Software
Development
Methodologies
We are WeylandCorp.
Frances Coronel, Brandon Richards, Justin
Havens, Jordan Quick, Charles Cephas
Hello!
Agile Development
Way better than Waterfalling.
1
Description
◉ How does it work?
◉ Why is it the most popular?
◉ What are the roles involved?
◉ What is the planning process?
◉ What are the meetings about?
“
What is Agile?
Agile is a process of product
development that is responsive to
market changes and changing
needs of the business in a timely
and iterative fashion.
“
Why is it such a buzzword?
In the beginning, there was Waterfall. Waterfall
was slow, clunky, and not able to cope with
change since it focused on long, detailed
specifications, strict, planning, and sticking to
the plan.
Source: http://www.agilemanifesto.org/
Disadvantages
Insufficient training
Teams may not be focused if the
PM isn’t providing key
leadership. There are no actual
rules, just prescribed
methodologies.
Testing integrated throughout
lifecycle
Meaning developers have to do
extra work to complete a sprint.
However, CI helps with this.
Potentially low requirements
There is a lack of architecture
since Agile doesn’t support
extensive documentation.
Trying too hard in a sprint
If a sprint has too much work
being assigned to the
developers, there will be
technical debt.
Roles
Product
Owner
Validation
(Market &
Customers)
Delivery
Team
Many Flavours
ASD
Crystal
DSDM
FDD
Kanban
Lean
Scrum
XP
ASD
● focused
● feature
based
● iterative
● timeboxed
● risk driven
● change
tolerant
ASD
Speculate LearnCollaborate
● project is
initiated
● adaptive cycle
planning is
conducted
● adapting to the
uncertain
surrounding mix of
changes caused by
various factors
● short
iterations with
design, build
and testing
Crystal
● lightest methodology
that will still lead to
successful projects
● supports fixed price
constraints
● teams can use
techniques from other
methodologies
● requires
documentation but is
not strict about what
that entails
DSDM (Dynamic Systems Development Method)
● Focus on the business
need
● Deliver on time
● Collaborate
● Never compromise
quality
● Build incrementally
from firm foundations
● Develop iteratively
● Communicate
continuously and
clearly
● Demonstrate control
FDD (Feature Driven Development)
● blends a number of
industry-recognized
best practices into a
cohesive whole
● practices are all
driven from a client-
valued functionality
feature perspective
● its main purpose is to
deliver tangible,
working software
repeatedly in a timely
manner
Kanban
● less strict than Scrum
● visualize the workflow
by splitting work into
pieces and putting it
in cards
● limits work in
progress by assigning
time limits
● measure the lead time
(average time to
complete one item)
Lean
● relentlessly eliminate
anything that doesn’t add
value and only work on
what we absolutely need
to be doing
● eliminating useless
meetings, tasks, and
documentation
● emphasis on fast delivery
● eliminate waste, build
quality, defer commitment,
respect people, optimize
whole, deliver fast
CEO
What Peter
Thiel was for
Facebook
co-CTO
co-CTO
CFO
XP (Extreme Programming)
● Elements
○ The Planning Game
○ Acceptance Tests
○ Small Releases
○ Continuous Integration
○ Pair Programming
● frequent "releases" in short development
cycles
● improves productivity and introduces
checkpoints where new customer
requirements can be introduced
Scrum
Roles ArtifactsCeremonies
● Product Owner
● Scrum Master
● Team
● Sprint planning
● Sprint review
● Sprint retrospective
● Daily scrum meeting
● Product backlog
● Sprint backlog
● Burndown charts
Product Owner/Product Manager
● defines product features
● decides release date and content
● responsible for ROI
● prioritizes features based on market value
● accepts/rejects work results
● adjusts features/priorities every iteration, as needed
Scrum Master
● represents management to project
● responsible for enacting scrum values and practices
● removes impediments
● ensures team is fully functional/productive
● enables close cooperation across all roles/functions
● shields team from external interferences
Team
● typically 5-9 people
● cross functional
○ programmers, testers, UX designers
● members work full-time
● teams are self-organizing
● membership only changes between sprints
Sprint Planning Meeting
● team selects items from product backlog they can
actually try to complete
● sprint backlog is created
○ tasks identified and each one is given a time
estimate for 1 to 16 hours
● high level design is considered
Daily Scrum Meeting
● daily, 15 minutes, stand up
● not for problem solving
● helps avoid other unnecessary meetings afterwards
● 3 key questions
○ what did you do yesterday?
