. diagram Advantages 1Customer satisfaction is there as customer is involved in every stage of the model. 2 Development time is extremely small. 3 Feedback from customer is available at initial stages. Disadvantages 1For large projects, RAD model require the size of team to be large and hence a significant human resource is needed. 2Team members must work in close association with users/customers to complete the project in time. 3 RAD model is not appropriate for all kinds ... Get more on HelpWriting.net ...
  • 39.
    Essay on TheDevelopment Stage in Cornella Brothers Inc The development stage in instructional design is an extremely important stage. Without a proper development plan put in place instructional designers can become easily frustrated and expending additional hours to do research to put the course in place. This is the stage where the content is not only written or developed but the content is also organized (University of Idaho, n.d.). It is imperative that this stage is done correctly so as to deliver information to students that will help them learn to the fullest and really grasp the information. The following will discuss what happens in the development stage at Cornella Brothers Inc. when developing a safety meeting. Authoring Content The person who authors the content for safety ... Show more content on Helpwriting.net ... When deciding on a safety meeting, managers need to decide what the company needs to address with their employees and then the Safety Officer at Cornella will create a Power Point or show pictures of the violations (Work Place Safety Experts, 2010). Inputting Technology Cornella Brothers is a medium sized family business. The organization is nowhere near being large enough to have an IT Department. Due to this managers and the safety officer hold many hats in the organization. The Safety Officer or one of the managers will input the information into technology. It would be nice to have an IT Department or even an accountant to do the billing but these tasks falls upon the managers. Beta Testing There really is no beta test involved in the safety classes. Employees are expected to follow the guidelines put in place at these classes. Managers will ensure that the employees are following government regulations and the company's regulations. A part of their employment obligation is following the safety rules and managers do enforce this. During the classes there is a discussion period in which employees have the opportunity to voice their concerns or ask questions; in this way managers can be sure the employees understand what is expected of them and can respond immediately or discuss pertinent matter further. Conclusion At Cornella Brothers, the subject matter experts are the ones who author the ... Get more on HelpWriting.net ...
  • 41.
    Report of SoftwareMaintence INTRODUCTION Software Engineering is an engineering discipline which is concerned with all aspect of software production. It also concerned with all aspects of computer–based systems development including hardware, software, and process engineering. SOFTWARE MAINTENANCE Software development efforts result in the delivery of a software product that satisfies user requirements. Accordingly, the software product must change or evolve. Once in operation, defects are uncovered, operating environments change, and new user requirements surface. The maintenance phase of the life cycle begins following a warranty period or post implementation support delivery, but maintenance activities occur much earlier. Software maintenance is an ... Show more content on Helpwriting.net ... Five key characteristics comprise the maintainer's activities: Maintaining control over the software's day to–day functions Maintaining control over software modification Perfecting existing functions Identifying security threats and fixing security vulnerabilities Preventing software performance from degrading to unacceptable levels Majority of Maintenance Costs Maintenance consumes a major share of the financial resources in a software life cycle. A common perception of software maintenance is that it merely fixes faults. However, studies and surveys over the years have indicated that the majority, over 80 percent, of software maintenance is used for non–corrective actions Grouping enhancements and corrections togetherin management reports contributes to some misconceptions regarding the high cost of corrections. Understanding the categories of software maintenance helps to understand the structure of software maintenance costs. Also, understanding the factors that influence the maintainability of software can help to contain costs. Some environmental factors and their relationship to software Maintenance costs include the following: Operating environment refers to hardware and software. Organizational environment refers to policies, competition, process, product, and personnel. Evolution of ... Get more on HelpWriting.net ...
  • 43.
