SlideShare a Scribd company logo
A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Nancemond Street Outfall Stabilization
Contract No. CN15125137
Project No. SD-000031-043
Task Order No. 3
Lee District
June 5, 2015
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Nancemond Street Outfall Stabilization
Post Construction
Nancemond Street Outfall Stabilization
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Lee District, VA, Tax Map # 80-3
Project Site
Project Details
Nancemond Street Outfall Stabilization
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Description:
The Nancemond Street Outfall Stabilization was substantially completed on March 9, 2015. The existing storm
sewer outfall is located north of Nancemond Street, adjacent to properties located at 7504 and 7506 Nancemond
Street. The project included stabilization improvements to the existing storm sewer outfall by constructing a rip-rap
lined channel and two check dams. The new improvements will reduce the flow velocity, stop the advancing Head-
Cut and provide stability and enhance water quality.
Project Overview:
• Clearing and grubbing the site
• Excavating the outfall to construct the proposed V-outfall ditch
• Placing geotextile fabric along and beneath the stones of the V-outfall ditch
• Lining the bottom of the V-outfall ditch with 10” VTOT Class IA rip-rap
• Constructing two big check dam structures in the proposed V-outfall ditch
• Placing backfill and re-grading the area along the edges of the rip-rap to tie into existing grade
• Placing jute mesh at the area along the rip-rap to stabilize slopes and promote vegetation
• Restoring the disturbed areas with seed mix and straw mulch
Project Team:
• Maintenance and Stormwater Management Division - Qais Bashir
• Utilities Design and Construction Division - Yousef Rayyan
• Utilities Design and Construction Division - Paul Thaler
• Land Survey Branch - Gregory Harper
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Nancemond Street Outfall Stabilization
Pre-Existing Condition
Nancemond Street Outfall Stabilization
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Pre-Existing Condition
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Nancemond Street Outfall Stabilization
During Construction
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Nancemond Street Outfall Stabilization
Post Construction
Check Dam Stone Structures
Jute Mesh Used To Stabilize The Banks
Before After
Nancemond Street Outfall Stabilization
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Additional Information
For additional information, please call
www.fairfaxcounty.gov/dpwes
Irene Haske, Public Information Officer
703-324-5500, TTY 711
Irene.Haske@fairfaxcounty.gov
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Nancemond Street Outfall Stabilization

More Related Content

What's hot

What's hot (20)

Gallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue ImprovementsGallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue Improvements
 
Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1Pohick Creek Restoration Project - Phase 1
Pohick Creek Restoration Project - Phase 1
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
 
Summerton Way Pond Retrofit
Summerton Way Pond RetrofitSummerton Way Pond Retrofit
Summerton Way Pond Retrofit
 
Flatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration ProjectFlatlick Branch Phase II Stream Restoration Project
Flatlick Branch Phase II Stream Restoration Project
 
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
Meadow Run Pond Improvement
Meadow Run Pond ImprovementMeadow Run Pond Improvement
Meadow Run Pond Improvement
 
Great Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement ProjectGreat Passage Storm Sewer Improvement Project
Great Passage Storm Sewer Improvement Project
 
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency RepairGraham Park Plaza Emergency Repair
Graham Park Plaza Emergency Repair
 
Armfield Farm Detention Basin Retrofit
Armfield Farm Detention Basin RetrofitArmfield Farm Detention Basin Retrofit
Armfield Farm Detention Basin Retrofit
 
North Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementNorth Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot Improvement
 
Crisis Care Facility
Crisis Care FacilityCrisis Care Facility
Crisis Care Facility
 
Waynewood l Force Main Rehabilitation Project Jan 8, 2021
Waynewood l Force Main Rehabilitation Project Jan 8, 2021Waynewood l Force Main Rehabilitation Project Jan 8, 2021
Waynewood l Force Main Rehabilitation Project Jan 8, 2021
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
 
Indian Run Restoration Project
Indian Run Restoration ProjectIndian Run Restoration Project
Indian Run Restoration Project
 
Colfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectColfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation Project
 
Guinea Road and Lakepointe Drive Sidewalk and Intersection Improvements
Guinea Road and Lakepointe Drive Sidewalk and Intersection ImprovementsGuinea Road and Lakepointe Drive Sidewalk and Intersection Improvements
Guinea Road and Lakepointe Drive Sidewalk and Intersection Improvements
 