○ what will you do today?
○ is anything in your way?
Sprint
Reviews/Retrospectives
● team presents what’s accomplished during sprint
● demo of new features/underlying architecture
● informal
● whole team participates
● typically takes 15-30 minutes
● done after every sprint
Sprint Burndown Chart
“
Conclusion?
Agile is all about delivering
maximum value in the minimum
amount of time.
Evolutionary
Prototyping
Evolutionary Prototyping
◉ Lifecycle model where the system is
developed in increments
◉ Concept is developed as the project is brought
along
◉ Demonstrate the software to the client then
continue to develop based on the feedback
received
Evolutionary Prototyping
Advantages
Ability to address risk early
on in project lifecycle. Early
feedback on whether the
final product will be
accepted. Visible progress
throughout the project.
Evolutionary Prototyping
Disadvantages
Unrealistic schedules and
budget expectations.
Inefficient use of prototyping,
poor design, unrealistic
system performance
expectations.
V-Model
V-Model
◉ V-Model is a SDLC that can be considered an
extension of the waterfall method
◉ It is based on association of a testing phase for
each corresponding development stage
◉ This model is highly disciplined and the next
phase can only begin after completion of the
previous phase.
V-Model
Advantages
Highly Disciplined and phases
completed one at a time. Works
well with smaller projects.
Simple and easy to use. Easy to
manage due to rigidity of the
model. All phases have a review
process and deliverables.
V-Model
Disadvantages
High risk as well as uncertainty.
Not a good model for complex
and object oriented projects.
Poor model for long and ongoing
projects. Not suitable for
projects where requirements
have a higher risk of changing.
Once in testing stage hard to go
back. No working product till
late in the lifecycle
Incremental
Model
Incremental Model
◉ A method of software development where the
product is designed, implemented, and tested
a bit at a time until it is completed.
◉ It involves development and maintenance and
is defined as finished when all requirements
are satisfied.
◉ This model combines elements of the waterfall
model with the iterative philosophy of
prototyping.
Tasks Involved
Advantages
◉ After each iteration regression testing should be
conducted, which in turn causes elements that are
malfunctioning to be identified simply because few
changes are made with any single iteration.
◉ It is also generally easier to test and debug with this
method of software development because smaller
changes are made during each iteration as well.
◉ Customers can also respond to features and review the
product for any changes that may be needed.
◉ Lower initial delivery costs.
Disadvantages
◉ The resulting costs may exceed the price range of the
corporation.
◉ Each phase of an iteration is rigid and do not overlap
one another.
◉ As additional functionality is added to the software
product, issues may arise that are related to system
architecture that were not evident in the earlier product
prototypes.
Cowboy Coding
Cowboy Coding
◉ A method of software development where
programmers have autonomy over the
development process.
◉ The autonomy includes the control of the
project’s schedule, languages, algorithms,
tools, frameworks and coding style.
Cowboy Coding
A cowboy coder can
be the lone developer
of a group or part of a
group of developers
working with minimal
process or discipline.
It usually occurs
when there is very
little participation by
business users or by
management that
controls non-
development aspects
of the project.
Cowboy Coding Is
commonly seen as a
derogatory term by
supporters of other
software
development
methodologies.
Advantages
Environment
Developers maintain
a free form working
environment that can
encourage
experimentation,
learning, and free
distribution of the
results.
Design Resolutions
Allows for
developers to cross
architectural and/or
tiered boundaries to
resolve design
limitations and
defects.
Free Thinking
Coding would be
completed during the
developer’s free time,
which allows for a
hobby project to
come to fruition
which otherwise may
not.
Disadvantages
Lack of Release
Structure
Lack of estimation or
implementation
planning can cause a
project to be delayed.
Uncertain Design
Requirements
Custom software
applications can experience
issues with the client’s
requirements. Cowboy
Coding can increase this
problem by not scaling the
requirements to a
reasonable timeline, which
can result in a rushed and
bug filled product.
Inexperienced
Developers
Common at the
hobbyist or student
level where developers
may not be as familiar
with the technologies.
This can result in
learning time to be
underestimated, which
can cause delays in
development.