    The Systems DevelopmentLife Cycle Essay The systems development life cycle (SDLC), also referred to as the application development life– cycle, is a term used in systems engineering, information systems and software engineering to describe a process for planning, creating, testing, and deploying an information system. The systems development life–cycle concept applies to a range of hardware and software configurations, as a system can be composed of hardware only, software only, or a combination of both. PHASES: o 1 System investigation o 2 System analysis o 3 Design o 4 Environments o 5 Testing o 6 Training and transition o 7 Operations and maintenance o 8 Evaluation The system development life cycle framework provides a sequence of activities for system designers and developers to follow. It consists of a set of steps or phases in which each phase of the SDLC uses the results of the previous one. The SDLC adheres to important phases that are essential for developers, such as planning, analysis, design, and implementation, and are explained in the section below. It includes evaluation of present system, information gathering, feasibility and request approval. A number of SDLC models have been created: waterfall, fountain, spiral build and fix, rapid prototyping, incremental, and synchronize and stabilize. The oldest of these, and the best known, is the waterfall model: a sequence of stages in which the output of each stage becomes the input for the next. These stages can be characterized and divided up in ... Get more on HelpWriting.net ...
  • 45.
    Advantages Of AgileSoftware Development 1. Introduction Agile software development is a conceptual framework for software engineering that promotes development iterations throughout the life–cycle of the project. There are many agile development methods; most minimize risk by developing software in short amounts of time. Software developed during one unit of time is referred to as an iteration, which may last from one to four weeks. Each iteration is an entire software project: including planning, requirements analysis, design, coding, testing, and documentation. An iteration may not add enough functionality to warrant releasing the product to market but the goal is to have an available release (without bugs) at the end of each iteration. At the end of each iteration, the team re–evaluates project priorities. Agile methods emphasize face–to–face communication over written documents. Most agile teams are located in a single open office sometimes referred to as a bullpen. At a minimum, this includes programmers and their "customers" (customers define the product; they may be product managers, business analysts, or the clients). The office may include testers, ... Show more content on Helpwriting.net ... The suitability of agile methods in general can be examined from multiple perspectives. From a product perspective, agile methods are more suitable when requirements are emergent and rapidly changing; they are less suitable for systems that have high criticality, reliability and safety requirements, though there is no complete consensus on this point. From an organizational perspective, the suitability can be assessed by examining three key dimensions of an organization: culture, people, and communication. In relation to these areas a number of key success factors have been identified (Cohen et al., ... Get more on HelpWriting.net ...
  • 47.
    Disadvantages Of SoftwareDevelopment Methodology The methodology is actually defines the workflows, processes and responsibilities which are necessary for project's aims and goals. So, we can say that software development methodology is a set of best practice to control the complete software development process. The development process of any project has specific phases which are known as project life cycle. Usually each project has five phases which are named as: 1– Analysis 2– Coding or Development 3– Testing or Validation 4– Deployment and Integration, 5–Maintenance. There are several software development methodologies are available and each of them has its own strengths and weaknesses. Not all methodologies could be appropriate for all projects. Each method is best known for certain ... Show more content on Helpwriting.net ... This will be helpful in customer satisfaction. This model delivers face–to–face conversion between the development team and customers which surely help to minimize risk and enhance overall product planning. The continuous attention to a good design and technical excellence makes this model flexible. Disadvantages Only high skilled and expert programmers are required for this model. In this model, there is lack of emphasis on all essential documentation and designing. This model is also not suitable to handle complex projects. 6– Spiral Model The spiral model is somewhat similar to the incremental model. This model requires four phases which are: Planning, Risk Analysis, Engineering and Evaluation. The spiral model focuses on early identification and reduction of project risks as well. It is mostly used for large projects. Also used when cost and risk evaluation is so important. Advantages One great advantage of this model is there is high amount of risk analysis required so the avoidance of risk is enhanced. This model is flexible as it allows any changes to be implemented at several stages of the ... Get more on HelpWriting.net ...
  • 49.
    Developing An InformationSystem Development A software development methodology or system development methodology in software engineering is a framework that is used to structure, plan, and control the process of developing an information system. In software engineering, a software development methodology (also known as a system development methodology, software development life cycle, software development process, software process) is a splitting of software development work into distinct phases (or stages) containing activities with the intent of better planning and management. It is often considered a subset of the systems development life cycle. The methodology may include the pre–definition of specific deliverables and artifacts that are created and completed by a project team to develop or maintain an application. There are following methodologies: Agile Software Development Crystal Methods Dynamic Systems Development Model (DSDM) Extreme Programming (XP) Feature Driven Development (FDD) Joint Application Development (JAD) Lean Development (LD) Rapid Application Development (RAD) Rational Unified Process (RUP) Scrum Spiral Systems Development Life Cycle (SDLC) Waterfall (a.k.a. Traditional) Based on the meed amd the compny 's view various companies uses different mothedologies to achieve success. It even changes with the human point of view that supports the system. As said if I were the Director of Application Development I would implement the Agile ... Get more on HelpWriting.net ...