Viewers also liked (7)

Colony Park and Woodlynne Project Updates
Colony Park and Woodlynne Project UpdatesColony Park and Woodlynne Project Updates
Colony Park and Woodlynne Project Updates
 
Harford Community Stream Restoration 2013
Harford Community Stream Restoration 2013Harford Community Stream Restoration 2013
Harford Community Stream Restoration 2013
 
Pinecrest Golf Course Stream Restoration April 2016
Pinecrest Golf Course Stream Restoration April 2016Pinecrest Golf Course Stream Restoration April 2016
Pinecrest Golf Course Stream Restoration April 2016
 
Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)
 
Broyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement ProjectBroyhill McLean Estates BMP Neighborhood Improvement Project
Broyhill McLean Estates BMP Neighborhood Improvement Project
 
Wakefield Park South Stream Restoration
Wakefield Park South Stream RestorationWakefield Park South Stream Restoration
Wakefield Park South Stream Restoration
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 

Similar to Nancemond Street Outfall Stabilization

Similar to Nancemond Street Outfall Stabilization (20)

Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
Quander Road Outfall and Stream Restoration
Quander Road Outfall and Stream RestorationQuander Road Outfall and Stream Restoration
Quander Road Outfall and Stream Restoration
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020
 
Sutton Oaks Pond Improvements
Sutton Oaks Pond ImprovementsSutton Oaks Pond Improvements
Sutton Oaks Pond Improvements
 
Peppercorn Drive Outfall Restoration
Peppercorn Drive Outfall RestorationPeppercorn Drive Outfall Restoration
Peppercorn Drive Outfall Restoration
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
Rabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration ProjectRabbit Branch Tributary Restoration Project
Rabbit Branch Tributary Restoration Project
 
Pohick Creek Restoration Project Phase I June 2016
Pohick Creek Restoration Project Phase I June 2016Pohick Creek Restoration Project Phase I June 2016
Pohick Creek Restoration Project Phase I June 2016
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
Long Branch Tributary at Long Branch Falls Park Public Meeting 1-20-2016
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality Retrofit
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
Potomac Avenue Sinkhole Emergency
Potomac Avenue Sinkhole EmergencyPotomac Avenue Sinkhole Emergency
Potomac Avenue Sinkhole Emergency
 
Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015
 
Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021
 
Bull Neck Run at Spring Hill Recreation Center Stream Restoration
Bull Neck Run at Spring Hill Recreation Center Stream RestorationBull Neck Run at Spring Hill Recreation Center Stream Restoration
Bull Neck Run at Spring Hill Recreation Center Stream Restoration
 
Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020Flatlick Branch III Stream Restoration June 6, 2020
Flatlick Branch III Stream Restoration June 6, 2020
 

More from Fairfax County

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 

Recently uploaded

R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatóriosR$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
Maurílio Júnior
 
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
Faga1939
 

Recently uploaded (16)

24052024_First India Newspaper Jaipur.pdf
24052024_First India Newspaper Jaipur.pdf24052024_First India Newspaper Jaipur.pdf
24052024_First India Newspaper Jaipur.pdf
 
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatóriosR$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
 
2024 - Love and Madness - a book about love, madness, heartbreak and politics
2024 - Love and Madness - a book about love, madness, heartbreak and politics2024 - Love and Madness - a book about love, madness, heartbreak and politics
2024 - Love and Madness - a book about love, madness, heartbreak and politics
 
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-ShirtNika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
Nika Muhl Visa Approval Shirt, Nika Muhl Visa Approval T-Shirt
 
Textile Waste In India | Textile Waste Management
Textile Waste In India | Textile Waste ManagementTextile Waste In India | Textile Waste Management
Textile Waste In India | Textile Waste Management
 
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
PEACE BETWEEN ISRAEL AND PALESTINE REQUIRES EXTREMISTS OUT OF POWER AND RESTR...
 