Personal Software Process
PSP improves an individual
Personal Software Process
◉ “ A flexible historical data-driven process tailored to teaching
individuals about their own unique programming styles and
even help software engineers further develop their skills in
writing quality software with few defects.”
◉ Provides engineers with a disciplined personal framework for
doing software work
◉ The PSP process consists of a set of methods, forms, and
scripts that show software engineers how to plan, measure,
and manage their work.
Purpose of the PSP
PSP helps software engineers to:
● Improve their estimating and planning skills.
● Make commitments they can keep.
● Manage the quality of their projects.
● Reduce the number of defects in their work.
Advantages Of PSP
◉ The data and analyses will offer an
appreciation of strengths and weaknesses
◉ Gain a Sense of Personal accomplishment
◉ Have total control over schedule and the
commitments you make
◉ The Quality portion will help produce better
products
◉ Builds team’s confidence in you
Disadvantages of PSP
◉ Not every engineer views productivity the
same way
◉ Strictly is aimed for the development of
software and not the time spent negotiating
with clients
◉ PSP doesn't force the user to timestamp
disruptions
Team Software Process
Team Software Process
◉ “Provides a defined operational process framework that is
designed to help teams of managers and engineers organize
projects and produce software products that range in size
from small projects of several thousand lines of code (KLOC)
to very large projects greater than half a million lines of code.”
◉ Guides Engineering Teams that are developing software-
intensive products
TSP Improves Individuals and
Teams
Advantages of TSP
◉ Productivity improvements of 25% or more
◉ Reductions in cost and schedule variance to less than +/- 10%
◉ Testing costs and schedule reductions of up to 80%
◉ Helps Organizations make a mature and disciplined
engineering proactive that makes reliable software
Disadvantages of TSP
◉ Training is Long and may hold back in-depth
coverage of content
◉ Teams may not retain as much information as
they need for full participation
◉ Some training that is needed may not be
provided
Waterfall Model
Description
◉ The waterfall model was the first process model to be
introduced in software development.
◉ Begins with customer specification of requirements and
progresses through planning, modeling, construction,
and deployment, culminating in ongoing support of the
completed software.
◉ Each phase must be completed before the next phase
can begin and there is no overlapping in the phases.
Phases in the Waterfall Model
Description of Phases
Implementation
Product is first
developed in
small programs
which are later
integrated. Each
unit is developed
and tested for
functionality.
Requirements
All possible
requirements of
the system to be
developed are
gathered and
documented.
System Design
Helps specify
hardware and
system
requirements
along with
defining the
overall system
architecture.
Integration &
Testing
All of the units
developed are
integrated and
after integration
the entire system
is tested.
Maintenance
Intended to
enhance the
product. Later
versions and
patches are
released as
issues arise in
the client
environment.
Advantages
◉ Easy to manage as each
phase has specific
deliverables and a
review process.
◉ Phases are completed
one at a time.
◉ Works well for smaller
projects where
requirements are well
understood.
Waterfall Model
Disadvantages
◉ Not ideal for long and
ongoing projects as you
can’t go back to a
previous phase
◉ Difficult for customer to
state all requirements.
◉ A working version of the
product will not be
available until late in the
process.
Spiral Model
Description
◉ The spiral model is a software
process model that brings
together the iterative aspect of
prototyping and the controlled
and systematic aspects of the
waterfall model together.
◉ Provides the potential for rapid
development of more
complete versions of the
software.
How it works
◉ Using the spiral model, software is developed in a series
of incremental releases.
◉ During early iterations, the release might be a prototype
and during later iterations the product evolves into its
complete form.
◉ There are four phases associated with the spiral model.
A software project repeatedly passes through these
phases in iterations called spirals.
Identification Phase
Starts with gathering the
business requirements in the
baseline spiral. In the later
spirals as the product
matures, identification of
system requirements,
subsystem requirements, and
unit requirements are all
done in this phase.
Spiral Model Phases
Design Phase
Starts with the conceptual
design, logical design of
modules, physical product
design and final design in the
later spirals.
Build Phase
In the baseline spiral, it
consists of a proof of concept
to gather customer feedback.
In the later spirals with more
clarity on requirements and
design, a working model of
the software is produced
with a version number. Each
build is sent to the customer
for feedback.