  • 51.
    Software Houses UseAgile Development Most of software houses use agile development methodologies such as XP and scrum to enhance its product quality, increase communication between teams, release products in short time and to participate its clients in software development life cycle. There are many problems usually occur, first problem the time spent between development of the software and to make it operational. Second problem is the difference between environments. There are two different environments; development environment is the first environment which is used to develop, build and deploy the software in development life cycle. This environment has no constrains. On the other hand, operation environment, which is usually called production environment. In operation ... Show more content on Helpwriting.net ... These enhancements aim to decrease time of software life cycle. Additionally, it aims to increase productivity and quality of software. Moreover, some researches introduce the idea of mixing two or three approaches together to enhance software lifecycle. Recently, a new approach called "DevOps" appeared in software engineering field. DevOps derived from Development and Operations. The main objective of DevOps is to resolve conflicts between teams and reduce time between software development and software delivery to customer. But there are differences between development environment and operation environment. Development environments are business driven, responsive to change and constantly updated. On the other hand, operation environment is procedure driven, controlled environment and stable. [1] DevOps challenge is to map between development and operation. The main challenge her is both of development and operation have a different environment. Whereas Development environment is changing environment, production environment is stable. The major challenge here is to deliver changes in stable environment without any kind of interruption. The key solution for this challenge is continuous integration [2]. DevOps is considered as an extension to agile methodologies [2]. Another view is that it is a separated method [1]. Table 1 shows the evolution of development methodologies and IT ... Get more on HelpWriting.net ...
  • 53.
    What The SoftwareDesign Life Cycle? Assignment 2 P5 To achieve P5, learners are expected to: a) Describe and explain what the Software Design Life Cycle is The SDLC Software design life cycle is used for the design and development stage of a software system. It's the structure for design and development the life cycle has multiple stages, there are 9 in total. Requirements, Specification, Design, implementation, testing and debugging, deployment, maintenance and post mortem. All of these stages are part of the software design life cycle. The reason they use the SDLC is to see if the software there producing is up to standards meets their desire of design. b) Describe and explain the nine necessary stages of the life cycle: Requirements This is the first step of the ... Show more content on Helpwriting.net ... Specification This is the second step of SDLC it's called Specification in this stage both developers and clients are deciding on who their going to realise the software for the age audience. The hardware and software requirements to make sure its compatible with the users for example if their making it for Mac or Windows they need to make it compatible for that OS. Other specification the input and output of the data and what's needed to show the user. So the main specification to cover is the function of the software and hardware but also the security system logging in and out. Design Design is the third stage of the SDLC. This is thinking more into the visual side of the process by planning the code and design for the software, by designing the GUI/user interface. Creating diagrams for the visual look doing a flow diagram and the step of that process. Once the developers have decided on the design of the software such as the interface and creating the diagrams they would then move on to the fourth stage of SDLC Implementation This is the fourth stage of SDLC, the implementation is putting the physical code design that was created from the design stage and making it. This part of the process can slow the project down even though you have planned it you can still run into problems and errors this could delay the process. The developers that have built the software they then need to move
  • 54.
    ... Get moreon HelpWriting.net ...
  • 56.
    Advantages Of OffshoreProduct Development Offshore Product Development – Competitive Advantage Offshore Product Development: Offshore product development is a strategic concept. Offshore product development allows software companies and enterprises to lower their development costs substantially and focus comprehensively strategic initiatives such as marketing products and developing next generation products. Companies opting for OPD can release their products faster than their competitors taking benefit of time zone difference and 24 hours development leading to competitive advantage. Competitive Advantage: Globalization, increasing cost pressures, changing market dynamics, the need for fast time to market and many other factors has led many product companies to opt for offshore product development. The situation is so acute that an approximately 500+ releases a year of various software products are happening from India. ... Show more content on Helpwriting.net ... Offshore software vendor should have history of proven track record and expertise to improve your business performance. Offshore Product Development vendor should provide its services across the entire life cycle to global ISVs and enterprises. They should be in a position to provide innovative solutions to complex product development situations by combining technical expertise, domain experience and process maturity. This enables clients to gain competitive advantage by surpassing competitors and generate new revenue streams. Their product development services should rank high on performance, security, maintainability and scalability and span across relevant verticals such as Insurance, Human Resource & Recruitment Services, Finance and Banking, Education, Travel and Hospitality, Printing, Audit & ... Get more on HelpWriting.net ...
