This is a 4,000 linear foot section of gravity sewer that was taken out of service. The pipe had deteriorated and was prone to collapse. The area was restored and site improvements were completed.
Gallows Road and Prosperity Avenue ImprovementsFairfax County
The Gallows Road and Prosperity Avenue improvements Project extended a four-foot concrete median along Gallows Road near the intersection of Prosperity Avenue to prevent illegal left turns. The Improvements include extending the existing median, resetting existing sign, eradicating existing pavement markings and placing new pavement marking around the new median.
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
Powerpoint - Langley School Pump Station and Force Main ProjectFairfax County
The Purpose
Inform the community about the upcoming project,
Phase 1 of the project is eminent
Gravity Sewer on Langley Lane
Force main from Langley High School to Georgetown Pike
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Fairfax County
Fairfax County plans to begin construction on a stream restoration project in Bull Neck Run in August 2018. Approximately 1,900 linear feet of Bull Neck Run will be restored. The stream runs through Fairfax County Park Authority property and Spring Hill Farm HOA property.
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Fairfax County
Fairfax County walkway construction of 1,600 linear feet of concrete sidewalk, curb ramps, curb and gutter, retaining wall, pavement markings and signage, drainage improvements and utility adjustments.
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Fairfax County
The emergency repair of an 8-inch sanitary sewer link in Little River Turnpike and Backlick Road replaced a severely defective 8-inch concrete sewer pipe with new PVC pipe to prevent sanitary sewer overflows in the travel lanes of Little River Turnpike and Backlick Rd. in Annandale, VA.
Gallows Road and Prosperity Avenue ImprovementsFairfax County
The Gallows Road and Prosperity Avenue improvements Project extended a four-foot concrete median along Gallows Road near the intersection of Prosperity Avenue to prevent illegal left turns. The Improvements include extending the existing median, resetting existing sign, eradicating existing pavement markings and placing new pavement marking around the new median.
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
Powerpoint - Langley School Pump Station and Force Main ProjectFairfax County
The Purpose
Inform the community about the upcoming project,
Phase 1 of the project is eminent
Gravity Sewer on Langley Lane
Force main from Langley High School to Georgetown Pike
Bull Neck Stream Restoration Pardon Our Dust Meeting May 2, 2018Fairfax County
Fairfax County plans to begin construction on a stream restoration project in Bull Neck Run in August 2018. Approximately 1,900 linear feet of Bull Neck Run will be restored. The stream runs through Fairfax County Park Authority property and Spring Hill Farm HOA property.
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Fairfax County
Fairfax County walkway construction of 1,600 linear feet of concrete sidewalk, curb ramps, curb and gutter, retaining wall, pavement markings and signage, drainage improvements and utility adjustments.
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Fairfax County
The emergency repair of an 8-inch sanitary sewer link in Little River Turnpike and Backlick Road replaced a severely defective 8-inch concrete sewer pipe with new PVC pipe to prevent sanitary sewer overflows in the travel lanes of Little River Turnpike and Backlick Rd. in Annandale, VA.
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
The Flatlick Sewer Rehabilitation Project included rehabilitation of approximately 2,500 linear feet of existing 24-inch diameter pipe and 650 linear feet of existing 15-inch diameter pipe using the Cured in Place Pipe (CIPP) lining method. The lining was cured using UV Light. In addition, 11 manholes were rehabilitated throughout the Flatlick Branch stream valley in Chantilly, Virginia. This project was substantially complete on January 4, 2021.
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Twinbrooke Shopping Centre Emergency Sewer RepairFairfax County
Work was coordinated with Twinbrooke Shopping Centre owner and businesses. Sewer cleaning and internal CCTV inspection to determine extent of failure and repair needed. Relocation of water service and associated isolation gate valve. Excavation and installation of 17 ' of PVC pipe repair to remove damaged, sagging pipe. Generate new as-built. Site cleanup and restoration. Completed November 24, 2020.
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use innovative & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Colfax Ave Emergency Sewer Rehabilitation ProjectFairfax County
This project rehabilitated 1,200 feet of failing 10-inch cast iron sewer pipe. Work included acquisition of land access rights from citizens, installation of a bypass pumping system, extensive cleaning of the wastewater sewer pipe, rehabilitation of the wastewater sewer pipe, and site restoration.
Merrywood Force Main Rehabilitation ProjectFairfax County
The Merrywood Force Main Rehabilitation project included rehabilitation of 1,080 linear feet of 6-inch force main, its discharge manhole, and the installation of a future bypass system in front of the pump station.