Spiral Model Phases Continued
Evaluation and Risk Analysis
Includes estimating,
identifying, and monitoring
technical feasibility and
management risks, such as
schedule slippage and cost
overrun. After testing the
build, at the end of the first
iteration, the customer
evaluates the software and
provides feedback.
Advantages
◉ Allows elements of the
product to be added in
as they become
available.
◉ Assures there is no
conflict with previous
requirements and design.
◉ Users are allowed to see
the system early.
Spiral Model
Disadvantages
◉ It takes strict
management to
complete products.
◉ The spiral can run in an
indefinite loop.
◉ Intermediate stages
requires a lot of
documentation.
“
Is software engineering an
oxymoron?
YES.
Software engineering isn't really engineering. If it was, then we would have clear and
definite methodologies for doing everything. When a civil engineer has to design a
bridge, he has a loading in mind, a safety margin, specific materials, and several design
alternatives. He can evaluate those alternatives in a quantifiable way to determine which
is optimal.
Software engineering, on the other hand, has significant factors that are an art. Yes,
obviously generating the code to get the right result is a function of basic programming,
and that is certainly an engineering skill, but creating the architecture that will be
optimal requires a certain level of insight and taste that is beyond anything that can be
found in a formula.
In other engineering disciplines, this is more clear. Was Ming Pei an engineer? How is an
architect different from a mechanical engineer?
References
● http://www.construx.com/uploadedFiles/Construx/Construx_Pages/Resources(1)/Evolutionary%20Prototyping%
20Lifecycle.pdf
● http://www.tutorialspoint.com/sdlc/sdlc_v_model.html
● http://cdn.oreillystatic.com/en/assets/1/event/3/Agil e%20Development%20Presentation.pdf
● http://www.slideshare.net/ydarias/agile-and-scrum- 35714242
● http://www.mountaingoatsoftware.com/uploads/pr esentations/English-Redistributable-Intro-Scrum.ppt
● https://www.sei.cmu.edu/tsp/
● http://resources.sei.cmu.edu/library/asset-view.cfm?assetid=5283
● https://www.crisp.se/file-uploads/Kanban-vs-Scrum.pdf
● http://istqbexamcertification.com/what-is-incremental-model-advantages-disadvantages-and-when-to-use-it/
● http://www.moweble.com/the-pros-and-cons-of-cowboy-coding.html
Any questions,
comments, or concerns ?
Thanks!

Software Development Methodologies

  • 1.
  • 2.
    We are WeylandCorp. FrancesCoronel, Brandon Richards, Justin Havens, Jordan Quick, Charles Cephas Hello!
  • 3.
    Agile Development Way betterthan Waterfalling. 1
  • 4.
    Description ◉ How doesit work? ◉ Why is it the most popular? ◉ What are the roles involved? ◉ What is the planning process? ◉ What are the meetings about?
  • 5.
    “ What is Agile? Agileis a process of product development that is responsive to market changes and changing needs of the business in a timely and iterative fashion.
  • 6.
    “ Why is itsuch a buzzword? In the beginning, there was Waterfall. Waterfall was slow, clunky, and not able to cope with change since it focused on long, detailed specifications, strict, planning, and sticking to the plan.
  • 7.
  • 8.
    Disadvantages Insufficient training Teams maynot be focused if the PM isn’t providing key leadership. There are no actual rules, just prescribed methodologies. Testing integrated throughout lifecycle Meaning developers have to do extra work to complete a sprint. However, CI helps with this. Potentially low requirements There is a lack of architecture since Agile doesn’t support extensive documentation. Trying too hard in a sprint If a sprint has too much work being assigned to the developers, there will be technical debt.
  • 9.
  • 10.
  • 11.
    ASD ● focused ● feature based ●iterative ● timeboxed ● risk driven ● change tolerant
  • 12.
    ASD Speculate LearnCollaborate ● projectis initiated ● adaptive cycle planning is conducted ● adapting to the uncertain surrounding mix of changes caused by various factors ● short iterations with design, build and testing
  • 13.
    Crystal ● lightest methodology thatwill still lead to successful projects ● supports fixed price constraints ● teams can use techniques from other methodologies ● requires documentation but is not strict about what that entails
  • 14.
    DSDM (Dynamic SystemsDevelopment Method) ● Focus on the business need ● Deliver on time ● Collaborate ● Never compromise quality ● Build incrementally from firm foundations ● Develop iteratively ● Communicate continuously and clearly ● Demonstrate control
  • 15.
