The Quander Road Walkway project in Fairfax County, Virginia involved constructing 1,800 feet of sidewalk, curb and gutter, a refuge island with ramps, drainage improvements, and road widening along Quander Road between Emmett Drive and Stokes Lane. The project was completed in June 2021 to provide safer connectivity for schools and neighborhoods. It was delivered using a design-bid-build approach and included relocating utilities, laying concrete, and replacing landscaping.
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Quander Road Walkway
Contract No. CN20304186
Project No. 5G25-060-034
Mount Vernon District
Tax Map No. 93-1
July 15, 2021
3. Quander Road Walkway
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Mount Vernon District, Tax Map No. 93-1
3
N
PROJECT
LOCATION
4. Quander Road Walkway
Project Detail
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 4
Description:
The Quander Road Walkway project was substantially completed on June 15, 2021. The project included construction of approximately 1,800 linear
feet of five-foot wide concrete sidewalk along the west side of Quander Road with curb and gutter, refuge island with ramps, curb-cut ramps, driveway
aprons, vast storm drainage improvements, utility relocations, asphalt pavement, pavement markings, and roadway widening to provide minimum
lane widths of 11 feet between Emmett Drive and Stokes Lane.
Benefits:
• Provides connectivity / a safe walkway for the public schools and the surrounding neighborhoods along Quander Road between Emmett Drive to
Stokes Lane.
Project Overview:
• Project Delivery: Design-Bid-Build
• Contract: Unit Price
Project Team:
• Contractor
• M&F Concrete, Inc. - Ricardo Parra
• Fairfax County
• Fairfax County Department of Transportation (FCDOT) – Galappa Madhusudhan (Design), Eldar Yusufoglu (Utilities)
• Construction Manager, UDCD – Tom Cutler
• Project Inspector, UDCD – David Simpson & Ken Atkins
• Land Survey Branch, UDCD – Christian Alfonzo & Gregory Harper
• Right of Way Agent, Land Acquisition Division – Clyde Monahan
5. Quander Road Walkway
Pre-Existing Conditions
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 5
6. Quander Road Walkway
Pre-Existing Conditions
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 6
7. Quander Road Walkway
Pre-Existing Conditions
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 7
8. Quander Road Walkway
Construction of Underground Storm Sewer
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 8
9. Quander Road Walkway
Concrete Sidewalk & Ramp Construction
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 9
10. Quander Road Walkway
Replacement of Landscaping
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 10
17. Additional Information
For additional information, please contact
www.fairfaxcounty.gov/publicworks
Quander Road Walkway
Sharon North or Irene Haske in the
DPWES Public Information Office
703-324-5500, TTY 711
Sharon.North@fairfaxcounty.gov
Irene.Haske@fairfaxcounty.gov
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch 17