The Burke View Court Sewer Emergency project addresses a broken 16-inch sanitary asbestos cement sewer pipe crossing a stream tributary to Pohick Creek. The break was found when Wastewater Collection Division investigated a report of a sanitary sewer overflow. It was determined that the line had been broken during a private dredging operation in the forebay of a pond. The pipe that was broken was under the stream and did not have casement around the pipe. The broken pipe segment was replaced and upgraded with a steel casing pipe to mitigate future damage. The project was substantially completed February 2, 2021.
The Burke View Court Sewer Emergency project addresses a broken 16-inch sanitary asbestos cement sewer pipe crossing a stream tributary to Pohick Creek. The break was found when Wastewater Collection Division investigated a report of a sanitary sewer overflow. It was determined that the line had been broken during a private dredging operation in the forebay of a pond. The pipe that was broken was under the stream and did not have casement around the pipe. The broken pipe segment was replaced and upgraded with a steel casing pipe to mitigate future damage. The project was substantially completed February 2, 2021.
The work on this project included investigation and repair to an 8-inch sewer line in Waterway Drive which had been previously lined with a plastic liner system. The project location was in Waterway Drive from Cavalier Court to the vicinity of Half Moon Circle. The project involved setting up a bypass system to remove sewage from the line so the pipe could be properly cleaned and inspected. Following this process, it was determined the plastic liner was causing capacity issues. It was determined that the liner could be repaired using internal methods and no excavation was needed. In addition, the five manholes associated with the segments of pipe in the project area were also rehabilitated. This project was substantially complete on June 25, 2021.
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Similar to Backlick Run Gravity Sewer Abandonment Project June 2020 (20)
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Fairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
The project consists of a new 17,400 square feet, two-story, four-bay fire station facility and associated improvements to the one-acre site including stormwater detention, landscaping, and parking. The scope also included the demolition of the existing two and a half bay facility, and construction of a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements include:
Apparatus Bays, Control Room and Offices
Battalion Chief Suite
Kitchen, Dayroom, and Dining Room
Bunk Rooms
Showers and Locker Rooms
Exercise Room
Ready Gear Room
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Runway Orientation Based on the Wind Rose Diagram.pptx
Backlick Run Gravity Sewer Abandonment Project June 2020
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Project No. WW-000028-002
Lee District & Mason District
June 18, 2020
BACKLICK RUN GRAVITY SEWER
ABANDONMENT PROJECT
2. Project Details
Backlick Run Gravity Sewer Abandonment Project
Capital Facilities/Wastewater Design and Construction Division
Description:
The Backlick Run Gravity Sewer is a 4,000 linear foot (LF) section of gravity sewer taken out of service in 1998. The
pipe had deteriorated and was prone to collapse. This project involved the in-place abandonment of roughly 3,000-
LF of 24-inch gravity sewer running parallel to Norfolk Southern Corporation’s railroad tracks. Approximately 1,000
LF of above ground sewer and manholes were also removed within the same area. Access to the project area was
through commercial properties and property owned by the Fairfax County Park Authority. This project was
substantially complete on June 10, 2020.
Project Overview:
• Pre-cleaning of gravity sewer pipe and construction of bulkheads
• Filled approximately 3,000 LF gravity sewer with cellular concrete (flowable fill)
• Removed approximately 1,000 linear feet of above ground gravity sewer and manholes
• Removed the tops (2 feet below grade) or removed entirely, 14 manholes
• Restored the area and performed site improvements
Project Team:
• Christopher Mata, Wastewater Design and Construction Division
• Randall Cyr, Wastewater Collection Division
• Engineer: Dewberry
• Contractor: Fort Myers Construction Company
3. Backlick Run Gravity Sewer Abandonment Project
Capital Facilities/Wastewater Design and Construction Division
Tax Map 81-2 Project Map Overview
4. Backlick Run Gravity Sewer Abandonment Project
Capital Facilities/Wastewater Design and Construction Division
Pre-Existing Conditions
5. Backlick Run Gravity Sewer Abandonment Project
Capital Facilities/Wastewater Design and Construction Division
Pipe & Manhole Removal
6. Backlick Run Gravity Sewer Abandonment Project
Capital Facilities/Wastewater Design and Construction Division
Pipe Cleaning Operation
7. Backlick Run Gravity Sewer Abandonment Project
Capital Facilities/Wastewater Design and Construction Division
Bulkhead Construction
8. Backlick Run Gravity Sewer Abandonment Project
Capital Facilities/Wastewater Design and Construction Division
Flowable Fill
11. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Backlick Run Gravity Sewer Abandonment Project
Capital Facilities/Wastewater Design and Construction Division
Irene Haske, Communications Specialist
703-324-5821, TTY 711
Irene.Haske@fairfaxcounty.gov