    FDD (Feature DrivenDevelopment) ● blends a number of industry-recognized best practices into a cohesive whole ● practices are all driven from a client- valued functionality feature perspective ● its main purpose is to deliver tangible, working software repeatedly in a timely manner
  • 16.
    Kanban ● less strictthan Scrum ● visualize the workflow by splitting work into pieces and putting it in cards ● limits work in progress by assigning time limits ● measure the lead time (average time to complete one item)
  • 17.
    Lean ● relentlessly eliminate anythingthat doesn’t add value and only work on what we absolutely need to be doing ● eliminating useless meetings, tasks, and documentation ● emphasis on fast delivery ● eliminate waste, build quality, defer commitment, respect people, optimize whole, deliver fast
  • 18.
    CEO What Peter Thiel wasfor Facebook co-CTO co-CTO CFO
  • 20.
    XP (Extreme Programming) ●Elements ○ The Planning Game ○ Acceptance Tests ○ Small Releases ○ Continuous Integration ○ Pair Programming ● frequent "releases" in short development cycles ● improves productivity and introduces checkpoints where new customer requirements can be introduced
  • 21.
    Scrum Roles ArtifactsCeremonies ● ProductOwner ● Scrum Master ● Team ● Sprint planning ● Sprint review ● Sprint retrospective ● Daily scrum meeting ● Product backlog ● Sprint backlog ● Burndown charts
  • 24.
    Product Owner/Product Manager ●defines product features ● decides release date and content ● responsible for ROI ● prioritizes features based on market value ● accepts/rejects work results ● adjusts features/priorities every iteration, as needed
  • 25.
    Scrum Master ● representsmanagement to project ● responsible for enacting scrum values and practices ● removes impediments ● ensures team is fully functional/productive ● enables close cooperation across all roles/functions ● shields team from external interferences
  • 26.
    Team ● typically 5-9people ● cross functional ○ programmers, testers, UX designers ● members work full-time ● teams are self-organizing ● membership only changes between sprints
  • 27.
    Sprint Planning Meeting ●team selects items from product backlog they can actually try to complete ● sprint backlog is created ○ tasks identified and each one is given a time estimate for 1 to 16 hours ● high level design is considered
  • 28.
    Daily Scrum Meeting ●daily, 15 minutes, stand up ● not for problem solving ● helps avoid other unnecessary meetings afterwards ● 3 key questions ○ what did you do yesterday? ○ what will you do today? ○ is anything in your way?
  • 29.
    Sprint Reviews/Retrospectives ● team presentswhat’s accomplished during sprint ● demo of new features/underlying architecture ● informal ● whole team participates ● typically takes 15-30 minutes ● done after every sprint
  • 30.
  • 31.
    “ Conclusion? Agile is allabout delivering maximum value in the minimum amount of time.
  • 32.
  • 33.
    Evolutionary Prototyping ◉ Lifecyclemodel where the system is developed in increments ◉ Concept is developed as the project is brought along ◉ Demonstrate the software to the client then continue to develop based on the feedback received
  • 34.
  • 35.
    Advantages Ability to addressrisk early on in project lifecycle. Early feedback on whether the final product will be accepted. Visible progress throughout the project. Evolutionary Prototyping Disadvantages Unrealistic schedules and budget expectations. Inefficient use of prototyping, poor design, unrealistic system performance expectations.
  • 36.
  • 37.
    V-Model ◉ V-Model isa SDLC that can be considered an extension of the waterfall method ◉ It is based on association of a testing phase for each corresponding development stage ◉ This model is highly disciplined and the next phase can only begin after completion of the previous phase.
  • 38.
  • 39.
    Advantages Highly Disciplined andphases completed one at a time. Works well with smaller projects. Simple and easy to use. Easy to manage due to rigidity of the model. All phases have a review process and deliverables. V-Model Disadvantages High risk as well as uncertainty. Not a good model for complex and object oriented projects. Poor model for long and ongoing projects. Not suitable for projects where requirements have a higher risk of changing. Once in testing stage hard to go back. No working product till late in the lifecycle
  • 40.
  • 41.
    Incremental Model ◉ Amethod of software development where the product is designed, implemented, and tested a bit at a time until it is completed. ◉ It involves development and maintenance and is defined as finished when all requirements are satisfied. ◉ This model combines elements of the waterfall model with the iterative philosophy of prototyping.