  • 58.
    Software Development LifeCycle Throughout The Project Name: P.Srikumar Student id: 700606641 Introduction: Agile is a methodology that which enables the continuous iteration of development and testing in the software development life cycle throughout the project. Iteration is defined as a basic or initial part of the software to release. Agile Testing process starts at the beginning of the project with high integration between development and testing teams. In agile testing, the testers will simultaneously work with the development team and testing is done in parallel at the each phase of code or piece of code that has been developed. There will be Daily team meetings, Client meetings and discussions is an essential part of agile projects. It ... Show more content on Helpwriting.net ... The highest priority of the agile process is to satisfy the customer and continuous delivery of the software based on the scheduled time. It helps in saving the time and money. Customers, developers, tester's plays a major role in the whole project they get interact with each other time to time. Working builds is delivered based on the client's requirements whether it may in weekly or monthly. Interaction between team members is very important. We can respond to the change requests based on client requirements rather than following the planned approach and can eliminate most of the defects and crashes at the initial stage by resolving the top most reported bugs. Collecting the requirements from client and then analyze the requirements then design the document and prototype and then to the development of the code after that it releases to the Quality Assurance to identify the defects and then resolve the defects or bugs by the development team and retest by the Quality Assurance and then submit the process to the client and then to the user for collecting the feedback and enhancement from the customer then if necessary changes are again made by the development team which is again processed to the quality assurance team to identify bugs then the bugs should be resolved and retest by the QA team if the client is satisfied with the process that can be released to the market and we can eliminate most of the defects at the initial stage. Test approach Agile way: ... Get more on HelpWriting.net ...
  • 60.
    My Company WithA Crm Implementation INTRODUCTION This case study that I am discussing is about my earlier company in India which was in the Telecom industry. Since there was an extremely stiff competition in the telecom industry, companies in the telecom business were adopting to new technological imperatives in order to outperform their competitors. Hence my company also chose to implement CRM solution which will connect all business users, stakeholders, inter–departmental executives so that all business processes are automated and the efficiency of operations is improved. CRM signified identifying the needs of the customers and stretching out ways and means to satisfy them. In this perspective CRM was not merely treated as a technology, it also had implications in the ... Show more content on Helpwriting.net ... AGILE WAY OF WORKING The consultant followed Agile processes to deliver efficient and effective solutions 1. User stories 2. Release & Iteration planning 3. Refactoring 4. Continuous integration 5. Collective ownership APPROACH OVERVIEW 1. Discussions happened with CXO, Managers, Senior developers, testers to understand pain points, challenges, issues and wish lists 2. Analyzed, segregated and prioritized improvement areas 3. To achieve all objectives, it was decided that the consultant will coach on Agile practices with some more value adding practices 4. Defined product development life cycle: Product Roadmap definition –> Requirements & Architecture –> Test Scenarios & Test Cases Definition –> Implementation & Verification –> Validation –> Maintenance & Support –> Product Retirement 5. Conducted Orientation session for teams implementing agile. Held session on review process, static code analysis, build and release process, Test Driven Development, Unit testing Participation in a few review meetings, initial demos and retrospection meetings 6. Survey was launched with all the Product Owners/Managers, team members 7. Everybody agreed that there was significant improvement that they could feel compared to how it was before the launch of this project ADOPTED MODEL My organization used Agile model defined on objective based improvements. The various stages of the model are: – Discussions with CXO/Managers/Stakeholders – Initial Analysis & Report – ... Get more on HelpWriting.net ...
  • 62.