Meta_AI_ads_investigation.pdfldoljjwejolejolol
Meta_AI_ads_investigation.pdfldoljjwejolejololMeta_AI_ads_investigation.pdfldoljjwejolejolol
Meta_AI_ads_investigation.pdfldoljjwejolejolol
 
Draft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdfDraft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdf
 
27052024_First India Newspaper Jaipur.pdf
27052024_First India Newspaper Jaipur.pdf27052024_First India Newspaper Jaipur.pdf
27052024_First India Newspaper Jaipur.pdf
 
Have A Complimentary Cheat Sheet, On Us!!!
Have A Complimentary Cheat Sheet, On Us!!!Have A Complimentary Cheat Sheet, On Us!!!
Have A Complimentary Cheat Sheet, On Us!!!
 
Chapter-8th-Recent Developments in Indian Politics-PPT.pptx
Chapter-8th-Recent Developments in Indian Politics-PPT.pptxChapter-8th-Recent Developments in Indian Politics-PPT.pptx
Chapter-8th-Recent Developments in Indian Politics-PPT.pptx
 
Mizzima Weekly Analysis & Insight Issue 1
Mizzima Weekly Analysis & Insight Issue 1Mizzima Weekly Analysis & Insight Issue 1
Mizzima Weekly Analysis & Insight Issue 1
 
May 2024 - Crypto Market Report_FINAL.pdf
May 2024 - Crypto Market Report_FINAL.pdfMay 2024 - Crypto Market Report_FINAL.pdf
May 2024 - Crypto Market Report_FINAL.pdf
 
role of women and girls in various terror groups
role of women and girls in various terror groupsrole of women and girls in various terror groups
role of women and girls in various terror groups
 
25052024_First India Newspaper Jaipur.pdf
25052024_First India Newspaper Jaipur.pdf25052024_First India Newspaper Jaipur.pdf
25052024_First India Newspaper Jaipur.pdf
 
23052024_First India Newspaper Jaipur.pdf
23052024_First India Newspaper Jaipur.pdf23052024_First India Newspaper Jaipur.pdf
23052024_First India Newspaper Jaipur.pdf
 

Nancemond Street Outfall Stabilization

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Nancemond Street Outfall Stabilization Contract No. CN15125137 Project No. SD-000031-043 Task Order No. 3 Lee District June 5, 2015
  • 2. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Nancemond Street Outfall Stabilization Post Construction
  • 3. Nancemond Street Outfall Stabilization Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Lee District, VA, Tax Map # 80-3 Project Site
  • 4. Project Details Nancemond Street Outfall Stabilization Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Description: The Nancemond Street Outfall Stabilization was substantially completed on March 9, 2015. The existing storm sewer outfall is located north of Nancemond Street, adjacent to properties located at 7504 and 7506 Nancemond Street. The project included stabilization improvements to the existing storm sewer outfall by constructing a rip-rap lined channel and two check dams. The new improvements will reduce the flow velocity, stop the advancing Head- Cut and provide stability and enhance water quality. Project Overview: • Clearing and grubbing the site • Excavating the outfall to construct the proposed V-outfall ditch • Placing geotextile fabric along and beneath the stones of the V-outfall ditch • Lining the bottom of the V-outfall ditch with 10” VTOT Class IA rip-rap • Constructing two big check dam structures in the proposed V-outfall ditch • Placing backfill and re-grading the area along the edges of the rip-rap to tie into existing grade • Placing jute mesh at the area along the rip-rap to stabilize slopes and promote vegetation • Restoring the disturbed areas with seed mix and straw mulch Project Team: • Maintenance and Stormwater Management Division - Qais Bashir • Utilities Design and Construction Division - Yousef Rayyan • Utilities Design and Construction Division - Paul Thaler • Land Survey Branch - Gregory Harper
  • 5. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Nancemond Street Outfall Stabilization Pre-Existing Condition
  • 6. Nancemond Street Outfall Stabilization Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Pre-Existing Condition
  • 7. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Nancemond Street Outfall Stabilization During Construction
  • 8. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Nancemond Street Outfall Stabilization Post Construction Check Dam Stone Structures Jute Mesh Used To Stabilize The Banks
  • 9. Before After Nancemond Street Outfall Stabilization Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
  • 10. Additional Information For additional information, please call www.fairfaxcounty.gov/dpwes Irene Haske, Public Information Officer 703-324-5500, TTY 711 Irene.Haske@fairfaxcounty.gov Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Nancemond Street Outfall Stabilization