  • 42.
  • 43.
    Advantages ◉ After eachiteration regression testing should be conducted, which in turn causes elements that are malfunctioning to be identified simply because few changes are made with any single iteration. ◉ It is also generally easier to test and debug with this method of software development because smaller changes are made during each iteration as well. ◉ Customers can also respond to features and review the product for any changes that may be needed. ◉ Lower initial delivery costs.
  • 44.
    Disadvantages ◉ The resultingcosts may exceed the price range of the corporation. ◉ Each phase of an iteration is rigid and do not overlap one another. ◉ As additional functionality is added to the software product, issues may arise that are related to system architecture that were not evident in the earlier product prototypes.
  • 45.
  • 46.
    Cowboy Coding ◉ Amethod of software development where programmers have autonomy over the development process. ◉ The autonomy includes the control of the project’s schedule, languages, algorithms, tools, frameworks and coding style.
  • 47.
    Cowboy Coding A cowboycoder can be the lone developer of a group or part of a group of developers working with minimal process or discipline. It usually occurs when there is very little participation by business users or by management that controls non- development aspects of the project. Cowboy Coding Is commonly seen as a derogatory term by supporters of other software development methodologies.
  • 48.
    Advantages Environment Developers maintain a freeform working environment that can encourage experimentation, learning, and free distribution of the results. Design Resolutions Allows for developers to cross architectural and/or tiered boundaries to resolve design limitations and defects. Free Thinking Coding would be completed during the developer’s free time, which allows for a hobby project to come to fruition which otherwise may not.
  • 49.
    Disadvantages Lack of Release Structure Lackof estimation or implementation planning can cause a project to be delayed. Uncertain Design Requirements Custom software applications can experience issues with the client’s requirements. Cowboy Coding can increase this problem by not scaling the requirements to a reasonable timeline, which can result in a rushed and bug filled product. Inexperienced Developers Common at the hobbyist or student level where developers may not be as familiar with the technologies. This can result in learning time to be underestimated, which can cause delays in development.
  • 50.
  • 51.
    PSP improves anindividual
  • 52.
    Personal Software Process ◉“ A flexible historical data-driven process tailored to teaching individuals about their own unique programming styles and even help software engineers further develop their skills in writing quality software with few defects.” ◉ Provides engineers with a disciplined personal framework for doing software work ◉ The PSP process consists of a set of methods, forms, and scripts that show software engineers how to plan, measure, and manage their work.
  • 53.
    Purpose of thePSP PSP helps software engineers to: ● Improve their estimating and planning skills. ● Make commitments they can keep. ● Manage the quality of their projects. ● Reduce the number of defects in their work.
  • 54.
    Advantages Of PSP ◉The data and analyses will offer an appreciation of strengths and weaknesses ◉ Gain a Sense of Personal accomplishment ◉ Have total control over schedule and the commitments you make ◉ The Quality portion will help produce better products ◉ Builds team’s confidence in you
  • 55.
    Disadvantages of PSP ◉Not every engineer views productivity the same way ◉ Strictly is aimed for the development of software and not the time spent negotiating with clients ◉ PSP doesn't force the user to timestamp disruptions
  • 56.
  • 57.
    Team Software Process ◉“Provides a defined operational process framework that is designed to help teams of managers and engineers organize projects and produce software products that range in size from small projects of several thousand lines of code (KLOC) to very large projects greater than half a million lines of code.” ◉ Guides Engineering Teams that are developing software- intensive products
  • 58.
  • 59.
    Advantages of TSP ◉Productivity improvements of 25% or more ◉ Reductions in cost and schedule variance to less than +/- 10% ◉ Testing costs and schedule reductions of up to 80% ◉ Helps Organizations make a mature and disciplined engineering proactive that makes reliable software
  • 60.
    Disadvantages of TSP ◉Training is Long and may hold back in-depth coverage of content ◉ Teams may not retain as much information as they need for full participation ◉ Some training that is needed may not be provided
  • 61.
  • 62.
    Description ◉ The waterfallmodel was the first process model to be introduced in software development. ◉ Begins with customer specification of requirements and progresses through planning, modeling, construction, and deployment, culminating in ongoing support of the completed software. ◉ Each phase must be completed before the next phase can begin and there is no overlapping in the phases.