    Agile And AgileSoftware Development Agile Agile software development refers to a group of software development methodologies e.g. Dynamics System Development Model, Crystal Methods and Extreme programming (XP methodology). Agile methods attempt to minimise the risk in software in short time boxes called iterations. Every iteration includes all the tasks necessary to release the mini increment of new functionality: planning, requirements analysis, design coding, testing and documentation. At the end of every iteration the priorities will be evaluated. Agile methods emphasise real time communication, preferably face to face instead of written documents. Agile methods also emphasise working software as the primary measure of progress. Agile methods produce very little documentation compared to other methods. Most Agile teams are located in a bullpen and include all the people necessary to finish the software. (1) (3) Crystal Methodology Crystal Methodology is one of the most lightweight and adaptable approaches to software development which focuses on people, interaction, community, skills and talents and communications. Crystal is actually made up of a family of agile methodologies such as Crystal Clear, Crystal Yellow, Crystal Orange and others. This refers to the underlining core which represents values and principals. The principal is that each team has a different set of talents and skills and each team should use a process uniquely tailored to it. (1) Dynamic Systems Development Model ... Get more on HelpWriting.net ...
  • 64.
    Compare Waterfall AndSpiral Life Cycle Model CTEC2121 Organisations, Project Management & Research Deferred/Referred Assignment 2013/14 Student id: P11242166 Tutor: Richard Smith Date: Aug 2014 Compare the waterfall and spiral lifecycle models discussing when it is appropriate to use the model. In this article we are going to discuss the software development life–cycles. But first lets break down the software development part and the life–cycle part. Software development– Software development is the whole combined process which involves the documentation, the software programming and the fixing & testing of the bugs that come across while building and during the maintenance of the software. Software development life–cycle– A software development life–cycle is made up ... Show more content on Helpwriting.net ... If a product that is required for constructing the system but for some reason it is not available or not known, then it can be added to the system in the later stages whenever it is sourced. This makes the system more flexible in terms of designing and modifying. This model consists of a vast utilisation of prototypes. Multiple versions of the same system are released along the different stages of the spiral which makes it easy to maintain and ensures a exponential growth in the quality of the product. Since there are a lot of stages involved in the spiral model, there is a lot of documentation to be done at each spiral of every phase. This makes it easy to understand and implement the requirements which leads to a successful final product. Once a concept model is complete after the first spiral, the customers get to use the software for review purposes. This happens at a very early stage. The work of the project can be divided into small sections(units). The Units that are classified as high risk can be dealt earlier on in the project so that the team is ensured of minimum risk in the later stages of the project. ... Get more on HelpWriting.net ...
  • 66.
    Case Study OfAvast 2.1. Product life cycle The product life cycle consists of six stages, these stages are; planning, defining, designing, building, testing and deployment. Planning: In the planning stage the requirements for the product are analysed. This is mostly seen as the most important part of the cycle, since it is use to research the needs and viability of the product and is therefore mostly done by senior employees who have the most experience. They usually do market surveys and look at the comments made by customers and the sales department. Furthermore it is a good idea to look at an industry expert. With this information a plan is made for the economic and technical and operation parts of the product Part of the planning ... Show more content on Helpwriting.net ... Positioning strategy The advantages that Avast has compared to the competition are that they were the first to market. Avast was the first since they anticipated the need of the product. Avast was the one company to do research about privacy regarding mobile phones and when to found out that there was room for improvement, they came to public with their findings and created the need for a better way to remove data from mobile phones. Avast had anticipated this and soon came with a product to fulfil this need. When looking what kind of strategy is best suited for Avast Anti–Theft. It is best to focus on the product leadership and the customer intimacy. Avast is the biggest Company to market anti–theft software after the release of the previously mentioned research, also it is a company know by a lot of people that already use a product made by Avast. In order to keep their product leadership it is important that Avast keeps track on the responses of the product users. It is suggested that Avast asks product users about their expectations and they functioning of the product regarding their expectations. It is important to create and maintaining a user base using the fact that they are the first to actually market the product. Making sure that current users are happy will ensure the usage of the product in the ... Get more on HelpWriting.net ...
  • 68.
    Disadvantages Of IncrementalModel 4. INCREMENTAL MODEL. This model involves continues user feedback and interactions resulting in a product that is much closer to user expectations. The development is built up from an initial Prototype that is continuously being developed and tested. The requirements of the incremental model is divided into various builds where multiple development cycles take place. This creates a "multi–waterfall" cycle and the cycles are divided up into smaller, more easily managed modules. Each module passes through the requirements, design, implementation and testing phases. A working version of software is produced during the first module, so you have working software early on during the software life cycle. Each subsequent release of the module adds ... Show more content on Helpwriting.net ... Increased reusability of components. Integration from very beginning solves a lot of integration issues. Disadvantages of RAD MODEL. Depends on strong team and individual performances for identifying business requirements. If the system cannot be properly modularized, building the components necessary for RAD will be problematic. High dependency on modelling skills. When to use RAD MODEL. RAD should be used when there is a need to create a system that can be modularized in 2–3 months of time. It should be used if there's high availability of designers for modelling and the budget is high enough to afford their cost along with cost of automated code generating tools. 6. AGILE MODEL. Agile Development Model is also a type of incremental model with focus on process adaptability and customer satisfaction by rapid delivery of working software product. Agile methods break the product into small incremental releases with each release building on previous functionality. Each release is thoroughly tested to ensure software quality is maintained. It is used for time critical applications. Extreme Programming (XP) is currently one of the most well know agile development life cycle ... Get more on HelpWriting.net ...
  • 70.
    Extreme Programming :A Successful Customer Satisfactions... Introduction Extreme Programming is one of the popular agile processes (Wells) and is about social changes (Beck and Andres). XP has been proven as one of the successful customer satisfactions since it delivers potential software that can be used, as the customer needs it. It continues to empower developers as it focus on developing excellent programing techniques and communication (Beck and Andres). Extreme programming includes collaborative teams in order to accomplish and solve problems as efficient as possible (Wells). Extreme programming hav five essential ways to improve software projects such: communication skills, simplicity, require feedback, respect and courage (Wells). An XP programmer requires maintaining communication with customers and colleague, and sustaining their design simple and clean (Wells). Programmers are to get feedback by testing the software, and delivering end system product to the customers as early s possible (Wells). Lastly, programmers respect their colleagues as they, together, courageously respond to the changing and evolving technology (Wells). In addition, XP has its own twelve simple rules these rules are: planning, building blocks or small releases, standardized naming schemes, collective ownership, coding standard, simple design, refactoring, testing, pair programming continuous integration, 40–hour workweek and on–site customer (Hutagalung). Although XP is an improved process, more efficient and predictable, it has its own weakness ... Get more on HelpWriting.net ...
  • 72.
    Advantages And LimitationsOf Agile Software Development... Agile software development methodology Agile development is a term used in software development to describe incremental software development methodologies. It is a type of incremental model because, in incremental model the whole requirement is separated into many separated builds. Here, the software is developed in incremental, rapid cycles resulting in small incremental releases with each release building on its former functionality. Each release is critically tested to make sure that the software quality is maintained. The phrase agile refers to a software development methodology which promotes a project environment for adaptation, rapid delivery and client focus, self–organization and team work. Agile software development methodology is a conceptual framework for ... Show more content on Helpwriting.net ... Whereas if a plan were there to be followed, a single area of code is expected to be written once.  Can increase the risk of scope creep due to the lack of detailed requirements documentation Advantages of Agile software development method  Able to gain customer satisfaction by rapid, continuous delivery of useful software.  More focused on people and interactions between people rather than process and tools. Customers, developers and testers constantly interact with each other.  Working software is delivered quickly and more often (weeks rather than months).  Using Face–to–face conversation as the best way of ... Get more on HelpWriting.net ...
  • 74.
    Agile Methodologies ForSoftware Development Agile Methodologies for Software Development Introduction: In agile development model, the development of software is in incremental, rapid cycles. It is building new features on previous functionality with each small incremental release. The software quality is maintained by rigorously testing each release. It is useful for time critical applications. The most well–known current agile development life cycle model is Extreme Programming (XP). Why Agile model: The freedom that agile gives when new changes are needed to be implemented is very important. New changes can be implemented at very little cost because of the incremental releases. Even late changes in requirements are welcomed Unlike the waterfall model in agile model very limited planning is required to get started with the project. Agile assumes that the end users' needs are ever changing in a dynamic business and IT world. Changes can be discussed and features can be newly effected or removed based on feedback. This effectively gives the customer the finished system they want or need. Face–to–face conversation is the best form of communication. In order to implement a new feature the developers need to lose only the work of a few days, or even only hours, to roll back and implement it. Close, daily cooperation between business people and developers. Regular adaptation to changing circumstances. There is customer satisfaction by rapid, continuous delivery of useful software. People and interactions are ... Get more on HelpWriting.net ...