  • 63.
    Phases in theWaterfall Model
  • 64.
    Description of Phases Implementation Productis first developed in small programs which are later integrated. Each unit is developed and tested for functionality. Requirements All possible requirements of the system to be developed are gathered and documented. System Design Helps specify hardware and system requirements along with defining the overall system architecture. Integration & Testing All of the units developed are integrated and after integration the entire system is tested. Maintenance Intended to enhance the product. Later versions and patches are released as issues arise in the client environment.
  • 65.
    Advantages ◉ Easy tomanage as each phase has specific deliverables and a review process. ◉ Phases are completed one at a time. ◉ Works well for smaller projects where requirements are well understood. Waterfall Model Disadvantages ◉ Not ideal for long and ongoing projects as you can’t go back to a previous phase ◉ Difficult for customer to state all requirements. ◉ A working version of the product will not be available until late in the process.
  • 66.
  • 67.
    Description ◉ The spiralmodel is a software process model that brings together the iterative aspect of prototyping and the controlled and systematic aspects of the waterfall model together. ◉ Provides the potential for rapid development of more complete versions of the software.
  • 68.
    How it works ◉Using the spiral model, software is developed in a series of incremental releases. ◉ During early iterations, the release might be a prototype and during later iterations the product evolves into its complete form. ◉ There are four phases associated with the spiral model. A software project repeatedly passes through these phases in iterations called spirals.
  • 69.
    Identification Phase Starts withgathering the business requirements in the baseline spiral. In the later spirals as the product matures, identification of system requirements, subsystem requirements, and unit requirements are all done in this phase. Spiral Model Phases Design Phase Starts with the conceptual design, logical design of modules, physical product design and final design in the later spirals.
  • 70.
    Build Phase In thebaseline spiral, it consists of a proof of concept to gather customer feedback. In the later spirals with more clarity on requirements and design, a working model of the software is produced with a version number. Each build is sent to the customer for feedback. Spiral Model Phases Continued Evaluation and Risk Analysis Includes estimating, identifying, and monitoring technical feasibility and management risks, such as schedule slippage and cost overrun. After testing the build, at the end of the first iteration, the customer evaluates the software and provides feedback.
  • 71.
    Advantages ◉ Allows elementsof the product to be added in as they become available. ◉ Assures there is no conflict with previous requirements and design. ◉ Users are allowed to see the system early. Spiral Model Disadvantages ◉ It takes strict management to complete products. ◉ The spiral can run in an indefinite loop. ◉ Intermediate stages requires a lot of documentation.
  • 72.
  • 73.
    YES. Software engineering isn'treally engineering. If it was, then we would have clear and definite methodologies for doing everything. When a civil engineer has to design a bridge, he has a loading in mind, a safety margin, specific materials, and several design alternatives. He can evaluate those alternatives in a quantifiable way to determine which is optimal. Software engineering, on the other hand, has significant factors that are an art. Yes, obviously generating the code to get the right result is a function of basic programming, and that is certainly an engineering skill, but creating the architecture that will be optimal requires a certain level of insight and taste that is beyond anything that can be found in a formula. In other engineering disciplines, this is more clear. Was Ming Pei an engineer? How is an architect different from a mechanical engineer?
  • 75.
    References ● http://www.construx.com/uploadedFiles/Construx/Construx_Pages/Resources(1)/Evolutionary%20Prototyping% 20Lifecycle.pdf ● http://www.tutorialspoint.com/sdlc/sdlc_v_model.html ●http://cdn.oreillystatic.com/en/assets/1/event/3/Agil e%20Development%20Presentation.pdf ● http://www.slideshare.net/ydarias/agile-and-scrum- 35714242 ● http://www.mountaingoatsoftware.com/uploads/pr esentations/English-Redistributable-Intro-Scrum.ppt ● https://www.sei.cmu.edu/tsp/ ● http://resources.sei.cmu.edu/library/asset-view.cfm?assetid=5283 ● https://www.crisp.se/file-uploads/Kanban-vs-Scrum.pdf ● http://istqbexamcertification.com/what-is-incremental-model-advantages-disadvantages-and-when-to-use-it/ ● http://www.moweble.com/the-pros-and-cons-of-cowboy-coding.html
  • 76.
    Any questions, comments, orconcerns ? Thanks!