  • 76.
    Management Of IncrementalSoftware Development Across... Agile is the management of incremental software development across cross functional teams. Learned from years of successes and failures, the agile philosophy centers on software development with an importance with self–organization, motivation, in addition to daily team interaction. It means being able to present working software instead of slides and documentation. Agile encourages customer collaboration throughout the entire process to allow developers to respond to change in a timely manner. The agile development process can be implemented by different developmental processes and is comprised of several key principles. With personal experience of the outcome of correct agile implementation; agile can have the opposite effect without ... Show more content on Helpwriting.net ... Each increment includes a planning phase where high level requirements are defined. These requirements are bundled into delivery cycles and at the end of each delivery cycle a working functionality is delivered to the customer. Iterative life cycles are scalable and can be used for large or small projects. They are also useful when projects have predefined schedule constraints. Other types of life cycles are sequential life cycles and prototyping life cycles. Sequential life cycles include models such as the Pure Waterfall Method, differ from agile because the product is not delivered until the end of the project. The waterfall method however, implements phases such as the agile method but, these phases produce documentation not working deliverables to the customer. The waterfall method works well for projects with customers that know what they want and are fully committed to the project. Prototype life cycle models are particularly unique. A prototype life cycle model, such as the rapid prototyping model, is commonly utilized as a visual tool than an entire standalone process. Rapid prototyping is designed to model a piece of software and product with limited functionality. The rapid prototyping model is usually incorporated into the waterfall method during the concept definition phase to provide a visual aid to the customers, since no working ... Get more on HelpWriting.net ...
  • 78.
    My Company WithA Crm Implementation INTRODUCTION This case study that I am discussing is about my earlier company in India which was in the Telecom industry. Since there was an extremely stiff competition in the telecom industry, companies in the telecom business were adopting to new technological imperatives in order to outperform their competitors. Hence my company also chose to implement CRM solution which will connect all business users, stakeholders, inter–departmental executives so that all business processes are automated and the efficiency of operations is improved. CRM signified identifying the needs of the customers and stretching out ways and means to satisfy them. In this perspective CRM was not merely treated as a technology, it also had implications in the strategy formulation for the organization. OVERVIEW My organization partnered with a CRM implementation company to develop and implement customizable solution for us which will help us improve upon the operational efficiency and effectiveness . After careful study of our company's existing processes and discussions with key stakeholders, the consulting company advised us to follow agile practices. The other software development models and methods are listed here below : 1. Waterfall model 2. V model 3. Incremental model 4. RAD model 5. Agile model 6. Iterative model 7. Spiral model During the three month assignment, the consultant had multiple sessions, formed logical teams, participated in meetings and shared information with each ... Get more on HelpWriting.net ...
  • 80.
    The 7 StepsOf Software Development Essay Tata Consultancy Services (TCS) is an Indian multinational information technology (IT) service, consulting and business solutions company. TCS provide a wide range of information technology– related products and services including application development, business process outsourcing, consulting, enterprise software, hardware sizing, payment processing, software management and technology education services. TCS uses Software Development Life Cycle [SDLC] process consisting of a series of planned activities to develop or alter the software products. These processes are normally oriented toward either sequential software development processes, such as the Waterfall model, or Agile software development processes, such as the Scrum model. The 7 Steps of Software Development are: 1. Preliminary Investigation or Analysis – This is the task of extracting the requirements from users and gauging the feasibility of the project. Project sponsors usually know what they want but often have incomplete, ambiguous or contradictory requirements. It is the job of software developers and project managers to steer them in the right direction and to clarify the requirements. Upper management, both in IT and the sponsoring department, should determine if the project has business value to the organization and if there are sufficient resources to complete the project as requested. 2. Specification and Requirement Analysis – This step can vary a lot depending on the formality, size, and scope of the ... Get more on HelpWriting.net ...